I
1 2.40 4.80 11.52 m2 1.0000 m2
0.65 m3 0.0564 m3
0.24 m3 0.0208 m3
12 lbr 1.0417 lbr
10 lbr 0.8681 lbr
10 kg 0.8681 kg
1.0000 m2
4 1.0000 m2
1.0000 m2
II
1 0.80 1.0000 m3
35.50 0.50 0.50 8.88 m3
18 0.80 0.80 0.80 9.22 m3
18.0910 m3
18.09 1.3000 jam
0.8500 jam
2 1.0000 m3
1.3000 jam
3 0.05 1.46 m3 1.0000 m3
35.50 0.50 0.05 0.89 m3
18 0.80 0.80 0.05 0.58 m3
1.7562 m3 1.2000 m3
1.75 1.3000 jam
1 1.0000 m3
5.9500 zak
1.3100 m3
1.0000 m2
III
1 1.0000 m3
1.2000 m3
- jam
4 550 m2 1.0000 m2
lt.1 39.00 3.60 140.4
70.00 1.00 70
lt.2 106.00 3.20 339.2
41,220 bh 75.0000 bh
0.0315 m3
0.0500
1.0000 m2
6 1029 m2 1.0000 m2
0.1662 sak
0.5000 jam
IV
1.0000 m3
7.7000 zak
0.2950 m3
0.4400 m3
1.0000 m3
1 1.0000 m3
18 0.80 0.80 0.20 2.304 m3
18 0.40 0.20 1.00 1.44 m3
3.744 m3 3.75 m3
18 8.00 1.50 216 m1 19.8000 btg
18 2.50 2.50 6.00 540 m1 49.5000 btg
18 0.70 0.30 7.50 135 m1 12.3750 btg
5%
18 0.90 0.40 1.00 23.4 m2 8.36 lb
18 8.00 3.60 6.00 316.80 m1 0.76 m3
5%
2 1.0000 m3
51.5 0.15 0.25 1.93125 m3 1.90 m3
51.5 4.00 206 m1 18.88 btg
257.5 0.20 0.40 154.5 m1 14.16 btg
5%
51.50 0.50 25.75 m2 4.60 lb
51.50 206 46.35 252.35 m1 0.30 m3
5%
3 1.0000 m3
18 0.40 0.15 3.60 3.888 m3 3.89 m3
18 8.00 3.60 518.4 m1 47.52 btg
18 0.70 0.20 24.00 388.80 m1 35.64 btg
5%
18 1.00 0.30 3.00 16.20 m2 2.89 lb
18 24.00 7 16.00 838.80 m1 1.01 m3
5%
3 1.0000 m3
54.00 0.20 0.40 4.32 m3 4.32 m3
54.00 8.00 432 m1 39.60 btg
360.0 0.30 0.70 360.0 m1 33.00 btg
5%
108.20 0.20 0.70 97.38 m2 27.82 lb
432 324.00 22 86 864 m1 1.66 m3
5%
3 1.0000 m3
55.00 0.15 0.35 2.89 m3 2.89 m3
55.00 6.00 330 m1 30.25 btg
366.7 0.20 0.60 293.3 m1 26.89 btg
5%
110.20 0.15 0.60 82.65 m2 14.76 lb
330.00 17 55 402 m1 0.48 m3
5%
3 1.0000 m3
167.00 1.00 0.12 20.04 m3 20.04 m3
1,670.00 1,670.00 3,340 306.17 btg
5%
167.00 m2 59.64 lb
668.00 1,002.00 1,011.00 2,681 m1 6.43 m3
5%
10%
3 1.0000 m3
64.55 1.00 0.10 6.46 m3 6.46 m3
64.55 0.15 0.20 1.94 m3 1.94
430.33 430.33 860.67 m1 78.89 btg
64.55 4.00 258.20 m1 23.67 btg
430.33 0.20 0.30 215.17 m1 19.72 btg
5%
77.46 m2 13.83 lb
387.30 387 396 1,171 m1 1.41 m3
5%
4 1.0000 ttk
46.00 3.40 0.15 0.15 3.52 m3 3.52 m3
156.40 4.00 625.60 m1 57.35 btg
782.00 0.20 0.20 312.80 m1 28.67 btg
5%
156.40 0.25 39.1 m2 6.98 lb
156.40 4 625.60 m1 0.75 m3
5%
7 1.0000 m3
145.00 0.15 0.25 5.44 m3 5.44 m3
145.0 4.00 580 m1 53.17 btg
725.0 0.20 0.40 435.0 m1 39.88 btg
5%
145.00 0.50 72.5 m2 12.95 lb
