Design parameters :
River/Nalla Discharge Q =
144.70
368.50 m
371.20 m
cumecs
367.50
1
16.5
2
1.75
0.6
0
3.7
2.6
3.2
0
t/m2
t/m3
t/m3
m
m
m
m
m
0.5
0.49
2.04
367.50
12.03
1.47
5.55
0.3
0.00
1.60
0.00
1.90
8.42
2.33
1.60
2.13
tonnes
m from
tonnes
m from
tonnes
m from
tonnes
m from
tonnes
m from
368.50 m
2.32
3.13
1.90
above
2.32
2.32
B
B
B
B
B
tonnes
m from B
t/m2
tonnes
m above B
t/m2
tonnes
acting at height =
(ii) Saturated earth pressure
(a) Submerged earth pressure
Intensity of horizontal pressure at bottom
0.50
m above B
0.49
0.25
0.33
t/m2
tonnes
m above B
acting at height
(b) Water pressure
367.50
Particular of Forces
12.03
1.47
0.3
1.60
1.90
2.33
2.13
5.55
0.00
0.00
8.42
-1.60
24.39
367.50
3.2
3.13
2.32
1.90
0.50
0.25
0.50
1.05
7.23
0.33
0.33
1.85
M M
26.25
ton.m
The eccentricity (e) about C.G. of Section at foundation block LVL =B/2 - x =
Check eccentricity e as compared to B/6 as (e<B/6)
No tension develops at any where within base section (Uncracked)
Maximum tension at heel =
Sliding Factor =
0.13
H
V
6e
M
M
6e
1.08
0.52
15.11
0.30
3.07
1.69
Safe in Sliding
m
1
tonnes/m2=
Safe
m from A
0.00
ton/m2
Safe
in Batter
b
5
c
M+ (t.m)
M-(t.m)
17.64
1.67
0.00
0.00
19.64
3.41
5.94
1.16
38.94
0.08
0.17
1.94
12.69
N/mm2
0.15
N/mm2
144.70
366.50 m
369.20 m
cumecs
365.50
1
16.5
2
1.75
0.6
0
3.7
2.6
3.2
0
t/m2
t/m3
t/m3
m
m
m
m
m
0.5
0.49
2.04
365.50
12.03
1.47
5.55
0.3
0.00
1.60
0.00
1.90
8.42
2.33
1.60
2.13
tonnes
m from
tonnes
m from
tonnes
m from
tonnes
m from
tonnes
m from
366.50 m
2.32
3.13
1.90
above
2.32
2.32
B
B
B
B
B
tonnes
m from B
t/m2
tonnes
m above B
t/m2
tonnes
acting at height =
(ii) Saturated earth pressure
(a) Submerged earth pressure
Intensity of horizontal pressure at bottom
0.50
m above B
0.49
0.25
0.33
t/m2
tonnes
m above B
acting at height
(b) Water pressure
365.50
Particular of Forces
12.03
1.47
0.3
1.60
1.90
2.33
2.13
5.55
0.00
0.00
8.42
-1.60
24.39
365.50
3.2
3.13
2.32
1.90
0.50
0.25
0.50
1.05
7.23
0.33
0.33
1.85
M M
26.25
ton.m
The eccentricity (e) about C.G. of Section at foundation block LVL =B/2 - x =
Check eccentricity e as compared to B/6 as (e<B/6)
No tension develops at any where within base section (Uncracked)
Maximum tension at heel =
Sliding Factor =
0.13
H
V
6e
M
M
6e
1.08
0.52
15.11
0.30
3.07
1.69
Safe in Sliding
m
1
tonnes/m2=
Safe
m from A
0.00
ton/m2
Safe
e in Batter
b
5
c
M+ (t.m)
M-(t.m)
17.64
1.67
0.00
0.00
19.64
3.41
5.94
1.16
38.94
0.08
0.17
1.94
12.69
N/mm2
0.15
N/mm2
144.70
362.50 m
366.00 m
cumecs
361.50
1
16.5
2
1.75
0.6
0
4.5
3.15
3.75
0
t/m2
t/m3
t/m3
m
m
m
m
m
0.5
0.49
2.04
361.50
17.72
1.65
6.75
0.3
0.00
1.88
0.00
2.18
12.40
2.70
1.88
2.50
tonnes
m from
tonnes
m from
tonnes
m from
tonnes
m from
tonnes
m from
362.50 m
3.00
5.25
2.17
above
3.00
3.00
B
B
B
B
B
tonnes
m from B
t/m2
tonnes
