F - Block Band 1

Start date Finish Date


1 Block Work 26September201
1.a Dwelling units 02July2010 0
1.b common areas 30August2010 16September201
02October2010
1.c shafts & fin walls 31July2010 0

2 Plastering works
2.a ceiling plastering 02July2010 23August2010
2.b internal plastering 31July2010 25October2010
07September201
2.c common areas plastering 0 26September201
10October2010
2.d inside shaft plastering 12August2010 03December201 0
2.e External plastering 05October2010 0

1 schedule prepared is not in line with the site condition.

2 understanding of the sequence of activities as per the quality.

3 The schedule is not supported by the catch up programme


Cycle in Block
Block Band Cycle Structure days work
Helipad 30 20June2011
OH Tank Band 7 30 21May2011
LMR 16 21April2011
24th floor 17 05April2011
23rd floor 17 19March2011
22nd floor Band 6 16 02March2011
21st floor 16 14February2011
20th floor 18 29January2011
19th floor 17 25December201
11January2011
18th floor 16 09December201 0
17th floor 16 23November201 0
16th floor Band 5 0
15th floor
14th floor
Band 4
13th floor
12th floor
11th floor
10th floor
Band 3
9th floor
8th floor
7th floor
6th floor
Band 2
5th floor
4th floor
3rd floor
2nd floor
Band 1
1st floor
GF floor
B1 floor
B2 floor
B3 floor
B4 floor
External Plastering

Electrica Plumbin Cycle


l works g works in days Start Finish

110 11March2012 29June2012

21December201
80 1 10March2012

80
20December201
01October2011 1

30September201
80 12July2011
1

80 22April2011 11July2011

110 01January2011 21April2011