Position ref Position ref


From To m Description 525UC 525SC 600SC 750SC 800 stair 600 stair perforated 675SC Kerb 800Berm From To m Description
1 2 7.3 perforated pipe 250dia 7.3 1 2 7.5 perforated pipe 250dia
1 3 58.36 perforated pipe 250dia 58.36 1 3 58.3 perforated pipe 250dia
4 5 7.3 perforated pipe 250dia 7.3 4 5 7.5 perforated pipe 250dia
4 6 56.08 perforated pipe 250dia 56.08 4 6 56.22 perforated pipe 250dia
1 6 40 600SC/ 600stair 40 40 1 6 40 600SC/ 600stair
6 7 15.26 800berm 15.26 6 7 15.66 800berm
6 28 5.26 800 stair 5.26 6 28 800 stair
28 8 24 800berm 24 28 8 24 800berm
9 10 15.56 perforated pipe 250dia 15.56 9 10 15.6 perforated pipe 250dia
11 12 28.89 perforated pipe 250dia 28.89 11 12 28.89 perforated pipe 250dia
11 13 48.26 675SC 48.26 11 13 48.26 675SC
14 15 37.66 perforated pipe 250dia 37.66 14 15 37.66 perforated pipe 250dia
16 17 14.86 perforated pipe 250dia 14.86 16 17 16.3 perforated pipe 250dia
18 19 14.86 perforated pipe 250dia 14.86 18 19 16.3 perforated pipe 250dia
13 27 12.16 800berm ` 12.16 13 27 12.78 800 berm
27 20 6.26 800 stair 6.26 27 20 6.26 800 stair
20 21 10.56 800berm 10.56 20 21 16.26 800 berm
30 27 4.56 800 stair 4.56 30 27 3 800 stair
13 24 6.76 800berm 6.76 13 24 4.56 800 berm
24 25 1.05 800 stair 1.05 24 25 2 800 stair
25 26 10.66 800berm 10.66 25 26 17.85 800 berm
22 23 28.13 525UC 28.13 22 23 55.6 525UC
22 28 25.26 525UC 25.26 22 28 Included 525UC
13 31 38.46 750SC/600stair 38.46 38.46 13 31 94.98 750SC/600stair
31 34 10.1 750SC/600stair 10.1 10.1 31 34 10.01 750SC/600stair
34 29 34.76 750SC/600stair 34.76 34.76 34 29 Included 750SC/600stair
35 36 21.46 750SC/600stair 21.46 21.46 35 36 5.2 750SC/600stair
32 33 10.06 800stair 32 33 14.86 800SC
36 37 2.1 800stair 36 37 Included 800SC
38 39 18.06 525UC 18.06 38 39 18.06 525UC
39 40 4 800stair 4 39 40 800stair
41 42 1.95 800berm 1.95 41 42 1.95 800berm
42 43 9.08 800 stair 9.08 42 43 9.08 800stair
43 44 21 750SC 21 42 43 750SC
45 46 7.9 800 stair 7.9 45 46 7.9 800stair
53 54 4.12 800 stair 4.12 45 47 800stair
41 46 4.8 800berm 4.8 41 46 800berm
46 47 7.9 800 stair 7.9 46 47 800stair
47 48 7.6 800stair w/kerb 7.6 7.6 47 48 800stair w/kerb
49 50 6.7 800berm 6.7 49 50 6.7 800berm
50 51 4.76 800stair w/kerb 4.76 4.76 50 51 8.46 800stair w/kerb
51 52 1.4 Kerb 1.4 51 52 2.3 Kerb
52 54 13.76 800 stair 13.76 52 54 13.76 800stair
54 55 8.46 800berm 8.46 54 55 1.2 800berm
55 56 16.48 800 stair 16.48 55 56 800stair
56 57 16.96 800berm w/kerb 16.96 16.96 56 57 17.6 800stair w/kerb
57 58 5.26 800stair w/kerb 5.26 5.26 57 58 800berm w/kerb
58 59 6.5 800berm w/kerb 6.5 6.5 57 58 6.5 800berm w/kerb
59 60 10.02 800berm w/kerb 10.02 10.02 59 60 10.07 800berm w/kerb
