Anda di halaman 1dari 33

NO jl p l t VOL SAT

I
1 2.40 4.80 11.52 m2 1.0000 m2
0.65 m3 0.0564 m3
0.24 m3 0.0208 m3
12 lbr 1.0417 lbr
10 lbr 0.8681 lbr
10 kg 0.8681 kg
1.0000 m2

2 24.00 15.00 2.00 39.00 m1 1.0000 m1


72.00 45.00 78.00 0.47 m3 0.0120 m3
24.00 15.00 39 lbr 1.0000 lbr
10 kg 0.2564 kg
1.0000 m2

3 30.00 24.00 54.00 m1 1.0000 m1


0.2592 0.0048 M3
0.2160 0.0040 m3
1.0800 0.0200 kg
1.0000 m1

4 1.0000 m2
1.0000 m2

II
1 0.80 1.0000 m3
35.50 0.50 0.50 8.88 m3
18 0.80 0.80 0.80 9.22 m3
18.0910 m3
18.09 1.3000 jam
0.8500 jam
2 1.0000 m3
1.3000 jam
3 0.05 1.46 m3 1.0000 m3
35.50 0.50 0.05 0.89 m3
18 0.80 0.80 0.05 0.58 m3
1.7562 m3 1.2000 m3
1.75 1.3000 jam

4 147.00 0.05 7.35 m3 1.0000 m3


8.8 m3 1.2000 m3
1.3000 jam

5 147.00 0.40 58.80 m3 1.0000 m3


70.6 m3 1.2000 m3
1 0.1300 jam
1.3000 jam

1 1.0000 m3
5.9500 zak
1.3100 m3
1.0000 m2

6 18 0.80 0.80 11.520 m2 1.0000 m2


0.05 0.576 m3 1.0000 m3
1.0000 m2

III
1 1.0000 m3
1.2000 m3
- jam

2 35.50 0.40 0.50 7.1 m3 1.0000 m3


0.8000 M3
0.3300 m3
5.0000 jam

4 550 m2 1.0000 m2
lt.1 39.00 3.60 140.4
70.00 1.00 70
lt.2 106.00 3.20 339.2
41,220 bh 75.0000 bh
0.0315 m3
0.0500
1.0000 m2

6 Total plesteran - yg tidak diplester 1029 m2 1.0000 m2


1099.2
0.0400 m3
0.8500 jam

6 1029 m2 1.0000 m2
0.1662 sak
0.5000 jam

IV
1.0000 m3
7.7000 zak
0.2950 m3
0.4400 m3
1.0000 m3

1 1.0000 m3
18 0.80 0.80 0.20 2.304 m3
18 0.40 0.20 1.00 1.44 m3
3.744 m3 3.75 m3
18 8.00 1.50 216 m1 19.8000 btg
18 2.50 2.50 6.00 540 m1 49.5000 btg
18 0.70 0.30 7.50 135 m1 12.3750 btg
5%
18 0.90 0.40 1.00 23.4 m2 8.36 lb
18 8.00 3.60 6.00 316.80 m1 0.76 m3
5%

2 1.0000 m3
51.5 0.15 0.25 1.93125 m3 1.90 m3
51.5 4.00 206 m1 18.88 btg
257.5 0.20 0.40 154.5 m1 14.16 btg
5%
51.50 0.50 25.75 m2 4.60 lb
51.50 206 46.35 252.35 m1 0.30 m3
5%

3 1.0000 m3
18 0.40 0.15 3.60 3.888 m3 3.89 m3
18 8.00 3.60 518.4 m1 47.52 btg
18 0.70 0.20 24.00 388.80 m1 35.64 btg
5%
18 1.00 0.30 3.00 16.20 m2 2.89 lb
18 24.00 7 16.00 838.80 m1 1.01 m3
5%

3 1.0000 m3
54.00 0.20 0.40 4.32 m3 4.32 m3
54.00 8.00 432 m1 39.60 btg
360.0 0.30 0.70 360.0 m1 33.00 btg
5%
108.20 0.20 0.70 97.38 m2 27.82 lb
432 324.00 22 86 864 m1 1.66 m3
5%

