Anda di halaman 1dari 9

PERENCANAAN PONDASI BLOK AKIBAT BEBAN DINAMIS

MESIN UNIGRATOR (PENUMBUK TEBU)

PADA PABRIK GULA KEBON AGUNG MALANG

Tugas Akhir
Diajukan Kepada
Fakultas Teknik Universitas Muhammadiyah Malang
Untuk Memenuhi Salah Satu Persyaratan
Akademik Dalam Menyelesaikan
Program Sarjana Teknik

Oleh :
Indah Candra Kumala
NIM : 98.520.018
Ira Lestian
NIM : 98.520.184

JURUSAN SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH MALANG
2003
DAFTAR ISI

HALAMAN JUDUL................................................................................ i

LEMBAR PENGESAHAN...................................................................... ii

KATA PENGANTAR ............................................................................. iii

ABSTRAK............................................................................................... iv

DAFTAR ISI............................................................................................ v

DAFTAR TABEL .................................................................................... vi

DAFTAR GRAFIK.................................................................................. vii

DAFTAR GAMBAR................................................................................ viii

DAFTAR NOTASI DAN SIMBOL......................................................... ix

BAB I PENDAHULUAN

1.1 Latar Belakang .......................................................................... 1

1.2 Rumusan Masalah...................................................................... 2

1.3 Maksud dan Tujuan................................................................... 3

1.4 Batasan Masalah ....................................................................... 3

BAB II LANDASAN TEORI

2.1 Umum....................................................................................... 5

2.2 Tipe Pondasi Dan pemakaiannya................................................ 6

2.3 Dasar Analisa Dinamis Pondasi.................................................. 10

2.3.1 Metode Lumped Mass System........................................... 10

2.3.2 Sistem Pemodelan Struktur .............................................. 11

2.3.3 Derajat Kebebasan Sebuah Blok ....................................... 13

2.4 Dasar Analisa Getaran............................................................... 16

2.4.1 Getaran Bebas................................................................... 16


2.4.2 Getaran Teredam............................................................... 18

2.4.3 Getaran Akibat Beban Dinamis .......................................... 22

2.5 Metode Analisa Pondasi Dinamis ............................................... 26

2.5.1 Analisa Pondasi Dinamis Tertanam Metode Elastic Half-Space

.................................................................................................. 28

2.5.1.1 Analisa Getaran Vertikal .......................................... 28

2.5.1.2 Analisa Getaran Horizontal....................................... 34

2.5.1.3 Analisa Getaran Goyangan....................................... 38

2.5.1.4 Analisa Getaran Kombinasi Horizontal

dan Goyangan.......................................................... 41

2.5.1.5 Analisa Getaran Torsi............................................... 48

2.6 Daya Dukung Pondasi................................................................ 53

BAB III METODE PERENCANAAN PONDASI DINAMIS

3.1 Umum....................................................................................... 62

3.2 Kriteria Data Input Perencanaan Pondasi ................................... 62

3.3 Kriteria Perencanaan Pondasi Dinamis ....................................... 64

3.4 Langkah Perencanaan Pondasi Dinamis...................................... 66

3.4.1 Pembebanan Pada Pondasi Dinamis ................................... 66

3.4.1.1 Pembebanan Pada Pengoperasian Normal................ 67

3.4.1.2 Pembebanan Pada Pengoperasian Darurat................ 69

3.4.2 Sifat Geometrik Pondasi-Mesin ......................................... 71

3.4.2.1 Pusat Gravitasi......................................................... 71

3.4.2.2 Moment Inersia Pondasi........................................... 71

3.4.2.3 Moment Inersia Massa............................................. 72


3.5 Perencanaan pondasi Dinamis Metode Elastic – Half Space........ 77

3.6 Diagram Alir Perencanaan Pondasi Dinamis................................ 89

BAB IV PERHITUNGAN

4.1 Data Perencanaan...................................................................... 90

4.1.1 Data Mesin........................................................................ 90

4.1.2 Data Tanah........................................................................ 91

4.2 Perencanaa Awal Pondasi Dinamis............................................. 92

4.2.1 Pembebanan...................................................................... 92

4.2.2 Perhitungan Modulus Geser Tanah..................................... 93

4.2.3 Sifat Geometrik Pondasi..................................................... 95

4.2.3.1 Berat Komponen..................................................... 96

4.2.3.2 Massa Komponen.................................................... 96

4.2.3.3 Pusat Gravitasi........................................................ 97

4.2.3.4 Momen Inersia Massa.............................................. 99

4.3 Perhitungan Pondasi Dinamis Metode Elastic half Space............. 103

4.4 Daya Dukung Pondasi ............................................................... 123

4.4.1 Daya Dukung Pondasi Mesin Turbin dan Gear Box............ 123

4.4.2 Daya Dukung Pondasi Mesin Unigrator............................. 126

BAB V PENUTUP

5.1 Kesimpulan............................................................................... 129

5.2 Saran ........................................................................................ 130

DAFTAR PUSTAKA ............................................................................. 132

DAFTAR LAMPIRAN.......................................................................... 133


DAFTAR TABEL

2.1 Parameter Kekakuan Dan Redaman Untuk Metode Elastic

Half-Space Pada Getaran Vertikal............................................... 33

