1. TA ANALISIS PERPINDAHAN PANAS KONVEKSI PAKSA PADA KOLEKTOR SURYA PELAT DATAR PIPA
SEJAJAR – 98
2. TA PENGARUH CYANIDING PADA BAJA KARBON RENDAH BERDASARKAN VARIASI WAKTU PENGERASAN
DAN MEDIA PENDINGIN DITINJAU DARI KEKERASAN DAN STRUKTUR MIKRO – 98
3. TA ANALISIS BAHAN DENGAN METODE HUBUNGAN ANTAR AKTIVITAS DAN KONTROL KUALITAS DI PT.
KARKA NUTRI INDUSTRI – 98
4. TA PROSES PRODUKSI KARUNG PLASTIK INNER DENGAN SISTEM PENIUPAN (BLOWING) – 98
5. TA FLUKTUASI PERMUKAAN AIR DI DALAM SURGE TANK AKIBAT WATER HAMMER PADA INSTALASI
ALIRAN FLUIDA – 98
6. PERANCANGAN SISTEM TRANSMISI WHEEL LOADER DENGAN KAPASITAS BUCKET 2,6 M3 – 04
7. TA RELEVANSI PENGGUNAAN PASIR CETAK SILIKA DAN SUNGAI UNTUK PRODUK CORAN DI INDUSTRI
PENGECORAN LOGAM CEPER KLATEN JATENG – 96
8. PROYEK AKHIR MESIN SERUT MAL UNIVERSAL – 04
9. STUI PENGARUH VISKOSITAS MEDIA CELUP TERHADAPKEKERASAN DAN STRUKTUR MIKRO AS SPROKET
DEPAN IMITASI HONDA GRAND AGAR MENDEKATI AS SPROKET ASLI – 03
10. REKONDISI MESIN DAIHATSU CHARDE PADA SISTEM PELUNASAN – 04
11. PERANCANGAN FEED GEARBOX MESIN FRALS UNIVERSAL DENGAN 12 TINGKAT KECEPATAN – 05
12. PERBANDINGAN KEKUATAN TEKANAN DAN STRUKTUR MIKRO PADA HELM KOMPOSIT BERPENGUAT
SERAT GELAS E KONTINYU, ACAK DAN ANYAM DENGAN MATRIK POLIESTER 157 – 06
13. TA KAJI KEKUATAN TERHADAP PUTUS BENANG DI MESIN RINGA SPINING PADA PROSES PRODUKSI
BENANG NEL 405 – 98
14. TRANSMISI PENGGERAK RODA BELAKANG PADA KENDARAAN KIJANG LGX – 01
15. TA ANALISIS KEKERASAN DAN STRUKTUR MIKRO BAJA KARBON MEDIUM DALAM PROSES PENEMPAAN
DENGAN VARIASI PENDINGINAN – 98
16. TA MENCARI BESARNYA KOEFISIENSI PERPINDAHAN PANAS KONVEKSI PAKSA PADA ALAT PENUKAR
KALOR TYPE I PASS SHELL JENIS MIXED FLOW – 98
17. TA ANALISIS PENGARUH BESAR BUTIR TERHADAP LAJU KOROSI BAJA KARBON MEDIUM – 98
18. TA UNJUK KERJA (COP) MESIN PENDINGIN SETELAH DIMODIFIKASI DARI PENGGUNAAN FLASHTANK KE
INTERCODER DAN PENAMBAHAN PENUKAR KALOR – 98
19. TRANSMISI RODA GIGI REDUKSI – 01
20. TRANSMISI PENGANGKAT TOWER CRANE – 00
21. TA PERAWATAN DAN BIAYA OPERASIONAL MESIN PERONTOK JAGUNG DENGAN KAPASITAS 2000 KG/JAM
– 98
22. TA PERENCANAAN ULANG [MEREDESAIN] KOMPONEN UTAMA MESIN [PIN DAN RING PISTON] SERTA
PERAWATAN DASAR MOTOR BENSIN 4 SILINDER – 03
23. TA PERENCANAAN ALAT PENGADUK PUPUK – 98
24. TA PERENCANAAN MESIN PERAJANG TEMBAKAU JENIS VERTIKAT CUT – 98
25. TA PERENCANAAN DAN PEMBUATAN ALAT PENGEPRES GERAM-GERAM DARI MESIN PERKAKAS DENGAN
MENGGUNAKAN SISTIM HIDROLIK – 99
26. TA PERENCANAAN ALAT UJI PUNTIR KAWAT DENGAN VARIASI PUTARAN 30 RPM-90 RPM – 00
27. TA PERANCANGAN PRONY BRAKE PADA LABORATORIUM PENGUJIAN MESIN INSTITUT TEKNOLOGI
NASIONAL MALANG – 00
28. TA PERANCANGAN KONSTRUKSI DAN TRANSMISI PADA MESIN PENCETAK BAKMI KAPASITAS 6 KG/JAM –
99