m above B
t/m2
tonnes
acting at height =
(ii) Saturated earth pressure
(a) Submerged earth pressure
Intensity of horizontal pressure at bottom
0.50
m above B
0.49
0.25
0.33
t/m2
tonnes
m above B
acting at height
(b) Water pressure
361.50
Particular of Forces
17.72
1.65
0.3
1.88
2.18
2.70
2.50
6.75
0.00
0.00
12.40
-1.88
35.00
361.50
3.75
5.25
3.00
2.17
0.50
0.25
0.50
1.27
10.27
0.33
0.33
2.25
M M
44.07
ton.m
The eccentricity (e) about C.G. of Section at foundation block LVL =B/2 - x =
Check eccentricity e as compared to B/6 as (e<B/6)
No tension develops at any where within base section (Uncracked)
Maximum tension at heel =
Sliding Factor =
0.14
H
V
6e
M
M
6e
1.26
0.62
18.53
0.29
3.13
1.70
Safe in Sliding
m
1
tonnes/m2=
Safe
m from A
0.00
ton/m2
Safe
e in Batter
b
5
c
M+ (t.m)
M-(t.m)
29.24
2.03
0.00
0.00
33.49
4.69
11.38
1.50
64.75
0.08
0.17
2.87
20.68
N/mm2
0.19
N/mm2
144.70
101.70 m
102.30 m
cumecs
100.00
1
10.5
2.00
1.75
0.45
0
2.3
2.00
2.45
0
t/m2
t/m3
t/m3
m
m
m
m
m
100.00
5.75
1.12
2.59
0.225
0.00
1.23
0.00
1.45
4.03
1.78
2.08
1.63
tonnes
m from
tonnes
m from
tonnes
m from
tonnes
m from
tonnes
m from
101.70 m
0.35
0.10
1.90
above
0.35
B
B
B
B
tonnes
m from B
t/m2
tonnes
m above B
t/m2
Horizontal force =
acting at height =
(ii) Saturated earth pressure
(a) Submerged earth pressure
Intensity of horizontal pressure at bottom
0.59
0.85
tonnes
m above B
0.56
0.48
0.57
t/m2
tonnes
m above B
acting at height
(b) Water pressure
Particular of Forces
(A) Vertical Forces
(i) Self weight of Abutment
(a) Weight of Triangular section (1)
(b) Weight of Rectangular section (2)
(c) Weight of Rectangular section (3)
(d) Weight of Rectangular soil backfill (4)
(d) Weight of Triangular soil backfill (5)
(ii) Up lift Force
(B) Horizontal Forces
(i) Wet earth pressure
(a) Wet earth pressure above FSL
(b) Wet earth pressure below FSL
(ii) Saturated earth pressure
(a) Submerged earth pressure
(b) Water pressure
(iii) Live Load Surcharge
SUM
100.00
5.75
1.12
0.225
1.23
1.45
1.78
1.63
2.59
0.00
0.00
4.03
-2.08
10.28
0.10
0.59
1.90
0.85
0.48
1.45
0.44
3.05
0.57
0.57
1.15
100.00
M M
2.45
8.49
ton.m
The eccentricity (e) about C.G. of Section at foundation block LVL =B/2 - x =
0.83
m from A
0.40
Sliding Factor =
0.09
H
V
6e
M
M
6e
tonnes/m2=
Safe
8.30
0.30
2.49
1.68
Safe in Sliding
0.00
ton/m2
Safe
As per IS-456 2000 clause 34.5.2 provide nominal reinforcement @ 140 mm spa cing c/c in both directions
b
5
c
M+ (t.m)
M-(t.m)
6.42
0.58
0.00
0.00
7.18
3.40
0.20
0.50
14.18
0.27
0.82
0.50
5.69
N/mm2
directions
0.08
N/mm2
144.70
364.50 m
369.50 m
cumecs
363.50
1
16.5
2
1.75
0.6
0
6
4.25
4.85
0
t/m2
t/m3
t/m3
m
m
m
m
m
0.5
0.49
2.04
363.50
31.88
2.02
9.00
0.3
0.00
2.43
0.00
2.73
22.31
3.43
2.43
3.23
tonnes
m from
tonnes
m from
tonnes
m from
tonnes
m from
tonnes
