Anda di halaman 1dari 45

DAFTAR ANALISA HARGA SATUAN PEKERJAAN

B.6 PEKERJAAN TANAH


B.6.1

Menggali 1 M3 tanah biasa sedalam 1 m


0.750
Oh
Pekerja
0.025
Oh
Mandor

@ Rp
@ Rp

75,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
B.6.2

Menggali 1 M3 tanah biasa sedalam 2 m


0.900
Oh
Pekerja
0.045
Oh
Mandor

@ Rp
@ Rp

75,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
B.6.3

Menggali 1 M3 tanah biasa sedalam 3 m


1.050
Oh
Pekerja
0.067
Oh
Mandor

@ Rp
@ Rp

75,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
B.6.6

Menggali 1 M3 tanah lumpur sedalam 1 m


1.200
Oh
Pekerja
0.045
Oh
Mandor

@ Rp
@ Rp

75,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
B.6.9

Mengurug kembali 1 M3 galian (Galian Tanah Sedalam 1 m')


0.250
Oh
Pekerja
@ Rp
0.008
Oh
Mandor
@ Rp

75,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
B.6.9

Mengurug kembali 1 M3 galian (Galian Tanah Sedalam 2 m')


0.300
Oh
Pekerja
@ Rp
0.015
Oh
Mandor
@ Rp

75,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
B.6.9-SPL Mengurug kembali 1 M3 galian (Galian Tanah Sedalam 3 m')
0.350
Oh
Pekerja
@ Rp
0.022
Oh
Mandor
@ Rp

75,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
B.6.10

Memadatkan 1 M3 tanah (per 20 cm)


0.500
Oh
Pekerja
0.050
Oh
Mandor

@ Rp
@ Rp

75,000.00
150,000.00

Rp
Rp
Rp
Rp
Rp

56,250.00
3,750.00
60,000.00
6,000.00

Rp
Rp
Rp
Rp
Rp

67,500.00
6,750.00
74,250.00
7,425.00

Rp
Rp
Rp
Rp
Rp

78,750.00
10,050.00
88,800.00
8,880.00

Rp
Rp
Rp
Rp
Rp

90,000.00
6,750.00
96,750.00
9,675.00

Rp
Rp
Rp
Rp
Rp

18,750.00
1,200.00
19,950.00
1,995.00

Rp
Rp
Rp
Rp
Rp

22,500.00
2,250.00
24,750.00
2,475.00

Rp
Rp
Rp
Rp
Rp

26,250.00
3,350.00
29,600.00
2,960.00

Rp
Rp
Rp

37,500.00
7,500.00
45,000.00

66,000.00

81,675.00

97,680.00

106,425.00

21,945.00

27,225.00

32,560.00

Profit Dan Overhead (10%)


Jumlah
B.6.11

Mengurug 1 M3 pasir urug


1.200
M3
Pasir urug
0.300
Oh
Pekerja
0.010
Oh
Mandor

@ Rp
@ Rp
@ Rp

100,000.00
75,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
Mengurug 1 M3 Tanah Timbunan
1.200
M3
Tanah timbunan
0.300
Oh
Pekerja
0.010
Oh
Mandor

@ Rp
@ Rp
@ Rp

80,000.00
75,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
B.6.15

Mengurug 1 M3 sirtu padat untuk peninggian lantai bangunan


1.200
M3
Sirtu
@ Rp
0.250
Oh
Pekerja
@ Rp
0.025
Oh
Mandor
@ Rp

177,000.00
75,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
SPL

Rp
Rp

4,500.00

Rp
Rp
Rp
Rp
Rp
Rp

120,000.00
22,500.00
1,500.00
144,000.00
14,400.00

Rp
Rp
Rp
Rp
Rp
Rp

96,000.00
22,500.00
1,500.00
120,000.00
12,000.00

Rp
Rp
Rp
Rp
Rp
Rp

212,400.00
18,750.00
3,750.00
234,900.00
23,490.00

49,500.00

158,400.00

132,000.00

258,390.00

Cabut 1 tunggul pohon pohon tanaman keras>15 cm dan membuang sisa tunggul kayu dan akar-akarnya
75,000.00
15,000.00
0.200
Oh
Pekerja
@ Rp
Rp
150,000.00
3,000.00
0.020
Oh
Mandor
@ Rp
Rp
7,300.00
7,300.00
1.000
ltr
Bensin
@ Rp
Rp
2,500,000.00
250,000.00
0.100
S/h
chainsaw
@ Rp
Rp
275,300.00
Rp
Profit Dan Overhead (10%)
27,530.00
Rp
Jumlah
Rp
302,830.00

C.6 PEKERJAAN PONDASI


C.6.2

Memasang 1 M3 pondasi batu belah, campuran 1PC : 4PP


1.200
M3
Batu gunung
@ Rp
163.000
Kg
Semen Portland
@ Rp
0.520
M3
Pasir pasang
@ Rp
1.500
Oh
Tukang batu
@ Rp
0.750
Oh
Pekerja
@ Rp
0.075
Oh
Kepala Tukang Batu
@ Rp
0.075
Oh
Mandor
@ Rp

167,000.00
1,225.00
135,000.00
100,000.00
75,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
C.6.3

Memasang 1 M3 pondasi batu belah, campuran 1PC : 5PP


1.200
M3
Batu gunung
@ Rp
136.000
Kg
Semen Portland
@ Rp
0.544
M3
Pasir pasang
@ Rp
1.500
Oh
Tukang batu
@ Rp
0.750
Oh
Pekerja
@ Rp
0.075
Oh
Kepala Tukang Batu
@ Rp

167,000.00
1,225.00
135,000.00
100,000.00
75,000.00
125,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

200,400.00
199,675.00
70,200.00
150,000.00
56,250.00
9,375.00
11,250.00
697,150.00
69,715.00

Rp
Rp
Rp
Rp
Rp
Rp

200,400.00
166,600.00
73,440.00
150,000.00
56,250.00
9,375.00

766,865.00

0.075

Oh

Mandor

@ Rp

150,000.00

Profit Dan Overhead (10%)


Jumlah
C.6.9

Memasang 1 M3 batu kosong (aanstamping)


1.200
M3
Batu gunung
0.432
M3
Pasir urug
0.780
Oh
Pekerja
0.390
Oh
Tukang batu
0.039
Oh
Kepala Tukang Batu
0.039
Oh
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

167,000.00
100,000.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah

Rp
Rp
Rp
Rp

11,250.00
667,315.00
66,731.50

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

200,400.00
43,200.00
58,500.00
39,000.00
4,875.00
5,850.00
351,825.00
35,182.50

A. 3.2.1.10 Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP:2PB:3KR dan 40% Batu belah
184,000.00
0.480
M3
Batu Kali
@ Rp
Rp
1,225.00
194.000
Kg
Semen Portland
@ Rp
Rp
148,000.00
0.312
M3
Pasir beton
@ Rp
Rp
197.78
0.468
M3
split/chipping 2-3 cm(Kg)
@ Rp
Rp
11,500.00
126.000
Kg
Besi beton polos
@ Rp
Rp
21,000.00
1.800
Kg
Kawat beton
@ Rp
Rp
75,000.00
3.400
Oh
Pekerja
@ Rp
Rp
100,000.00
0.850
Oh
Tukang batu
@ Rp
Rp
125,000.00
0.085
Oh
Kepala Tukang Batu
@ Rp
Rp
150,000.00
0.170
Oh
Mandor
@ Rp
Rp
Rp
Profit Dan Overhead (10%)
Rp
Jumlah
Rp
SPL

Memasang 1 Ttk Pondasi Sumuran, Diameter 100 Cm, Type SR 1 (T = 4,43 M)


Gorong-gorong/Buis Beton 100 @
Cm,Rp
T = 100 Cm275,000.00
4.430
Bh
75,000.00
1.767
Oh
Pekerja
@ Rp
100,000.00
0.884
Oh
Tukang batu
@ Rp
125,000.00
0.088
Oh
Kepala Tukang Batu
@ Rp
150,000.00
0.088
Oh
Mandor
@ Rp
1.000
Ls
Alat Bantu

Profit Dan Overhead (10%)


Jumlah
SPL

Memasang 1 Ttk Pondasi Sumuran, Diameter 100 Cm (T = 4,65 M)


Gorong-gorong/Buis Beton 100 @
Cm,Rp
T = 100 Cm275,000.00
4.650
Bh
75,000.00
1.767
Oh
Pekerja
@ Rp
100,000.00
0.884
Oh
Tukang batu
@ Rp
125,000.00
0.088
Oh
Kepala Tukang Batu
@ Rp
150,000.00
0.088
Oh
Mandor
@ Rp
1.000
Ls
Alat Bantu

Profit Dan Overhead (10%)


Jumlah

734,046.50

387,007.50

88,320.00
237,650.00
46,176.00
92.56
1,449,000.00
37,800.00
255,000.00
85,000.00
10,625.00
25,500.00
2,235,163.56
223,516.36
2,458,679.92

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,218,250.00
132,525.00
88,350.00
11,043.75
13,252.50
121,825.00
1,463,421.25
146,342.13

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,278,750.00
132,525.00
88,350.00
11,043.75
13,252.50
127,875.00
1,523,921.25
152,392.13

1,609,763.38

1,676,313.38

D.6

PEKERJAAN DINDING
D.6.2

Memasang 1 M2 dinding bata merah uk. (5x11x22) cm tebal 1 bt. camp. 1PC : 3PP
550.00
140.000
Bh
Batu merah
@ Rp
1,225.00
32.950
Kg
Semen Portland
@ Rp
135,000.00
0.091
M3
Pasir pasang
@ Rp
75,000.00
0.600
Oh
Pekerja
@ Rp
100,000.00
0.200
Oh
Tukang batu
@ Rp
125,000.00
0.020
Oh
Kepala Tukang Batu
@ Rp
150,000.00
0.030
Oh
Mandor
@ Rp

Profit Dan Overhead (10%)


Jumlah

D.6.3

Memasang 1 M2 dinding bata merah uk. (5x11x22) cm tebal 1 bt. camp. 1PC : 4PP
550.00
140.000
Bh
Batu merah
@ Rp
1,225.00
26.550
Kg
Semen Portland
@ Rp
135,000.00
0.093
M3
Pasir pasang
@ Rp
75,000.00
0.600
Oh
Pekerja
@ Rp
100,000.00
0.200
Oh
Tukang batu
@ Rp
125,000.00
0.020
Oh
Kepala Tukang Batu
@ Rp
150,000.00
0.030
Oh
Mandor
@ Rp

Profit Dan Overhead (10%)


Jumlah
D.6.4

Memasang 1 M2 dinding bata merah uk. (5x11x22) cm tebal 1 bt. camp. 1PC : 5PP
550.00
140.000
Bh
Batu merah
@ Rp
1,225.00
22.200
Kg
Semen Portland
@ Rp
135,000.00
0.102
M3
Pasir pasang
@ Rp
75,000.00
0.600
Oh
Pekerja
@ Rp
100,000.00
0.200
Oh
Tukang batu
@ Rp
125,000.00
0.020
Oh
Kepala Tukang Batu
@ Rp
150,000.00
0.030
Oh
Mandor
@ Rp

Profit Dan Overhead (10%)


Jumlah
D.6.8

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

77,000.00
40,363.75
12,285.00
45,000.00
20,000.00
2,500.00
4,500.00
201,648.75
20,164.88

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

77,000.00
32,523.75
12,555.00
45,000.00
20,000.00
2,500.00
4,500.00
194,078.75
19,407.88

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

77,000.00
27,195.00
13,770.00
45,000.00
20,000.00
2,500.00
4,500.00
189,965.00
18,996.50

Memasang1 M2 dinding bata merah uk. (5x11x22) cm tebal 1/2 bt. camp. 1PC : 3PP
550.00
70.000
Bh
Batu merah
@ Rp
Rp
1,225.00
14.370
Kg
Semen Portland
@ Rp
Rp
135,000.00
0.040
M3
Pasir pasang
@ Rp
Rp
75,000.00
0.300
Oh
Pekerja
@ Rp
Rp
100,000.00
0.100
Oh
Tukang batu
@ Rp
Rp
125,000.00
0.010
Oh
Kepala Tukang Batu
@ Rp
Rp
150,000.00
0.015
Oh
Mandor
@ Rp
Rp
Rp
Profit Dan Overhead (10%)
Rp

221,813.63

213,486.63

208,961.50

38,500.00
17,603.25
5,400.00
22,500.00
10,000.00
1,250.00
2,250.00
97,503.25
9,750.33

Jumlah

D.6.9

D.6.10

Rp

107,253.58

Memasang1 M2 dinding bata merah uk. (5x11x22) cm tebal 1/2 bt. camp. 1PC : 4PP
550.00
70.000
Bh
Batu merah
@ Rp
Rp
1,225.00
11.500
Kg
Semen Portland
@ Rp
Rp
135,000.00
0.043
M3
Pasir pasang
@ Rp
Rp
75,000.00
0.300
Oh
Pekerja
@ Rp
Rp
100,000.00
0.100
Oh
Tukang batu
@ Rp
Rp
125,000.00
0.010
Oh
Kepala Tukang Batu
@ Rp
Rp
150,000.00
0.015
Oh
Mandor
@ Rp
Rp
Rp
Profit Dan Overhead (10%)
Rp
Jumlah
Rp

38,500.00
14,087.50
5,805.00
22,500.00
10,000.00
1,250.00
2,250.00
94,392.50
9,439.25

Memasang 1 M2 dinding bata merah uk. (5x11x22) cm tebal 1/2 bt. camp. 1PC : 5PP
550.00
70.000
Bh
Batu merah
@ Rp
Rp
1,225.00
9.680
Kg
Semen Portland
@ Rp
Rp
135,000.00
0.045
M3
Pasir pasang
@ Rp
Rp
75,000.00
0.300
Oh
Pekerja
@ Rp
Rp
100,000.00
0.100
Oh
Tukang batu
@ Rp
Rp
125,000.00
0.010
Oh
Kepala Tukang Batu
@ Rp
Rp
150,000.00
0.015
Oh
Mandor
@ Rp
Rp
Rp
Profit Dan Overhead (10%)
Rp
Jumlah
Rp

38,500.00
11,858.00
6,075.00
22,500.00
10,000.00
1,250.00
2,250.00
92,433.00
9,243.30

103,831.75

101,676.30

E.6 PEKERJAAN PLESTERAN


E.6.3

Memasang 1 M2 plesteran 1PC : 3PP, tebal 15 mm


7.776
Kg
Semen Portland
0.023
M3
Pasir pasang
0.300
Oh
Pekerja
0.150
Oh
Tukang batu
0.015
Oh
Kepala Tukang Batu
0.015
Oh
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

1,225.00
135,000.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
E.6.4

Memasang 1 M2 plesteran 1PC : 4PP, tebal 15 mm


6.240
Kg
Semen Portland
0.024
M3
Pasir pasang
0.300
Oh
Pekerja
0.150
Oh
Tukang batu
0.015
Oh
Kepala Tukang Batu
0.015
Oh
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

1,225.00
135,000.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
E.6.5

Memasang 1 M2 plesteran 1PC : 5PP, tebal 15 mm


5.184
Kg
Semen Portland
@ Rp

1,225.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

9,525.60
3,105.00
22,500.00
15,000.00
1,875.00
2,250.00
54,255.60
5,425.56

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

7,644.00
3,240.00
22,500.00
15,000.00
1,875.00
2,250.00
52,509.00
5,250.90

Rp

6,350.40

59,681.16

57,759.90

0.026
0.300
0.150
0.015
0.015

M3
Oh
Oh
Oh
Oh

Pasir pasang
Pekerja
Tukang batu
Kepala Tukang Batu
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