145.00 580 130.50 710.50 m1 0.85 m3
5%
9 1.0000 m3
26.00 0.12 0.60 1.87 m3 1.88 m3
26.00 6.00 156 m1 14.30 btg
173.3 0.14 1.10 214.9 m1 19.70 btg
5%
52.20 0.12 1.10 63.68 m2 11.37 lb
156.00 6 52 214 m1 0.26 m3
5%
1.0000 m3
1.80 m3 1.80 m3
8.00 1.00 0.12 0.96 m3
0.03 1.00 20.00 0.60 m3
2.00 1.00 0.12 0.24 m3
9.00 6.67 60 5.50 btg
60.00 1.20 3.00 216 19.80 btg
5%
9.00 1.80 16.20 m2 5.79 lb
36.00 54 32 122 m1 0.29 m3
5%
10%
1 1.0000 m3
1.1000 m3
5.0000 kg
1.0000 m3
1.0000 m3
2 1.0000 m2
0.0264 m3
1.0000 m2
1.0000 ls
1.0000 ls
3 1.0000 m2
0.0264 m3
1.0000 lbr
1.0000 lbr
1.0000 ls
1.0000 ls
1.0000 m2
0.0264 m3
0.5000 lembar
1.0000 lbr
1.0000 m1
1.0000 ls
1.0000 m2
0.0160 m3
1.0000 m2
1.0000 m1
1.0000 ls
1 1
2.00 5.00 7.00 m1 0.0630 m3
2 0.80 2.50 2.00 m2 4.0000 m2
2 - psg
- bh
2 - psg
1
0.90 5.00 5.90 m1 0.0531 m3
1 0.80 2.50 2.00 m2 2.0000 m2
1 - psg
1 - bh
1
0.80 5.00 5.80 m1 0.0522 m3
1 0.70 2.50 1.75 m2 1.7500 m2
1 - psg
1 - bh
1
5.10 12.50 17.60 m1 0.1584 m3
1 0.80 2.50 2.00 m2 2.0000 m2
3 0.60 2.40 1.44 m2 4.3200 m2
1 - psg
1 - bh
1
3.50 5.00 8.50 m1 0.0765 m3
5 0.70 2.50 1.75 m2 8.7500 m2
5 - psg
- bh
5 - psg
1
3.50 5.00 8.50 m1 0.0765 m3
5 0.70 2.50 1.75 m2 8.7500 m2
5 - psg
- bh
5 - psg
1
5.80 7.20 13.00 m1 0.1170 m3
3 0.80 0.60 0.48 m2 1.4400 m2
2.16 0.48 2.6400 2.6400 m2
1 - psg
1 - bh
1
3.00 7.20 10.20 m1 0.0918 m3
2 0.70 2.30 1.61 m2 3.2200 m2
1 - psg
1 - bh
1
4.00 7.20 11.20 m1 0.1008 m3
1 0.70 2.30 1.61 m2 1.6100 m2
1.20 2.30 2.7600 m2 2.7600 m2
1 - psg
1 - bh
1
1.40 4.80 6.20 m1 0.0558 m3
1 0.70 2.30 1.61 m2 1.6100 m2
0.0000 m2 - m2
1 - psg
1 - bh
1
6.00 12.00 18.00 m1 0.1620 m3
4 0.70 2.30 1.61 m2 6.4400 m2
- m2
1 - psg
1 - bh
1
1.40 3.40 4.80 m1 0.0432 m3
1 0.70 1.60 1.12 m2 1.1200 m2
- m2
1 - psg
1 - bh
1
3.00 1.50 4.50 m1 0.0405 m3
2 0.70 0.60 0.42 m2 0.8400 m2
249.2000 m1
1.00 7.00 m1 7.0000
8.00 5.90 m1 47.2000
6.00 5.80 m1 34.8000
1.00 17.60 m1 17.6000
2.00 8.50 m1 17.0000
1.00 8.50 m1 8.5000
1.00 13.00 m1 13.0000
4.00 10.20 m1 40.8000
1.00 11.20 m1 11.2000
1.00 6.20 m1 6.2000
1.00 18.00 m1 18.0000
3.00 4.80 m1 14.4000
3.00 4.50 m1 13.5000
68.0000 m2
1.00 2.00 4.0000 8.0000
8.00 2.00 2.0000 32.0000
6.00 1.00 1.7500 10.5000
1.00 2.00 8.7500 17.5000
27.0000 bh
11.0000 bh
VI
1 1.0000 m3
1.1000 m3
4.0000 kg
1.0000
1.0000 m3
2 1.0000 m3
1.2000 m3
25.0000 kg
1.0000 m3
3 1.0000 m3
1.1000 m3
2.5000 kg
1.0000 m3
4 1.0000 m2
0.0120 m3
0.2500 kg