29. TA PERENCANAAN KONSTRUKSI MESIN PERANCAH RAMBAK DENGAN PENGGERAK MOTOR LISTRIK – 99
30. PENGARUH FRAKSI VOLUME AL2 O3 DALAM KOMPOSIT MATRIK ALUMUNIUM TERHADAP POROSITAS,
MIKRO STRUKTUR DAN PENGUJIAN IMPACT – 98
31. TA PERENCANAAN TRANSMISI MESIN PENGGILING JAGUNG DENGAN KAPASITAS 50 KG/JAM – 00
32. TA PERENCANAAN KOSNTRUKSI KERANGKA PADA MESIN PENGEPRES ”MELINJO” DAN ”PISANG” DENGAN
KAPASITAS 15 KG/JAM – 00
33. TA PERENCANAAN POROS DAN BANTALAN PADA ALAT PEMBELAH KEDELAI UNTUK BAHAN BAKU
PEMBUATAN TEMPE – 99
34. PERENCANAAN TRANSMISI DAN PERHITUNGAN KALOR MESIN PENGERING AMPAS TEBU KAPASITAS 300
KG/ JAM – 01
35. TA PERANCANGAN DAN PEMBUATAN SISTEM PENGHALUS KAYU BALOK GUNA PENINGKATAN MUTU
PRODUKSI – 98
36. TA RANCANGAN BANGUN CHIPER MACHINE (KAYU) UNTUK INDUSTRI HARDBOARD DENGAN KAPASITAS
3
5 M /JAM – 00
37. TA PERENCANAAN ULANG (MEREDESAIN) KOMPONEN UTAMA MESIN (CONECTING ROD) SERTA
PERAWATAN DASAR MOTOR BENSIN 4 SILINDER – 03
38. TA PERENCANAAN DAYA MOTOR, SABUK DAN PULLEY PADA MESIN PENGUPAS KACANG TANAH – 99
39. TA PERENCANAAN TRANSMISI SABUK V PADA MESIN PEMBUAT SUMPIT – 00
40. TA PERENCANAAN POROS, PASAK DAN BANTALAN PADA MESIN PENYARING DAUN TEH SETELAH
DIGILING – 98
41. TA RANCANGAN BANGUN TRANSMISI MESIN PERKAKAS SERBAGUNA – 00
42. TA PERANCANGAN MESIN POLES UNTUK LOGAM FERRAS DAN NON FERRAUS (TRANSMISI) – 98
43. PERENCANAAN DAN PEMBUATAN MESIN GURDI PCB – 00
44. PERANCANGAN MESIN PEMBELAH KEDELAI UNTUK BAHAN BAKU TEMPE DENGAN KAPASITAS 7,5
KG/MENIT – 00
45. PENGARUH PENAMBAHAN Mn (0,3%, 0,6%, 0,9%) DAN Mg (1,4%) PADA AL CU TERHADAP KEKERASAN,
POROSITAS, KEKUATAN TARIK DAN STRUKTUR MIKRO – 99
46. PERENCANAAN DAN PEMBUATAN MESIN GURDI PCB – 00
47. PERENCANAAN KONSTRUKSI MESIN PEMBUAT SUMPIT – 00
48. ANALISIS PEMILIHAN BAHAN PADA PENCETAK WADAH DIAMOND – 02
49. TRANSMISI MESIN PENGGILING TEBU – 01
50. PENGARUH PENAMBAHAN Si (2,7%) DAN Ni (0,458%) TERHADAP SIFAT MEKANIK DAN STRUKTUR MIKRO
PADA BESI TUANG KELABU FC 25 – 98
51. TA PERENCANAAN POROS ULIR TEKAN, TABUNG PROSES DAN CORONG PADA MESIN TEPUNG IKAN – 98
52. TA PERENCANAAN MESIN GURDI VERTIKAL DENGAN PENGGERAK MOTOR LISTRIK – 98
53. TA PERENCANAAN DAYA MOTOR, SABUK PULLY DAN PASAK PADA ALAT PEMBELAH KEDELAI UNTUK
BAHAN BAKU PEMBUATAN TEMPE – 98
54. TA PERENCANAAN BANTALAN DAN SABUK PADA MESIN PEMOLES TEGEL – 98
55. TA PERENCANAAN CHAIN UNTUK CONVEYOR – 98
56. PERENCANAAN POROS, BANTALAN DAN BAUT MUR PENGIKAT PADA MESIN PENYAWUT KETELA – 98
57. TA PERENCANAAN SISTEM PNEUMATIK PADA ALAT BANTU PEMBUKA KATUP – 98
58. TA TUNGKU SURYA – 01
59. TA PROSES PRODUKSI MESIN PEMBUAT KAWAT SLING BAJA DIAMETER 3 MM S/D 15 MM – 99
60. TA PERENCANAAN KONSTRUKSI PENGELASAN PADA ALAT BANTU PEMBUKA KATUP DENGAN TENAGA
PNEUMATIK – 98