135,000.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
E.6.20

Memasang 1 M2 plesteran skoning 1PC : 2PP, tebal 10 mm


0.500
Kg
Semen Portland
@ Rp
0.013
M3
Pasir pasang
@ Rp
0.080
Oh
Pekerja
@ Rp
0.400
Oh
Tukang batu
@ Rp
0.040
Oh
Kepala Tukang Batu
@ Rp
0.004
Oh
Mandor
@ Rp

1,225.00
135,000.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
E.6.27

Memasang 1 M2 acian
3.250
Kg
Semen Portland
0.150
Oh
Pekerja
0.100
Oh
Tukang batu
0.010
Oh
Kepala Tukang Batu
0.008
Oh
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

1,225.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

3,510.00
22,500.00
15,000.00
1,875.00
2,250.00
51,485.40
5,148.54

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

612.50
1,755.00
6,000.00
40,000.00
5,000.00
600.00
53,967.50
5,396.75

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

3,981.25
11,250.00
10,000.00
1,250.00
1,200.00
27,681.25
2,768.13

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

302,575.00
91,865.71
197,580.00
21,500.00
123,750.00
27,500.00
3,500.00
12,450.00
780,720.71
78,072.07

56,633.94

59,364.25

30,449.38

G.6 PEKERJAAN BETON


G.6.1

Membuat 1 M3 beton mutu f'c=7,4 Mpa (K100), slump (12 2) cm, w/c=0,87
247.000
869.000
999.000
215.000
1.650
0.275
0.028
0.083

Kg
Kg
Kg
Ltr
Oh
Oh
Oh
Oh

Semen Portland
Pasir beton (Kg)
split/chipping 2-3 cm(Kg)
Air
Pekerja
Tukang batu
Kepala Tukang Batu
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

1,225.00
105.71
197.78
100.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
G.6.4

Membuat 1 M3 lantai kerja beton mutu f'c=7,4 Mpa (K 100), slump (3-6) cm, w/c=0,87
1,225.00
230.000
Kg
Semen Portland
@ Rp
Rp
105.71
893.000
Kg
Pasir beton (Kg)
@ Rp
Rp
197.78
1,027.000
Kg
split/chipping 2-3 cm(Kg)
@ Rp
Rp
100.00
200.000
Ltr
Air
@ Rp
Rp
75,000.00
1.200
Oh
Pekerja
@ Rp
Rp
100,000.00
0.200
Oh
Tukang batu
@ Rp
Rp
125,000.00
0.020
Oh
Kepala Tukang Batu
@ Rp
Rp
150,000.00
0.060
Oh
Mandor
@ Rp
Rp
Rp
Profit Dan Overhead (10%)
Rp

858,792.79

281,750.00
94,402.86
203,117.78
20,000.00
90,000.00
20,000.00
2,500.00
9,000.00
720,770.63
72,077.06

Jumlah

G.6.5

Kg
Kg
Kg
Ltr
Oh
Oh
Oh
Oh

Semen Portland
Pasir beton (Kg)
split/chipping 2-3 cm(Kg)
Air
Pekerja
Tukang batu
Kepala Tukang Batu
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

1,225.00
105.71
197.78
100.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

399,350.00
80,342.86
203,513.33
21,500.00
123,750.00
27,500.00
3,500.00
12,450.00
871,906.19
87,190.62

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

454,475.00
73,788.57
207,073.33
21,500.00
123,750.00
27,500.00
3,500.00
12,450.00
924,036.90
92,403.69

959,096.81

Membuat 1 M3 beton mutu f'c=19,3 Mpa (K 225), slump (12 2) cm, w/c=0,58
371.000
698.000
1,047.000
215.000
1.650
0.275
0.028
0.083

Kg
Kg
Kg
Ltr
Oh
Oh
Oh
Oh

Semen Portland
Pasir beton (Kg)
split/chipping 2-3 cm(Kg)
Air
Pekerja
Tukang batu
Kepala Tukang Batu
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

1,225.00
105.71
197.78
100.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
B.13

792,847.70

Membuat 1 M3 beton mutu f'c=14,5 Mpa (K 175), slump (12 2) cm, w/c=0,66
326.000
760.000
1,029.000
215.000
1.650
0.275
0.028
0.083

G.6.7

Rp

1,016,440.60

1 M3 beton mutu f'c=26,4 Mpa (K 300), slump (12 2) cm, w/c=0,52 menggunakan ready mixed dan pompa beton

1.020

Kg

Ready Mixed K300

0.120 Sewa/Hari Pompa dan Conveyor beton


1.000
Oh
Pekerja
0.250
Oh
Tukang batu
0.025
Oh
Kepala Tukang Batu
0.100
Oh
Mandor

@ Rp

880,000.00

Rp

897,600.00

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

1,000,000.00
75,000.00
100,000.00
125,000.00
150,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

120,000.00
75,000.00
25,000.00
3,125.00
15,000.00
1,135,725.00
113,572.50

Rp
Rp
Rp
Rp
Rp

120,750.00
3,150.00
5,250.00
7,000.00
875.00

Profit Dan Overhead (10%)


Jumlah
G.6.17 - SPL Pembesian 1 Kg dengan besi polos atau besi ulir
A.
Pembesian 1 Kg dengan besi polos
10.500
Kg
Besi beton polos
0.150
Kg
Kawat beton
0.070
Oh
Pekerja
0.070
Oh
Tukang besi
0.007
Oh
Kepala Tukang Besi

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

11,500.00
21,000.00
75,000.00
100,000.00
125,000.00

1,249,297.50

0.004

Oh

Mandor

150,000.00
@ Rp
Untuk Pembesian 10 Kg
Untuk Pembesian 1 Kg
Profit Dan Overhead (10%)
Jumlah

B.

Pembesian 1 Kg dengan besi ulir


10.500
Kg
Besi beton ulir
0.150
Kg
Kawat beton
0.070
Oh
Pekerja
0.070
Oh
Tukang besi
0.007
Oh
Kepala Tukang Besi
0.004
Oh
Mandor

12,500.00
@ Rp
21,000.00
@ Rp
75,000.00
@ Rp
100,000.00
@ Rp
125,000.00
@ Rp
150,000.00
@ Rp
Untuk Pembesian 10 Kg
Untuk Pembesian 1 Kg
Profit Dan Overhead (10%)
Jumlah

G.6.19
A.

Pemasangan 1 Kg Jaring Kawat Baja (Wiremesh)


Pemasangan 1 Kg Jaring Kawat Baja (Wiremesh) M.8
10,000.00
10.200
Kg
Wiremesh M.8
@ Rp
21,000.00
0.050
Kg
Kawat beton
@ Rp
75,000.00
0.025
Oh
Pekerja
@ Rp
100,000.00
0.025
Oh
Tukang besi
@ Rp
125,000.00
0.025
Oh
Kepala Tukang Besi
@ Rp
150,000.00
0.001
Oh
Mandor
@ Rp
Untuk Pembesian 10 Kg
Untuk Pembesian 1 Kg

Profit Dan Overhead (10%)


Jumlah
B.

Pemasangan 1 Kg Jaring Kawat Baja (Wiremesh) M.10


10,500.00
10.200
Kg
Wiremesh M.10
@ Rp
21,000.00
0.050
Kg
Kawat beton
@ Rp
75,000.00
0.025
Oh
Pekerja
@ Rp
100,000.00
0.025
Oh
Tukang besi
@ Rp
125,000.00
0.025
Oh
Kepala Tukang Besi
@ Rp
150,000.00
0.001
Oh
Mandor
@ Rp
Untuk Pembesian 10 Kg
Untuk Pembesian 1 Kg

Profit Dan Overhead (10%)


Jumlah
G.6.20

Memasang 1 M2 bekisting untuk Pondasi


0.040
M3
Kayu klas III (papan)
0.300
Kg
Paku biasa 2" - 5"
0.100
Ltr
Minyak bekisting
0.520
Oh
Pekerja
0.260
Oh
Tukang batu
0.026
Oh
Kepala Tukang Batu
0.026
Oh
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

3,275,000.00
17,500.00
7,500.00
75,000.00
100,000.00
125,000.00
150,000.00

Rp
Rp
Rp
Rp
Rp

600.00
137,625.00
13,762.50
1,376.25

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

131,250.00
3,150.00
5,250.00
7,000.00
875.00
600.00
148,125.00
14,812.50
1,481.25

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

102,000.00
1,050.00
1,875.00
2,500.00
3,125.00
150.00
110,700.00
11,070.00
1,107.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

107,100.00
1,050.00
1,875.00
2,500.00
3,125.00
150.00
115,800.00
11,580.00
1,158.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

131,000.00
5,250.00
750.00
39,000.00
26,000.00
3,250.00
3,900.00

15,138.75

16,293.75

12,177.00

12,738.00

Rp
Rp
Rp

209,150.00
20,915.00

3,275,000.00

Rp

65,500.00

17,500.00
7,500.00
75,000.00
100,000.00
125,000.00
150,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

5,250.00
750.00
39,000.00
26,000.00
3,250.00
3,900.00
143,650.00
14,365.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

147,375.00
5,250.00
750.00
39,000.00
26,000.00
3,250.00
3,900.00
225,525.00
22,552.50

3,275,000.00

Rp

73,687.50

17,500.00
7,500.00
75,000.00
100,000.00
125,000.00
150,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

5,250.00
750.00
39,000.00
26,000.00
3,250.00
3,900.00
151,837.50
15,183.75

Rp
Rp
Rp
Rp

131,000.00
7,000.00
1,500.00
68,250.00

Profit Dan Overhead (10%)


Jumlah

Memasang 1 M2 bekisting untuk Pondasi 2 Kali Pemakaian


0.0200
M3
Kayu klas III (papan)
@ Rp
(Papan 2 kali Pakai)
0.300
Kg
Paku biasa 2" - 5"
@ Rp
0.100
Ltr
Minyak bekisting
@ Rp
0.520
Oh
Pekerja
@ Rp
0.260
Oh
Tukang batu
@ Rp
0.026
Oh
Kepala Tukang Batu
@ Rp
0.026
Oh
Mandor
@ Rp

Profit Dan Overhead (10%)


Jumlah
G.6.21

Memasang 1 M2 bekisting untuk sloof


0.045
M3
Kayu klas III (papan)
0.300
Kg
Paku biasa 2" - 5"
0.100
Ltr
Minyak bekisting
0.520
Oh
Pekerja
0.260
Oh
Tukang batu
0.026
Oh
Kepala Tukang Batu
0.026
Oh
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

3,275,000.00
17,500.00
7,500.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
Memasang 1 M2 bekisting untuk sloof 2 Kali Pemakaian
0.023
M3
Kayu klas III (papan)
@ Rp
(Papan 2 kali Pakai)
0.300
Kg
Paku biasa 2" - 5"
@ Rp
0.100
Ltr
Minyak bekisting
@ Rp
0.520
Oh
Pekerja
@ Rp
0.260
Oh
Tukang batu
@ Rp
0.026
Oh
Kepala Tukang Batu
@ Rp
0.026
Oh
Mandor
@ Rp

Profit Dan Overhead (10%)


Jumlah
G.6.22

Memasang 1 M2 bekisting untuk kolom


0.040
M3
Kayu klas III (papan)
0.400
Kg
Paku biasa 2" - 5"
0.200
Ltr
Minyak bekisting
0.015
M3
Kayu klas II (balok)

@ Rp
@ Rp
@ Rp
@ Rp

3,275,000.00
17,500.00
7,500.00
4,550,000.00

230,065.00

158,015.00

248,077.50

167,021.25

0.350
2.000
0.660
0.330
0.033
0.033

Lbr
Btg
Oh
Oh
Oh
Oh

Multipleks 1.22 x 2.44 x 9 mm


Dolken kayu 8-10/400 cm
Pekerja
Tukang kayu
Kepala Tukang Kayu
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

130,000.00
25,000.00
75,000.00
100,000.00
125,000.00
150,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

45,500.00
50,000.00
49,500.00
33,000.00
4,125.00
4,950.00
394,825.00
39,482.50

3,275,000.00

Rp

65,500.00

17,500.00
7,500.00
4,550,000.00

Rp
Rp
Rp

7,000.00
1,500.00
34,125.00

130,000.00

Rp

22,750.00

25,000.00

Rp

25,000.00

75,000.00
100,000.00
125,000.00
150,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

49,500.00
33,000.00
4,125.00
4,950.00
247,450.00
24,745.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

131,000.00
7,000.00
1,500.00
81,900.00
45,500.00
50,000.00
49,500.00
33,000.00
4,125.00
4,950.00
408,475.00
40,847.50

3,275,000.00

Rp

65,500.00

17,500.00
7,500.00
4,550,000.00

Rp
Rp
Rp

7,000.00
1,500.00
40,950.00

Profit Dan Overhead (10%)


Jumlah

Memasang 1 M2 bekisting untuk kolom Untuk 2x Pemakaian


0.020
M3
Kayu klas III (papan)
@ Rp
(papan 2 x pakai)
0.400
Kg
Paku biasa 2" - 5"
@ Rp
0.200
Ltr
Minyak bekisting
@ Rp
0.008
M3
Kayu klas II (balok)
@ Rp
(Balok 2x pakai)
0.175
Lbr
Multipleks 1.22 x 2.44 x 9 mm
@ Rp
(Multipleks 2x pakai)
1.000
Btg
Dolken kayu 8-10/400 cm
@ Rp
(dolken 2x pakai)
0.660
Oh
Pekerja
@ Rp
0.330
Oh
Tukang kayu
@ Rp
0.033
Oh
Kepala Tukang Kayu
@ Rp
0.033
Oh
Mandor
@ Rp

Profit Dan Overhead (10%)


Jumlah
G.6.23

Memasang 1 M2 bekisting untuk balok


0.040
M3
Kayu klas III (papan)
0.400
Kg
Paku biasa 2" - 5"
0.200
Ltr
Minyak bekisting
0.018
M3
Kayu klas II (balok)
0.350
Lbr
Multipleks 1.22 x 2.44 x 9 mm
2.000
Btg
Dolken kayu 8-10/400 cm
0.660
Oh
Pekerja
0.330
Oh
Tukang kayu
0.033
Oh
Kepala Tukang Kayu
0.033
Oh
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

3,275,000.00
17,500.00
7,500.00
4,550,000.00
130,000.00
25,000.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
Memasang 1 M2 bekisting untuk balok Untuk 2x pemakaian
0.020
M3
Kayu klas III (papan)
@ Rp
(papan 2 x pakai)
0.400
Kg
Paku biasa 2" - 5"
@ Rp
0.200
Ltr
Minyak bekisting
@ Rp
0.009
M3
Kayu klas II (balok)
@ Rp
(Balok 2x pakai)

434,307.50

272,195.00

449,322.50

0.175

Lbr

1.000

Btg

0.660
0.330
0.033
0.033

Oh
Oh
Oh
Oh

Multipleks 1.22 x 2.44 x 9 mm


(Multipleks 2x pakai)
Dolken kayu 8-10/400 cm
(dolken 2x pakai)
Pekerja
Tukang kayu
Kepala Tukang Kayu
Mandor