1.0000 m3
4 1.0000 m2
14.0000 bh
1.0000 m2
5 1.0000 m1
3.5000 bh
0.0040 m3
0.0353 m3
1.0000 m2
6 1.0000 m1
0.0070 m3
1.0000 m1
0.1000 kg
1.0000 m1
7 1.0000 m1
0.0090 m3
0.0500 kg
1.0000 m1
7 1.0000 m1
0.4167 lbr
- lbr
0.0500 kg
1.0000 m1
8 1.0000 m2
1.2000 btg
25.0000 bh
1.0000 ls
1.0000 m2
9 1.0000 m2
0.4000 lbr
25.0000 bh
1.0000 LS
1.0000 m3
10 1.0000 m1
0.5000 m1
0.0300 zak
1.0000 m3
VII
2 1.0000 m2
1.0417 dus
0.0300 m3
1.0000 m2
3 1.0000 m2
1.0203 dus
0.0300 m3
1.0000 m2
4 1.0000 m2
1.0000 dus
0.0300 zak
1.0000 m2
5 4.8000 m1
1.0000 dus
0.0216 zak
1.0000 m2
VIII
1 1.0000 m2
730.70 0.1429 kg
0.4286 kg
0.0500 lbr
0.0100 bh
5% ls
1.0000 m2
1.0000 m2
298.50 0.1429 kg
0.2857 kg
0.0500 lbr
0.0100 bh
5% ls
1.0000 m2
1.0000 m1
5.0000 m1
0.4800 m3
15.0000 m2
1.0000 bh
1.0000 bh
0.2500
ANALISA HARGA SATUAN
HA JUMLAH HARGA
URAIAN PEKERJAAN BAHAN BAHAN
(Rp) (Rp)
PEKERJAAN PENDAHULUAN
Bedeng dan gudang 223,784.72 223,700.00
- Kaso 4/6 1,400,000 910,000
- Papan 2/20 1,600,000 384,000
- Triplek 4 mm 62,000 744,000
- Seng gelombang 1.80 42,000 420,000
- Paku 12,000 120,000
- Upah kerja -
2,578,000
Pagar pengaman 39,876.92 39,800.00
- Kaso 4/6 1,400,000 655,200
- Seng gelombang 1.80 20,000 780,000
- Paku 12,000 120,000
- Upah kerja -
1,555,200
Pasang Bouwplank 13,360 13,300.00
- Kaso 4/6 1,400,000 362,880
- Papan 2/20 1,600,000 345,600
- Paku 12,000 12,960
- Upah kerja -
721,440
Pembersihan Lokasi
- Upah kerja -
PEKERJAAN TANAH
Galian tanah pondasi
lajur
tapak
- Upah knek -
- Upah tk -
Urugan kembali bekas galian
- Upah knek -
Urugan pasir bawah pondasi 120,000 120,000.00
lajur
tapak
- Pasir urug 120,000 210,744
- Upah knek -
210,744
Urugan pasir bawah lantai 120,000 120,000.00
- Pasir urug 120,000 1,058,400
- Upah knek -
1,058,400
Urugan tanah peninggian lantai 122,126 122,000.00
- Tanah urug 120,000 8,467,200
- alat bantu 150,000 150,000
- Upah knek -
8,617,200
Mortar 1 : 5 577,350 577,300.00
- Semen 53,000 315,350
- Pasir 200,000 262,000
- Upah kerja -
577,350
Lantai kerja t=5cm 28,865 28,000.00
Mortar 1 : 5 577,300 332,525
- Upah kerja -
332,525
PEKERJAN BATU
Aan stamping/batu kosong
- Batu belah 183,333 220,000
- Upah kerja -
220,000
Pondasi batu belah 1 : 5 337,176 337,100.00
- Batu kali 183,333 146,667
- Mortar 577,300 190,509
- Upah (1Tk + 2kn)
337,176
Pasangan bata 1 : 5 42,719 42,700.00
PEKERJAAN BETON
Beton 1 ; 2 ; 3 K 225 555,100 555,100.00
