Anda di halaman 1dari 1

EQUIP STORE

300x150
FAD, 145 L/s

200x100

1000x400
EAD T/A

See Drawing No. 3350-L57-100-6 for Continuation


300x150
FAD, 145 L/s

AG-069

200x150

MH

KG2 - CLASSROOM 07

AG-070

WC-T10
G-0-27
AG-059(2 Nos.)

700x350

A-0-27
UTILITY

700x300

300x150
FAD, 145 L/s

150x100

200x100
KG2 - CLASSROOM 05

250x200

300x150
EAD, 130 L/s

150x150

AG-082

NRD

AG-081

1.
2.

150x100

AG-077

NRD WC-T10
AG-072
200x100

650x350

DUC

AG-075

AG-056

150x150

1050x400
FAD F/A

550x300

300x150
EAD, 130 L/s

250x150
EAD, 130 L/s

150x150
FAD, 62 L/s

600x350

6.

150x100

AG-073

150x100

5.

WC-T10

AG-080

KG2 - CLASSROOM 01

3.

150x100

AG-071

WC-T11

G-0-29
(2 Nos.)

4.

A-0-29
UTILITY

G-0-28
WC-T10 (2 Nos.)

WC-T10

GENERAL NOTES

250x200
FAD, 145 L/s

G-0-22
(2 Nos.)

600x350

AG-079 A-0-28

300x150
EAD, 130 L/s

250x200

WATER COOLER

BUILT IN FRIDGE/
MICROWAVE

800x350
STAFF ROOM

KG2 - CLASSROOM 06
650x350
AG-078
UTILITY

300x150
FAD, 145 L/s

100x100
EAD, 19 L/s

1000x400

650x300

AG-058

WC-T11

DUC

AG-076

AG-057

WC-T10

NRD

250x200
FAD, 145 L/s

7.

250x250

This Drawing is not to be scaled.


All dimensions shown are in millimeters and do not take into
account applied finishes unless specifically indicated otherwise.
Any omissions or discrepancies found shall be reported to the
Architect / Engineer immediately.
Levels are given in meters to three decimal places above survey
datum.
This drawing is to be read in conjunction with the relevant section
of the specification and schedules.
The contractor shall submit full shop / setting out drawing for
approval (based on site dimensions) prior to commencement of
any site works, placing of orders, manufacture of fittings, fixtures
and components.
For External Finishes refer to Landscape Drawings and
Specifications.

KEY PLAN

550x350

350x250

COURTYARD

300x150
EAD, 130 L/s

KG2 - CLASSROOM 08

AG-087

AG-074

450x300

300x250

NRD
500x300
350x300

150x100

150x150

500x300
M2
MOVEMENT JOINT

450x300
M1
NRD

250x200

250x200

AG-090

AG-091

NRD

300x150
EAD, 130 L/s

300x250
G-0-30
(2 Nos.)

NRD
NRD

KG1 - CLASSROOM 04

AG-088

AG-092

200x100

300x150
EAD, 130 L/s

300x150
EAD, 130 L/s

250x200

250x200

KG1 - CLASSROOM 05

KG2 - CLASSROOM 09

AG-093

AG-099

450x250

FINISH FLOOR LEVEL +0.480 = F.F.L. +8.40 ON SITE


REVISIONS

250x200

No. DATE

DESCRIPTION

C0

CONSTRUCTION ISSUE

BY

300x150
FAD, 145 L/s

250x200
FAD, 145 L/s

250x200
FAD, 145 L/s

300x150
FAD, 145 L/s

200x100

ZONE-B

NRD

300x150
EAD, 130 L/s

KG1 - CLASSROOM 03
500x250

ZONE-A

350x250

250x200

AG-055

150x150

WC-T10

UTILITY
A-0-30
AG-089

300x150
350x250
EAD, 130 L/s
KG1 - CLASSROOM 02
ROAD LVL + 7.28M

WC-T10

250x200
FAD, 145 L/s

15-06-15

DA

3
4
5
6
7

L
WC-T10
G-0-31
AG-054
(2 Nos.)

A-0-31
UTILITY

WC-T10

AG-053

300x250

350x250

AG-096

10
11

150x100
12

AG-100

13

WC-T10

150x100

AG-101

A-0-33
UTILITY

AG-094

150x100

G-0-33
(2 Nos.)