@ Rp

130,000.00

Rp

22,750.00

@ Rp

25,000.00

Rp

25,000.00

@ Rp
@ Rp
@ Rp
@ Rp

75,000.00
100,000.00
125,000.00
150,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

49,500.00
33,000.00
4,125.00
4,950.00
254,275.00
25,427.50

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

131,000.00
7,000.00
1,500.00
68,250.00
45,500.00
150,000.00
49,500.00
33,000.00
4,125.00
4,950.00
494,825.00
49,482.50

3,275,000.00

Rp

65,500.00

17,500.00
7,500.00
4,550,000.00

Rp
Rp
Rp

7,000.00
1,500.00
34,125.00

130,000.00

Rp

22,750.00

25,000.00

Rp

75,000.00

75,000.00
100,000.00
125,000.00
150,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

49,500.00
33,000.00
4,125.00
4,950.00
297,450.00
29,745.00

Rp
Rp
Rp

180,250.00
112,000.00
1,750.00

Profit Dan Overhead (10%)


Jumlah

G.6.24

Memasang 1 M2 bekisting untuk lantai


0.040
M3
Kayu klas III (papan)
0.400
Kg
Paku biasa 2" - 5"
0.200
Ltr
Minyak bekisting
0.015
M3
Kayu klas II (balok)
0.350
Lbr
Multipleks 1.22 x 2.44 x 9 mm
6.000
Btg
Dolken kayu 8-10/400 cm
0.660
Oh
Pekerja
0.330
Oh
Tukang kayu
0.033
Oh
Kepala Tukang Kayu
0.033
Oh
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

3,275,000.00
17,500.00
7,500.00
4,550,000.00
130,000.00
25,000.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah

Memasang 1 M2 bekisting untuk lantai Untuk 2x Pemakaian


0.020
M3
Kayu klas III (papan)
@ Rp
(papan 2 x pakai)
0.400
Kg
Paku biasa 2" - 5"
@ Rp
0.200
Ltr
Minyak bekisting
@ Rp
0.008
M3
Kayu klas II (balok)
@ Rp
(Balok 2x pakai)
0.175
Lbr
Multipleks 1.22 x 2.44 x 9 mm
@ Rp
(Multipleks 2x pakai)
3.000
Btg
Dolken kayu 8-10/400 cm
@ Rp
(dolken 2x pakai)
0.660
Oh
Pekerja
@ Rp
0.330
Oh
Tukang kayu
@ Rp
0.033
Oh
Kepala Tukang Kayu
@ Rp
0.033
Oh
Mandor
@ Rp

Profit Dan Overhead (10%)


Jumlah

SPL

Memasang 1 M2 Bondek untuk lantai


1.030
m2
Bondek Superdyma T50
0.040
M3
Kayu klas III (Balok)
0.100
Kg
Paku biasa 2" - 5"

@ Rp
@ Rp
@ Rp

175,000.00
2,800,000.00
17,500.00

279,702.50

544,307.50

327,195.00

1.500
0.170
0.080
0.010
0.010

Btg
Oh
Oh
Oh
Oh

Dolken kayu 8-10/400 cm


Pekerja
Tukang kayu
Kepala Tukang Kayu
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

25,000.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah

G.6.25

Memasang 1 M2 bekisting untuk dinding


0.030
M3
Kayu klas III (papan)
0.400
Kg
Paku biasa 2" - 5"
0.200
Ltr
Minyak bekisting
0.020
M3
Kayu klas II (balok)
0.350
Lbr
Multipleks 1.22 x 2.44 x 9 mm
3.000
Btg
Dolken kayu 8-10/400 cm
4.000
Bh
Spacer/formite/penjaga jarak be
0.660
Oh
Pekerja
0.330
Oh
Tukang kayu
0.033
Oh
Kepala Tukang Kayu
0.033
Oh
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

3,275,000.00
17,500.00
7,500.00
4,550,000.00
130,000.00
25,000.00
7,500.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
Memasang 1 M2 bekisting untuk dinding Untuk 2x Pemakaian
3,275,000.00
0.015
M3
Kayu klas III (papan)
@ Rp
(papan 2 x pakai)
17,500.00
0.400
Kg
Paku biasa 2" - 5"
@ Rp
7,500.00
0.200
Ltr
Minyak bekisting
@ Rp
4,550,000.00
0.010
M3
Kayu klas II (balok)
@ Rp
(Balok 2x pakai)
130,000.00
0.175
Lbr
Multipleks 1.22 x 2.44 x 9 mm
@ Rp
(Multipleks 2x pakai)
25,000.00
1.500
Btg
Dolken kayu 8-10/400 cm
@ Rp
(dolken 2x pakai)
7,500.00
2.000
Bh
Spacer/formite/penjaga jarak be @ Rp
(spacer 2x pemakaian)
75,000.00
0.660
Oh
Pekerja
@ Rp
100,000.00
0.330
Oh
Tukang kayu
@ Rp
125,000.00
0.033
Oh
Kepala Tukang Kayu
@ Rp
150,000.00
0.033
Oh
Mandor
@ Rp

Profit Dan Overhead (10%)


Jumlah
G.6.26

Memasang 1 M2 bekisting untuk tangga

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

37,500.00
12,750.00
8,000.00
1,250.00
1,500.00
355,000.00
35,500.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

98,250.00
7,000.00
1,500.00
91,000.00
45,500.00
75,000.00
30,000.00
49,500.00
33,000.00
4,125.00
4,950.00
439,825.00
43,982.50

Rp

49,125.00

Rp
Rp
Rp

7,000.00
1,500.00
45,500.00

Rp

22,750.00

Rp

37,500.00

Rp

15,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

49,500.00
33,000.00
4,125.00
4,950.00
269,950.00
26,995.00

390,500.00

483,807.50

296,945.00

0.030
0.400
0.150
0.015
0.350
2.000
0.660
0.330
0.033

0.033

M3
Kg
Ltr
M3
Lbr
Btg
Oh
Oh
Oh
Oh

Kayu klas III (papan)


Paku biasa 2" - 5"
Minyak bekisting
Kayu klas II (balok)
Multipleks 1.22 x 2.44 x 9 mm
Dolken kayu 8-10/400 cm
Pekerja
Tukang kayu
Kepala Tukang Kayu
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

3,275,000.00
17,500.00
7,500.00
4,550,000.00
130,000.00
25,000.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah

Memasang 1 M2 bekisting untuk tangga Untuk 2x Pemakaian


3,275,000.00
0.015
M3
Kayu klas III (papan)
@ Rp
(papan 2 x pakai)
17,500.00
0.400
Kg
Paku biasa 2" - 5"
@ Rp
7,500.00
0.150
Ltr
Minyak bekisting
@ Rp
4,550,000.00
0.008
M3
Kayu klas II (balok)
@ Rp
(Balok 2x pakai)
130,000.00
0.175
Lbr
Multipleks 1.22 x 2.44 x 9 mm
@ Rp
(Multipleks 2x pakai)
25,000.00
1.000
Btg
Dolken kayu 8-10/400 cm
@ Rp
(dolken 2x pakai)
75,000.00
0.660
Oh
Pekerja
@ Rp
100,000.00
0.330
Oh
Tukang kayu
@ Rp
125,000.00
0.033
Oh
Kepala Tukang Kayu
@ Rp
150,000.00
0.033
Oh
Mandor
@ Rp

Profit Dan Overhead (10%)


Jumlah
H.6 PEKERJAAN PENUTUP ATAP
SPL Menutup 1 m2 Atap Dengan Atap Zincalume
1.050
M2
Atap Zincalume AZ 150 G 550,
8.000
Bh
Paku Sekrup + Mor + Pelapis
0.140
Oh
Pekerja
0.070
Oh
Tukang kayu
0.007
Oh
Kepala Tukang Kayu
0.007
Oh
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

125,000.00
2,500.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
SPL - 6.39 Memasang 1 M' Atap Nok Seng zincalume
0.900
M
Nok Atap Zincalume AZ 150 G 5
10.000
Bh
Paku Sekrup + Mor + Pelapis
0.150
Oh
Pekerja
0.070
Oh
Tukang kayu

@ Rp
@ Rp
@ Rp
@ Rp

95,000.00
2,500.00
75,000.00
100,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

98,250.00
7,000.00
1,125.00
68,250.00
45,500.00
50,000.00
49,500.00
33,000.00
4,125.00
4,950.00
361,700.00
36,170.00

Rp

49,125.00

Rp
Rp
Rp

7,000.00
1,125.00
34,125.00

Rp

22,750.00

Rp

25,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

49,500.00
33,000.00
4,125.00
4,950.00
230,700.00
23,070.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

131,250.00
20,000.00
10,500.00
7,000.00
875.00
1,050.00
170,675.00
17,067.50

Rp
Rp
Rp
Rp

85,500.00
25,000.00
11,250.00
7,000.00

397,870.00

253,770.00

187,742.50

0.008
0.006

Oh
Oh

Kepala Tukang Kayu


Mandor

@ Rp
@ Rp

125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
SPL
2.512

1.050

M2

Polycarbonate, Tbl = 10 mm, Uk @ Rp

195,000.00

Rp

204,750.00

0.050

Kg
Oh

Paku sekrup 3,5"

@ Rp

Rp

Tukang besi

@ Rp

15,000.00
100,000.00

750.00
6,700.00

Oh
Oh

Pekerja

@ Rp
@ Rp

75,000.00
125,000.00

Rp

Kepala Tukang Besi

Oh
Ls

Mandor

@ Rp

150,000.00

Rp

0.140
0.007
0.007
1.000

Acsesories, Alat Bantu, Dll


Profit Dan Overhead (10%)
Jumlah

Memasang Lisplank Ukuran (2x30) cm, woodplank


0.275
Lbr
Woodplank T. 8 x 300 x 4000
0.088
Kg
Paku sekrup 3,5"
2.860
M
Besi Hollow Galvanis 4 x 4 MB,
0.100
Oh
Pekerja
0.100
Oh
Tukang kayu
0.010
Oh
Kepala Tukang Kayu
0.050
Oh
Mandor
1.000
Ls
Alat Bantu

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

80,000.00
15,000.00
14,100.00
75,000.00
100,000.00
125,000.00
150,000.00
10,000.00

Profit Dan Overhead (10%)


Jumlah
SPL

Memasang Lisplank Ukuran 2x (2x30) cm, woodplank


0.550
Lbr
Woodplank T. 8 x 300 x 4000
@ Rp
0.175
Kg
Paku Biasa 1/2" - 1"
@ Rp
4.620
M
Besi Hollow 40 x 40 x 2.3 mm
@ Rp
0.100
Oh
Pekerja
@ Rp
0.100
Oh
Tukang kayu
@ Rp
0.010
Oh
Kepala Tukang Kayu
@ Rp
0.050
Oh
Mandor
@ Rp
1.000
Ls
Alat Bantu
@ Rp

80,000.00
17,500.00
40,000.00
75,000.00
100,000.00
125,000.00
150,000.00
10,000.00

Profit Dan Overhead (10%)


Jumlah
H.6.42

1,000.00
900.00
130,650.00
13,065.00
143,715.00

Pemasangan 1 m2 Atap Polycarbonate, Tbl = 10 mm

0.067

SPL

Rp
Rp
Rp
Rp
Rp

Memasang 1 M2 Alluminium Foil/sisalation


1.050
M2
Aluminium foil/sisalation single
0.150
Oh
Pekerja
0.050
Oh
Tukang kayu
0.005
Oh
Kepala Tukang Kayu
0.008
Oh
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

15,000.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)

Rp
Rp
Rp
Rp
Rp
Rp

10,500.00
875.00
1,050.00
61,425.00
286,050.00
28,605.00
314,655.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

22,000.00
1,312.50
40,326.00
7,500.00
10,000.00
1,250.00
7,500.00
10,000.00
99,888.50
9,988.85

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

44,000.00
3,062.50
184,800.00
7,500.00
10,000.00
1,250.00
7,500.00
10,000.00
268,112.50
26,811.25

Rp
Rp
Rp
Rp
Rp
Rp
Rp

15,750.00
11,250.00
5,000.00
625.00
1,200.00
33,825.00
3,382.50

109,877.35

294,923.75

Jumlah

I.6

Rp

37,207.50

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

23,114.00
1,650.00
2,520.00
22,500.00
7,500.00
5,000.00
625.00
750.00
63,659.00
6,365.90

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

25,480.00
1,650.00
2,520.00
22,500.00
7,500.00
5,000.00
625.00
750.00
66,025.00
6,602.50

Rp
Rp
Rp

14,100.00
32,400.00
46,500.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

26,250.00
35,000.00
4,375.00
2,700.00
161,325.00
16,132.50

Rp
Rp

1,850,000.00
111,000.00

PEKERJAAN LANGIT - LANGIT/PLAFOND


I.6.7 - SPL Memasang 1 M2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm
63,500.00
0.364
Lbr
Gypsumboard 9 mm
@ Rp
15,000.00
0.110
Kg
Paku sekrup 3,5"
@ Rp
35,000.00
0.072
Bh
Isolasi Gypsun
@ Rp
9,000.00
2.500
Kg
UB 888/400 Compoud
@ Rp
75,000.00
0.100
Oh
Pekerja
@ Rp
100,000.00
0.050
Oh
Tukang kayu
@ Rp
125,000.00
0.005
Oh
Kepala Tukang Kayu
@ Rp
150,000.00
0.005
Oh
Mandor
@ Rp

Profit Dan Overhead (10%)


Jumlah

I.6.7 - SPL Memasang 1 M2 langit-langit Calsy board ukuran (120x240x4) mm, tebal 4 mm
70,000.00
0.364
Lbr
Calsyboard 4 mm
@ Rp
15,000.00
0.110
Kg
Paku sekrup 3,5"
@ Rp
35,000.00
0.072
Bh
Isolasi Gypsun
@ Rp
9,000.00
2.500
Kg
UB 888/400 Compoud
@ Rp
75,000.00
0.100
Oh
Pekerja
@ Rp
100,000.00
0.050
Oh
Tukang kayu
@ Rp
125,000.00
0.005
Oh
Kepala Tukang Kayu
@ Rp
150,000.00
0.005
Oh
Mandor
@ Rp

Profit Dan Overhead (10%)


Jumlah
F.6.21 - SPL Memasang 1 M2 Rangka Besi Hollow, Modul 60 x 60 cm, Plafond
14,100.00
1.000
M'
Besi Hollow Galvanis 4 x 4 MB, @ Rp
10,800.00
3.000
M'
Besi Hollow Galvanis 2 x 4 MB, @ Rp
46,500.00
1.000
Ls
Assesories (Perkuatan, Las, Dll @ Rp
(100% X Rangka)
75,000.00
0.350
Oh
Pekerja
@ Rp
100,000.00
0.350
Oh
Tukang besi
@ Rp
125,000.00
0.035
Oh
Kepala Tukang Besi
@ Rp
150,000.00
0.018
Oh
Mandor
@ Rp

Profit Dan Overhead (10%)


Jumlah

70,024.90

72,627.50

177,457.50

J.6 PEKERJAAN PIPA DAN SANITER


J.6.1

Memasang 1 Bh kloset duduk/monoblok


1.000
Bh
Closet duduk Lengkap
6
%
Perlengkapan

@ Rp

1,850,000.00

3.300
1.100
0.001
0.160

Oh
Oh
Oh
Oh

Pekerja
Tukang batu
Kepala Tukang Batu
Mandor

@ Rp
@ Rp
@ Rp
@ Rp

75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
J.6.2

Memasang 1 Bh kloset jongkok porselen


1.000
Bh
Closet jongkok
6.000
Kg
Semen Portland
0.010
M3
Pasir pasang
1.000
Oh
Pekerja
1.500
Oh
Tukang batu
1.500
Oh
Kepala Tukang Batu
0.160
Oh
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

