5. Ideally the First Order, the last order & the order 5. OE to Run the Order status macro to ensure the
number in the middle is checked to ensure if all orders are moved to CL status.
are cancelled .
6. If yes, proceed with the Re-enter. Else, Re-run the
6. If all the orders are cancelled proceed with Cancellation Macro & follow the steps 6 & 7 .
re- enter.
7. Second step check at the Cross validation stage.
DELL CONFIDENTIAL
Company Sams.Com
Corrective Action
• Educated the team to ensure any orders placed in DOMS on Macro crash
• Instructed to check the output sheet any order number got reflected
• Edit the input sheet as by the output sheet rows prior to run the macro.
• 100 % validation implemented to prevent the duplication.
DELL CONFIDENTIAL
Company#2 Costco
Cause Duplication on cancel and rebook process
ISR placed CLRE request due to LCD issue
Request was uploaded in POM.
Orders must be cancelled prior to rebook.
Total Impact 6 orders – 1660 units - $ 1,245,000
Corrective Action
Three Level checks implemented.
• Order cancellation would be ensured before request upload on POM by the Gate
Keeper
• OE Team was instructed to check about order cancellation prior to rebook
• CL/RE check point is included the Validation tracker to ensure for no duplication
Company#3 Costco.com
Over shipped 540 Boxes – customer needed 18 units.
Cause
Input sheet prepared with 18 x 18 instead of 1 x 18.
270 systems were dispatched instead of 18.
Total Impact 252 orders - $160,020
DELL CONFIDENTIAL