m from
364.50 m
4.29
10.72
2.67
above
4.29
4.29
B
B
B
B
B
tonnes
m from B
t/m2
tonnes
m above B
t/m2
tonnes
acting at height =
(ii) Saturated earth pressure
(a) Submerged earth pressure
Intensity of horizontal pressure at bottom
0.50
m above B
0.49
0.25
0.33
t/m2
tonnes
m above B
acting at height
(b) Water pressure
363.50
Particular of Forces
31.88
2.02
0.3
2.43
2.73
3.43
3.23
9.00
0.00
0.00
22.31
-2.43
60.76
363.50
4.85
10.72
4.29
2.67
0.50
0.25
0.50
1.70
17.45
0.33
0.33
3.00
M M
99.68
ton.m
The eccentricity (e) about C.G. of Section at foundation block LVL =B/2 - x =
Check eccentricity e as compared to B/6 as (e<B/6)
No tension develops at any where within base section (Uncracked)
Maximum tension at heel =
Sliding Factor =
0.37
H
V
6e
M
M
6e
1.64
0.78
24.69
0.29
3.27
1.74
Safe in Sliding
m
1
tonnes/m2=
Safe
m from A
0.00
ton/m2
Safe
e in Batter
b
5
c
M+ (t.m)
M-(t.m)
64.28
2.70
0.00
0.00
76.61
7.84
28.58
2.14
143.59
0.08
0.17
5.09
43.91
N/mm2
0.25
N/mm2
144.70
6.35
0.64
258.97
258.97
254.30
1.00
m
m
75
6.55
0.7
4.00
2.97
5.67
0.6
19.34
263.55
-3.02
1.15
14
14.55
261.27
260.57
254.3
9
7.75
8.02
18.55
5
1.6
1
t/m2
m
ton/m
ton/m
m
m
m
m2
cumecs
m
m
m
m
m
m
m
m
m
Nos
m
m
m
m
m
m
2.47
4.93
Level of foundation of Piers should not be less than 1 m below anticipated depth of scour
Level of foundation =
253.04 m
say 252.70 m
78.60
9.00
10.50
55.60
tonnes
tonnes
tonnes
tonnes
30.00
183.70
tonnes
tonnes
center of pier
tonnes
m
m
8.36
262.47
1.900
tonnes
m
m
Since intensity of wind pressure depends upon the height of the point above mean retarding surface, so
two cases for calculation of wind forces have been considered
(i) When level of water in the canal is at F.S.L.
(ii) When depth of water is zero
(i) When level of water in the canal is at F.S.L.
Average height of elevation area =
4.58
46.3
34.35
1.59
261.26
300.00
7.50
2.25
m
kg/m
m2
tonnes
m
kg/m
m
tonnes
262.47
85.0
66.8
5.68
259.10
8.91
kg/sqm
sqm
tonnes
m
2.25
262.47
tonnes
m
21.35
0.6
Sqm
m
32.03
tonnes
89.33
tonnes
Sqm
tonnes
10.23
m/s
0.87
V=
2
1.05
4.98
0.05
3.03
m
0.04
where K =
19.62
0.75
4.93
tonnes
26
kg/m
kg/m2
Sqm
tonnes
m
0.30
V2=
80
0.09
0.00
for rectangular shape
7.06
kg/m2
0.16
66.66
0.24
3.08
kg/m2
Sqm
tonnes
m
(i) Force on pier due to pressure of water perpendicular to length of pier when water flows i
Lateral Forces on pier when one gate is opened for flow and adjacent one are closed F = h A
h=
2.35
m
Area under influence for water pressure =
34.14
sqm
Total pressure force F = h A =
80.17
tonnes
Center of pressure below water surface yp =( I0/A h ) + h
I0= h3(a2+4ab+b2)/36 a b=
yp=
2.56
Level of center of pressure above base =
16.98
m
256.410
m3
m
35.0
tonnes
m
m
16.07
254.30
Sqm
1.73
m4
262.03
m4
Case 1 : When Live load on the bridge and canal is running at F.S.L.