200x100

A-0-32
UTILITY

AG-052

WC-T10

300x200

200x100

AG-095

150x100

WC-T10

WC-T10
NRD

See Drawing No. 3350-L57-100-2 for Continuation

FH

G-0-32
(2 Nos.)

NRD
LIGHTWELL

AG-102

14

150x100
15
16
17

AG-098

18
19

300x150
FAD, 145 L/s

250x200
FAD, 145 L/s

20

250x200
FAD, 145 L/s

21

KG1 - CLASSROOM 01

COURTYARD

KG1 - CLASSROOM 06

KG2 - CLASSROOM 10

AG-051

AG-120

AG-097

AG-103

300x150
EAD, 130 L/s

300x150
EAD, 130 L/s

GATE

UP

22

300x150
EAD, 130 L/s

STAIR A04
A1-104

1
2
FFL +7.60M

FFL +7.5M

KGKG
ENTRANCE
ENTRANCE

300x150
EAD, 130 L/s

LIGHTWELL
AG-111

ENTRANCE LOBBY

300x200

Godwin Austen Johnson


Architects
STRUCTURAL ENGINEERS

OWNER

AG-050

FFL. + 8.38M

FORTES HOLDING

KG1 - CLASSROOM 09

AG-105

150x150
FAD, 50 L/s

WC-T07G-0-34
AG-119
150x100
300x150
FAD, 145 L/s

150x100
EAD, 26 L/s

300x150
FAD, 145 L/s
KG1 - CLASSROOM 08

250x200

NRD

300x150
FAD, 145 L/s
KG1 - CLASSROOM 07

200x100

AG-116

ISSUED FOR

CONSTRUCTION

300x150
FAD, 145 L/s

KG LIBRARY

AG-112

AG-110

AG-107

AG-113A-0-35

AG-118

250x200

300x150
EAD, 130 L/s

NRD

PROJECT

G-0-36
(2 Nos.)

WC-T10

UTILITY

SECURITY ROOM

300x150
EAD, 130 L/s

300x150
EAD, 130 L/s

WC-T10

WC-T10

AG-115

AG-114

300x250

300x250

12a

150x100

UTILITY

12b

AG-106

A-0-36

WC-T10

150x150

150x100

DRAWING TITLE

10 11 12 13 14 15 16 17 18 19 20 21

G-0-35
(2 Nos.)

FFL +7.70M

MECHANICAL SERVICES
GROUND FLOOR PLAN, PART-5
VENTILATION LAYOUT

150x150
300x300

300x150
FAD, 145 L/s

250x150
FAD, 110 L/s

PRIMARY
ENTRANCE

JVT SCHOOL
Plot No. JVT05SCP001
Jumeirah Village Triangle, Dubai, UAE

AG-108

PRIMARY
ENTRANCE

200x100

Drawn

MAIN LOBBY

STAIR A05

STORE

AG-126

AG-127

AG-128

500x300

Date

KG1 - CLASSROOM 10
AG-109

Project No.

FFL +8.10M

250x150
EAD, 99 L/s

08.06.2014 Scale
Zone

3350

EL Approved

OP

1:101 @ A1

Drawing No.

L57-100-5

Rev.

C0
Consecutive No.

300x150
EAD, 130 L/s
This drawing, the designs and details shown are the copyright of
GODWIN AUSTEN JOHNSON and shall not be copied or reproduced in
any form without their written consent.

NRD
1

FA Checked

Authority Dwg. No.

300x200

10 11 12 13 14 15 16 17 18 19 20 21

01

A1

DESIGN ARCHITECTS & MEP ENGINEERS

02

03

Original Sheet FILE PATH : F:\- PROJECTS CURRENT\3350 - Fortes School\LIVE\ACAD\MEP DEPT\Sheet Files\Mechanical\57-Ventilation\3350-L57-100-5.dwg
Size

04

05

See Drawing 06
No. 3350-L57-100-4
for Continuation
07

350x250

08

09

10

11

12a

12b

T +971 4 3237555 E mail@gaj-uae.ae


F +971 4 3237717 W www.gaj-uae.ae
PO Box 7185 Dubai United Arab Emirates

Anda mungkin juga menyukai