K.P.I. MANAGEMENT
< Electrical Team 1 >

Better, Cheaper, Faster

Improvement Activity Proposal


Improvement
Name

Mechanical protection

Organization

Field

4402

Initiator /
collaborator

Before

Present State & Problem

Electrical team need to


install mechanical
protection in car decks;
On car deck no.1 and 3
was not possible to
weld protection covers.

Electrical-1

July

After

Content of improvement

Install cable conduit,


and mounted
mechanical protection
with bolt and u-bolt

DF 0391
(0)
Data

No.___

Effect

-comment was closed;


-paint was not
destroyed;

Improvement Activity LCA


Improvement
Name

Flood light shall by provided


with switch

Organization

Field

4402

Initiator /
collaborator

Before

Present State & Problem

Owner request Flood light of life raft


embarkation ladder shall be provided
with switch control from wheelhouse.
(cable no. L03856, L03858);

Electrical-1

July

After

Content of improvement

We connected the flood


light to a contactor
acted by switch;

DF 0391
(0)
Data

No.___

Effect

Comment was closed;


Electrical team
delivered the system;

Improvement Activity Design


Improvement
Name

LCA

Organization

Field

H4402 Life raft flood light

Initiator /
collaborator

Electrical-1

DF 0391
(0)
Data
July
No.___

In according with drawing the life raft


flood light could not be switch on/off
from the outside light control panel;

We connected the flood light to a


spare switch. We inform design team
to modify drawing, and solved the
problem;

ONE-POINT LESSON CHART


Team/
Group

ELECTRICAL
ELECTRICAL 1

Creator

Created
date

INSTALL CONNECTED EL EQ.

Subject

Foreman

G/L

T/L

ALL

Miron Ion

Stan Nicolae

Problems

Masuri de urmat

TO BE DISCUSSED TO
BAN METTING.

NAM
E

PJ 4402 Missing/Wrong name plate

Name plate for cable, will be


installed according with
standard

SIGNAT NAME

SIGNAT