3 1.0000 m3
55.00 0.15 0.35 2.89 m3 2.89 m3
55.00 6.00 330 m1 30.25 btg
366.7 0.20 0.60 293.3 m1 26.89 btg
5%
110.20 0.15 0.60 82.65 m2 14.76 lb
330.00 17 55 402 m1 0.48 m3
5%

3 1.0000 m3
167.00 1.00 0.12 20.04 m3 20.04 m3
1,670.00 1,670.00 3,340 306.17 btg
5%
167.00 m2 59.64 lb
668.00 1,002.00 1,011.00 2,681 m1 6.43 m3
5%
10%

3 1.0000 m3
64.55 1.00 0.10 6.46 m3 6.46 m3
64.55 0.15 0.20 1.94 m3 1.94
430.33 430.33 860.67 m1 78.89 btg
64.55 4.00 258.20 m1 23.67 btg
430.33 0.20 0.30 215.17 m1 19.72 btg
5%
77.46 m2 13.83 lb
387.30 387 396 1,171 m1 1.41 m3
5%

4 1.0000 ttk
46.00 3.40 0.15 0.15 3.52 m3 3.52 m3
156.40 4.00 625.60 m1 57.35 btg
782.00 0.20 0.20 312.80 m1 28.67 btg
5%
156.40 0.25 39.1 m2 6.98 lb
156.40 4 625.60 m1 0.75 m3
5%

7 1.0000 m3
145.00 0.15 0.25 5.44 m3 5.44 m3
145.0 4.00 580 m1 53.17 btg
725.0 0.20 0.40 435.0 m1 39.88 btg
5%
145.00 0.50 72.5 m2 12.95 lb
145.00 580 130.50 710.50 m1 0.85 m3
5%

9 1.0000 m3
26.00 0.12 0.60 1.87 m3 1.88 m3
26.00 6.00 156 m1 14.30 btg
173.3 0.14 1.10 214.9 m1 19.70 btg
5%
52.20 0.12 1.10 63.68 m2 11.37 lb
156.00 6 52 214 m1 0.26 m3
5%

3 luas lantai 147 m2 1.0000 m2


147.00 1.00 0.06 8.82 m3 8.82 m3
- - - m1 - btg
5%

1.0000 m3
1.80 m3 1.80 m3
8.00 1.00 0.12 0.96 m3
0.03 1.00 20.00 0.60 m3
2.00 1.00 0.12 0.24 m3
9.00 6.67 60 5.50 btg
60.00 1.20 3.00 216 19.80 btg
5%
9.00 1.80 16.20 m2 5.79 lb
36.00 54 32 122 m1 0.29 m3
5%
10%

1 1.0000 m3
1.1000 m3
5.0000 kg
1.0000 m3
1.0000 m3

2 1.0000 m2
0.0264 m3
1.0000 m2
1.0000 ls
1.0000 ls

3 1.0000 m2
0.0264 m3
1.0000 lbr
1.0000 lbr
1.0000 ls
1.0000 ls

1.0000 m2
0.0264 m3
0.5000 lembar
1.0000 lbr
1.0000 m1
1.0000 ls

1.0000 m2
0.0160 m3
1.0000 m2
1.0000 m1
1.0000 ls

1 1
2.00 5.00 7.00 m1 0.0630 m3
2 0.80 2.50 2.00 m2 4.0000 m2
2 - psg
- bh
2 - psg

1
0.90 5.00 5.90 m1 0.0531 m3
1 0.80 2.50 2.00 m2 2.0000 m2
1 - psg
1 - bh

1
0.80 5.00 5.80 m1 0.0522 m3
1 0.70 2.50 1.75 m2 1.7500 m2
1 - psg
1 - bh

1
5.10 12.50 17.60 m1 0.1584 m3
1 0.80 2.50 2.00 m2 2.0000 m2
3 0.60 2.40 1.44 m2 4.3200 m2
1 - psg
1 - bh