230,000.00
1,225.00
135,000.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah

J.6.4

Memasang 1 Bh Urinoir
1.000
Bh
Urinoir Type U57, Lengkap
30
%
Perlengkapan
6.000
Kg
Semen Portland
0.010
M3
Pasir pasang
1.000
Oh
Pekerja
1.000
Oh
Tukang batu
0.300
Oh
Kepala Tukang Batu
0.110
Oh
Mandor

@ Rp

1,900,000.00

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

1,225.00
135,000.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
J.6.5

Memasang 1 Bh wastafel
1.000
Bh
Wastafel keramik
12
%
Perlengkapan
6.000
Kg
Semen Portland
0.010
M3
Pasir pasang
1.200
Oh
Pekerja
1.450
Oh
Tukang batu
0.150
Oh
Kepala Tukang Batu
0.100
Oh
Mandor

@ Rp

475,000.00

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

1,225.00
135,000.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
J.6.9

Memasang 1 Bh badkip porselen


1.000
Bh
Bath tub + Acs
2
%
Perlengkapan
0.008
Oh
Pekerja
0.075
Oh
Tukang pipa

@ Rp

8,500,000.00

@ Rp
@ Rp

75,000.00
100,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

247,500.00
110,000.00
125.00
24,000.00
2,342,625.00
234,262.50

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

230,000.00
7,350.00
1,350.00
75,000.00
150,000.00
187,500.00
24,000.00
675,200.00
67,520.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,900,000.00
570,000.00
7,350.00
1,350.00
75,000.00
100,000.00
37,500.00
16,500.00
2,707,700.00
270,770.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

475,000.00
57,000.00
7,350.00
1,350.00
90,000.00
145,000.00
18,750.00
15,000.00
809,450.00
80,945.00

Rp
Rp
Rp
Rp

8,500,000.00
170,000.00
562.50
7,500.00

2,576,887.50

742,720.00

2,978,470.00

890,395.00

0.008
0.004

Oh
Oh

Kepala Tukang pipa


Mandor

@ Rp
@ Rp

125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
J.6.19

Memasang 1 M' pipa GIP Medium class diameter 1/2"


1.200
M'
Pipa GIP Medium Class Dia. 15 @ Rp
35
%
Perlengkapan
0.054
Oh
Pekerja
@ Rp
0.090
Oh
Tukang pipa
@ Rp
0.009
Oh
Kepala Tukang pipa
@ Rp
0.027
Oh
Mandor
@ Rp

25,700.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
J.6.20

Memasang 1 M' pipa GIP Medium class diameter 3/4"


1.200
M'
Pipa GIP Medium Class Dia. 20 @ Rp
35
%
Perlengkapan
0.054
Oh
Pekerja
@ Rp
0.090
Oh
Tukang pipa
@ Rp
0.009
Oh
Kepala Tukang pipa
@ Rp
0.027
Oh
Mandor
@ Rp

30,000.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah

J.6.21

Memasang 1 M' pipa GIP Medium class diameter 1"


1.200
M'
Pipa GIP Medium Class Dia. 25 @ Rp
35
%
Perlengkapan
0.054
Oh
Pekerja
@ Rp
0.090
Oh
Tukang pipa
@ Rp
0.009
Oh
Kepala Tukang pipa
@ Rp
0.027
Oh
Mandor
@ Rp

50,500.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
J.6.22

Memasang 1 M' pipa GIP Medium class diameter 1 1/2"


1.200
M'
Pipa GIP Medium Class Dia. 40 @ Rp
35
%
Perlengkapan
0.108
Oh
Pekerja
@ Rp
0.180
Oh
Tukang pipa
@ Rp
0.018
Oh
Kepala Tukang pipa
@ Rp
0.005
Oh
Mandor
@ Rp

81,405.50
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
J.6.22 - SPL A Memasang 1 M' pipa GIP Medium class diameter 1 1/4"
1.200
M'
Pipa GIP Medium Class Dia. 32 @ Rp
35
%
Perlengkapan
0.108
Oh
Pekerja
@ Rp

76,444.00
75,000.00

Rp
Rp
Rp
Rp
Rp

937.50
570.00
8,679,570.00
867,957.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

30,840.00
8,995.00
4,050.00
9,000.00
1,125.00
4,050.00
58,060.00
5,806.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

36,000.00
10,500.00
4,050.00
9,000.00
1,125.00
4,050.00
64,725.00
6,472.50

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

60,600.00
17,675.00
4,050.00
9,000.00
1,125.00
4,050.00
96,500.00
9,650.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

97,686.60
28,491.93
8,100.00
18,000.00
2,250.00
810.00
155,338.53
15,533.85

Rp
Rp
Rp

91,732.80
26,755.40
8,100.00

9,547,527.00

63,866.00

71,197.50

106,150.00

170,872.38

0.180
0.018
0.005

Oh
Oh
Oh

Tukang pipa
Kepala Tukang pipa
Mandor

@ Rp
@ Rp
@ Rp

100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
J.6.22 - SPL B Memasang 1 M' pipa GIP Medium class diameter 2"
1.200
M'
Pipa GIP Medium Class Dia. 50 @ Rp
35
%
Perlengkapan
0.108
Oh
Pekerja
@ Rp
0.180
Oh
Tukang pipa
@ Rp
0.018
Oh
Kepala Tukang pipa
@ Rp
0.005
Oh
Mandor
@ Rp

100,833.33
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
J.6.22 - SPL C Memasang 1 M' pipa GIP Medium class diameter 2 1/2"
1.200
M'
Pipa GIP Medium Class Dia. 65 @ Rp
35
%
Perlengkapan
0.108
Oh
Pekerja
@ Rp
0.180
Oh
Tukang pipa
@ Rp
0.018
Oh
Kepala Tukang pipa
@ Rp
0.005
Oh
Mandor
@ Rp

165,000.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
J.6.23 Memasang 1 M' pipa GIP Medium class diameter 3"
1.200
M'
Pipa GIP Medium Class Dia. 80 @ Rp
35
%
Perlengkapan
0.108
Oh
Pekerja
@ Rp
0.180
Oh
Tukang pipa
@ Rp
0.018
Oh
Kepala Tukang pipa
@ Rp
0.005
Oh
Mandor
@ Rp

210,833.33
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah

J.6.24 Memasang 1 M' pipa GIP Medium class diameter 4"


1.200
M'
Pipa GIP Medium Class Dia. 10 @ Rp
35
%
Perlengkapan
0.135
Oh
Pekerja
@ Rp
0.225
Oh
Tukang pipa
@ Rp
0.023
Oh
Kepala Tukang pipa
@ Rp
0.007
Oh
Mandor
@ Rp

315,000.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
J.6.24 Memasang 1 M' pipa GIP Medium class diameter 6"
1.200
M'
Pipa GIP Medium Class Dia. 15 @ Rp
35
%
Perlengkapan
0.135
Oh
Pekerja
@ Rp

507,500.00
75,000.00

Rp
Rp
Rp
Rp
Rp
Rp

18,000.00
2,250.00
810.00
147,648.20
14,764.82

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

121,000.00
35,291.67
8,100.00
18,000.00
2,250.00
810.00
185,451.67
18,545.17

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

198,000.00
57,750.00
8,100.00
18,000.00
2,250.00
810.00
284,910.00
28,491.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

253,000.00
73,791.67
8,100.00
18,000.00
2,250.00
810.00
355,951.67
35,595.17

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

378,000.00
110,250.00
10,125.00
22,500.00
2,812.50
1,020.00
524,707.50
52,470.75

Rp
Rp
Rp

609,000.00
177,625.00
10,125.00

162,413.02

203,996.83

313,401.00

391,546.83

577,178.25

0.225
0.023
0.007

Oh
Oh
Oh

Tukang pipa
Kepala Tukang pipa
Mandor

@ Rp
@ Rp
@ Rp

100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
J.6.19a Memasang 1 M' pipa BS Medium class diameter 1/2"
1.200
M'
Pipa BS Medium Class Dia. 15 @ Rp
35
%
Perlengkapan
0.054
Oh
Pekerja
@ Rp
0.090
Oh
Tukang pipa
@ Rp
0.009
Oh
Kepala Tukang pipa
@ Rp
0.027
Oh
Mandor
@ Rp

25,620.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
J.6.20a Memasang 1 M' pipa BS Medium class diameter 3/4"
1.200
M'
Pipa BS Medium Class Dia. 20 @ Rp
35
%
Perlengkapan
0.054
Oh
Pekerja
@ Rp
0.090
Oh
Tukang pipa
@ Rp
0.009
Oh
Kepala Tukang pipa
@ Rp
0.027
Oh
Mandor
@ Rp

33,180.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
J.6.21a Memasang 1 M' pipa BS Medium class diameter 1"
1.200
M'
Pipa BS Medium Class Dia. 25
35
%
Perlengkapan
0.054
Oh
Pekerja
0.090
Oh
Tukang pipa
0.009
Oh
Kepala Tukang pipa
0.027
Oh
Mandor

@ Rp

51,240.00

@ Rp
@ Rp
@ Rp
@ Rp

75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
J.6.22a Memasang 1 M' pipa BS Medium class diameter 1 1/2"
1.200
M'
Pipa BS Medium Class Dia. 40 @ Rp
35
%
Perlengkapan
0.108
Oh
Pekerja
@ Rp
0.180
Oh
Tukang pipa
@ Rp
0.018
Oh
Kepala Tukang pipa
@ Rp
0.005
Oh
Mandor
@ Rp

75,810.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
.6.22a - SPL A Memasang 1 M' pipa BS Medium class diameter 1 1/4"
1.200
M'
Pipa BS Medium Class Dia. 32 @ Rp
35
%
Perlengkapan
0.108
Oh
Pekerja
@ Rp
0.180
Oh
Tukang pipa
@ Rp

65,940.00
75,000.00
100,000.00

Rp
Rp
Rp
Rp
Rp
Rp

22,500.00
2,812.50
1,020.00
823,082.50
82,308.25

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

30,744.00
8,967.00
4,050.00
9,000.00
1,125.00
4,050.00
57,936.00
5,793.60

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

39,816.00
11,613.00
4,050.00
9,000.00
1,125.00
4,050.00
69,654.00
6,965.40

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

61,488.00
17,934.00
4,050.00
9,000.00
1,125.00
4,050.00
97,647.00
9,764.70

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

90,972.00
26,533.50
8,100.00
18,000.00
2,250.00
810.00
146,665.50
14,666.55

Rp
Rp
Rp
Rp

79,128.00
23,079.00
8,100.00
18,000.00

905,390.75

63,729.60

76,619.40

107,411.70

161,332.05

0.018
0.005

Oh
Oh

Kepala Tukang pipa


Mandor

@ Rp
@ Rp

125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
.6.22a - SPL B Memasang 1 M' pipa BS Medium class diameter 2"
1.200
M'
Pipa BS Medium Class Dia. 50
35
%
Perlengkapan
0.108
Oh
Pekerja
0.180
Oh
Tukang pipa
0.018
Oh
Kepala Tukang pipa
0.005
Oh
Mandor

@ Rp

107,100.00

@ Rp
@ Rp
@ Rp
@ Rp

75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
.6.22a - SPL C Memasang 1 M' pipa BS Medium class diameter 2 1/2"
1.200
M'
Pipa BS Medium Class Dia. 65 @ Rp
35
%
Perlengkapan
0.108
Oh
Pekerja
@ Rp
0.180
Oh
Tukang pipa
@ Rp
0.018
Oh
Kepala Tukang pipa
@ Rp
0.005
Oh
Mandor
@ Rp

136,710.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
J.6.23a Memasang 1 M' pipa BS Medium class diameter 3"
1.200
M'
Pipa BS Medium Class Dia. 80
35
%
Perlengkapan
0.108
Oh
Pekerja
0.180
Oh
Tukang pipa
0.018
Oh
Kepala Tukang pipa
0.005
Oh
Mandor

@ Rp

177,870.00

@ Rp
@ Rp
@ Rp
@ Rp

75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
J.6.24a Memasang 1 M' pipa BS Medium class diameter 4"
1.200
M'
Pipa BS Medium Class Dia. 100
35
%
Perlengkapan
0.135
Oh
Pekerja
0.225
Oh
Tukang pipa
0.023
Oh
Kepala Tukang pipa
0.007
Oh
Mandor

@ Rp

231,000.00

@ Rp
@ Rp
@ Rp
@ Rp

75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
J.6.25

Memasang 1 M' pipa PVC tipe AW diameter 1/2"


1.200
M'
Pipa PVC AW Dia. 15 mm (1/2''
35
%
Perlengkapan
0.036
Oh
Pekerja
0.060
Oh
Tukang pipa
0.006
Oh
Kepala Tukang pipa
0.002
Oh
Mandor

@ Rp

5,625.00

@ Rp
@ Rp
@ Rp
@ Rp

75,000.00
100,000.00
125,000.00
150,000.00

Rp
Rp
Rp
Rp
Rp

2,250.00
810.00
131,367.00
13,136.70

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

128,520.00
37,485.00
8,100.00
18,000.00
2,250.00
810.00
195,165.00
19,516.50

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

164,052.00
47,848.50
8,100.00
18,000.00
2,250.00
810.00
241,060.50
24,106.05

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

213,444.00
62,254.50
8,100.00
18,000.00
2,250.00
810.00
304,858.50
30,485.85

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

277,200.00
80,850.00
10,125.00
22,500.00
2,812.50
1,020.00
394,507.50
39,450.75

Rp
Rp
Rp
Rp
Rp
Rp

6,750.00
1,968.75
2,700.00
6,000.00
750.00
270.00

144,503.70

214,681.50

265,166.55

335,344.35

433,958.25

Profit Dan Overhead (10%)


Jumlah
Memasang 1 M' pipa PVC tipe AW diameter 1/2" Untuk Instalasi Air Panas
54,600.00
1.200
M'
Pipa PVC Air Panas 1/2''
@ Rp
35
%
Perlengkapan
75,000.00
0.036
Oh
Pekerja
@ Rp
100,000.00
0.060
Oh
Tukang pipa
@ Rp
125,000.00
0.006
Oh
Kepala Tukang pipa
@ Rp
150,000.00
0.002
Oh
Mandor
@ Rp

Profit Dan Overhead (10%)


Jumlah
J.6.26

Memasang 1 M' pipa PVC tipe AW diameter 3/4"


1.200
M'
Pipa PVC AW Dia. 20 mm (3/4''
35
%
Perlengkapan
0.036
Oh
Pekerja
0.060
Oh
Tukang pipa
0.006
Oh
Kepala Tukang pipa
0.002
Oh
Mandor

@ Rp

8,000.00

@ Rp
@ Rp
@ Rp
@ Rp

75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
J.6.27

Memasang 1 M' pipa PVC tipe AW diameter 1"


1.200
M'
Pipa PVC AW Dia. 25 mm (1'')
35
%
Perlengkapan
0.036
Oh
Pekerja
0.060
Oh
Tukang pipa
0.006
Oh
Kepala Tukang pipa
0.002
Oh
Mandor