(i) Vertical dead loads
(a) Dead Load of super structure =
(b) Dead load of bed block =
(c) Dead Load due to self weight of Pier =
(d) Increase in reaction due to braking =
(ii) Live load with impact factor =
(iii) Buoyancy force acting upwards =
(iv) Vertical reaction from anchorage system =
183.70
32.03
89.33
2.12
34.60
-10.23
35.00
tonnes
tonnes
tonnes
tonnes
tonnes
tonnes
tonnes
366.55 tonnes
t.m
t.m
0.74
169.14
-14.00
t.m
t.m
t.m
t.m
t.m
My
P Mx
( xm )
( ym )
A I xx
I yy
com,max
com,min
112.03
-66.41
t/m2
t/m2 =
< 0.67 N/mm2 for M30 concrete grade permissible tensile stress casted in full height at a ti
183.70
32.03
89.33
2.12
34.60
tonnes
tonnes
tonnes
tonnes
tonnes
341.78 tonnes
68.30
38.09
106.39
107.00
t.m
t.m
t.m
t.m
My
P Mx
( xm )
( ym )
A I xx
I yy
com,max
com,min
61.64
-19.11
t/m2
(Tensile)
t/m2 =
92.75
252.70
Sqm
193.23
m4
2659.63
m4
Case 1 : When Live load on the bridge and canal is running at F.S.L.
(i) Vertical dead loads
(a) Dead Load of super structure =
(b) Dead load of bed block =
(c) Dead Load due to self weight of Pier =
(d) Increase in reaction due to braking =
(e) Live load with impact factor =
(f) Buoyancy force acting upwards =
(g) Dead load of foundation block =
183.70
32.03
89.33
2.12
34.60
-10.23
313.49
tonnes
tonnes
tonnes
tonnes
tonnes
tonnes
tonnes
645.04 tonnes
81.68
47.81
428.11
429.00
t.m
t.m
1.21
297.41
t.m
t.m
t.m
t.m
My
P Mx
( xm )
( ym )
A I xx
I yy
com,max
com,min
13.20
(Compressive) t/m2
0.71
t/m2 =
183.70
32.03
89.33
2.12
34.60
tonnes
tonnes
tonnes
tonnes
tonnes
371.00
tonnes
712.78 tonnes
81.68
47.81
129.49
130.00
t.m
t.m
t.m
t.m
My
P Mx
( xm )
( ym )
A I xx
I yy
com,max
com,min
10.06
5.31
t/m2
t/m2 =
12.49
Load
11.4
6.8
6.8
6.8
6.8
tonnes
tonnes
surface, so
291.36
-258.52
t.m
t.m
eight at a time
291.36
-258.52
t.m
t.m
291.36
-258.52
t.m
t.m
291.36
-258.52
t.m
t.m
tonnes
Span
5.6
6.60
0
4.3
7.3
-13.3
-9
-6
10.3
13.3
-3
0
Thickness of slab as per MOST
0.6
0.65
75
30.0
kN/m2
degree
876.36
kN/m2
0.28
N/mm2
Section is safe in d
1991.47221 mm2
mm2
Nos
714.3
mm c/c
200.0
mm c/c at bottom of footing
+X
+Y
14.55
B
1.15
-X
75
30.0
kN/m2
degree
314
34
10450.7489 mm2
mm2
Nos
245.6
mm c/c
150.0
mm c/c at bottom of footing
8.35
+X
+Y
6.55
B
7
-X
207.30
6.35
0.68
258.97
1.15
254.3
1
75
2
1.75
0.45
0.7
0.6
0.95
5.67
6.37
5.75
8.35
1.6
6.55
cumecs
m
m
m
m
m
t/m2
t/m3
t/m3
m
m
m
m
m
m
m
m
m
m
0.5
2.78
5.56
Level of foundation of abutment should not be less than 1 m below anticipated depth of scour
Level of foundation =
252.41 m
say 252.70 m
Evaluation of forces acting on the Abutment at El 254.30 m about X-X Axis
(A) Vertical Forces
23.57
1.56
tonnes
m above A
30.59
71.42
1.56
t/m
tonnes
m above A
26.36
3.49
tonnes
m above A
8.36
tonnes
4
5
6
7
1
Particular of Forces
(A) Vertical Forces
(i) Self weight of Abutment
(a) Weight of Triangular section (1)
(b) Weight of Rectangular section (2)
(c) Weight of Rectangular section (3)
(ii) Vertical Reaction due to L.L and D.L
(a) Reaction due to dead load of super structure
(b) Reaction due to L.L
(iii) Vertical force due to wt of earth
(a) Wet earth of section (4)
(b) Wet earth of section (5)
(c) Wet earth of section (6)
(d) Saturated earth of section (7)
(iv) Vertical load due to L.L. surcharge
(v) Up lift Force
(B) Horizontal Forces
(i) Wet earth pressure
(a) Wet earth pressure above FSL
(b) Wet earth pressure below FSL
(ii) Saturated earth pressure
(a) Submerged earth pressure
(b) Water pressure
(iii) Live Load Surcharge
