Cost Element
Balance
--------------------
----------------
Material
1,991.70
Material Overhead
136.90
Resource
0.00
Outside Processing
0.00
Overhead
0.00
----------------
Total:
2,128.60
Subinventory: Intransit
Asset: No
Planning MRP Item
Item Description Rev Category Method M/B Asset Status
UOM Quantity Unit Cost Extended Value
--------------- -------------- --- --------------- -------- ---- ----- ---------
- --- ------------ -------------- ----------------
J01.40-03175- 40-03175-002 - Medical.Johnson MRP plan Buy Yes Active
EA 20.00 49.60798 992.16
002.A
----------------
Subinventory
Intransit Total: 992.16
================
Cost Element
Balance
--------------------
----------------
Material
409.52
Material Overhead
582.64
Resource
0.00
Outside Processing
0.00
Overhead
0.00
---------------- ----------------
Total:
Report Total: 992.16 3,120.76
================