@ Rp

11,000.00

@ Rp
@ Rp
@ Rp
@ Rp

75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
J.6.28

Memasang 1 M' pipa PVC tipe AW diameter 1 1/2"


1.200
M'
Pipa PVC AW Dia. 40 mm (1 1/2' @ Rp
35
%
Perlengkapan
0.036
Oh
Pekerja
@ Rp
0.060
Oh
Tukang pipa
@ Rp
0.006
Oh
Kepala Tukang pipa
@ Rp
0.002
Oh
Mandor
@ Rp

24,125.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
J.6.29

Memasang 1 M' pipa PVC tipe AW diameter 2"


1.200
M'
Pipa PVC AW Dia. 50 mm (2'')
35
%
Perlengkapan
0.054
Oh
Pekerja
0.090
Oh
Tukang pipa
0.009
Oh
Kepala Tukang pipa
0.003
Oh
Mandor

@ Rp

28,750.00

@ Rp
@ Rp
@ Rp
@ Rp

75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)

Rp
Rp
Rp

18,438.75
1,843.88

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

65,520.00
19,110.00
2,700.00
6,000.00
750.00
270.00
94,350.00
9,435.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

9,600.00
2,800.00
2,700.00
6,000.00
750.00
270.00
22,120.00
2,212.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

13,200.00
3,850.00
2,700.00
6,000.00
750.00
270.00
26,770.00
2,677.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

28,950.00
8,443.75
2,700.00
6,000.00
750.00
270.00
47,113.75
4,711.38

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

34,500.00
10,062.50
4,050.00
9,000.00
1,125.00
405.00
59,142.50
5,914.25

20,282.63

103,785.00

24,332.00

29,447.00

51,825.13

Jumlah
J.6.30

Memasang 1 M' pipa PVC tipe AW diameter 2 1/2"


1.200
M'
Pipa PVC AW Dia. 65 mm (2 1/2' @ Rp
35
%
Perlengkapan
0.054
Oh
Pekerja
@ Rp
0.090
Oh
Tukang pipa
@ Rp
0.009
Oh
Kepala Tukang pipa
@ Rp
0.003
Oh
Mandor
@ Rp

40,625.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
J.6.31

Memasang 1 M' pipa PVC tipe AW diameter 3"


1.200
M'
Pipa PVC AW Dia. 80 mm (3'')
35
%
Perlengkapan
0.081
Oh
Pekerja
0.135
Oh
Tukang pipa
0.014
Oh
Kepala Tukang pipa
0.004
Oh
Mandor

@ Rp

58,500.00

@ Rp
@ Rp
@ Rp
@ Rp

75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
J.6.32

Memasang 1 M' pipa PVC tipe AW diameter 4"


1.200
M'
Pipa PVC AW Dia. 100 mm (4'')
35
%
Perlengkapan
0.081
Oh
Pekerja
0.135
Oh
Tukang pipa
0.014
Oh
Kepala Tukang pipa
0.004
Oh
Mandor

@ Rp

75,375.00

@ Rp
@ Rp
@ Rp
@ Rp

75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
J.6.32

Memasang 1 M' pipa PVC tipe AW diameter 6"


1.200
M'
Pipa PVC AW Dia. 150 mm (6'')
35
%
Perlengkapan
0.081
Oh
Pekerja
0.135
Oh
Tukang pipa
0.014
Oh
Kepala Tukang pipa
0.004
Oh
Mandor

@ Rp

102,500.00

@ Rp
@ Rp
@ Rp
@ Rp

75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
J.6.32

Memasang 1 M' pipa PVC tipe AW diameter 10"


1.200
M'
Pipa PVC AW Dia. 250 mm (10''
35
%
Perlengkapan
0.081
Oh
Pekerja
0.135
Oh
Tukang pipa
0.014
Oh
Kepala Tukang pipa
0.004
Oh
Mandor

@ Rp

289,406.25

@ Rp
@ Rp
@ Rp
@ Rp

75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah

Rp

65,056.75

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

48,750.00
14,218.75
4,050.00
9,000.00
1,125.00
405.00
77,548.75
7,754.88

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

70,200.00
20,475.00
6,075.00
13,500.00
1,687.50
615.00
112,552.50
11,255.25

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

90,450.00
26,381.25
6,075.00
13,500.00
1,687.50
615.00
138,708.75
13,870.88

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

123,000.00
35,875.00
6,075.00
13,500.00
1,687.50
615.00
180,752.50
18,075.25

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

347,287.50
101,292.19
6,075.00
13,500.00
1,687.50
615.00
470,457.19
47,045.72

85,303.63

123,807.75

152,579.63

198,827.75

517,502.91

J.6.33

Memasang 1 Bh bak cuci piring stainles steel


1.000
Bh
Washbasin stainless stel
1.000
Bh
Waterdrain + accesoriss
0.030
Oh
Pekerja
0.300
Oh
Tukang batu
0.030
Oh
Kepala Tukang Batu
0.002
Oh
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

451,000.00
65,000.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
J.6.35

Memasang 1 Bh kran diameter 3/4" atau 1/2"


1.000
Bh
Kran air biasa 1/2" - 3/4"
0.025
Bh
Seal tape
0.010
Oh
Pekerja
0.100
Oh
Tukang pipa
0.010
Oh
Kepala Tukang pipa
0.005
Oh
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

50,500.00
3,500.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
Memasang 1 Bh kran air ganda diameter 3/4" atau 1/2"
1.000
Bh
Kran air ganda 1/2" - 3/4"
@ Rp
0.025
Bh
Seal tape
@ Rp
0.010
Oh
Pekerja
@ Rp
0.100
Oh
Tukang pipa
@ Rp
0.010
Oh
Kepala Tukang pipa
@ Rp
0.005
Oh
Mandor
@ Rp

250,000.00
3,500.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah

Memasang 1 Bh kran Shower


1.000
Bh
Kran Shower
0.025
Bh
Seal tape
0.010
Oh
Pekerja
0.100
Oh
Tukang pipa
0.010
Oh
Kepala Tukang pipa
0.005
Oh
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

75,000.00
3,500.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
Memasang 1 Bh Shower
1.000
Bh
Shower + Acc
0.025
Bh
Seal tape
0.010
Oh
Pekerja
0.100
Oh
Tukang pipa
0.010
Oh
Kepala Tukang pipa
0.005
Oh
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

275,000.00
3,500.00
75,000.00
100,000.00
125,000.00
150,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

451,000.00
65,000.00
2,250.00
30,000.00
3,750.00
225.00
552,225.00
55,222.50

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

50,500.00
87.50
750.00
10,000.00
1,250.00
750.00
63,337.50
6,333.75

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

250,000.00
87.50
750.00
10,000.00
1,250.00
750.00
262,837.50
26,283.75

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

75,000.00
87.50
750.00
10,000.00
1,250.00
750.00
87,837.50
8,783.75

Rp
Rp
Rp
Rp
Rp
Rp

275,000.00
87.50
750.00
10,000.00
1,250.00
750.00

607,447.50

69,671.25

289,121.25

96,621.25

Profit Dan Overhead (10%)


Jumlah
Memasang 1 Bh Stop kran
1.000
Bh
Stop Kran
0.025
Bh
Seal tape
0.010
Oh
Pekerja
0.100
Oh
Tukang pipa
0.010
Oh
Kepala Tukang pipa
0.005
Oh
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

76,000.00
3,500.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
J.6.36

Memasang 1 Bh floor drain


1.000
Bh
Floor drain Stainlees
0.010
Oh
Pekerja
0.100
Oh
Tukang batu
0.010
Oh
Kepala Tukang Batu
0.005
Oh
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

50,000.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
J.6.36 - SPL Memasang 1 Bh Roof drain
1.000
Bh
Roof drain
0.010
Oh
Pekerja
0.100
Oh
Tukang batu
0.010
Oh
Kepala Tukang Batu
0.005
Oh
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

125,000.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah

Rp
Rp
Rp

287,837.50
28,783.75

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

76,000.00
87.50
750.00
10,000.00
1,250.00
750.00
88,837.50
8,883.75

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

50,000.00
750.00
10,000.00
1,250.00
750.00
62,750.00
6,275.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

125,000.00
750.00
10,000.00
1,250.00
750.00
137,750.00
13,775.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

14,044.25
4,500.00
6,000.00
750.00
450.00
25,744.25
2,574.42

Rp
Rp
Rp
Rp

12,980.63
4,500.00
6,000.00
750.00

316,621.25

97,721.25

69,025.00

151,525.00

K.6 PEKERJAAN BESI DAN ALUMINIUM


K.6.1
A.

Memasang 1 Kg besi profil


1.150
Kg
Besi Siku L. 50. 50. 5
0.060
Oh
Pekerja
0.060
Oh
Tukang las
0.006
Oh
Kepala Tukang Besi
0.003
Oh
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

12,212.39
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
B.

1.150
0.060
0.060
0.006

Kg
Oh
Oh
Oh

Besi Siku L. 60. 60. 6


Pekerja
Tukang las
Kepala Tukang Besi

@ Rp
@ Rp
@ Rp
@ Rp

11,287.50
75,000.00
100,000.00
125,000.00

28,318.67

0.003

Oh

Mandor

@ Rp

150,000.00

Profit Dan Overhead (10%)


Jumlah
C.

1.150
0.060
0.060
0.006
0.003

Kg
Oh
Oh
Oh
Oh

Besi Siku L. 70. 70. 7


Pekerja
Tukang las
Kepala Tukang Besi
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

11,864.79
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah

D.

1.150
0.060
0.060
0.006
0.003

Kg
Oh
Oh
Oh
Oh

Plat Baja T = 10 mm
Pekerja
Tukang las
Kepala Tukang Besi
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

15,263.38
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
E.

1.150
0.060
0.060
0.006
0.003

Kg
Oh
Oh
Oh
Oh

Besi Profil Kanal C. 125 x 50 x


Pekerja
Tukang las
Kepala Tukang Besi
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

9,686.35
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
F.

1.150
0.060
0.060
0.006
0.003

Kg
Oh
Oh
Oh
Oh

Besi Profil Kanal C. 150 x 50 x


Pekerja
Tukang las
Kepala Tukang Besi
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

10,170.12
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah

G.

Pek. Treaktang Besi 10 mm Dan Crosstank Besi 16 mm


1.150
Kg
Besi beton polos
@ Rp
0.060
Oh
Pekerja
@ Rp
0.060
Oh
Tukang las
@ Rp
0.006
Oh
Kepala Tukang Besi
@ Rp
0.003
Oh
Mandor
@ Rp

11,500.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
H.

Memasang 1 M' Pipa Stainless Steel 4"


1.100
M'
Pipa Stainless Steel 4"
0.726
Oh
Pekerja
0.726
Oh
Tukang las

@ Rp
@ Rp
@ Rp

201,500.00
75,000.00
100,000.00

Rp
Rp
Rp
Rp

450.00
24,680.63
2,468.06

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

13,644.51
4,500.00
6,000.00
750.00
450.00
25,344.51
2,534.45

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

17,552.89
4,500.00
6,000.00
750.00
450.00
29,252.89
2,925.29

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

11,139.30
4,500.00
6,000.00
750.00
450.00
22,839.30
2,283.93

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

11,695.64
4,500.00
6,000.00
750.00
450.00
23,395.64
2,339.56

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

13,225.00
4,500.00
6,000.00
750.00
450.00
24,925.00
2,492.50

Rp
Rp
Rp

221,650.00
54,450.00
72,600.00

27,148.69

27,878.96

32,178.18

25,123.23

25,735.20

27,417.50

0.073
0.036
1.000

Oh
Oh
Ls

Kepala Tukang Besi


Mandor
Alat Bantu + Accessories, dll

@ Rp
@ Rp

125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
I.

Memasang 1 M' Pipa Stainless Steel 3"


1.100
M'
Pipa Stainless Steel 3"
0.508
Oh
Pekerja
0.508
Oh
Tukang las
0.051
Oh
Kepala Tukang Besi
0.025
Oh
Mandor
1.000
Ls
Alat Bantu + Accessories, dll

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

140,833.33
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
J.

Memasang 1 M' Hollow Stainless Steel, Uk. 20 x 20 mm


1.100
M'
Hollow Stainless Steel, Uk. 20 @ Rp
0.060
Oh
Tukang besi
@ Rp
0.060
Oh
Pekerja
@ Rp
0.006
Oh
Kepala Tukang Besi
@ Rp
0.000
Oh
Mandor
@ Rp
1.000
Ls
Alat Bantu + Accessories, dll

50,995.00
100,000.00
75,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
K

Memasang 1 M' Hollow Stainless Steel, Uk. 40 x 40 mm


1.100
M'
Hollow Stainless Steel, Uk. 40 @ Rp
0.151
Oh
Tukang besi
@ Rp
0.151
Oh
Pekerja
@ Rp
0.015
Oh
Kepala Tukang Besi
@ Rp
0.001
Oh
Mandor
@ Rp
1.000
Ls
Alat Bantu + Accessories, dll

104,340.00
100,000.00
75,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah

Memasang 1 M' Hollow Stainless Steel, Uk. 40 x 60 mm


1.100
M'
Hollow Stainless Steel, Uk. 40 @ Rp
0.217
Oh
Tukang besi
@ Rp
0.217
Oh
Pekerja
@ Rp
0.022
Oh
Kepala Tukang Besi
@ Rp
0.001
Oh
Mandor
@ Rp
1.000
Ls
Alat Bantu + Accessories, dll

131,250.00
100,000.00
75,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah

K.6.2

Memasang 1 Kg rangka kuda-kuda baja IWF/ H Beam

Rp
Rp
Rp
Rp
Rp
Rp

9,075.00
5,445.00
36,322.00
399,542.00
39,954.20

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

154,916.67
38,115.00
50,820.00
6,352.50
3,811.50
25,401.57
279,417.23
27,941.72

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

56,094.50
6,000.00
4,500.00
750.00
45.00
6,738.95
74,128.45
7,412.85

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

114,774.00
15,072.00
11,304.00
1,884.00
113.04
14,314.70
157,461.74
15,746.17

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

144,375.00
21,666.00
16,249.50
2,708.25
162.50
18,516.12
203,677.37
20,367.74

439,496.20

307,358.96

81,541.30

173,207.92

224,045.11

A.

1.150
0.060
0.060
0.006
0.003

Kg
Oh
Oh
Oh
Oh

Besi Profil H Beam 200 x 200 x


Pekerja
Tukang las
Kepala Tukang Besi
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

15,000.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
B.

