Calculate : Volume of cement per feet, Volume of cement, Cement for 1500
ft, Sak of cement, Mix water require, Displace fluid required, Hydrostatic
pressure outside casing, Hydrostatic pressure inside casing, Buoyancy factor,
Differential pressure, Area, Push up pressure, Push down pressure, Total
push, Bump plug pressure
After bump plug pressure acquired, we have to know the casing brush
pressure for that grade, only to make sure that casing will not brush when
the cementing operation carry out.
After reading that cementing operation calculation we also need to know how
to calculate slurry yield within the cement laboratory, which usually base on
fluid from a future cementing location took place.
Laboratory calculation
Answer :
- 𝑉𝑜𝑙𝑢𝑚𝑒 𝑜𝑓 𝑤𝑎𝑡𝑒𝑟 = 𝑐𝑒𝑚𝑒𝑛𝑡 𝑤𝑒𝑖𝑔𝑡 𝑥 𝑤𝑎𝑡𝑒𝑟 𝑝𝑒𝑟𝑐𝑒𝑛𝑡𝑎𝑔𝑒
𝑉𝑜𝑙𝑢𝑚𝑒 𝑜𝑓 𝑤𝑎𝑡𝑒𝑟 = 100 𝑥 0.44
𝑉𝑜𝑙𝑢𝑚𝑒 𝑜𝑓 𝑤𝑎𝑡𝑒𝑟 = 44 𝑐𝑚3
𝑐𝑒𝑚𝑒𝑛𝑡 𝑤𝑒𝑖𝑔 𝑡
- 𝑉𝑜𝑢𝑚𝑒 𝑜𝑓 𝑐𝑒𝑚𝑒𝑛𝑡 =