(v) Temp or due to sliding friction force
SUM
Vertical
Force (Tons)
Horizontal Force
(Tons)
299.89
51.36
82.14
98.10
19.35
39.55
14.95
82.14
128.94
21.75
-107.06
10.01
40.63
731.11
23.57
71.42
26.36
6.07
178.06
254.3
7.0
1565.59 ton.m
M M
2.14
6e
1.36
0
-17.19
tonnes/m2=
Safe
As Permissible tensile stress for M30 grade concrete= 0.67 N/mm however steel provided for temperature
and shrinkage will take tensile stresses in the concrete mass at bed level
2
H
V
M
M
6e
0.24
< N/mm2
< 0.65 Hence Safe
2.69
2.05
Safe in Sliding
226.07
of bearing of abutment
260.57
F
S
2L
258.97
A 254.3
8
tonnes
Lever
M+ (t.m)
arm (m)
3.17
1.025
0.40
949.64
52.64
32.85
0.4
0.4
39.24
7.74
4.13
2.27
4.892268
5.59
4.13
4.67
163.13
33.98
401.87
721.43
89.72
M-(t.m)
499.61
5.44
2.34
54.39
94.87
1.56
1.56
3.49
6.27
36.69
111.18
91.88
38.03
926.66
2492.25
m from A
m
-0.17
N/mm2
temperature
ton/m2
Safe
2.26
N/mm2
207.30
6.4
0.68
258.97
1.15
254.3
252.70
1
75
2
1.75
0.45
0.7
0.6
0.95
5.67
6.37
5.75
8.35
1.6
6.55
0.65
cumecs
m
m
m
m
m
m
t/m2
t/m3
t/m3
m
m
m
m
m
m
m
m
m
m
2.78
5.56
Level of foundation of abutment should not be less than 1 m below anticipated depth of scour
Level of foundation =
252.41 m
say 252.70 m
Evaluation of forces acting on the Abutment at El 252.70 m about X-X Axis
(A) Vertical Forces
(i) Self weight of Abutment
(a) Weight of Triangular section (1)=
299.89 tonnes
acting at a distance of
4.37
m from B
(b) Weight of Rectangular section (2)=
51.36 tonnes
acting at a distance of
2.225 m from B
(c) Weight of Rectangular section (3)=
82.14 tonnes
acting at a distance of
1.60
m from B
(d) Weight of foundation block (8) =
218.77 tonnes
acting at a distance of
4.18
m from B
(ii) Vertical Reaction due to Live Loads and dead load of super structure
(a) Reaction due to dead load of super structure =
98.10
tonnes
acting at a distance of
1.6
m from B
(b) Maximum live load reaction on abutment is obtained when third axle load 11.4 t at center of bearing of abutm
Reaction from right span =
14.48 tonnes
Total Live Load reaction on the abutment from L.L =
14.48
tonnes
Impact Factor =
0.34
So Maximum live load reaction with impact =
19.35 tonnes
acting at a distance of
1.6
m from B
(iii) Vertical force due to wt of earth retained as backfill
The soil upto FSL will be saturated while above that it will be a wet soil
(a) Wet earth of section (4) =
39.55 tonnes
acting at a distance of
5.33
m from B
(b) Wet earth of section (5) =
14.95 tonnes
acting at a distance of
3.47
m from B
(c) Wet earth of section (6) =
82.144 tonnes
4
acting at a distance of
6.092 m from B
(d) Saturated earth of section (7) =
128.94 tonnes
acting at a distance of
6.79
m from B
(iv) Vertical load due to equivalent live load surcharge of 1m
6
Intensity of loading =
0.578 tonnes per sqm
Vertical load due to surcharge =
22.32 tonnes
5
acting at a distance of
5.55
m
from B
(v) Up lift Force
Uplift force =
171.46
tonnes
7
acting at a distance of
5.57
m
from B
1
(B) Horizontal Forces
(i) Wet earth pressure
(a) Wet earth pressure above FSL of
258.97 m
Intensity of pressure at FSL =
8.70
t/m
Horizontal force =
10.01 tonnes
acting at height =
7.04
m above B
(b) Wet earth pressure effect below FSL due to wet soil above
Intensity of pressure at FSL =
8.70
t/m
Horizontal force =
54.55 tonnes
acting at height =
3.14
m above B
(ii) Saturated earth pressure
(a) Submerged earth pressure
Intensity of horizontal pressure at bottom
13.55
t/m
Hor. force due to submerge earth pressure =