60 61 1.9 800berm w/kerb 1.9 1.9 60 61 1.96 800berm w/kerb
61 62 2.9 800berm w/kerb 2.9 2.9 61 62 9.08 800berm w/kerb
62 63 3.4 800stair w/kerb 3.4 3.4 62 63 21.73 800stair w/kerb
63 64 4 800 stair 4 63 64 800stair
64 65 6.56 800 stair 6.56 64 65 800stair
65 66 9.76 800 stair 9.76 65 66 800stair
66 67 7.46 800 stair 7.46 66 67 800stair
67 68 31.46 800stair w/kerb 31.46 31.46 67 68 31.46 800stair w/kerb
69 69 3 800 stair 3 68 69 800stair
69 70 7.6 800berm w/kerb 7.6 7.6 69 70 800berm w/kerb
70 71 2.4 800stair w/kerb 2.4 2.4 70 71 800stair w/kerb
68 72 800stair w/kerb 0 0 68 72 3.6 800stair w/kerb
72 73 5.4 525UC 5.4 72 73 10.12 525UC
73 74 11.9 525SC 11.9 73 74 525SC
74 81 8.1 525UC 8.1 74 81 13.13 525UC
81 75 19.7 800 stair 19.7 81 75 19.7 800stair
75 76 24.6 800berm 24.6 75 76 24.6 800berm w/kerb
76 77 7.3 800berm 7.3 76 77 7.3 800berm
76 78 800berm 0 76 78 33.4 800berm
78 79 3.6 800 stair 3.6 78 79 800stair
79 80 13.4 800 stair 13.4 79 80 800stair
79 80 8.1 800 stair 8.1 79 80 800stair
80 81 11.9 800 stair 11.9 80 81 800stair
967.14 84.95 11.9 40 125.78 220.33 144.78 240.87 48.26 102.16 181.49 895.21
1098.36 84.95 11.9 40 125.78 220.33 144.78 240.87 48.26 181.49 905.27
CCL
Position ref
From To m Description 525UC 525SC 600SC 750SC 800 stair 600 stair perforated 675SC Kerb 800Berm
1 2 7.3 perforated pipe 250dia 7.3
1 3 58.36 perforated pipe 250dia 58.36
4 5 7.3 perforated pipe 250dia 7.3
4 6 56.08 perforated pipe 250dia 56.08
1 6 40 600SC/ 600stair 40 40
6 7 15.26 800berm 15.26
6 28 5.26 800 stair 5.26
28 8 24 800berm 24
9 10 15.56 perforated pipe 250dia 15.56
11 12 28.89 perforated pipe 250dia 28.89
11 13 48.26 675SC 48.26
14 15 37.66 perforated pipe 250dia 37.66
16 17 14.86 perforated pipe 250dia 14.86
18 19 14.86 perforated pipe 250dia 14.86
13 27 12.16 800berm ` 12.16
27 20 6.26 800 stair 6.26
20 21 10.56 800berm 10.56
30 27 4.56 800 stair 4.56
13 24 6.76 800berm 6.76
24 25 1.05 800 stair 1.05
25 26 10.66 800berm 10.66
22 23 28.13 525UC 28.13
22 28 25.26 525UC 25.26
13 31 38.46 750SC/600stair 38.46 38.46
31 34 10.1 750SC/600stair 10.1 10.1
34 29 34.76 750SC/600stair 34.76 34.76
35 36 21.46 750SC/600stair 21.46 21.46
32 33 10.06 800stair
36 37 2.1 800stair
38 39 18.06 525UC 18.06
39 40 4 800stair 4
41 42 1.95 800berm 1.95
42 43 9.08 800 stair 9.08
43 44 21 750SC 21
45 46 7.9 800 stair 7.9
53 54 4.12 800 stair 4.12
41 46 4.8 800berm 4.8
46 47 7.9 800 stair 7.9
47 48 7.6 800stair w/kerb 7.6 7.6
49 50 6.7 800berm 6.7
50 51 4.76 800stair w/kerb 4.76 4.76
51 52 1.4 Kerb 1.4
52 54 13.76 800 stair 13.76
54 55 8.46 800berm 8.46
55 56 16.48 800 stair 16.48
56 57 16.96 800berm w/kerb 16.96 16.96
57 58 5.26 800stair w/kerb 5.26 5.26
58 59 6.5 800berm w/kerb 6.5 6.5