3.14
100
𝑉𝑜𝑢𝑚𝑒 𝑜𝑓 𝑐𝑒𝑚𝑒𝑛𝑡 =
3.14
𝑉𝑜𝑢𝑚𝑒 𝑜𝑓 𝑐𝑒𝑚𝑒𝑛𝑡 = 31.85 𝑐𝑚3
- 𝑉𝑜𝑙𝑢𝑚𝑒 𝑜𝑓 𝑠𝑙𝑢𝑟𝑟𝑦 = 𝑣𝑜𝑙𝑢𝑚𝑒 𝑜𝑓 𝑤𝑎𝑡𝑒𝑟 + 𝑣𝑜𝑙𝑢𝑚𝑒 𝑜𝑓 𝑐𝑒𝑚𝑒𝑛𝑡
𝑉𝑜𝑙𝑢𝑚𝑒 𝑜𝑓 𝑠𝑙𝑢𝑟𝑟𝑦 = 44 + 31.85
𝑉𝑜𝑙𝑢𝑚𝑒 𝑜𝑓 𝑠𝑙𝑢𝑟𝑟𝑦 = 75.85 𝑐𝑚3
- 𝑇𝑜𝑡𝑎𝑙 𝑚𝑎𝑠𝑠 𝑠𝑙𝑢𝑟𝑟𝑦 = 𝑐𝑒𝑚𝑒𝑛𝑡 𝑤𝑒𝑖𝑔𝑡 + 𝑤𝑎𝑡𝑒𝑟 𝑤𝑒𝑖𝑔𝑡
𝑇𝑜𝑡𝑎𝑙 𝑚𝑎𝑠𝑠 𝑠𝑙𝑢𝑟𝑟𝑦 = 100 + 44
𝑇𝑜𝑡𝑎𝑙 𝑚𝑎𝑠𝑠 𝑠𝑙𝑢𝑟𝑟𝑦 = 144 𝑔𝑟𝑎𝑚
- 𝐷𝑒𝑛𝑠𝑖𝑡𝑦 = 𝑡𝑜𝑡𝑎𝑙 𝑚𝑎𝑠𝑠 𝑠𝑙𝑢𝑟𝑟𝑦/𝑣𝑜𝑙𝑢𝑚𝑒 𝑠𝑙𝑢𝑟𝑟𝑦
𝐷𝑒𝑛𝑠𝑖𝑡𝑦 = 144𝑔𝑟𝑎𝑚/75.85 𝑐𝑚3
𝐷𝑒𝑛𝑠𝑖𝑡𝑦 = 1.89 𝑔𝑟𝑎𝑚/𝑐𝑚3
𝐷𝑒𝑛𝑠𝑖𝑡𝑦 = 1.89 𝑔𝑟𝑎𝑚/𝑐𝑚3 𝑥 8.34134
𝐷𝑒𝑛𝑠𝑖𝑡𝑦 = 15.76 𝑙𝑏/𝑔𝑎𝑙
𝐷𝑒𝑛𝑠𝑖𝑡𝑦 = 15.8 𝑝𝑝𝑔
- 𝑊𝑎𝑡𝑒𝑟 𝑟𝑒𝑞𝑢𝑖𝑟𝑒 𝑝𝑒𝑟 𝑠𝑎𝑐𝑘 𝑐𝑒𝑚𝑒𝑛𝑡 = 𝑣𝑜𝑙𝑢𝑚𝑒 𝑤𝑎𝑡𝑒𝑟 𝑥 𝑐𝑒𝑚𝑒𝑛𝑡 𝑖𝑛 𝑠𝑎𝑐𝑘
𝑊𝑎𝑡𝑒𝑟 𝑟𝑒𝑞𝑢𝑖𝑟𝑒 𝑝𝑒𝑟 𝑠𝑎𝑐𝑘 𝑐𝑒𝑚𝑒𝑛𝑡 = 44 𝑥 426.38
𝑊𝑎𝑡𝑒𝑟 𝑟𝑒𝑞𝑢𝑖𝑟𝑒 𝑝𝑒𝑟 𝑠𝑎𝑐𝑘 𝑐𝑒𝑚𝑒𝑛𝑡 = 18760.72 𝑐𝑚3
𝑊𝑎𝑡𝑒𝑟 𝑟𝑒𝑞𝑢𝑖𝑟𝑒 𝑝𝑒𝑟 𝑠𝑎𝑐𝑘 𝑐𝑒𝑚𝑒𝑛𝑡 = 18760.72 /3785.4
𝑊𝑎𝑡𝑒𝑟 𝑟𝑒𝑞𝑢𝑖𝑟𝑒 𝑝𝑒𝑟 𝑠𝑎𝑐𝑘 𝑐𝑒𝑚𝑒𝑛𝑡 = 4.96 𝑔𝑎𝑙/𝑠𝑎𝑘
- 𝑠𝑙𝑢𝑟𝑟𝑦 𝑦𝑖𝑒𝑙𝑑 = 𝑤𝑒𝑖𝑔𝑡 𝑜𝑓 𝑎 𝑠𝑎𝑐𝑘/𝑣𝑜𝑙𝑢𝑚𝑒 𝑜𝑓 𝑐𝑒𝑚𝑒𝑛𝑡
𝑠𝑙𝑢𝑟𝑟𝑦 𝑦𝑖𝑒𝑙𝑑 = 75.85 𝑐𝑚3 /100 𝑔𝑟𝑎𝑚
𝑠𝑙𝑢𝑟𝑟𝑦 𝑦𝑖𝑒𝑙𝑑 = 0.76 𝑐𝑚3 /𝑔𝑟𝑎𝑚
𝑠𝑙𝑢𝑟𝑟𝑦 𝑦𝑖𝑒𝑙𝑑 = 0.76 𝑐𝑚3 𝑥 1.5032
𝑠𝑙𝑢𝑟𝑟𝑦 𝑦𝑖𝑒𝑙𝑑 = 1.14 𝑓𝑡 3 /𝑠𝑎𝑘