acting at height
(b) Water pressure
Intensity of pressure at bottom =
Horizontal force due to water pressure =
acting at height =
(iii) Live Load Surcharge
Horizontal force =
42.49
2.09
tonnes
m above B
41.07
t/m
128.75 tonnes
2.09
m above B
32.42
tonnes
8.35
acting at height =
4.29
m above B
(iv) Braking Force
Equal to 20% of total live load on the bridge =
8.36
tonnes
R.L. of application of braking force =
262.47
Height of application force above bearing level =
1.900
m
Increase in reaction due to braking force =
2.12
tonnes
(v) Temperature force or due to sliding friction
Reaction on sliding end when loads are placed so as to produc maximum reaction at sliding end
Live load Reaction at sliding end =
12.24 tonnes
Impact factor =
0.34
Live load with impact =
16.36 tonnes
Dead Load reaction =
183.70 tonnes
Increase due to braking force =
2.12
tonnes
Total :
202.18
tonnes
Friction in sliding bearing ( with coeff. of sliding friction as 0.03) =
6.07
R.L. of point of application =
260.57 m
So acting at height =
7.87
m above B
(vi) Passive Earth pressure of soil retained in front of Abutment
Int of Passive pressure at found block top LVL 254.30
0.0
Int Passive pressure at found block bottom LVL 252.70 =
77.01
Total Passive earth pressure on found block
61.61 t
Acting at height above found block bottom LVL (252.70)
0.65
Particular of Forces
(A) Vertical Forces
(i) Self weight of Abutment
(a) Weight of Triangular section (1)
(b) Weight of Rectangular section (2)
(c) Weight of Rectangular section (3)
(d) Weight of Rectangular section (4)
(ii) Vertical Reaction due to L.L and D.L
(a) Reaction due to dead load of super structure
(b) Reaction due to L.L
(iii) Vertical force due to wt of earth
(a) Wet earth of section (4)
(b) Wet earth of section (5)
(c) Wet earth of section (6)
(d) Saturated earth of section (7)
(iv) Vertical load due to L.L. surcharge
252.70
t/m
t/m
m
299.89
51.36
82.14
218.77
98.10
19.35
39.55
14.95
82.14
128.94
22.32
-171.46
10.01
54.55
667.28
42.49
128.75
32.42
6.07
-61.61
274.27
254.3
2718.90
M
8.35
ton.m
4.07
The eccentricity (e) about C.G. of Section at foundation block LVL =B/2 Check eccentricity e as compared to B/6 as (e<B/6)
No tension develops at any where within base section (Uncracked)
Maximum tension at heel =
6e
H
V
74.15
M
M
6e
0.10
1
tonnes/m2=
Safe
0.41
2.56
1.58
Safe in Sliding
85.68
2
nts
er of bearing of abutment
260.57
F
S
L2
258.97
A
8
254.3
tonnes
Lever
arm (m)
M+ (t.m)
4.37
2.225
1.60
4.18
1309.51
114.28
131.42
913.36
1.6
1.6
156.96
30.97
5.33
3.47
6.092268
6.79
5.55
210.58
51.93
500.44
876.16
123.86
M-(t.m)
5.57
954.47
7.04
3.14
70.40
171.01
2.09
2.09
4.29
7.87
0.65
88.80
269.09
138.91
47.73
39.8409374
4459.30
1740.41
m from A
m
0.74
ton/m2
Safe
N/mm2
0.86
N/mm2
Design Data :
Height of counterfort retaining wall above NSL :
Depth of foundation of Retaining Wall :
6.78
2.5
m
m
165
20.0
kN/m2
degree
17.5
0.5
kN/m3
N/mm2
N/mm2
Solution :
1. Design constants : For M 20 concrete and Fe 415 steel reinforcement we have the following :
Modular ratio m =280/3cbc=
13.33
Kbal=1/(1+(st/mcbc))=
0.289
jbal=1-kbal/3
0.904
Rc=0.5cbckbaljbal=
0.913
Ka= (1-sin)/(1+sin)=
0.490
3. Stability of wall. The preliminary dimensions of the wall are marked as per fig
Desig-nation
Horizontal Force (H)
W1
weight of stem, per
metre length.
L.A.(m)
Vertical
Force (F)
56.745
1.73
98.17
51.25
2.05
105.06
342.216
2.98
1019.80
3.08
-1123.82
Sum M =
99.21
W2
2
weight of base
slab.
W3
weight of soil on heel
slab.
