Mek Ta N1
Mek Ta N1
Hv = H - Hs e = Hv / Hs
(Kg/cm2) gauge, H (cm)
0.000 2.00 1.472 2.788
0.133 1.95 1.422 2.693
0.267 1.88 1.352 2.561
0.534 1.78 1.252 2.371
1.067 1.65 1.122 2.125
2.135 1.48 0.952 1.803
4.269 1.35 0.822 1.557
8.538 1.14 0.612 1.159
0.133 1.25 0.722 1.367
TABEL HUBUNGAN U, Tv, T, St
15.5
20.0
24.2
34.9
40.0
St(cm)
49.7
60.0
70.0
80.0
100.0
104.7
t(bulan)
120.0
t(hari) St(cm)
30 1.19
90 2.04
180 2.93
0.5
St(cm)
1
1.19
1.5
2 2.04
2.5
2.93
3
3.5 t(hari)
t(hari) St(cm)
5.23 0.5
20.98 1
30 1.19
90 2.04
180 2.93
0.5 0.5
1 1
1.19
1.5
2 2.04
2.5
3 2.93
waktu t(hari)
3.5
5.23 0.5
20.98 1
30 1.19
90 2.04
141.78 2.61
180 2.93
613.425 4.15
0.5 0.5
1 1
1.19
1.5
2 2.04
2.5
2.61
2.93
3
3.5
4
4.15
waktu t(hari)
4.5
Kurva e vs Log P (Lapisan Lempung)
Pc'
3.0
e0 = 2.788
1
2
2.5
3
Angka Pori,e
2.0
e1 = 1.803
5
e2 = 1.557
6
1.5
A1 = 1.367
8
A2 = 1.159
7
0.4*e0 = 1.115
1.0
0.5
0.0 P2 = 2.135
Pc = 0.6 P1 = 4.269
0.1 1.0 10.0 100.0
Pt = 10.2
Tegangan P,Skala Log (kg/cm2)