2.2 Parameter Kekakuan Dan Redaman Untuk Metode Elastic

Half-Space Pada Getaran Horizontal........................................... 36

2.3 Parameter Kekakuan Dan Redaman Untuk Metode Elastic

Half-Space Pada Getaran Goyangan ........................................... 40

2.4 Parameter Kekakuan Dan Redaman Untuk Metode Elastic

Half-Space Pada Getaran Torsi................................................... 52

2.5 Faktor Daya Dukung.................................................................... 56

3.1 Momen Inersia Massa Dalam Berbagai Geometri.......................... 73

4.1 Massa Komponen........................................................................ 97

4.2 Pusat Gravitasi............................................................................. 98

4.3 Momen Inersia Massa.................................................................. 102

4.4 Kapasitas Daya Dukung Mesin Turbin dan Gear Box.................... 123

4.5 Kapasitas Daya Dukung Mesin Unigrator ..................................... 126


DAFTAR GRAFIK

2.1 Grafik Hubungan Waktu Penurunan Pada Getaran Teredam.......... 21

2.2Grafik Hubungan Antara Frekuensi Natural Dan Amplitudo........... 27

2.3 Grafik Hubungan Beban dan Waktu............................................. 55

2.4 Grafik hubungan Durasi Pembebanan dan Penurunan.................... 61

3.1 Grafik Amplitudo Ijin.................................................................... 65


DAFTAR GAMBAR

2.1a Pondasi Tipe Blok...................................................................... 7

2.1b Pondasi Tipe Blok Berongga ...................................................... 7

2.1c Pondasi Tipe Dinding.................................................................. 8

2.1d Pondasi Tipe Portal.................................................................... 8

2.2a Deskripsi Struktur Pondasi ......................................................... 11

2.2b Deskripsi Sistim dinamis ............................................................. 11

2.2c Pemodelan Sistem Massa dan Kekakuan.................................... 12

2.2 Derajat Kebebasan Sebuah Balok ............................................... 15

2.3 Getaran bebas.............................................................................. 16

2.4 Sistem Massa-Kekakuan Dengan Redaman.................................. 19

2.5 Getaran Vertikal Pondasi Tertanam .............................................. 29

2.6 Getaran Horizontal Untuk Pondasi Tertanam................................. 34

2.7 Getaran Goyangan Untuk Pondasi Tertanam................................. 38

2.8 Gabungan Horizontal Dan Goyangan Untuk Pondasi Tertanam 42

2.9 Getaran Akibat Torsi Pondasi Tertanam ....................................... 49

2.10 Model Keruntuhan Tanah........................................................... 54


DAFTAR NOTASI DAN SIMBOL

γ = Berat Isi Tanah (t/m3 )

e = Angka Pori Tanah (0 )

φ = Sudut Gesr Dalam Tanah (0 )

v = Angka Pori Tanah

C = kohesifitas Tanah

ωn = Kecepatan Operasi Mesin (rad/det)

W = Berat (t)

Wu = Berat Unigrator (t)

Wt = Berat Turbin (t)

Wr = Berat Rotor (t)

fn = Frekuensi Resonansi (rpm atau Hz)

T = Periode (detik)

g = Gravitasi (m/det2 )

er = Eksentrisitas Rotor (m)

z = Jarak Pusat Rotor Terhadap Sisi Atas Pondasi

L = Panjang Pondasi (m)

Z = Displacement / simpangan (mm)

B = Lebar Pondasi (m)

h = Kedalaman Tertanam Pondasi (m)

H = Tinggi Pondasi (m)

G = Modulus Geser Tanah (t/m2 )

m = Massa struktur Pondasi (t.m /det2 )

A = Luas Pondasi (m2 )


Aze = Amplitudo Getaran Vertikal (mm)

Axe = Amplitudo Getaran Horisontal (mm)

I = Inersia Massa (m4 )

Px = Beban dinamis (ton.rad2 )

An φe = Amplitudo Getaran Goyangan (mm)

An ψ e = Amplitudo Getaran Torsi (mm)

D = Redaman

K = Konstanata Pegas (t/m)

CG = Pusat Gravitasi

Gs = Modulus Geser Dinamis Tanah Sisi Pondasi (t/m2 )

S = Gaya Geser Ultimit

σ = Tegangan Normal

td = Durasi Waktu Pembebanan

Df = Kedalaman Pondasi

K = Kekakuan Tanah

∆ = Penurunan pada Periode Waktu

Nc = Faktor Kapasitas Daya Dukung

Nq = Faktor Kapasitas Daya Dukung

Nγ = Faktor Kapasitas Daya Dukung

Ni = Koefisien Tahanan Inersia Geser

Anda mungkin juga menyukai