1
3.50 5.00 8.50 m1 0.0765 m3
5 0.70 2.50 1.75 m2 8.7500 m2
5 - psg
- bh
5 - psg

1
3.50 5.00 8.50 m1 0.0765 m3
5 0.70 2.50 1.75 m2 8.7500 m2
5 - psg
- bh
5 - psg

1
5.80 7.20 13.00 m1 0.1170 m3
3 0.80 0.60 0.48 m2 1.4400 m2
2.16 0.48 2.6400 2.6400 m2
1 - psg
1 - bh

1
3.00 7.20 10.20 m1 0.0918 m3
2 0.70 2.30 1.61 m2 3.2200 m2
1 - psg
1 - bh

1
4.00 7.20 11.20 m1 0.1008 m3
1 0.70 2.30 1.61 m2 1.6100 m2
1.20 2.30 2.7600 m2 2.7600 m2
1 - psg
1 - bh

1
1.40 4.80 6.20 m1 0.0558 m3
1 0.70 2.30 1.61 m2 1.6100 m2
0.0000 m2 - m2
1 - psg
1 - bh

1
6.00 12.00 18.00 m1 0.1620 m3
4 0.70 2.30 1.61 m2 6.4400 m2
- m2
1 - psg
1 - bh

1
1.40 3.40 4.80 m1 0.0432 m3
1 0.70 1.60 1.12 m2 1.1200 m2
- m2
1 - psg
1 - bh

1
3.00 1.50 4.50 m1 0.0405 m3
2 0.70 0.60 0.42 m2 0.8400 m2

249.2000 m1
1.00 7.00 m1 7.0000
8.00 5.90 m1 47.2000
6.00 5.80 m1 34.8000
1.00 17.60 m1 17.6000
2.00 8.50 m1 17.0000
1.00 8.50 m1 8.5000
1.00 13.00 m1 13.0000
4.00 10.20 m1 40.8000
1.00 11.20 m1 11.2000
1.00 6.20 m1 6.2000
1.00 18.00 m1 18.0000
3.00 4.80 m1 14.4000
3.00 4.50 m1 13.5000
68.0000 m2
1.00 2.00 4.0000 8.0000
8.00 2.00 2.0000 32.0000
6.00 1.00 1.7500 10.5000
1.00 2.00 8.7500 17.5000

27.0000 bh
11.0000 bh
VI
1 1.0000 m3
1.1000 m3
4.0000 kg
1.0000
1.0000 m3

2 1.0000 m3
1.2000 m3
25.0000 kg
1.0000 m3

3 1.0000 m3
1.1000 m3
2.5000 kg
1.0000 m3

4 1.0000 m2
0.0120 m3
0.2500 kg
1.0000 m3

4 1.0000 m2
14.0000 bh
1.0000 m2

5 1.0000 m1
3.5000 bh
0.0040 m3
0.0353 m3
1.0000 m2

6 1.0000 m1
0.0070 m3
1.0000 m1
0.1000 kg
1.0000 m1

7 1.0000 m1
0.0090 m3
0.0500 kg
1.0000 m1
7 1.0000 m1
0.4167 lbr
- lbr
0.0500 kg
1.0000 m1

8 1.0000 m2
1.2000 btg
25.0000 bh
1.0000 ls
1.0000 m2

9 1.0000 m2
0.4000 lbr
25.0000 bh
1.0000 LS
1.0000 m3

10 1.0000 m1
0.5000 m1
0.0300 zak
1.0000 m3

VII
2 1.0000 m2
1.0417 dus
0.0300 m3
1.0000 m2

3 1.0000 m2
1.0203 dus
0.0300 m3
1.0000 m2

4 1.0000 m2
1.0000 dus
0.0300 zak
1.0000 m2

5 4.8000 m1
1.0000 dus
0.0216 zak
1.0000 m2

VIII
1 1.0000 m2
730.70 0.1429 kg
0.4286 kg
0.0500 lbr
0.0100 bh
5% ls
1.0000 m2

1.0000 m2
298.50 0.1429 kg
0.2857 kg
0.0500 lbr
0.0100 bh
5% ls
1.0000 m2

1.0000 m1
5.0000 m1
0.4800 m3
15.0000 m2
1.0000 bh
1.0000 bh
0.2500
ANALISA HARGA SATUAN
HA JUMLAH HARGA
URAIAN PEKERJAAN BAHAN BAHAN
(Rp) (Rp)