1.150
0.060
0.060
0.006
0.003

Kg
Oh
Oh
Oh
Oh

Besi Profil IWF


Pekerja
Tukang las
Kepala Tukang Besi
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

12,408.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
K.6.3

Mengerjakan 100 Kg pekerjaan perakitan


1.000
Ltr
Solar
0.100
Ltr
Minyak pelumas
0.100
Oh
Pekerja
0.100
Oh
Tukang besi
0.001
Oh
Kepala Tukang Besi
0.005
Oh
Mandor
0.008
Jam Sewa alat

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

6,500.00
30,000.00
75,000.00
100,000.00
125,000.00
150,000.00
75,000.00

Untuk 1 Kg Pek. Perakitan

Profit Dan Overhead (10%)


Jumlah
K.6.11-SNI Mengerjakan 1 M' Kusen Aluminium
1.100
M'
Kusen Aluminium Warna 4" x 1
2.000
Bh
Sektrup Fixer
0.060 Tube Sealent
0.043
Oh
Pekerja
0.043
Oh
Tukang besi
0.0043
Oh
Kepala Tukang Besi
0.0021
Oh
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

105,891.54
1,850.00
90,000.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah

SPL.1 Mengerjakan 1 M' Bingkai Jendela Aluminium


A
1.100
M'
Bingkai Pintu Aluminium Warna 4@ Rp
B
1.100
M'
Bingkai Pintu / Rangka Partisi
@ Rp
C
1.100
M1
Bingkai Jendela Aluminium Warn @ Rp
0.060 Tube Sealent
@ Rp
0.043
Oh
Pekerja
@ Rp
0.043
Oh
Tukang besi
@ Rp
0.0043
Oh
Kepala Tukang Besi
@ Rp
0.0021
Oh
Mandor
@ Rp
1.000
Ls
Alat Bantu + Accessories dll

85,100.00
76,187.50
65,780.00
90,000.00
75,000.00
100,000.00
125,000.00
150,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

17,250.00
4,500.00
6,000.00
750.00
450.00
28,950.00
2,895.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

14,269.20
4,500.00
6,000.00
750.00
450.00
25,969.20
2,596.92

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

6,500.00
3,000.00
7,500.00
10,000.00
125.00
750.00
600.00
28,475.00
284.75
28.48

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

116,480.70
3,700.00
5,400.00
3,225.00
4,300.00
537.50
315.00
133,958.20
13,395.82

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

93,610.00
83,806.25
72,358.00
5,400.00
3,225.00
4,300.00
537.50
315.00
8,325.81

31,845.00

28,566.12

313.23

147,354.02

Profit Dan Overhead (10%)


Jumlah A
B

Profit Dan Overhead (10%)


Jumlah B
C

Profit Dan Overhead (10%)


Jumlah C
SPL

1 M2 Pintu Aluminium, Uk. 78 x 195


10.920
m
Bingkai Pintu Aluminium Warna 4@ Rp
3.346
m2
Kaca Ryben 5mm
@ Rp
21.840
m
Karet List Kaca
@ Rp
1.000
Ls
Alat Bantu + Assesories
@ Rp
0.085
Oh
Pekerja
@ Rp
0.085
Oh
Tukang besi
@ Rp
0.009
Oh
Kepala Tukang Besi
@ Rp
0.005
Oh
Mandor
@ Rp

85,100.00
175,000.00
2,500.00
156,947.70
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah

SPL

1 M2 Pintu Aluminium, Uk. 75 x 195


10.800
m
Bingkai Pintu Aluminium Warna 4@ Rp
3.218
m2
Kaca Ryben 5mm
@ Rp
21.600
m
Karet List Kaca
@ Rp
1.000
Ls
Alat Bantu + Assesories
@ Rp
0.085
Oh
Pekerja
@ Rp
0.085
Oh
Tukang besi
@ Rp
0.009
Oh
Kepala Tukang Besi
@ Rp
0.005
Oh
Mandor
@ Rp

85,100.00
175,000.00
2,500.00
153,614.25
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah

SPL

1 M2 Pasang Pintu
1.000
m2
1.050
Oh
1.050
Oh
0.105
Oh
0.0052
Oh

Aluminium
Pintu Aluminium
Pekerja
Tukang besi
Kepala Tukang Besi
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

975,000.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
SPL

1
11.730
73.844
1.000
5.134
5.134
0.513
0.257

Unit
M'
Kg
Ls
Oh
Oh
Oh
Oh

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

115,713.31
11,571.33

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

929,292.00
585,585.00
54,600.00
156,947.70
6,375.00
8,500.00
1,125.00
750.00
1,743,174.70
174,317.47

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

919,080.00
563,062.50
54,000.00
153,614.25
6,375.00
8,500.00
1,125.00
750.00
1,706,506.75
170,650.68

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

975,000.00
78,750.00
105,000.00
13,125.00
780.00
1,172,655.00
117,265.50

127,284.64
105,909.56

10,590.96
116,500.51
94,461.31

9,446.13
103,907.44

1,917,492.17

1,877,157.43

1,289,920.50

Membuat Dan Memasang Pintu Emergency Rangka Hollow 4 x 4, Uk. 90 x 220


40,000.00
469,200.00
Besi Hollow 40 x 40 x 2.3 mm
@ Rp
Rp
16,488.00
1,217,546.06
Plat Baja T = 2 mm
@ Rp
Rp
506,023.82
506,023.82
Alat Bantu + Assesories
@ Rp
Rp
75,000.00
385,084.69
Pekerja
@ Rp
Rp
100,000.00
513,446.25
Tukang las
@ Rp
Rp
125,000.00
64,180.78
Kepala Tukang Besi
@ Rp
Rp
150,000.00
38,508.47
Mandor
@ Rp
Rp
3,193,990.06
Rp

Profit Dan Overhead (10%)


Jumlah

Rp
Rp

319,399.01

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

227,000.00
750.00
50,000.00
1,250.00
750.00
279,750.00
27,975.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

350,000.00
375.00
50,000.00
625.00
375.00
401,375.00
40,137.50

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

28,000.00
1,125.00
15,000.00
1,875.00
112.50
46,112.50
4,611.25

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

900,000.00
1,125.00
30,000.00
3,750.00
112.50
934,987.50
93,498.75

Rp
Rp
Rp
Rp
Rp
Rp

25,000.00
750.00
10,000.00
1,250.00
75.00
37,075.00

3,513,389.06

L.6 PEKERJAAN KUNCI DAN KACA


L.6.2

Memasang 1 Bh kunci tanam biasa


1.000
Bh
Kunci tanam biasa (2 x Slag)
0.010
Oh
Pekerja
0.500
Oh
Tukang kayu
0.010
Oh
Kepala Tukang Kayu
0.005
Oh
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

227,000.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
L.6.4

Memasang 1 Bh kunci silinder


1.000
Bh
Kunci tanam silinder
0.005
Oh
Pekerja
0.500
Oh
Tukang kayu
0.005
Oh
Kepala Tukang Kayu
0.0025
Oh
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

350,000.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
L.6.5

Memasang 1 Bh engsel pintu


1.000
Bh
Engsel pintu Kw.1
0.015
Oh
Pekerja
0.150
Oh
Tukang kayu
0.015
Oh
Kepala Tukang Kayu
0.0008
Oh
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

28,000.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
SPL

Memasang 1 Psg Flooring Engsel pintu


1.000
Psg Flooring engsel
0.015
Oh
Pekerja
0.300
Oh
Tukang kayu
0.030
Oh
Kepala Tukang Kayu
0.0008
Oh
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

900,000.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah

L.6.6

Memasang 1 Bh engsel jendela


1.000
Bh
Engsel jendela Kw.1
0.010
Oh
Pekerja
0.100
Oh
Tukang kayu
0.010
Oh
Kepala Tukang Kayu
0.0005
Oh
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

25,000.00
75,000.00
100,000.00
125,000.00
150,000.00

307,725.00

441,512.50

50,723.75

1,028,486.25

Profit Dan Overhead (10%)


Jumlah
L.6.9

Memasang 1 Bh kait angin


1.000
Bh
Kait angin
0.015
Oh
Pekerja
0.150
Oh
Tukang kayu
0.015
Oh
Kepala Tukang Kayu
0.00075
Oh
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

20,000.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
SPL

Memasang 1 Bh grendel jendela


1.000
Bh
Grendel jendela Kw.1
0.010
Oh
Pekerja
0.100
Oh
Tukang kayu
0.010
Oh
Kepala Tukang Kayu
0.00050
Oh
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

28,000.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
L.6.10

Memasang 1 Bh door closer


1.000
Bh
Door closer/espanyolet
0.050
Oh
Pekerja
0.500
Oh
Tukang kayu
0.050
Oh
Kepala Tukang Kayu
0.0025
Oh
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

250,000.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
L.6.11
A
B

Memasang 1 Bh kunci selot


1.000
Bh
Kunci selot
1.000
Bh
Kunci selot biasa
0.020
Oh
Pekerja
0.200
Oh
Tukang kayu
0.020
Oh
Kepala Tukang Kayu
0.0010
Oh
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

500,000.00
225,000.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah A

Profit Dan Overhead (10%)


Jumlah B

L.6.12

Memasang 1 Bh pegangan pintu/door holder


1.000
Bh
Door Holder
0.050
Oh
Pekerja
0.500
Oh
Tukang kayu
0.050
Oh
Kepala Tukang Kayu

@ Rp
@ Rp
@ Rp
@ Rp

150,000.00
75,000.00
100,000.00
125,000.00

Rp
Rp

3,707.50

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

20,000.00
1,125.00
15,000.00
1,875.00
112.50
38,112.50
3,811.25

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

28,000.00
750.00
10,000.00
1,250.00
75.00
40,075.00
4,007.50

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

250,000.00
3,750.00
50,000.00
6,250.00
375.00
310,375.00
31,037.50

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

500,000.00
225,000.00
1,500.00
20,000.00
2,500.00
150.00
524,150.00
52,415.00

Rp
Rp
Rp
Rp

150,000.00
3,750.00
50,000.00
6,250.00

40,782.50

41,923.75

44,082.50

341,412.50

576,565.00

249,150.00
24,915.00
274,065.00

0.0025

Oh

Mandor

@ Rp

150,000.00

Profit Dan Overhead (10%)


Jumlah
L.6.17

Memasang 1 M2 kaca, tebal 5 mm


1.100
M2
Kaca Ryben 5mm
0.050
Kg
Sealent (Kg)
0.015
Oh
Pekerja
0.150
Oh
Tukang kayu
0.015
Oh
Kepala Tukang Kayu
0.00075
Oh
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

175,000.00
150,000.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
Memasang 1 M2 kaca, tebal 5 mm
1.100
M2
Kaca bening 5 mm
0.050
Kg
Sealent (Kg)
0.015
Oh
Pekerja
0.150
Oh
Tukang kayu
0.015
Oh
Kepala Tukang Kayu
0.00075
Oh
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

125,000.00
150,000.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
Memasang 1 M2 kaca, tebal 8 mm
1.100
M2
Kaca bening 8 mm
0.070
Kg
Sealent (Kg)
0.017
Oh
Pekerja
0.170
Oh
Tukang kayu
0.017
Oh
Kepala Tukang Kayu
0.0009
Oh
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

350,000.00
150,000.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah

Rp
Rp
Rp
Rp

375.00
210,375.00
21,037.50

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

192,500.00
7,500.00
1,125.00
15,000.00
1,875.00
112.50
218,112.50
21,811.25

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

137,500.00
7,500.00
1,125.00
15,000.00
1,875.00
112.50
163,112.50
16,311.25

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

385,000.00
10,500.00
1,275.00
17,000.00
2,125.00
135.00
416,035.00
41,603.50

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

251,805.05
11,760.00
6,075.00
2,475.00
18,750.00
12,000.00
1,500.00
1,950.00
306,315.05
30,631.51

Rp
Rp
Rp

247,418.97
12,005.00
6,075.00

231,412.50

239,923.75

179,423.75

457,638.50

M.6 PEKERJAAN PENUTUP LANTAI DAN DINDING


M.6.13

Memasang 1 M2 lantai Keramik Anti Noda T = 1 cm, ukuran (60x60) cm


81,227.44
3.100
Bh
Tegel keramik Anti noda, T = 1 @ Rp
1,225.00
9.600
Kg
Semen Portland
@ Rp
135,000.00
0.045
M3
Pasir pasang
@ Rp
1,650.00
1.500
Kg
Semen warna
@ Rp
75,000.00
0.250
Oh
Pekerja
@ Rp
100,000.00
0.120
Oh
Tukang batu
@ Rp
125,000.00
0.012
Oh
Kepala Tukang Batu
@ Rp
150,000.00
0.013
Oh
Mandor
@ Rp

Profit Dan Overhead (10%)


Jumlah
Memasang 1 M2 lantai Keramik Anti Noda T = 1 cm, ukuran (20x60) cm
27,010.80
9.160
Bh
Tegel keramik Anti noda, T = 1 @ Rp
1,225.00
9.800
Kg
Semen Portland
@ Rp
135,000.00
0.045
M3
Pasir pasang
@ Rp

336,946.56

1.300
0.250
0.120
0.012
0.013

Kg
Oh
Oh
Oh
Oh

Semen warna
Pekerja
Tukang batu
Kepala Tukang Batu
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

1,650.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
Memasang 1 M2 lantai keramik ukuran (40x40) cm
6.630
Bh
Tegel keramik 40 x 40 cm (War
9.800
Kg
Semen Portland
0.045
M3
Pasir pasang
1.300
Kg
Semen warna
0.700
Oh
Pekerja
0.350
Oh
Tukang batu
0.035
Oh
Kepala Tukang Batu
0.035
Oh
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

15,000.00
1,225.00
135,000.00
1,650.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
Memasang 1 M2 lantai keramik ukuran (30x30) cm
11.870
Bh
Tegel keramik 30 x 30 cm (War
10.000
Kg
Semen Portland
0.045
M3
Pasir pasang
1.500
Kg
Semen warna
0.700
Oh
Pekerja
0.350
Oh
Tukang batu
0.035
Oh
Kepala Tukang Batu
0.035
Oh
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

7,727.27
1,225.00
135,000.00
1,650.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
Memasang 1 M2 lantai keramik ukuran (20x20) cm
26.500
Bh
Tegel keramik 20 x 20 cm (kasa
10.400
Kg
Semen Portland
0.045
M3
Pasir pasang
1.620
Kg
Semen warna
0.700
Oh
Pekerja
0.350
Oh
Tukang batu
0.035
Oh
Kepala Tukang Batu
0.035
Oh
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

3,000.00
1,225.00
135,000.00
1,650.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah

SPL

Memasang 1 M2 dinding keramik ukuran (20x25) cm


21.000
Bh
Tegel keramik 20 x 25 cm ( war @ Rp
9.300
Kg
Semen Portland
@ Rp

4,250.00
1,225.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

2,145.00
18,750.00
12,000.00
1,500.00
1,950.00
301,843.97
30,184.40

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

99,450.00
12,005.00
6,075.00
2,145.00
52,500.00
35,000.00
4,375.00
5,250.00
216,800.00
21,680.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

91,722.73
12,250.00
6,075.00
2,475.00
52,500.00
35,000.00
4,375.00
5,250.00
209,647.73
20,964.77

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

79,500.00
12,740.00
6,075.00
2,673.00
52,500.00
35,000.00
4,375.00
5,250.00
198,113.00
19,811.30

Rp
Rp

89,250.00
11,392.50

332,028.36

238,480.00

230,612.50

217,924.30

0.018
1.940
0.900
0.450
0.045
0.045

M3
Kg
Oh
Oh
Oh
Oh

Pasir pasang
Semen warna
Pekerja
Tukang batu
Kepala Tukang Batu
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

135,000.00
1,650.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
SPL

Memasang 1 M2 dinding keramik ukuran (30x50) cm


7.000
Bh
Tegel keramik 30 x 50 Cm
@ Rp
9.300
Kg
Semen Portland
@ Rp
0.018
M3
Pasir pasang
@ Rp
1.940
Kg
Semen warna
@ Rp
0.900
Oh
Pekerja
@ Rp
0.450
Oh
Tukang batu
@ Rp
0.045
Oh
Kepala Tukang Batu
@ Rp
0.045
Oh
Mandor
@ Rp

13,571.43
1,225.00
135,000.00
1,650.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
SPL