PH Horizontal Earth
Pressure
Sum F =
365.27
365.27
x=
eccentricity e =b/2-x =
0.22
1.83
450.211
403.82
kN/m2
-184.20
kN/m2
174.35
kN/m2
137.06
kN/m2
3.00
-184.20
kN/m2
152.775
kN/m2
12.5
kN/m2
262.11
Depth of heel slab d =
Shear force V is given as :
kN.m
535.77
524.22
mm
kN
2353.47
mm2
1588.54 mm
However, keep Overall depth of heel slab as D=
500
mm
Effective cover of slab reinforcement provided =
60
mm
Effective depth of heel slab d=
440
mm
2
v=
N/mm > c hence shear reinforcement will be necessary
1.191
Area of steel at supports is given as Ast =
Provide 12 mm dia bars with area of bar
Spacing of 12 mm dia bars =
39.45
However Provide 12 mm dia bars at spacing of
2865.75
113.04
mm
130
mm
869.5384615385
196.58
mm
kN.m
652.15
Provide 12 mm dia bars with area of bar
Spacing of 12 mm dia bars =
173.33
However Provide 12 mm dia bars at spacing of
mm2
113.04
mm
150
mm
753.60
mm2
mm
mm
mm
Distribution steel :
Area of distribution reinforcement for temp and shrinkage= 0.12 bD/100 =
Using 12 mm bars with area of bar as =
Spacing of distribution steel =
188.4
However provide distribution steel at spacing of
113.04
mm
180
600
mm
mm
Shear Reinforcement :
Shear stress at C is given =
Per Steel at C as 100As/bd=
Hence c=
0.22
1.191
0.198
N/mm2
N/mm2
%
Shear Reinforcement is necessary
Vc=c bd =
96.8
kN
Consider a section distance x1 from face of counter fort where shearforce is
Check distance x1 =
0.49
m
Shear force at distance x1 =
352.44
96.8
-4.42
kN/m2
169.69
kN/m2
254.54
kN
1.3
m from heel of base slab
So provide in rectangular portion of size 1.3 m x 0.5 m on either side of counterfort in heel slab portion
Let us provide 4 legged stirrups of 8 mm dia bars having area of401.92
reinf= mm2
So spacing of shear reinforcement is gven as Sv=
95.16
mm
However provide shear reinforcement at spacing of600 mm c/c on either side of counterfort
500
mm
403.82
kN/m2
12.5
kN/m2
391.32
kN/m2
293.49
Depth of toe slab d =
Shear force V is given as :
kN.m
566.94
586.98
mm
kN
2823.78
mm2
1778.72 mm
However, keep Overall depth of heel slab as D=
500
mm
Effective cover of slab reinforcement provided =
60
mm
Effective depth of heel slab d=
440
mm
v=
N/mm2 > c hence shear reinforcement will be necessary
1.334
Area of steel at supports is given as Ast =
Provide 12 mm dia bars with area of bar
Spacing of 12 mm dia bars =
35.23
However Provide 12 mm dia bars at spacing of
3208.84
113.04
mm
90
mm
1256
220.12
mm2
mm
mm
kN.m
942.00
Provide 12 mm dia bars with area of bar
Spacing of 12 mm dia bars =
120.00
However Provide 12 mm dia bars at spacing of
mm2
113.04
mm
120
942.00
mm
305.27
kN/m2
mm
mm
It is about
0.780
of Load intensity at C
Hence spacing of 12 mm dia steel bars near supports at bottom face is given by
However provide steel bars 12 mm dia at supports on bottom face with
Spacing of 12 mm dia steel bars at mid span at top face is given by =
Provide steel bars 12 mm dia at mid span on top face with spacing =
115.4
110
153.83
140
Distribution steel :
Area of distribution reinforcement for temp and shrinkage= 0.12 bD/100 =
Using 12 mm bars with area of bar as =
Spacing of distribution steel =
188.4
However provide distribution steel at spacing of
113.04
mm
180
600
mm
mm
Shear Reinforcement :
Shear stress at D is given =
Per Steel at D as 100As/bd=
Hence c=
0.24
1.334
0.2855
N/mm2
N/mm2
%
Shear Reinforcement is necessary
Vc=c bd =
105.6
kN
Consider a section distance x1 from face of counter fort where shearforce is
Check distance x1 =
0.68
m
Shear force at distance x1 =
320.97
Hence provide shear reinforcement upto a distance
0.7
Consider a point at distance y1 from end of toe where SF is valued=
Check distance y1 =
Upward Pressure intensity at y1=
2.8
6.00
105.6
kN
m
kN/m2
4.75
kN/m2
Shear force at face of counterforts at distance y1 from toe =
7.13
kN
It is more than length of toe slab
1.6
m hence S.F. at E is more than value
Actual S.F. at E is given by
259.64
kN
Consider a section distance z from face of counter fort where shearforce is
105.6
Check z =
0.44
m
SF at section distant z from face of front counterfort=
183.06 kN
So provide in trapezoidal portion at distant 0.45 m and 0.7 m
from face of counterfort in toe slab port
Let us provide 4 legged stirrups of 8 mm dia bars having area of reinf= 401.92 mm2
So spacing of shear reinforcement is given as Sv=
84.50
mm
However provide shear reinforcement at spacing of400 mm c/c on either side of counterfort
Design of Stem (Vetical Slab)
The stem acts as a continuous slab. Consider 1 m strip at B.