PEKERJAAN PENDAHULUAN
Bedeng dan gudang 223,784.72 223,700.00
- Kaso 4/6 1,400,000 910,000
- Papan 2/20 1,600,000 384,000
- Triplek 4 mm 62,000 744,000
- Seng gelombang 1.80 42,000 420,000
- Paku 12,000 120,000
- Upah kerja -
2,578,000
Pagar pengaman 39,876.92 39,800.00
- Kaso 4/6 1,400,000 655,200
- Seng gelombang 1.80 20,000 780,000
- Paku 12,000 120,000
- Upah kerja -
1,555,200
Pasang Bouwplank 13,360 13,300.00
- Kaso 4/6 1,400,000 362,880
- Papan 2/20 1,600,000 345,600
- Paku 12,000 12,960
- Upah kerja -
721,440
Pembersihan Lokasi
- Upah kerja -

PEKERJAAN TANAH
Galian tanah pondasi
lajur
tapak

- Upah knek -
- Upah tk -
Urugan kembali bekas galian
- Upah knek -
Urugan pasir bawah pondasi 120,000 120,000.00
lajur
tapak
- Pasir urug 120,000 210,744
- Upah knek -
210,744
Urugan pasir bawah lantai 120,000 120,000.00
- Pasir urug 120,000 1,058,400
- Upah knek -
1,058,400
Urugan tanah peninggian lantai 122,126 122,000.00
- Tanah urug 120,000 8,467,200
- alat bantu 150,000 150,000
- Upah knek -
8,617,200
Mortar 1 : 5 577,350 577,300.00
- Semen 53,000 315,350
- Pasir 200,000 262,000
- Upah kerja -
577,350
Lantai kerja t=5cm 28,865 28,000.00
Mortar 1 : 5 577,300 332,525
- Upah kerja -
332,525

PEKERJAN BATU
Aan stamping/batu kosong
- Batu belah 183,333 220,000
- Upah kerja -
220,000
Pondasi batu belah 1 : 5 337,176 337,100.00
- Batu kali 183,333 146,667
- Mortar 577,300 190,509
- Upah (1Tk + 2kn)
337,176
Pasangan bata 1 : 5 42,719 42,700.00

- Batu Bata merah 300 22,500


- Mortar 577,300 18,185
- alat bantu (steger) 5% 40,685 2,034
- Upah kerja
42,719
Plesteran 1 : 5 23,092 23,000.00

- Mortar 577,300 23,092


- Upah kerja -
23,092
Acian 8,809 8,800.00
- Semen 53,000 8,809
- Upah kerja -
8,809

PEKERJAAN BETON
Beton 1 ; 2 ; 3 K 225 555,100 555,100.00
- Semen 53,000 408,100
- Pasir 200,000 59,000
- Split 200,000 88,000
- Upah kerja -
555,100 38,857

Pondasi Poor beton 80 x 80 cm 2,420,366 2,420,300.00


tapak
Kolom
- Beton 555,100 2,081,625
- Pembesian 8 dia 13 82,950 1,642,410
- Pembesian dia 10-100 54,600 2,702,700
- Pembesian dia 8-150 34,650 428,794
- Bendrad 6,855,529 342,776
- multipleks 85,000 710,357
- kaso 1,400,000 1,064,448
- paku dll 1,774,805 88,740
9,061,851
Sloof beton 15 x 25 cm 2,107,539 2,107,500.00
- Beton 555,100 1,054,690
- Pembesian 4 dia 13, & 6 - 15 82,950 1,566,373
- Pembesian dia 8-150 34,650 490,731
- Bendrad 2,057,103 102,855
- multipleks 85,000 390,848
- kaso 1,400,000 423,948
- paku dll 814,796 40,740
4,070,184
Kolom struktur 15x40 cm 2,428,159 2,428,000.00
- Beton 555,100 2,159,339
- Pembesian 8 dia 13 82,950 3,941,784
- Pembesian dia 8 - 20 34,650 1,234,926
- Bendrad 7,336,049 366,802
- multipleks 85,000 245,893
- kaso 1,400,000 1,409,184
- paku dll 1,655,077 82,754
9,440,682
Balok struktur 20x40 cm 2,856,749 2,856,000.00
- Beton 610,610 2,637,835
- Pembesian 8 dia 13 82,950 3,284,820
- Pembesian dia 8 - 20 34,650 1,143,450
- Bendrad 7,066,105 353,305
- multipleks 85,000 2,364,943
- kaso 1,400,000 2,322,432
- paku dll 4,687,375 234,369
12,341,154
Blk 15x30 2,594,411 2,594,000.00
- Beton 610,610 1,764,663
- Pembesian 8 dia 13 82,950 2,509,238
- Pembesian dia 8 - 20 34,650 931,700
- Bendrad 5,205,600 260,280
- multipleks 85,000 1,254,509
- kaso 1,400,000 674,520
- paku dll 1,929,029 96,451
7,491,361