- Semen 53,000 408,100
- Pasir 200,000 59,000
- Split 200,000 88,000
- Upah kerja -
555,100 38,857
Type P 1
Kusen 11,150,000 702,450
Daun pintu PANEL 587,000 2,348,000
engsel 40,000 -
kunci 200,000 -
handel 300,000 -
3,050,450 3,050,000.00
Type P2
Kusen 11,150,000 592,065
Daun pintu PANEL 587,000 1,174,000
engsel 40,000 -
kunci 200,000 -
1,766,065 1,760,000.00
Type P3
Kusen 11,150,000 582,030
Daun pintu PANEL km/wc 565,000 988,750
engsel 40,000 -
kunci 150,000 -
1,570,780 1,570,000.00
Type PJ
Kusen 11,150,000 1,766,160
Daun pintu PANEL kaca 479,000 958,000
Daun jendela 376,000 1,624,320
engsel 40,000 -
kunci 200,000 -
4,348,480 4,340,000.00
Type PL
Kusen 11,150,000 852,975
Daun pintu PANEL kaca 479,000 4,191,250
engsel 40,000 -
kunci 200,000 -
handel 300,000 -
5,044,225 5,040,000.00
Type Pg
Kusen 11,150,000 852,975
Daun pintu PANEL 587,000 5,136,250
engsel 40,000 -
kunci 200,000 -
handel 300,000 -
5,989,225 5,980,000.00
Type J1
Kusen 11,150,000 1,304,550
Daun jendela 376,000 541,440
Kaca 5 mm 82,000 216,480
engsel 40,000 -
kunci 200,000 -
2,062,470 2,060,000.00
Type J2
Kusen 11,150,000 1,023,570
Daun jendela 376,000 1,210,720
engsel 40,000 -
kunci 200,000 -
2,234,290 2,230,000.00
Type J3
Kusen 11,150,000 1,123,920
Daun jendela 376,000 605,360
Kaca 5 mm 82,000 226,320
engsel 40,000 -
kunci 200,000 -
1,955,600 1,950,000.00
Type J4
Kusen 11,150,000 622,170
Daun jendela 376,000 605,360
Kaca 5 mm 82,000 -
engsel 40,000 -
kunci 200,000 -
1,227,530 1,220,000.00
Type J5
Kusen 11,150,000 1,806,300
Daun jendela 376,000 2,421,440
Kaca 5 mm 82,000 -
engsel 40,000 -
kunci 200,000 -
4,227,740 4,220,000.00
Type J6
Kusen 11,150,000 481,680
Daun jendela 376,000 421,120
Kaca 5 mm 82,000 -
engsel 40,000 -
kunci 200,000 -
902,800 900,000.00
Type BV
Kusen 11,150,000 451,575
Daun jendela 376,000 315,840
767,415 760,000.00
melamik kusen 35,000
melamik daun pintu panel 60,000
PEK. PENGECATAN
Cat tembok (INTERIOR) 15,668 15,600.00
- Plamir 24,000 2,505,257
- Cat tembok 26,000 8,142,086
- Amplas 3,000 109,605
- Rol 20,000 146,140
- Steger 10,903,088 545,154
- Upah kerja
11,448,242 11,448,200.00
Cat tembok (EXTERIOR) 20767.5 20,700.00
- Plamir 24,000 1,023,429
- Cat tembok 56,000 4,776,000
- Amplas 3,000 44,775
- Rol 20,000 59,700
- Steger 5,903,904 295,195
- Upah kerja
6,199,099
40,000
60,000
44,000
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT SATUAN HARGA
Rp. Rp.
