FOUR STEPS TO ACHIEVE JH
STEP 0 Understanding the equipment.
STEP 1 Initial cleaning & abnormality
identification.
STEP 2 Abnormality rectification &
eliminating hard to access area.
STEP 3 Preparation of tentative “ CLTI”
standards
STEP 0
This is a preparatory step, which deals with making people aware of the
adverse effects of forced deterioration.
Major problem(1)
Medium problem(30)
Minor problems(300)
Invisible problems(3000)
Heienrich triangle.
STEP 0
Understanding the equipment
1. Draw single line diagram to know
function of all parts and sub assemblies
2. To understand safety requirements
associated with the equipment.
3. Understand why forced deterioration is
caused and the losses due to this
4. To provide one point lesson in all unsafe
condition and in skill required for CLTI.
Draw single line diagram to know function of all parts
and sub assemblies
INNER RACE
BALL
OUTER RACE
STEP 1
Initial cleaning
Abnormal Abnormal
temperatur smell
e
Abnormal
vibration
leakages
List out the abnormality and put a red tag near the
equipment.
Abnormal Abnormal
temperatur smell
e
Abnormal
vibration
leakages
Go near the equipment and put red tags on the abnormalities found.
STEP 2
Countermeasure for the cause of forced
deterioration and improving hard to access areas
Before After
Countermeasure against hard to access areas
Before After
Kaizen made for hard to clean area
Before After
Preparation of tentative “ CLTI ” standards
First understand the requirement of the operator and
whether the present standard is meeting his requirement. If
it is not then take the action to develop a new cleaning,
inspection and lubrication standard for the same.
In consultation with the operators and the maintenance
crew, prepare a plan for cleaning, oiling and retightening of
the equipment parts, including the time required. After
these things are finalized the leader should assign the
responsibility to the different people.
After this CLTI calendar to be filled.
Come up with better ideas of all
CLIT CALENDAR
Pressure gauge marking
Before After
Oil level marking for better inspection
Before After
Points marked on retightening parts
CLTI marking and direction of rotation marking
Before After
Open and close marked on the equipment
Hmm
everythin
g is fine
VALVE KEPT CLOSED IN OPERATION
MATCHED MIS-MATCHED
C-1
C-4
C-3
C-2
VT PUMP-1
L-2.1
L-1
I-5
I-2
I-1
I-3 I-4
Examples of visual controls implemented for easy
inspection (BLOWER AREA)
A blower is having three valves, these valves are painted in three
different colors for easy identification.
Stand
Stand--33 Pressure
Pressuregauges
gauges
DDCC
Bevel
Bevelgear
gearbox
box
Motor
Motor
Visual Management
TILL STEP-4 IN STEP-5
After
After
Lubricator scale
marked for easy
inspection
JISHU HOZEN
ICL VISHNUPURAM
Step -1 Initial cleaning
Step -1 Initial cleaning & abnormality listing
Step -1 Initial cleaning & abnormality listing
We are
We are responsible
responsible of
of our
our equipment
equipment
TPM coordinator
Kiln Team Leader
KILN MAINDRIVE
BEFORE AFTER
KILN MAINDRIVE
BEFORE AFTER
STEP3 – CLTI MARKING VISUALISATION
BEFORE AFTER
STEP3 – CLTI MARKING VISUALISATION
BEFORE AFTER
STEP3 – CLTI MARKING VISUALISATION
BEFORE AFTER
STEP 3 – CLTI MARKING
BEFORE AFTER
STEP 3 – CLTI MARKING
BEFORE AFTER
STEP 3 – CLTI MARKING
BEFORE AFTER
STEP 3 – CLTI MARKING
BEFORE BEFORE
CLTI in Kiln-1 main drive area
BEFORE AFTER
CLTI in Kiln-1 main drive area
BEFORE AFTER
CLTI in Kiln-1 main drive area
BEFORE AFTER
Finally conduct Audits and confirm
the proper implementation of the
standards