plat 12mm 2,128,053 2,128,000.00


- Beton 610,610 12,236,624
- Pembesian dia 9-20 34,650 10,608,675
- Bendrad 22,845,299 1,142,265
- multipleks 85,000 5,069,643
- kaso 1,400,000 9,008,160
- paku dll 14,077,803 703,890
- Alat bantu 38,769,257 3,876,926
42,646,183

Dak beton t=-10 1,869,208 1,869,000.00


- Beton plat 610,610 3,944,541
- Beton ring balk
- Pembesian dia 8 - 15 34,650 2,733,693
- Pembesian 4 dia 10 50,000 1,183,417
- Pembesian dia 8 - 20 34,650 683,423
- Bendrad 4,600,532 230,027
- multipleks 85,000 1,175,732
- kaso 1,400,000 1,967,112
- paku dll 3,142,844 157,142
12,075,086
Kolom praktis 10 x 10 cm 2,162,212 2,162,000.00
- Beton 555,100 1,953,952
- Pembesian 4 dia 10 50,000 2,867,333
- Pembesian dia 6 - 20 27,300 782,782
- Bendrad 5,604,067 280,203
- multipleks 85,000 593,482
- kaso 1,400,000 1,051,008
- paku dll 1,644,490 82,225
7,610,985
Ring balok 15 x 25 cm 2,059,234 2,059,000.00
- Beton 555,100 3,019,744
- Pembesian 4 dia 13, & 6 - 15 82,950 4,410,175
- Pembesian dia 6-150 27,300 1,088,588
- Bendrad 5,498,763 274,938
- multipleks 85,000 1,100,446
- kaso 1,400,000 1,193,640
- paku dll 2,294,086 114,704
11,202,235
Listplank beton 2,425,818 2,425,000.00
- Beton 610,610 1,147,947
- Pembesian 8 dia 13 82,950 1,186,185
- Pembesian dia 8 - 20 34,650 682,682
- Bendrad 3,016,814 150,841
- multipleks 85,000 966,632
- kaso 1,400,000 359,923
- paku dll 1,326,555 66,328
4,560,538
Beton sparasi t=-7 33,306 33,000.00
- Beton plat 555,100 4,895,982
- Pembesian dia 6 - 20 21,000 -
- Bendrad - -
4,895,982
tangga beton 1,953,570 1,953,000.00
- Beton 555,100 999,180
plat
anak tangga
bordes
- Pembesian dia 13 82,950 456,225
- Pembesian dia 8-20 34,650 686,070
- Bendrad 2,141,475 107,074
- multipleks 85,000 491,786
- kaso 1,400,000 411,264
- paku dll 903,050 45,152
- Alat bantu 3,196,751 319,675
3,516,426

PEK. KUSEN PINTU & JENDELA


( Upah hanya stel, bahan jadi)
Kusen pintu dan jendela 13,888,889
Kayu Kamper Samarinda Oven 8,500,000 9,350,000
Paku 15,000 75,000
Lem kayu 25,000 25,000
Upah kerja + pasang 1,700,000
11,150,000 11,150,000.00
Daun Pintu panel kaca
Frame pintu l kayu kamper 9,000,000 237,600
Kaca 82,000 82,000
Alat bantu dll 10,000 10,000
Upah kerja + pasang 150,000
479,600 479,000.00