59 60 10.02 800berm w/kerb 10.02 10.02
60 61 1.9 800berm w/kerb 1.9 1.9
61 62 2.9 800berm w/kerb 2.9 2.9
62 63 3.4 800stair w/kerb 3.4 3.4
63 64 4 800 stair 4
64 65 6.56 800 stair 6.56
65 66 9.76 800 stair 9.76
66 67 7.46 800 stair 7.46
67 68 31.46 800stair w/kerb 31.46 31.46
69 69 3 800 stair 3
69 70 7.6 800berm w/kerb 7.6 7.6
70 71 2.4 800stair w/kerb 2.4 2.4
68 72 800stair w/kerb 0 0
72 73 5.4 525UC 5.4
73 74 11.9 525SC 11.9
74 81 8.1 525UC 8.1
81 75 19.7 800 stair 19.7
75 76 24.6 800berm 24.6
76 77 7.3 800berm 7.3
76 78 800berm 0
78 79 3.6 800 stair 3.6
79 80 13.4 800 stair 13.4
79 80 8.1 800 stair 8.1
80 81 11.9 800 stair 11.9
967.14 84.95 11.9 40 125.78 220.33 144.78 240.87 48.26 102.16 181.49
1098.36 84.95 11.9 40 125.78 220.33 144.78 240.87 48.26 181.49
Fong Nian
Position ref
From To m Description 525UC 525SC 600SC 750SC 800 stair 600 stair perforated 675SC Kerb 800Berm
1 2 7.5 perforated pipe 250dia 7.5
1 3 58.3 perforated pipe 250dia 58.3
4 5 7.5 perforated pipe 250dia 7.5
4 6 56.22 perforated pipe 250dia 56.22
1 6 40 600SC/ 600stair 40 40
6 7 15.66 800berm 15.66
6 28 800 stair 0
28 8 24 800berm 24
9 10 15.6 perforated pipe 250dia 15.6
11 12 28.89 perforated pipe 250dia 28.89
11 13 48.26 675SC 48.26
14 15 37.66 perforated pipe 250dia 37.66
16 17 16.3 perforated pipe 250dia 16.3
18 19 16.3 perforated pipe 250dia 16.3
13 27 12.78 800berm ` 12.78
27 20 6.26 800 stair 6.26
20 21 16.26 800berm 16.26
30 27 3 800 stair 3
13 24 4.56 800berm 4.56
24 25 2 800 stair 2
25 26 17.85 800berm 17.85
22 23 55.6 525UC 55.6
22 28 Included 525UC Included
13 31 94.98 750SC/600stair 94.98 94.98
31 34 10.01 750SC/600stair 10.01 10.01
34 29 Included 750SC/600stair Included Included
35 36 5.2 750SC/600stair 5.2 5.2
32 33 14.86 800stair 14.86
36 37 Included 800stair Included
38 39 18.06 525UC 18.06
39 40 800stair 0
41 42 1.95 800berm 1.95
42 43 9.08 800stair 9.08
43 44 750SC 0
45 46 7.9 800stair 7.9
53 54 800stair 0
41 46 800berm
46 47 800stair
47 48 800stair / w kerb
49 50 6.7 800berm 6.7
50 51 8.46 800stair / w kerb 8.46 8.46
51 52 2.3 Kerb 2.3
52 54 13.76 800stair 13.76
54 55 1.2 800berm 800berm
55 56 800stair
56 57 17.6 800stair w/kerb 17.6 17.6
57 58 800berm w/kerb 0 0
58 59 6.5 800berm w/kerb 6.5 6.5
59 60 10.07 800berm w/kerb 10.07 10.07
60 61 1.96 800berm w/kerb 1.96 1.96
61 62 9.08 800berm w/kerb 9.08 9.08
62 63 21.73 800stair w/kerb 21.73 21.73
63 64 800stair
64 65 800stair
65 66 800stair
66 67 800stair
67 68 31.46 800stair 31.46 31.46
69 69 800stair 0
69 70 800berm w/kerb
70 71 800stair
68 72 3.6 800stair w/kerb 3.6 3.6
72 73 10.12 525UC 10.12
73 74 525SC
74 81 13.13 525UC 13.13
81 75 19.7 800stair 19.7
75 76 24.6 800berm w/kerb 24.6 24.6
76 77 7.3 800berm 7.3
