Schedule-3A/12
Special Tools and Tackle
The list of special maintenance and erection tools and tackles offered
along with the Offer.
Sl.
No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
Particulars
Nos.
STG Tools
Special spanner
reamer
Electric heater and controlling box
Bridge-type gauge
Installing bearing
Tools disassembling bearing bush
Piston ring field tool
metering
Tool for lifting casing sling (HP/MP outer casing)
Tool for lifting casing sling (HP inner casing)
Tool for lifting ST.rotor
Tool for lifting casing sling (LP outer casing)
Tool for lifting casing sling (LP inner casing)
Tool for lifting diaphragm and diaphragm sleeve
Dismantle tools for rotor
Supplying one set of tool when delivering the first
machine for the same type.
Dismantle tools for guard ring of fan
Supplying one set of tool when delivering the first
machine for the same type.
1set
1set
1set
1set
1set
1set
1set
16set
1set
1set
1set
1set
1set
1set
1set
1set
SG Tools
1
2
3
Feb 2013
1 set
1 set
Each
2 sets
Page 1 of 3
4
5
1
2
1 set
ESP Tools
Special tools for emitting frame lifting
Stretching Tool
1 set
2set
1 Set
1
1
1
1
Fan Tools
Testing gauge list
Standard pitot tube
U pressure metering
Temperature metering
Box air pressure metering
Tigital rotor speed metering
Three phases power meter
The joint with six pass
The joint with three pass
Rubber piping
Pressure meter joint
1 Set
4 Set
6 Set
4 Set
1 Set
1 Set
1 Set
2 Set
4 Set
50m
6 Set
1
2
3
4
5
CEP Tools
spanner
File
Disassemble file
The weight to match the center
spanner
1set
1set
1set
1set
1set
1
2
3
4
5
6
7
BFP Tools
support and guide equipments for suction-out side
support and guide equipments for suction side
Dismantle equipments for balance drum and plate
Dismantle equipments for Thrust bearing
Spanner 7500Nm
Spanner
Screw knife
1set
1set
1set
1set
1set
1set
1set
1
2
3
4
5
6
7
8
9
10
11
Feb 2013
MPL/Technical Offer/Schedule-3A/12
Set
Set
Set
Set
Page 2 of 3
Seal of Company
Signature: .............................
Name: .............................
Designation: .............................
Feb 2013
MPL/Technical Offer/Schedule-3A/12
Page 3 of 3