Daun Pintu panel playwood


Frame pintu l kayu kamper 9,000,000 237,600
Panel playwood 6 mm 65,000 65,000
Lapis teakwood 4 mm 85,000 85,000
Alat bantu dll 50,000 50,000
Upah pasang 150,000
587,600 587,000.00

Daun Pintu km/wc


Frame pintu l kayu kamper 9,000,000 237,600
Triplexs 6 mm 85,000 42,500
Lapis teakwood & melaminto 85,000 85,000
Alat bantu 50,000 50,000
Upah pasang 150,000
565,100 565,000.00

Daun Jendela kaca


Rangka Borneo Super 9,000,000 144,000
Kaca 5 mm 82,000 82,000
Alat bantu 50,000 50,000
Upah pasang 100,000
376,000 376,000.00

Type P 1
Kusen 11,150,000 702,450
Daun pintu PANEL 587,000 2,348,000
engsel 40,000 -
kunci 200,000 -
handel 300,000 -
3,050,450 3,050,000.00

Type P2
Kusen 11,150,000 592,065
Daun pintu PANEL 587,000 1,174,000
engsel 40,000 -
kunci 200,000 -
1,766,065 1,760,000.00

Type P3
Kusen 11,150,000 582,030
Daun pintu PANEL km/wc 565,000 988,750
engsel 40,000 -
kunci 150,000 -
1,570,780 1,570,000.00

Type PJ
Kusen 11,150,000 1,766,160
Daun pintu PANEL kaca 479,000 958,000
Daun jendela 376,000 1,624,320
engsel 40,000 -
kunci 200,000 -
4,348,480 4,340,000.00
Type PL
Kusen 11,150,000 852,975
Daun pintu PANEL kaca 479,000 4,191,250
engsel 40,000 -
kunci 200,000 -
handel 300,000 -
5,044,225 5,040,000.00
Type Pg
Kusen 11,150,000 852,975
Daun pintu PANEL 587,000 5,136,250
engsel 40,000 -
kunci 200,000 -
handel 300,000 -
5,989,225 5,980,000.00
Type J1
Kusen 11,150,000 1,304,550
Daun jendela 376,000 541,440
Kaca 5 mm 82,000 216,480
engsel 40,000 -
kunci 200,000 -
2,062,470 2,060,000.00
Type J2
Kusen 11,150,000 1,023,570
Daun jendela 376,000 1,210,720
engsel 40,000 -
kunci 200,000 -
2,234,290 2,230,000.00
Type J3
Kusen 11,150,000 1,123,920
Daun jendela 376,000 605,360
Kaca 5 mm 82,000 226,320
engsel 40,000 -
kunci 200,000 -
1,955,600 1,950,000.00
Type J4
Kusen 11,150,000 622,170
Daun jendela 376,000 605,360
Kaca 5 mm 82,000 -
engsel 40,000 -
kunci 200,000 -
1,227,530 1,220,000.00
Type J5
Kusen 11,150,000 1,806,300
Daun jendela 376,000 2,421,440
Kaca 5 mm 82,000 -
engsel 40,000 -
kunci 200,000 -
4,227,740 4,220,000.00
Type J6
Kusen 11,150,000 481,680
Daun jendela 376,000 421,120
Kaca 5 mm 82,000 -
engsel 40,000 -
kunci 200,000 -
902,800 900,000.00
Type BV
Kusen 11,150,000 451,575
Daun jendela 376,000 315,840
767,415 760,000.00
melamik kusen 35,000
melamik daun pintu panel 60,000