76 78 33.4 800berm 33.4
78 79 800stair
79 80 800stair
79 80 800stair
80 81 800stair
895.21 96.91 0 40 110.19 159.41 150.19 244.27 48.26 137.36 192.67
1041.9 96.91 0 40 110.19 159.41 150.19 244.27 48.26 192.67
Shotcrete Area Site Measure
0.5

Shotcrete

A1

0.5
0.5

Side Side Side Area=


Triangle A B C Z Z-A Z-B Z-C =√[Z(Z-A)(Z-B)(Z-C)],
A1 0.5 0.5 0.5 0.75 0.25 0.25 0.25 0.108253
0.108253 m2
Line Ref Description/ Location/Signpost Tims'g1 Tims'g2 Tims'g3 Dim1 Dim2 Dim3 Sqr'g Unit
1 Drawing C2409H
2 Width = H+T+T= 525+100+100=725
3 Depth=B+E=150+525=675
4 Car Away Material for 525UC 1 0.725 0.675 0.489375
5 Car Away Material for 525UC associate Apron 1 0.5 0.075 0.0375
6 0.526875 m³/m x 96.9 m= 51.05946 m³ 51.05946 m³
7 Drawing C2411G
8 Width = H+T+T= 600+100+100=800
9 Depth=B+300+D=150+300+650=1100
10 Say 30°slope
11 l=D/tan30°=650/tan30°=650/ tan(2px(30/360))= 1125.833025
12 h=Btan30°=150tan30°=150tan(2px(30/360))= 86.60254038
13 D1=D+h=650+87=737
14 D2=D+D+B=650+650+150=1450
15 D1+D2=737+1450=2187/2=1094 (average depth)
16 1126-150=976
17 Slope Length S=976/cos30°=976/cos(2px(30/360)= 1126.987725
17 Car Away Material for 600SC 0.976 0.800 1.094 0.854195
18 Car Away Material for 600SC assocate Apron (1 side only) 0.976 0.500 0.075 0.0366
19 0.890795 m³÷ 1.127 m= 0.790413 m³per m x 40.0 m= 31.61651 m³
20 Drawing C2411G
21 Width = H+T+T= 675+125+125=925
22 Depth=B+300+D=175+300+740=1215
23 Say 30°slope
24 l=D/tan30°=740/tan30°=740/ tan(2px(30/360))= 1281.717598
25 h=Btan30°=175tan30°=175tan(2px(30/360))= 101.0362971
26 D1=D+h=740+101=841
27 D2=D+D+B=740+740+175=1655
28 D1+D2=841+1655=2496/2=1248 (average depth)
29 1282-175=1107
30 Slope Length S=1107/cos30°=1107/cos(2px(30/360)= 1278.253496
31 Car Away Material for 675SC 1.107 0.925 1.248 1.277921
32 Car Away Material for 675SC assocate Apron (1 side only) 1.107 0.5 0.075 0.041513
33 1.319433 m³÷ 1.278 m= 1.03242 m³per m x 48.3 m= 49.82461 m³
Line Ref Description/ Location/Signpost Tims'g1 Tims'g2 Tims'g3 Dim1 Dim2 Dim3 Sqr'g Unit
34 Drawing C2411G
35 Width = H+T+T= 525+100+100=725
36 Depth=B+300+D=150+300+615=1065
37 Say 30°slope
38 l=D/tan30°=615/tan30°=615/ tan(2px(30/360))= 1065.211247
39 h=Btan30°=150tan30°=150tan(2px(30/360))= 86.60254038
40 D1=D+h=615+87=702
41 D2=D+D+B=615+615+150=1380
42 D1+D2=702+1380=2082/2=1041 (average depth)
43 1065-150=915
44 Slope Length S=915/cos30°=915/cos(2px(30/360)= 1147.772335
45 Car Away Material for 525SC 0.915 0.725 1.041 0.690573
46 Car Away Material for 525SC 0.915 0.5 0.075 0.034313
47 0.724886 m³÷ 1.148 m= 0.631434 m³per m x 11.9 m= 7.514061 m³
48 Drawing C2101C
49 Car Away Material for 600 stair 1 0.6 0.1 0.06
50 0.06 m³÷ 1.000 m= 0.06 m³per m x 150.2 m= 9.0114 m³