Intensity of earth pressure at B, ph=KaH1=
74.9
2
Negative B.M. in Vertical slab near back Counterforts M 1=ph.l /12=
So depth of vertical slab (d) =
247.97
mm
200
However provide effective depth of vertical slab as
Effective Cover of slab main reinforcement
60
kN/m2
56.15
mm
mm
kN.m
14.39
degree
Sin =
0.248
Cos
0.969
Depth F1G1 of counterfort =
1684.23
mm
Depth FG of Counterfort =
1944.2
mm
Assuming reinf with 20 mm dia bars is provided in 2 layers with 20 mm space betn bars and nominal cover
Effective depth at Section F =
1854.2
mm
So Area of steel to be provided =
4044.78
Using 20 mm dia bars As=
314.00
No of bars to be provided =
14
Provide these in two layers.
Effective shear force =Q-(M/d') tanwhere d'=d/cos
S.F. =
480857.5
N
Nominal shear stress at section =
0.52
100 As/bd at section is given as :
0.474
Hence c=
0.236
N/mm2
mm2
mm2
Nos
N/mm2
Thus shear stress at section is more than v . However the horizontal and vertical ties will take care of exce
Height where half of the reinforcement can be curtailed is giv
AI1=
3.14
m
AG1=
7.00
m
I1G1=
3.86
m
O.K.
3.04
m below A at point I1
The vertical stem has a tendency to separate out from the counterfort so it should be tied by horizontal ties
Active Earth Pressure at height
6.78
m below A is 203.49 kN/m
Steel area required for horizontal ties at level above :
884.74
mm
m
kN/m length along toe slab
kN/m length along toe slab
: 1548.86 kN
m
mm
mm
1125
mm beyond E
kN
N/mm2
So c=
0.285
N/mm2
Shear reinorcement is necessary
Using 12 mm dia 2 legged stirrups with Asv =
226.08 mm2
Vc=
145350
N
Vs=V-Vc=
884972.64
N
6.8
Spacing of shear reinforcement =
59.93
mm
However provide shear reinforcement at spacing of 200 mm c/c
NSL
2.5
E
20.6
D
0.5
1.6
Spacing =
125.80
mm
However provide 10 mm dia fixing bars at spacing o
100
mm
(ii) In Toe slab @ 0.12% of cross section to be provided at the lower face of slab for a length of 45
As=
600
mm2
Use 10 mm dia bars area A(10)=
78.5
mm2
Spacing =
130.83
mm
However provide 10 mm dia fixing bars at spacing o
120
mm
(iii) In Heel slab @ 0.12% of cross section to be provided at the upper face of slab for a length of 45
As=
600
mm2
Use 10 mm dia bars area A(10)=
78.5
mm2
Spacing =
130.83
mm
However provide 10 mm dia fixing bars at spacing o
120
mm
kN
kN
kN
kN
safe
wing :
: 1-q 0/2.2H
per fig
98.17
105.06
1019.80
-1123.82
99.21
mm
mm
mm
mm
mm2
kN
ounterfort
nterfort
mm
mm
mm
mm
mm2
kN
ounterfort
105.6
kN
nterfort
mm2
eases with Ht
kN
e by front counterfort
kN/m
1847.91
equired O.K.
mm
nd nominal cover of 50 mm
by horizontal ties.
vertical stem
vertical ties.
heel slab at C
orts C.
heel slab at C
orts at B.
oe slab
oe slab
ond E
0.26
A
All dim in metre
14.39
sary
f 45
4.10
2.24
h of 45
gth of 45