Anda di halaman 1dari 9

SKEMA JAWAPAN

BUKU TUNAI
Tarikh Butir Fol Disk Tunai Bank Tarikh Butir Fol Disk Tunai Bank
2010           2010          
April
Apr 1 Baki b/b     400 3 000 4 Perabot 500 1m
10 bank     500*   10 Tunai       500* (1m)
12 Samsiah   70   2 230 1m 20 Kadar Bayaran     380   1m
23 Dividen       1 700 1m 24 Rahman   100   3700 1m
      70 900 6930 30 Baki h/b   520 2230
Mei 1 Baki b/b 520 2 230       70 900 6930

Samsiah

2010 RM 2010 RM
April April
1 Baki b/b 2 300 12 Bank 2 230 1m
4 200 Diskaun diberi 70
7 Jualan
April 30 Baki h/b 4 200 1 OF
6 500 6 500
Mei 1 Baki b/b 4 200
Rahman

2010 RM 2010 RM
April Bank 3 700 April Baki b/b 1 500
24 1m 1
Diskaun diterima 100 2 Belian 3 600
30 Baki h/b 1 300 1 OF
5 100 5 100
Mei 1 Baki b/b 1 300
Akaun Perabot

2010 RM 2010 RM
April 1 Baki b/b 1 000 April 30 Baki h/b 1 500
4 Bank 500
1 500 1 500
Mei 1 Baki b/b 1500

Akaun Diskaun Diberi

2010 RM 2010 RM
April 12 Penghutang 70 April 30 Baki h/b 70
Mei 1 Baki b/b 70

Akaun Kadar Bayaran

2010 RM 2010 RM
April 20 Tunai 380 April 30 Baki h/b 380
Mei 1 Baki b/b 380

Akaun Dividen diterima

2010 RM 2010 RM
April 30 Baki h/b 1 700 April 23 Bank 1 700
Mei 1 Baki b/b 1 700
Akaun Diskaun diterima

2010 RM 2010 RM
April 30 Baki h/b 100 April 24 Pemiutang 100
Mei 1 Baki b/b 100

Perniagaan Muslimah

Imbangan Duga pada 30 April 2010

Butir Debit Kredit


(RM) (RM)
Tunai 520 1 OF
Bank 2230 1 OF
Samsiah 4 200 1 + 1 OF
Diskaun diberi 70 1m
Kadar Bayaran 380 1m
Rahman 1000 1 + 1 OF
Dividen diterima 1 700 1m
Diskaun diterima 100 1m
.
5 (a)(i),(ii) BUKU TUNAI RUNCIT

Tarikh Butir Fol No. Penerimaan Pembayaran Analisis Bayaran


Baucar (Debit) (Kredit) Alat Tambang Pos Belanja Fol Pelbagai
Tulis Am
Dis 1 Bank 300
2 Pen dan pensil 5 5 (1)
3 Kertas warna dan 18 18 (1)
Kertas A4
5 Setem 3 3 (1)
6 Surat berdaftar 6 6 (1)
7 Derma Anak yatim 50 50 (1)
9 Bunga hiasan 10 10 (1)
pejabat
10 Belanja tol 2 2 (1)
11 Kurier 25 25 (1)
12 Petrol 20 20 (1)
14 upah 57 57 (1)
penyelenggaraan
mesin fotostat
15 Pinjaman kepada 30 30 (1)
pekerja

300 226 23 22 34 117 30


Baki h/b 74 (1)
300 300.00

Baki b/b 74
Bank 226
5 (b)
(i) Dt Ambilan 300
Kt Belian 300

(ii) Dt Perniagaan Mahani 750


Kt Perniagaan Rohani 750

(iii) Dt Tunai 90
Kt Sewa diterima 90

(iv) Dt Gaji 1 200


Kt Tunai 1 200
6. (a)
Akaun Sewa Diterima

2009 RM 2009 RM
Dis 31 Untung rugi (1) 6 600 Dis 31 Tunai (1) 7 700
Baki h/b 1 100

Akaun Gaji

2009 RM 2009 RM
Dis 31 Tunai (1) 5 800 Dis 31 Untung rugi (1) 6 600
Baki h/b 800

Akaun Untung Rugi bagi tahun berakhir 31 Disember 2010

Gaji (1) 6 600 Sewa diterima (1) 6 600


Kunci kira-kira pada 31 Disember 2010

Liabiliti Semasa RM
Sewa diterima terdahulu (1) 1 100
Gaji terakru (1) 800

6. (b)

Akaun Mesin

2009 RM 2010 RM
Jul 1 Baki b/b 6 700 Jun 30 baki h/b 6 700
2010 2011
Jul 1 baki b/b 6 700 Jun 30 pelupusan mesin (1) 6 700
Dis 31 bank (1) 4 500 Baki h/b 4 500
11 200 11 200
2012
Jul 1 baki b/b 4 500
Akaun Susutnilai Terkumpul Mesin

2010 RM 2009 RM
Jun 30 baki h/b 1 273 Jul 1 Baki b/b 6 70
2010
Jun 30 Untung Rugi (1) 603
1 273 1 273
2011 2010
Jun 30 pelupusan mesin (1AS)1 815.70 Jul 1 baki b/b (1) 1 273
Baki h/b 225 2011
Jun 30 Untung rugi (1+1AS) 767.70
2 040.70 2 040.70
2011
Jul 1 baki b/b (1) 225

Akaun Pelupusan Mesin

2011 RM 2011 RM
Jun 30 Mesin (1) 6 700 Jun 30 Per.Susutnilai (1AS) 1 815.70
Bank (1) 3 500
Rugi pel.mesin (1AS) 1 384.30
6 700 6 700
NOTA:
Pengiraan susutnilai:
Mesin A = 670 + 10 % x (6 700 - 670) + 10 % x (6 700 – 1 273)
= RM ( 670 + 603 + 542.70 )
= RM 1 815.70
Mesin B = 10 % x 4 500 x 6/12
= RM 225
MARKAH 1AS AKAN DIBERI SEKIRANYA PELAJAR MENUNJUKKAN SALAH SATU PENGIRAAN SUSUTNILAI DI ATAS. 2
MARKAH TERUS AKAN DIBERI KE ATS NILAI YANG TEPAT.
Jumlah susutnilai = RM 542.70 + RM 225
(bg tahun berakhir 30 Jun 2011) = RM 767.70

Anda mungkin juga menyukai