51
52 Car Away Material for 800 stair 1 0.8 0.1 0.08
53 0.08 m³÷ 1.000 m= 0.08 m³per m x 159.4 m= 12.7528 m³
54 Drawing C2411G
55 Width = H+T+T= 750+125+125=1000
56 Depth=B+300+D=175+300+775=1250
57 Say 30°slope
58 l=D/tan30°=775/tan30°=775/ tan(2px(30/360))= 1342.339376
59 h=Btan30°=175tan30°=175tan(2px(30/360))= 101.0362971
60 D1=D+h=775+101=876
61 D2=D+D+B=775+775+175=1725
62 D1+D2=876+1725=2601/2=1301 (average depth)
63 1342-175=1167
64 Slope Length S=1167/cos30°=1167/cos(2px(30/360)= 1347.535528
65 Car Away Material for 750SC 1.167 1 1.301 1.518267
66 Car Away Material for 750SC associate apron 0.915 0.5 0.075 0.034313
67 1.55258 m³÷ 1.348 m= 1.151765 m³per m x 110.2 m= 126.913 m³
68
69 Car Away Material for Additional Apron (+1 side only) 1 0.500 0.075 0.0375
70 0.0375 m³÷ 1.000 m= 1 m³per m x 40.0 m= 40 m³
71 Catchpit 1.3x1.3x1.9
72 Depth= 1900+150Bed=2050-350=1700
73 1.3 1.3 1.7 2.873
Line Ref Description/ Location/Signpost Tims'g1 Tims'g2 Tims'g3 Dim1 Dim2 Dim3 Sqr'g Unit
74 Car Away Material for 1.3x1.3x1.9 catchpit 2.873 m³÷ 1.000 no= 2.873 m³per no x 1.0 no= 2.873 m³
75
76 Catchpit 2.2x2.2x1.7
77 Depth= 1700+150Bed=1850-350=1500
78 2.2 2.2 1.5 7.26
79 Car Away Material for 1.3x1.3x1.9 catchpit 7.26 m³÷ 1.000 no= 7.26 m³per no x 1.0 no= 7.26 m³
80
81 Total CA= 338.8248 m³ @ 226.00
82 = 76,574.42
83
84
85 2 4 3.00 0.600 14.4
86 Fwk to Concrete Flatform 3000x3000x600 14.4 ㎡
87
88 2 4 2.90 0.500 11.6
89 2 2.90 2.900 16.82
90 A292 mesh to Concrete Flatform 3000x3000x600 28.42 ㎡
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
Line Ref Description/ Location/Signpost Tims'g1 Tims'g2 Tims'g3 Dim1 Dim2 Dim3 Sqr'g Unit
1 Water Intake Structure
2 3600+1800=5400/2=2700
3 2700+3600=6300/2=3150
4 2700+1800=4500/2=2250
5 (C 1.414 1.2 3.15 0.2 1.068984
6 (D 1.154 1.2 2.25 0.2 0.62316
7 Concrete to slab 1.692144 m3 @ 1,150.00 1,945.97
8 (A 0.8 0.2 1.8 0.288
9 (B 0.8 0.2 1.54 0.2464
10 (C 2.5 0.2 0.9 0.45
11 1800+1540=3340/2=1670 (D 1.8 0.2 1.67 0.6012
12 (E 2.5 0.2 0.9 0.45
13 Ddt outlet hole -1 0.6 0.2 0.6 -0.072
14 Ddt 525UC -1 0.525 0.2 0.525 -0.055125
15 Concrete to wall 1.908475 m3 @
16 (C 1.414 1.2 3.15 5.34492
17 (D 1.154 1.2 2.25 3.1158
18 Fwk to sloping slab 8.46072 m2 @ 280.00 2,369.00
19
20 (A 2 0.8 1.8 2.88
21 (B 2 0.8 1.54 2.464
22 (C 2 2.5 0.9 4.5
23 1800+1540=3340/2=1670 (D 2 1.8 1.67 6.012
24 (E 2 2.5 0.9 4.5
25 Ddt outlet hole 2 -1 0.6 0.6 -0.36
26 Ddt 525UC 2 -1 0.525 0.525 -0.275625
27 Vert fwk to wall 19.72038 m2 @ 250.00 4,930.09
28 (A 0.8 1.8 1.44
29 (B 0.8 1.54 1.232
30 (C 2.5 0.9 2.25
31 (D 1.8 1.67 3.006
32 (E 2.5 0.9 2.25
33 -1 0.6 0.6 -0.36
34 -1 0.525 0.525 -0.275625
35 A252 mesh reinforcement 9.542375 m2 @ 23.00 219.47