A. MATERIAL
I PEKERJAAN PERSIAPAN
TERBILANG : TUJUH RATUS DELAPAN PULUH TUJUH JUTA TUJUH RATUS RIBU RUPIAH
2,382,583.02
(__________________________)
TABEL JUMLAH VOLUME MATRIAL UTAMA PEKERJAAN STRUKTUR
PROYEK :
LOKASI :
7900 7900 7900 7900 7900
7895 7911.4 6081.1 7772.4 7035.6
2.66 4.74 7.4 12.48 10.66
21000 37500 45000 97000 75000
21014 37446 58460 98592 84214
98500
12mm
Jumlah Dimensi Besi dia. Bekisting
No. Jenis Pekerjaan 6mm 8mm 10mm 13 13mm Multiplex ky 4x6 ky 5x7
P L T btg btg btg btg btg 9mm (lbr) (m3) (m3)
1 Pondasi 16.75 25.33 5.13 0.24 0.23
- Tapak 12 1 1 0.2 10.00 0.15 13.33 1.67 0.0576 0.0115
- kolom pondasi 12 0.15 0.4 1.5 6.75 8 12.00 6.88 0.3456 0.3780
Kolom 15x50cm base 12 0.15 0.4 2.5 15.00 10 25.00 6.30 0.32 0.35
kebutuhan - - -
Kolom praktis 69.00 0.15 0.15 3.5 40.25 80.50 7.55 0.6955 0.5216
4 Balok 34.92 47.83 16.24 0.61 2.28
- Balok 15x40 lt.1 54.50 0.15 0.4 1 27.25 8 36.33 17.98 0.7848 1.9075
- Balok 15x25 lt.1 23.00 0.15 0.25 1 7.67 6 11.50 5.19 0.3312 0.8050
Exra - (6.1488)
kebutuhan lt2 - - -
6.1488
Exra 2.00
7 Listplank tbl 8 cm 14.14 bekas bekas bekas
Exra 1.84
- Plat Tangga 12 1 1 0.2 5.00 5.00 0.15 6.67 4.17 0.0360 0.5250
Exra 2.33
1 Pasangan bata
2 plesteran
3 Acian
Jumlah
Pembulatan
KEBUTUHAN KAYU UNTUK KUSEN, PINTU & JENDELA
KUBIKASI
PJG LUAS Uk. 6/15 Uk. 4/20 Uk. 4/10
URAIAN PEKERJAAN TIANG AMBANG
(M1) (M2) KUSEN PINTU JENDELA
1 PEKERJAAN TANGGA
a Utama 1 bh 20,000,000.00 20,000,000.00
b Service 1 bh 12,000,000.00 12,000,000.00
1 PEKERJAAN BETON
a Lantai beton 35 m2 500,000.00 17,500,000.00
b Dak beton 65 m2 400,000.00 26,000,000.00
6 PEKERJAAN KM/WC
a Km/wc besar 3 bh 7,000,000.00 21,000,000.00
b Km/wc kecil 2 bh 4,000,000.00 8,000,000.00
JUMLAH 729,580,000.00
TOTAL 802,538,000.00
KEUNTUNGAN 0
OVERHEAD 0
REKAPITULASI ANGGARAN BIAYA
PROYEK : RUNAH TINGGAL
LOKASI :CIPUTAT
TERBILANG : TUJUH RATUS DELAPAN PULUH TUJUH JUTA TUJUH RATUS RIBU RUPIAH
2,382,583.02
(__________________________)