Memasang 1 M plint Keramik ukuran (15 x 60) cm


1.700
Bh
Plint Keramik 15 x 60 Cm
1.140
Kg
Semen Portland
0.003
M3
Pasir pasang
0.100
Kg
Semen warna
0.090
Oh
Pekerja
0.090
Oh
Tukang batu
0.035
Oh
Kepala Tukang Batu
0.005
Oh
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

18,000.00
1,225.00
135,000.00
1,650.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah
SPL

Memasang 1 M plint Keramik ukuran (10 x 40) cm


2.650
Bh
Plint Keramik 10 x 40 Cm
1.140
Kg
Semen Portland
0.003
M3
Pasir pasang
0.100
Kg
Semen warna
0.090
Oh
Pekerja
0.090
Oh
Tukang batu
0.035
Oh
Kepala Tukang Batu
0.005
Oh
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

3,750.00
1,225.00
135,000.00
1,650.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah

N.6 PEKERJAAN PENGECATAN

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

2,430.00
3,201.00
67,500.00
45,000.00
5,625.00
6,750.00
231,148.50
23,114.85

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

95,000.00
11,392.50
2,430.00
3,201.00
67,500.00
45,000.00
5,625.00
6,750.00
236,898.50
23,689.85

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

30,600.00
1,396.50
405.00
165.00
6,750.00
9,000.00
4,375.00
750.00
53,441.50
5,344.15

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

9,937.50
1,396.50
405.00
165.00
6,750.00
9,000.00
4,375.00
750.00
32,779.00
3,277.90

254,263.35

260,588.35

58,785.65

36,056.90

N.6.8

Mengecat 1 M2 bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis cat penutup
16,375.00
0.200
Kg
Cat meni
@ Rp
Rp
31,000.00
0.150
Kg
Dempul
@ Rp
Rp
19,000.00
0.170
Kg
Cat dasar
@ Rp
Rp
61,000.00
0.260
Kg
Cat kayu
@ Rp
Rp
75,000.00
0.070
Oh
Pekerja
@ Rp
Rp
100,000.00
0.009
Oh
Tukang cat
@ Rp
Rp
125,000.00
0.006
Oh
Kepala Tukang Cat
@ Rp
Rp
150,000.00
0.0025
Oh
Mandor
@ Rp
Rp
Rp
Profit Dan Overhead (10%)
Rp
Jumlah
Rp

N.6.10 - SPL Melabur 1 M2 bidang Batu Alam dengan Coating


0.360
Ltr
Coating
0.040
Oh
Pekerja
0.063
Oh
Tukang cat
0.063
Oh
Kepala Tukang Cat
0.0025
Oh
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

55,000.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

N.6.14 Mengecat 1 M2 tembok baru (1 lapis plamir, 1 lapis cat dasar, dan 2 lapis cat penutup)
31,000.00
0.100
Kg
Plamur tembok
@ Rp
Rp
19,000.00
0.100
Kg
Cat dasar
@ Rp
Rp
57,500.00
0.260
Kg
Cat tembok Kw. 1
@ Rp
Rp
75,000.00
0.020
Oh
Pekerja
@ Rp
Rp
100,000.00
0.063
Oh
Tukang cat
@ Rp
Rp
125,000.00
0.0063
Oh
Kepala Tukang Cat
@ Rp
Rp
150,000.00
0.0030
Oh
Mandor
@ Rp
Rp
Rp
Profit Dan Overhead (10%)
Rp
Jumlah
Rp

3,275.00
4,650.00
3,230.00
15,860.00
5,250.00
900.00
750.00
375.00
34,290.00
3,429.00
37,719.00

19,800.00
3,000.00
6,300.00
7,875.00
375.00
37,350.00
3,735.00
41,085.00

3,100.00
1,900.00
14,950.00
1,500.00
6,300.00
787.50
450.00
28,987.50
2,898.75
31,886.25

N.6.14 - SPL Mengecat 1 M2 tembok baru (1 lapis plamir, 1 lapis cat dasar, dan 2 lapis cat penutup), (Eksterior)
31,000.00
3,100.00
0.100
Kg
Plamur tembok
@ Rp
Rp
19,000.00
1,900.00
0.100
Kg
Cat dasar
@ Rp
Rp
57,500.00
14,950.00
0.260
Kg
Cat tembok Kw. 1
@ Rp
Rp
75,000.00
1,500.00
0.020
Oh
Pekerja
@ Rp
Rp
100,000.00
6,300.00
0.063
Oh
Tukang cat
@ Rp
Rp
125,000.00
787.50
0.0063
Oh
Kepala Tukang Cat
@ Rp
Rp
150,000.00
450.00
0.0030
Oh
Mandor
@ Rp
Rp
28,987.50
Rp
Profit Dan Overhead (10%)
2,898.75
Rp
Jumlah
Rp
31,886.25
N.6.23 Mengecat 1 M2 permukaan baja lapis seng (galbani) secara manual sistem 1 lapis
cat mutakhir dengan tebal 200 m
0.300
0.060
0.060
0.012
0.003

Kg
Oh
Oh
Oh
Oh

Cat Kapal
Pekerja
Tukang cat
Kepala Tukang Cat
Mandor

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

148,500.00
75,000.00
100,000.00
125,000.00
150,000.00

Profit Dan Overhead (10%)


Jumlah

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

44,550.00
4,500.00
6,000.00
1,500.00
450.00
57,000.00
5,700.00
62,700.00

N.6.25 SPL Mengecat 1 M2 permukaan baja Galvanis secara semprot sistem 3 lapis cat mutakhir
148,500.00
0.300
Kg
Cat Kapal
@ Rp
Rp
31,000.00
0.010
Ltr
Minyak cat
@ Rp
Rp
75,000.00
0.400
Oh
Pekerja
@ Rp
Rp
100,000.00
0.700
Oh
Tukang cat
@ Rp
Rp
125,000.00
0.070
Oh
Kepala Tukang Cat
@ Rp
Rp
150,000.00
0.020
Oh
Mandor
@ Rp
Rp
Rp
Profit Dan Overhead (10%)
Rp
Jumlah
Rp

44,550.00
310.00
30,000.00
70,000.00
8,750.00
3,000.00
156,610.00
15,661.00
172,271.00

PEKERJAAN LISTRIK
SPL - 01 Mengerjakan 1 Titik Instalasi Penerangan
16.000
M'
Kabel NYM (3x2,5) mm
32.000
Bh
Klem Kabel No. 10
1.000
Bh
Pipa Instalasi Listrik
1.000
Bh
Inbow Dos
4.000
Bh
Las Dop
4.000
Bh
Isolasi
1.000
Bh
T - Dos 5/8"
0.100
Ls
Alat bantu
0.500
Oh
Tukang listrik
0.500
Oh
Kepala Tukang listrik

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

14,040.00
500.00
15,500.00
5,000.00
500.00
25,000.00
500.00
10,000.00
100,000.00
125,000.00

Profit Dan Overhead (10%)


Jumlah
SPL - 02 Mengerjakan 1 Titik Instalasi Stop Kontak
18.000
M'
Kabel NYM (3x2,5) mm
36.000
Bh
Klem Kabel No. 10
5.000
Bh
Pipa Instalasi Listrik
1.000
Bh
Inbow Dos
6.000
Bh
Las Dop
4.000
Bh
Isolasi
1.000
Bh
T - Dos 5/8"
0.100
Ls
Alat bantu
0.500
Oh
Tukang listrik
0.500
Oh
Kepala Tukang listrik

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

14,040.00
500.00
15,500.00
5,000.00
500.00
25,000.00
500.00
10,000.00
100,000.00
125,000.00

Profit Dan Overhead (10%)


Jumlah

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

224,640.00
16,000.00
15,500.00
5,000.00
2,000.00
100,000.00
500.00
1,000.00
50,000.00
62,500.00
477,140.00
47,714.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

252,720.00
18,000.00
77,500.00
5,000.00
3,000.00
100,000.00
500.00
1,000.00
50,000.00
62,500.00
570,220.00
57,022.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

27,720.00
150,155.01
5,544.00
16,649.80
83,553.62
283,622.43
28,362.24

524,854.00

627,242.00

PEKERJAAN SALURAN
SPL

Mengerjakan 1 M' Saluran Keliling Bangunan


0.420
M3
Galian Tanah
1.400
M2
Pas. Trassram 1/2 Bt. 1pc:3pp
0.035
M3
Pasir Alas
0.021
M3
Rabat Beton Alas Saluran t=7
1.400
M2
Plester Trasram

@ Rp
@ Rp
@ Rp
@ Rp
@ Rp

66,000.00
107,253.58
158,400.00
792,847.70
59,681.16

Profit Dan Overhead (10%)


Jumlah

311,984.67

DAFTAR HARGA BAHAN DAN UPAH


Tahun Anggaran 2015
I.

HARGA BAHAN
BAHAN BATU, PASIR, CIPPING DAN BATU MERAH
Batu gunung
Batu Kali
Batu belah 7/10
Batu pecah 5/7
Pasir pasang
Pasir beton
Pasir beton (Kg)
Pasir urug
split/chipping 2-3 cm
split/chipping 2-3 cm(Kg)
Tanah Timbunan
Tanah timbunan (Pilihan)
Krikil
Krikil (Kg)
Sirtu
Batu merah
Air
Ready Mixed K300
BAHAN SEMEN
Semen PC 50kg (zak)
Semen Portland
Semen PC 40 kg (zak)
Semen Nat
Semen Putih
Semen warna
BAHAN BESI
Besi beton polos
Besi beton ulir
Wiremesh M.8
Wiremesh M.10
Besi Siku L. 50. 50. 5
Besi Siku L. 60. 60. 6
Besi Siku L. 70. 70. 7
Besi Profil Kanal C. 125 x 50 x 20 x 2,3
Besi Profil Kanal C. 150 x 50 x 20 x 3,2
Besi Profil H Beam 400 x 400 x 13 x 21
Besi Profil H Beam 300 x 300 x 10 x 15
Besi Profil H Beam 200 x 200 x 8 x 12
Besi Profil IWF
Plat Baja T = 10 mm
Plat Baja T = 8 mm
Plat Baja T = 5 mm
Plat Baja T = 2 mm
Kawat beton
Kawat Rang 3 x 3
Paku Biasa 1/2" - 1"
Paku biasa 2" - 5"
Paku asbes
Paku beton
Paku pancing
Paku Sekrup Galvaniz Dia. 3 mm
Besi Hollow 20 x 40 x 1.8 mm
Besi Hollow 30 x 30 x 1.8 mm
Besi Hollow 30 x 30 x 2.3 mm
Besi Hollow 40 x 40 x 1.8 mm
Besi Hollow 40 x 40 x 2.3 mm

SAT
M3
M3
M3
M3
M3
M3
Kg
M3
M3
Kg
M3
M3
M3
Kg
M3
Bh
Ltr
M3

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

HARGA
167,000.00
184,000.00
237,000.00
256,000.00
135,000.00
148,000.00
105.71
100,000.00
267,000.00
197.78
80,000.00
110,000.00
277,000.00
205.19
177,000.00
550.00
100.00
880,000.00

Zak
Kg
Zak
Kg
Zak
Kg

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

61,250.00
1,225.00
49,000.00
10,000.00
53,000.00
1,650.00

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
M2
Kg
Kg
Kg
Dos
Kg
Bj
M
M
M
M
M

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

11,500.00
12,500.00
10,000.00
10,500.00
12,212.39
11,287.50
11,864.79
9,686.35
10,170.12
15,000.00
15,000.00
15,000.00
12,408.00
15,263.38
15,775.40
16,452.00
16,488.00
21,000.00
25,000.00
17,500.00
17,500.00
21,500.00
27,500.00
27,500.00
1,500.00
23,400.00
22,500.00
28,600.00
31,200.00
40,000.00

Besi Hollow Galvanis 2 x 4 MB, Tbl 0.7 mm


Besi Hollow Galvanis 4 x 4 MB, Tbl 0.7 mm
Besi strip
Baut - Baut
Baut Dia. 16 mm
Paku sekrup 3,5"
Paku sekrup 4"-6"
Paku Sekrup + Mor + Pelapis
Jarum Pengeras
Pintu Aluminium
List Alluminium strip
Aluminium Composite Panel
Srews/sekrup

M
M
Kg
Bh
Bh
Kg
Kg
Bh
Bh
M2
M
M2
Bh

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

10,800.00
14,100.00
12,500.00
10,000.00
15,000.00
15,000.00
15,000.00
2,500.00
275,000.00
975,000.00
10,000.00
275,000.00
1,000.00

BAHAN PLAPON DAN PARTISI


Multipleks 1.22 x 2.44 x 4 mm
Multipleks 1.22 x 2.44 x 6 mm
Multipleks 1.22 x 2.44 x 9 mm
Gypsumboard 9 mm
Calsyboard 4 mm
Teakwood Uk. 80 x 240 x 4 mm
Plywood Uk.80x240 cm Tebal 4 mm
Glass Wool DN City 48 kg/m2, Uk. 1.2 x 2.3 m, T = 5 cm
Jalusi Aluminium
Ramsel nails
UB 888/400 Compoud
Isolasi Gypsun

Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Roll
M2
Bh
Kg
Roll

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

52,500.00
98,000.00
130,000.00
63,500.00
70,000.00
65,000.00
85,000.00
230,000.00
275,000.00
5,000.00
9,000.00
35,000.00

BAHAN KERAMIK
Tegel keramik 40 x 40 cm (putih)
Tegel keramik 40 x 40 cm (Warna)
Tegel keramik 30 x 30 cm (putih)
Tegel keramik 30 x 30 cm (Warna)
Tegel keramik 20 x 20 cm (kasar)
Tegel keramik 20 x 20 cm (putih)
Tegel keramik 20 x 25 cm ( warna )
Tegel keramik 10 x 10 cm ( putih )
Tegel keramik 30 x 50 Cm
Tegel keramik Anti noda, T = 1 Cm, 60 x 60 Cm
Tegel keramik Anti noda, T = 1 Cm, 20 x 60 Cm
Granit Lantai Type Starwhite, t = 2 cm
Granit Dinding Type Starwhite, t = 2 cm
Marmer Lantai Ex Ujungpandang, t = 2 cm
Marmer Dinding Ex Ujungpandang, t = 2 cm
Plint Granit Type Starwhite, t = 2 cm
Plint Keramik 15 x 60 cm
Plint Keramik 10 x 40 cm
Batu Alam Undersheet

Bh
Bh
Bh
Bh
Bh
Bh
Dos
Dos
Bh
Bh
Bh
M2
M2
M2
M2
M
M
M
M2

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

14,166.67
15,000.00
6,818.18
7,727.27
3,000.00
2,600.00
4,250.00
500.00
13,571.43
81,227.44
27,010.80
420,000.00
420,000.00
638,000.00
638,000.00
35,000.00
18,000.00
3,750.00
190,000.00

BAHAN ATAP
Genteng keramik Natural
Karet Pelapis Genteng
Nok genteng keramik Natural
Atap Genteng Bitumen Uk. 106 x 40 x 0.3
Nok Atap Bitumen Uk. 50 x 90 x 0.3
Atap Zincalume AZ 150 G 550, T = 0.4 mm Colorbond
Nok Atap Zincalume AZ 150 G 550, T = 0.4 mm Colorbond
Atap Zincalume Type Flexlok 0.6 mm tct Zincalume + Insulation
Ridge Capping 0.45 TCT Colorbond 580 WIDTH
Custom Flashing 0.45 MM TCT Zincalume 406 WIDTH
Flexlok Clip
Polycarbonate, Tbl = 10 mm, Uk. 2,10 x 11,80 M
Rangka Atap Baja Ringan

Bh
M2
Bh
Lbr
Lbr
M2
M'
M2
M'
M'
Pcs
M2
M2

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

16,000.00
10,000.00
20,500.00
70,000.00
95,500.00
125,000.00
95,000.00
279,776.00
173,875.00
63,700.00
15,000.00
195,000.00
220,000.00

Aluminium foil/sisalation single type


Ancor / Seng Pelapis Genteng

M2
Rol

Rp.
Rp.

