Cementing Design

SG besi 8.45 Casing sebelumnya ada Shoe Joint


W 44.7 lb/ft
Liner ada OD 17 in Hole
OD 8 in ID 16.5 in Depth
ID 7.675 in SG 7.8412 Diameter
Length 2000 ft Length 2000 ft
Top of liner 30 ft Top of Lead
Casing sebelumnya lagi, gan! ada
Casing terakhir ada W 65 lb/ft Top of Tail
W 61 lb/ft OD 28 in
OD 13.375 in ID 26.8 in Mud density
ID 12.5571 in SG 2.9043 Lama
Length 5000 ft Length 400 ft Baru

Analisis Volume Per Section

Section ke- Tipe Fluida Keadaan Tinggi (ft) C (cu.ft./ft) Volume (cu.ft.)
1 Mud baru Dalam pipa 4970 0.8600 4274.2444
2 Mud baru Dalam pipa 1970 0.3213 632.9223
3 Tail Cement Dalam pipa 30 0.3213 9.6384
4 Tail Cement Open-Hole 30 1.2272 55.2233
5 Tail Cement Open-Hole 970 0.8781 1277.6628
6 Lead Cement Open-Hole 1000 0.8781 1317.1782
7 Lead Cement Open-Hole 3000 0.2515 1131.6943
8 Lead Cement Dalam pipa 1000 0.5092 509.1964
9 Spacer Dalam pipa 441.0872 0.5092 224.6000
10 Mud lama Dalam pipa 558.9128 0.5092 284.5964

Vdisplacement 873.9389 bbl Vlead 22126.2500 gal


Vpumping 70553.718067 gal Vtail 10042.0358 gal
tpumping 176.3843 min
strkpumping 14117 stroke
tdisplacement 91.763580795 min
strkdisplacement 7345 stroke
ementing Design

30 ft Spacer ada @ ann Converter


Volume 40 bbl 1 bbl
Density 12.5 ppg 42 gal
7000 ft 5.615 cu.ft.
15 in Pump
Rate 80.0320 SPM 1 cu.ft.
1000 ft Displacement 0.119 bbl/stroke 7.4800 gal
Q 400 GPM 0.1781 bbl
6000 ft
Excess volume 50 % 1 gal
0.1337 cu.ft.
11 ppg ΔP casing 400 psi 0.0238 bbl
11 ppg ΔP annulus 350 psi
Lead Cement Vlead 22126.2500 gal

No SG Vabs(gal/lb) % BW Of … % W/sak cmnt (lb/sk) V/sak cmnt (gal/sk) W (lb) V (gal)


1 3.15 0.03811 94.0000 3.5824 152485.0260 5811.2779
2 1 0.1200480192 c 81.2 76.3280 9.1630 123817.8411 14864.0866
3 2.65 0.04530 c 4 3.7600 0.1703 6099.4010 276.3098
4 2.17 0.05532 w 12 9.1594 0.5067 14858.1409 821.9771
5 0.1014 1.9724 0.2000 3199.5683 324.4362
6 1.3 0.09234 c 0.2 0.1880 0.0174 304.9701 28.1623
7 0.0000 0.0000 0 0.0000
8 0.0000 0.0000 0 0.0000
9 0.0000 0.0000 0 0.0000
10 0.0000 0.0000 0 0.0000
11 0.0000 0.0000 0 0.0000
12 0.0000 0.0000 0 0.0000
Total 185.4077 13.6398 300764.9475 22126.2500

rho lead 13.5931 ppg


Yield of lead 1.8235 sk/cu.ft
Sk of lead 1622.1811281 1623

Tail Cement Vtail 10042.0358 gal

No SG Vabs(gal/lb) % BW Of … % W/sak cmnt (lb/sk) V/sak cmnt (gal/sk) W (lb) V (gal)


1 3.15 0.03811 94.0000 3.5824 152485.0260 5811.2779
2 1 0.1200480192 c 50 47.0000 5.6423 76242.5130 9152.7627
3 0.02440 c 7 6.5800 0.1606 10673.9518 260.4444
4 0.07600 w 1 0.4700 0.0357 762.4251 57.9443
5 1.3 0.0923446302 c 0.2 0.1880 0.0174 304.9701 28.1623
6 0.0000 0.0000 0.0000 0.0000
7 0.0000 0.0000 0 0.0000
8 0.0000 0.0000 0 0.0000
9 0.0000 0.0000 0 0.0000
10 0.0000 0.0000 0 0.0000
11 0.0000 0.0000 0 0.0000
12 0.0000 0.0000 0 0.0000
Total 148.2380 9.4383 240468.8861 15310.5916

rho tail 15.7060 ppg


Yield of tail 1.2618 sk/cu.ft
Sk of tail 1063.9693944 1064
Converter
1 bbl
42 gal
5.615 cu.ft.

1 cu.ft.
7.4800 gal
0.1781 bbl

1 gal
0.1337 cu.ft.
0.0238 bbl
Pump Pressure OR Minimum Pressure for Pushing Plug

Section Tipe Fluida Tinggi (ft) Density (ppg) HS. Pressure (psi)
1 Mud baru 4970 11 2842.8400
2 Mud baru 1970 11 1126.8400
3 Tail Cement
4 Tail Cement
30
30
15.7060
15.7060
24.5014
24.5014
P 1688.6497 psi

5 Tail Cement 970 15.7060 792.2131


6 Lead Cement 1000 13.5931 706.8427
7 Lead Cement 3000 13.5931 2120.5280
8 Lead Cement 1000 13.5931 706.8427
9 Spacer 441.0871715 12.5 286.7067
10 Mud lama 558.9128285 11 319.6981

P annulus 4957.3326 psi


P casing 4018.6829 psi
ΔP casing 400 psi
ΔP annulus 350 psi

Minimum and Maximum Pressure


Min. Press 4004 psi only early mud
Max. Press 4957.3326 psi after cemented

Maximum ECD
Pbhd 5307.3326 psi >>>bhd=bottom hole dynamic
ECDmax 14.5806 ppg