CE DOWNGRADE/ UPGRADE

TITLE: MO:REPLACING BPK WITH 2 BPC

INCIDENT DATE: 2016/04/01 16:42:11

TT REFERENCE: EWZNAT2016040100000114

EWZNAT2016040100000115

PROBLEM DESCRIPTION

There was a request from SFO to increase channel elements on Chinda Heights (Mid0054).
Therefore CE boards had to be swapped between Zvishavane Town (Mid0140) with less CE
utilization and Chinda Heights with high CE utilization.

PROBLEM SYMPTOMS

CE congestion on Mid0054

REMEDY CONDITIONS

Get BPK board (384 CE) from Mid0140 and replace BPC board (192 CE) on Mid0054
so that the final CE configurations are:
Mid0054: 2xBPK boards (768 CE)
Mid0140:2xBPC boards (384 CE)

Econet Wireless Zimbabwe

SOLUTION(S)

Steps
1. Export Public and UMTS templates for Mid0054 and Mid0140
Planning Data Export Export Close

i.

ii.

Edit the UMTS template:


On the sheet UMTS Local Cell, delete the configurations here so to remove the association
between the cell and baseband resources (Column E and Column I relation) and Save.

Import the edited UMTS template


Planning data import Add ImportClose

Econet Wireless Zimbabwe

iii.

iv.
v.

vi.
vii.

Edit the Public Template:


On the Equipment sheet, remove BPK/BPC from configuration and Save: In Column B type M
(for Modify) and under the slot columns, clear the relevant cells- in this case slot 7 cells.

Import the edited Public Template: follow step (ii) above


Edit Public Template again to add the boards according to the new requirement: (ie 768 CE on
Mid0054 and 384 CE on Mid0140).
On the Equipment sheet Add BPK/BPC to configuration and Save. In Column cell(s) type A (for
Add) and under slot 7 Cells input relevant board types; BPK,1,0 and BPC,1,0.
Import the re-edited Public template according to (ii)
Re-edit UMTS template:

Econet Wireless Zimbabwe


viii.
Do baseband resource assignment on the sheet UMTS Local Cell. Type A (Add) in Column B
and the assignment pattern Column I and Save.
The Assignment pattern is: BPSlot#Unit Number & BPSlot#Unit Number e.g 7#0&8#0 or
8#0&7#0 as in our case.

ix.
x.

Import the re-edited UMTS template according to 1a.


Synchronize modified data
Data SynchronizationSynchronize modified dataSynchronise

CAUSE

Econet Wireless Zimbabwe

Improper dimensioning of sites

RECOMMENDATION
Sites ought to be appropriately dimensioned.