(QUANTITY CALCULATION CARPET FLOOR FINISHES SHEET), QCS-SHEET

PROJECT TITLE/NO.: SUNDUS ROTANA MUSCAT

DATE:

MAIN CONTRACTOR: SHAKSY ENGINEERING SERVICE LLC

13-Feb-2016

SHEET NO: 01
DIMENSION
ITEM
CODES

DRAWING DETAILS

QTY LOCTION

NO. OF
SETS

L (M)

W (M)

AREA (SQM)

Carpet
PERIMETER
(M)

H (M)

prayer Carpet Office Carpet


( F2 )
( F4 )

BASMENT FLOOR
PART-1
Tri.Mng

(719)

11.60

11.60

Training Room (720)

27.08

27.08

IT Manager (780)

12.40

12.40

IT Work Shop (800)

14.07

14.07

Gen.casher (769)

8.93

8.93

A.Fin .Controller (768)

8.87

8.87

A.Fin .Controller (772)

8.99

8.99

Accounts Department (770)

42.60

42.60

Ban.&Con. Mngr (764)

9.59

9.59

Sales Mngr (765)

9.10

9.10

Market Mngr (766)

8.98

8.98

Common Space (767)

44.68

44.68

9.14

9.14

9.08

9.08

HR Assit. (716)

9.21

9.21

HR Manager (717)

9.20

9.20

HR Sec + PRO (760)


F.Prayer (759)

38.22

38.22

9.24

9.24

12.91

12.91

IT Room (824)

3.77

3.77

Office (831)

5.60

5.60

Office (818)

2.12

2.12

Chefs Off. (797)

6.45

6.45

IT Room (822)

6.10

6.10

IT Room (774)

14.33

14.33

6.02

IT (29)

8.83

8.83

Tel.Opr. (58)

12.27

12.27

Back Off. (60)

27.43

27.43

Reservation office (03)

19.02

19.02

GM (55)

14.19

14.19

EAM (56)

10.55

10.55

FOM (59)

9.40

9.40

Rev. Mngr. (57)

10.49

10.49

Sec+Waiting (49)

24.14

24.14

IT Room (99)

3.80

3.80

F&B Assit. Mngr. (763)


F&B Mngr. (762)

M.Prayer (734,734)

PART-2

PART-3

PART-4
Prayer (820)

6.02

GROUND FLOOR
PART-1
PART-2

Page 1 of 3

REMARKS

(QUANTITY CALCULATION CARPET FLOOR FINISHES SHEET), QCS-SHEET


PROJECT TITLE/NO.: SUNDUS ROTANA MUSCAT

DATE:

MAIN CONTRACTOR: SHAKSY ENGINEERING SERVICE LLC

13-Feb-2016

SHEET NO: 01
DIMENSION
ITEM
CODES

DRAWING DETAILS

QTY LOCTION

NO. OF
SETS

L (M)

W (M)

AREA (SQM)

Carpet
PERIMETER
(M)

H (M)

prayer Carpet Office Carpet


( F2 )
( F4 )

FIRST FLOOR
IT (153)

5.25

5.25

IT (253)

5.25

5.25

IT (353)

5.25

5.25

IT (453)

5.25

5.25

IT (553)

5.25

5.25

SECOND FLOOR
THIRD FLOOR
FOURTH FLOOR
FIFTH FLOOR

TOTAL (M2)

28.16

PREPARED BY:
DATE:

Page 2 of 3

486.50

REMARKS

(SUMMARY SHEET), QCS-SW


PROJECT TITLE/NO.: SUNDUS ROTANA MUSCAT
MAIN CONTRACTOR: SHAKSY ENGINEERING SERVICE LLC
SUMMARY SHEET NO: 01
Item

Description

Code

Unit

Acutal Qty

Floor
1

Prayer Carpet

F2

m2

28.16

Office Carpet

F4

m2

486.50

Page 3

Summary Sheet for BOH Carpet