61. TA PERENCANAAN KONSTRUKSI PADA MESIN PENYARING DAUN TEH SETELAH DIGILING – 99
62. TA PERENCANAAN MESIN PENGGILING JAGUNG KAPASITAS 150 KG/JAM – 00
63. TA PERENCANAAN KONSTRUKSI MESIN PENGGILING KEDELAI UNTUK BAHAN BAKU PEMBUATAN TAHU –
01
64. TA PERENCANAAN DAYA MOTOR, SABUK, PULI PADA MESIN PERAJANG TEMBAKAU JENIS VERTIKAL CUT
– 98
65. TA PERENCANAAN TRANSMISI SISTEM SABUK V PADA MESIN PEMERAS KULIT BIJI JAMBU METE DENGAN
SIMULASI PROGRAM PASCAL VERSI 7.0 KAPASITAS 360 KG/JAM DAYA 3 HP – 00
66. TA PERANCANGAN POROS DAN SILINDER PENGUPAS PADA MESIN PENGUPAS KACANG TANAH – 98
67. TA PERENCANAAN MESIN PENGUPAS SABUT KELAPA – 99
68. TA PERENCANAAN SISTEM TRANSMISI SABUK V PADA MESIN PENGURAI SABUT KELAPA KAPASITAS 180
KG/JAM – 00
69. TA PERENCANAAN TRANSMISI DAN KONSTRUKSI PADA PENGUJIAN RANTAI ROL DENGAN PEMBEBANAN –
00
70. PENELITIAN SIFAT FISIK DAN MEKANIS KATUP MOTOR JINCHENG DAN YAMAHA – 02
71. PENELITIAN SIFAT FISIK DAN MEKANIS DARI KOMPONEN RANTAI DAN SPROKET MOTOR HONDA SANEX –
01
72. PENCETAKAN COVER BODY MOTOR DENGAN MENGGUNAKAN BAHAN FIBERGLASS REINFOCED PLASTICS
– 97
73. PENGARUH PENGETAHUAN MENGGAMBAR TEKNIK MESIN DAN PENGUASAAAN PERMESINAN TERHADAP
PRESTASI PRAKTEK MESIN BUBUT PADA SISWA KELAS II PEMOGRAMAN MEKANIK UMUM SMK GENERASI
PEMBANGUNAN KAB. KLATEN TAHUN AJARAN 02/03 – 04
74. PENGARUH PENILAIAN ORANG TUA DAN FASILITAS BELAJAR DI RUMAH TERHADAP PRESTASI BELAJAR
KEJURUAN OTOMOTIF KELAS II PEMOGRAMAN KEAHLIAN MEKANIK OTOMOTIF SMK PANCASILA WONOGIRI
TH AJARAN 2004/2005 – 05
75. TA PERANCANGAN PABRIK ES BALOK DENGAN KAPASITAS 10 TON PER HARI – 06
76. PROSES PEMBUATAN PIRINGAN MESIN POLES – 05
77. PROSES PEMBUATAN RANGKA DAN DUDUKAN ALAT PENGEPRES BLONDO – 07
78. TA PENELITIAN SIFAT FISIK DAN MEKANIS DAUR ULANG ALUMUNIUM BEKAS – 02
79. ANALISIS KEGAGALAN PROSES PENGELASAN KERETA BALAST WAYON SRT THAILAND DI PT. INKA
MADIUN – 98
80. TA PERENCANAAN PISAU PONS/PELUBANG PADA MESIN PELUBANG PLAT SARANGAN KOMPOR MINYAK
TANAH – 01
81. MERENCANA MESIN TRANSMISI PESAWAT PERANGKAT – 00
82. PERENCANAAN TRANSMISI RODA GIGI MOBIL DAIHATSU – 00
83. TA PERENCANAAN ALAT PENGANGKAT SISTEM HIDROLIK – 98
84. TA BULLDOZER UNTUK PERTAMBANGAN – 00
85. TA PERANCANGAN MESIN DIESEL SEBAGAI PENGGERAK BULLDOZER – 02
86. TA PERANCANGAN ALAT PEMERAS MADU – 06
87. PA PROSES PEMBUATAN POROS PADA ALAT PEMBUAT KANCING BAJU BERBAHAN TEMPURUNG KELAPA –
06
88. PA PROSES PEMBUATAN POROS PENEKAN PRES PADA ALAT TAMBAL BAN PRES DIGITAL – 06
89. PA PROSES PEMBUATAN LANDASAN PADA ALAT BANTU PENGUKURAN KUALITAS GEOMETRIS RODA GIGI
– 06
90. PA PERANCANGAN ALAT PENGEROL ENCENG GONDOK – 04
91. KEIAPAN KERJA SISWA JURUSAN TEKNIK MESIN SMKN 2 KENDARI DI KOTA KENDARI – 06
92. PERANCANGAN LOGGING TRUCK DENGAN DAYA ±220 PS – 01