15,000.00
2,500,000.00

BAHAN SENG/ALUMINIUM
Seng plat BJLS 0.30
Seng plat BJLS 0.28
Seng gelombang BWG 34 " BJLS 0.18 mm
Seng gelombang BWG 33 " BJLS 0.22 mm
Seng gelombang BWG 32 " BJLS 0.30 mm
Seng gelombang BWG 28 " BJLS 0.35 mm
Kusen Aluminium Warna 4" x 1 3/4"
Bingkai Pintu Aluminium Warna 4" x 1 1/2"
Bingkai Pintu / Rangka Partisi Aluminium Warna 3" x 1 1/2"
Bingkai Jendela Aluminium Warna (2"x1")
Cubical Toilet 12 mm Laminated (Harga Terpasang)

Lbr
Lbr
Kaki
Kaki
Kaki
Kaki
M'
M'
M'
M'
M'

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

65,000.00
75,000.00
7,000.00
7,500.00
9,000.00
11,750.00
105,891.54
85,100.00
76,187.50
65,780.00
3,250,000.00

BAHAN KAYU
Kayu klas I (balok) untuk kuda-kuda
Kayu klas II (balok)
Kayu klas II (papan)
Kayu klas III (balok)
Kayu klas III (papan)
Kayu klas I (papan) listplank dan pintu/jendela
Dolken kayu 8-10/400 cm
Kayu klas I (balok) untuk kosen pintu/jendela
HPL Uk. 120 x 240
Woodplank T. 8 x 300 x 4000 mm

M3
M3
M3
M3
M3
M3
Btg
M3
Lbr
Lbr

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

8,550,000.00
4,550,000.00
4,850,000.00
2,800,000.00
3,275,000.00
9,550,000.00
25,000.00
10,050,000.00
185,000.00
80,000.00

BAHAN KUNCI, ENGSEL, GRENDEL DAN HAK ANGIN


Kunci tanam biasa (2 x Slag)
Kunci tanam silinder
Kunci selot
Kunci selot biasa
Kunci tanam biasa
Flooring engsel
Engsel pintu Kw.1
Engsel jendela Kw.1
Grendel jendela Kw.1
Kait angin
Grendel tanam
Door closer/espanyolet
Door Holder
Door stop

Bh
Bh
Bh
Bh
Bh
Psg
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

227,000.00
350,000.00
500,000.00
225,000.00
150,000.00
900,000.00
28,000.00
25,000.00
28,000.00
20,000.00
150,000.00
250,000.00
150,000.00
75,000.00

BAHAN KACA
Kaca bening 3 mm
Kaca bening 5 mm
Kaca buram 5 mm
Kaca Ryben 5mm
Kaca bening 8 mm
Kaca Stopsol Laminated 8 mm
Kaca nako lengkap teralis
Pintu Kaca Tempered 12 mm
Karet List Kaca

M2
M2
M2
M2
M2
M2
set
M2
M'

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

100,000.00
125,000.00
110,000.00
175,000.00
350,000.00
667,700.00
350,000.00
1,506,750.00
2,500.00

BAHAN CAT
Cat tembok Kw. 1
Cat tembok Kw. 1 (Exterior)
Cat tembok Kw. 2
Cat Seng
Cat kayu
Cat Besi

Kg
Kg
Kg
Kg
Kg
Kg

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

57,500.00
65,000.00
31,000.00
78,000.00
61,000.00
61,000.00

Minyak bekisting
Cat meni
Plamur tembok
Lem kayu
Residu
Kertas amplas
Dempul
Minyak cat
Cat dasar
Cat dasar Kayu
Cat Waterproofing
Cat Zincromate
Cat Epoxy
Coating
Cat Kapal

Ltr
Kg
Kg
Kg
Ltr
Lbr
Kg
Kg
Kg
Kg
Ltr
Kg
Kg
Ltr
Kg

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,500.00
16,375.00
31,000.00
25,000.00
6,400.00
3,000.00
31,000.00
31,000.00
19,000.00
56,000.00
75,000.00
71,500.00
65,600.00
55,000.00
148,500.00

BAHAN SANITASI
Closet duduk Lengkap
Bath tub + Acs
Closet jongkok
Urinoir Type U57, Lengkap
Wastafel Keramik
Roof drain
Floor drain Stainlees
Seal tape
Kran air Biasa 1/2" - 3/4"
Kran air ganda 1/2" - 3/4"
Kran Shower
Shower + Acc
Stop kran
Washbasin stainless stel
Waterdrain + Accesoriss
Reservoir stainless steel Kap. 1 M3
Tempat Sabun Dinding
Saringan got

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Set
Bh
Bh
Bh
Bh
Bh
Bh

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,850,000.00
8,500,000.00
230,000.00
1,900,000.00
475,000.00
125,000.00
50,000.00
3,500.00
50,500.00
250,000.00
75,000.00
275,000.00
76,000.00
451,000.00
65,000.00
4,000,000.00
150,000.00
50,000.00

BAHAN PIPA
Pipa PVC AW Dia. 15 mm (1/2'')
Pipa PVC AW Dia. 20 mm (3/4'')
Pipa PVC AW Dia. 25 mm (1'')
Pipa PVC AW Dia. 32 mm (1 1/4'')
Pipa PVC AW Dia. 40 mm (1 1/2'')
Pipa PVC AW Dia. 50 mm (2'')
Pipa PVC AW Dia. 65 mm (2 1/2'')
Pipa PVC AW Dia. 80 mm (3'')
Pipa PVC AW Dia. 100 mm (4'')
Pipa PVC AW Dia. 150 mm (6'')
Pipa PVC AW Dia. 250 mm (10'')
Pipa PVC Type D, Dia. 150 mm (6'')
Pipa PVC Type D, Dia. 100 mm (4'')
Pipa PVC Type D, Dia. 80 mm (3'')
Pipa PVC Type D, Dia. 65 mm (2 1/2'')
Pipa PVC Type D, Dia. 50 mm (2'')
Pipa PVC Air Panas 1/2''
Pipa GIP Medium Class Dia. 150 mm (6")
Pipa GIP Medium Class Dia. 100 mm (4")
Pipa GIP Medium Class Dia. 80 mm (3")
Pipa GIP Medium Class Dia. 65 mm (2 1/2")
Pipa GIP Medium Class Dia. 50 mm (2")
Pipa GIP Medium Class Dia. 40 mm (1 1/2")
Pipa GIP Medium Class Dia. 32 mm (1 1/4")
Pipa GIP Medium Class Dia. 25 mm (1")
Pipa GIP Medium Class Dia. 20 mm (3/4")

M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,625.00
8,000.00
11,000.00
20,000.00
24,125.00
28,750.00
40,625.00
58,500.00
75,375.00
102,500.00
289,406.25
252,750.00
118,250.00
78,750.00
55,000.00
38,125.00
54,600.00
507,500.00
315,000.00
210,833.33
165,000.00
100,833.33
81,405.50
76,444.00
50,500.00
30,000.00

Pipa GIP Medium Class Dia. 15 mm (1/2")


Pipa BS Medium Class Dia. 100 mm (4")
Pipa BS Medium Class Dia. 80 mm (3")
Pipa BS Medium Class Dia. 65 mm (2 1/2")
Pipa BS Medium Class Dia. 50 mm (2")
Pipa BS Medium Class Dia. 40 mm (1 1/2")
Pipa BS Medium Class Dia. 32 mm (1 1/4")
Pipa BS Medium Class Dia. 25 mm (1")
Pipa BS Medium Class Dia. 20 mm (3/4")
Pipa BS Medium Class Dia. 15 mm (1/2")
Pipa Black Steel Pipe STK 41-JLS. G-3444, 7"
Pipa Black Steel Pipe STK 41-JLS. G-3444, 7" (Kg)
Pipa Black Steel Pipe STK 41-JLS. G-3444, 6"
Pipa Black Steel Pipe STK 41-JLS. G-3444, 6" (Kg)
Pipa Black Steel Pipe STK 41-JLS. G-3444, 5"
Pipa Black Steel Pipe STK 41-JLS. G-3444, 5" (Kg)
Pipa Black Steel Pipe STK 41-JLS. G-3444, 4"
Pipa Black Steel Pipe STK 41-JLS. G-3444, 4" (Kg)
Pipa Black Steel Pipe STK 41-JLS. G-3444, 3"
Pipa Black Steel Pipe STK 41-JLS. G-3444, 3" (Kg)
Pipa Black Steel Pipe STK 41-JLS. G-3444, 2,5"
Pipa Black Steel Pipe STK 41-JLS. G-3444, 2,5" (Kg)
Lem pipa
Pipa Stainless Steel 4"
Pipa Stainless Steel 3"
Hollow Stainless Steel, Uk. 20 x 20 mm
Hollow Stainless Steel, Uk. 40 x 40 mm
Hollow Stainless Steel, Uk. 40 x 60 mm

M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
Kg
M'
Kg
M'
Kg
M'
Kg
M'
Kg
M'
Kg
Klg
M'
M'
M'
M'
M'

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

25,700.00
231,000.00
177,870.00
136,710.00
107,100.00
75,810.00
65,940.00
51,240.00
33,180.00
25,620.00
418,916.67
17,310.61
339,166.67
19,054.31
300,116.67
20,007.78
194,333.33
20,327.75
128,333.33
18,928.22
105,416.67
18,269.79
35,000.00
201,500.00
140,833.33
50,995.00
104,340.00
131,250.00

BAHAN LISTRIK
Lampu Pijar 40 Watt
Lampu Pijar 15 Watt
Lampu Downlight DL PLC 9 Watt
Lampu RMI 2 x 40 Watt, Tutup Metal Louvre Lengkap
Lampu TL 1 x 40 Watt
Lampu SL-E 15 Watt
Lampu SL-E 18 Watt
Lampu SL-E 23 Watt
Lampu Hias
Ceiling Fan For Lavatory/Wc
Stop Kontak Kw. 1 16A
Stop Kontak AC Kw. 1 c/w Fuse
Saklar Tunggal Kw. 1
Saklar Ganda Kw. 1
Klem Kabel No. 10
Pipa Instalasi Listrik
Inbow Dos
Las Dop
Isolasi
T - Dos 5/8"
Fitting
Kabel NYM (2x2,5) mm
Kabel NYM (3x2,5) mm
Kabel NYY (4x6) mm
Kabel NYY (4x10) mm
MCB 6A Ex. Supran
MCB 32A Ex. Supran
Fuse Box
Tranking kabel
Kabel NYFGby 4 x 16 mm2
Alat bantu

Bh
Bh
Bh
Set
Set
Bh
Set
Bh
Set
Set
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
M'
M'
M'
M'
Bh
Bh
Bh
M'
M'
Ls

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

6,000.00
5,000.00
160,000.00
675,000.00
93,000.00
33,600.00
36,000.00
42,000.00
3,850,000.00
325,000.00
48,000.00
75,000.00
40,000.00
45,000.00
500.00
15,500.00
5,000.00
500.00
25,000.00
500.00
15,500.00
10,752.00
14,040.00
42,291.00
67,465.00
61,200.00
85,000.00
150,000.00
210,000.00
50,000.00
10,000.00

BAHAN LAIN - LAIN


Tiang Pancang 40 Cm, segmen Bottom mamira
Tiang Pancang 40 Cm, Segmen Bottom (Pencil Shoe)
Tiang Pancang 40 Cm, Segmen Middle
Gorong-gorong/Buis Beton 80 Cm, T = 100 Cm
Gorong-gorong/Buis Beton 100 Cm, T = 100 Cm
Electroda 6 mm
Spacer/formite/penjaga jarak bekisting
Bondek Superdyma T50
Bambu, Uk. Besar
Tali Ijuk
Sealent
Sealent (Kg)
Sektrup Fixer
Pompa Air Booster (Lengkap Preasure Tank Dan Pengabelan)
Karpet KW 1
Underlayer/rubber corrugate
Lem Karpet

Solar

Bensin

Minyak pelumas
Mesin Las
chainsaw

Sewa Alat
Buldozer 110 HP
Pompa dan Conveyor beton

M'
Rp.
M'
Rp.
M'
Rp.
Bh
Rp.
Bh
Rp.
Kg
Rp.
Bh
Rp.
M2
Rp.
Btg
Rp.
Kg
Rp.
Tube Rp.
Kg
Rp.
Bh
Rp.
Unit
Rp.
M2
Rp.
M2
Rp.
Kg
Rp.
Ltr
Rp.
Ltr
Rp.
Ltr
Rp.
Jam
Rp.
S/h
Rp.
Jam
Rp.
Jam
Rp.
Sewa/Ha
Rp.

510,400.00
560,000.00
546,700.00
200,000.00
275,000.00
65,000.00
7,500.00
175,000.00
25,000.00
65,000.00
90,000.00
150,000.00
1,850.00
1,900,000.00
350,000.00
75,000.00
17,500.00
6,500.00
7,300.00
30,000.00
75,000.00
2,500,000.00
75,000.00
275,000.00
1,000,000.00

II.

HARGA UPAH KERJA


Tukang kayu
Tukang las
Tukang Pipa
Tukang gali
Tukang batu
Tukang besi
Tukang cat
Tukang listrik
Tukang Taman
Kepala Tukang Kayu
Kepala Tukang Batu
Kepala Tukang Cat
Kepala Tukang Listrik
Kepala Tukang Pipa
Kepala Tukang Besi
Mandor
Pekerja
Operator terampil
Pembantu operator
Sopir terampil
Pembantu sopir
Buruh tak terampil
Buruh semi terampil
Buruh terampil
Pilling Crew
Pilling Master
Surveyor
Ass. Surveyor
Recorder

Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Makassar,

100,000.00
100,000.00
100,000.00
100,000.00
100,000.00
100,000.00
100,000.00
100,000.00
100,000.00
125,000.00
125,000.00
125,000.00
125,000.00
125,000.00
125,000.00
150,000.00
75,000.00
125,000.00
90,000.00
125,000.00
90,000.00
65,000.00
70,000.00
75,000.00
100,000.00
95,000.00
120,000.00
90,000.00
75,000.00

2015

KONSULTAN PERENCANA

PT. PRAPRIMADANI PRATAMA

Hj. SUMARNI, SH
Direktris Utama

KEMENTERIAN RISET, TEKNOLOGI DAN PENDIDIKAN TINGGI

FAKULTAS ILMU KELAUTAN DAN PERIKANAN


UNIVERSITAS HASANUDDIN
Jalan Perintis Kemerdekaan KM. 10, Makassar Sulawesi Selatan 90245

RENCANA ANGGARAN BIAYA


RENCANA KERJA DAN SYARAT-SYARAT

PEKERJAAN :

DED PEMBANGUNAN GEDUNG FAKULTAS ILMU KELAUTAN DAN PERIKANAN


UNIVERSITAS HASANUDDIN

TAHUN ANGGARAN 2015

Konsultan Perencana :