melamik daun pintu panel kaca 210,000


melamik daun jendela panel kaca 140,000
PEK. ATAP & PLAFOND
Pas. kuda-kuda bentang 6 m
- Kayu Balok 1,400,000 1,540,000
- Paku, baut & ankur #REF! #REF!
alat bantu 100,000 100,000
- Upah kerja
#REF!
Pas. kuda-kuda bentang 9 m
- Kayu Balok 1,400,000 1,680,000
- Paku, baut & ankur 15,000 375,000
- Upah kerja
2,055,000
Pas. Gordeng
- Kayu Balok 1,400,000 1,540,000
- Paku, baut & ankur 15,000 37,500
- Upah kerja
1,577,500
Pas. kaso dan reng
- Kayu Balok 1,400,000 16,800
- Paku, baut & ankur 15,000 3,750
- Upah kerja
20,550
Pas. genteng
- Genteng beton 4,600 64,400
- Upah kerja
64,400
Pas. nok genteng
- Genteng nok beton 6,500 22,750
- Papan 2/20 boeneo 1,600,000 6,400
- Mortar 577,300 20,393
- Upah kerja -
49,543 49,000.00
Pas. talang jurai
- Papan 2/30 boeneo 1,600,000 11,200
- Seng plat lebar 60 cm 10,000 10,000
- Paku 15,000 1,500
- Upah kerja
22,700 22,000.00
Pas. list plank 3/30
- Papan 3/30 8,000,000 72,000
- Paku 15,000 750
- Upah kerja
72,750
Pas. list plank GRC3/30
- GRC 9mm 30x2,4 62,700 26,125
- GRC 9mm 20x2,4 40,000 -
- Paku 15,000 750
- Upah kerja
26,875
Pas. rangka plafond
- hollow 20,000 24,000
- Skrup 70 1,750
- Alat bantu steger 3,863 3,863
- Upah kerja -
29,613 29,000.00
Pas. plafond
- Trpleks / gypsum 54,000 21,600
- Skrup 70 1,750
- Alat bantu coumpon 4,670 4,670
- Upah kerja -
28,020 28,000.00
Pas. list plafond
- List plafond 12,000 6,000
- Coumpon 70,000 2,100
- Upah kerja
8,100

FINISHING LANTAI & DINDING


Keramik lantai 40 x 40 173,569 173,500.00
- Keramik 40x40 150,000 156,250
- Mortar 577,300 17,319
- Upah kerja -
173,569
Keramik lantai 33 x 33 83,639 83,600.00
- Keramik 33 x 33 65,000 66,320
- Mortar 577,300 17,319
- Upah kerja -
83,639
Keramik dinding 40 x 25 92,319 92,000.00
- Keramik 20 x 25 75,000 75,000
- Mortar 577,300 17,319
- Upah kerja -
92,319
Plint keramik 10 x 40 33,848 33,800.00
- Keramik 40x40 150,000 150,000
- Mortar 577,300 12,470
- Upah kerja -
162,470

PEK. PENGECATAN
Cat tembok (INTERIOR) 15,668 15,600.00
- Plamir 24,000 2,505,257
- Cat tembok 26,000 8,142,086
- Amplas 3,000 109,605
- Rol 20,000 146,140
- Steger 10,903,088 545,154
- Upah kerja
11,448,242 11,448,200.00
Cat tembok (EXTERIOR) 20767.5 20,700.00
- Plamir 24,000 1,023,429
- Cat tembok 56,000 4,776,000
- Amplas 3,000 44,775
- Rol 20,000 59,700
- Steger 5,903,904 295,195
- Upah kerja
6,199,099

40,000
60,000
44,000

Meja beton 775280 775,000.00


3,876,400
Meja beton 1,869,000 897,120
Keramik 83,600 1,254,000
Zink 750,000 750,000
Kran 200,000 200,000
Upah 3,101,120 775,280
RENCANA ANGGARAN BIAYA
PROYEK : RUMAH TINGGAL
LOKASI : CIPUTAT

HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT SATUAN HARGA
Rp. Rp.

A. MATERIAL

I PEKERJAAN PERSIAPAN

1 Disain dan Gambar Kerja 1.00 ls - -


2 Ijin Mendirikan Bangunan (IMB) 1.00 ls - -
3 Pagar pengaman proyek 12.00 m1 59,700.00 716,400.00
4 Bedeng pekerja 1.00 ls 2,578,000.00 2,578,000.00
5 Pekerjaan bongkaran 1.00 ls 5,000,000.00 5,000,000.00
6 Pengukuran dan Pemasangan bouwplank 54.00 m1 19,950.00 1,077,300.00
7 Buang puing bekas bongkaran 1.00 ls 1,000,000.00 1,000,000.00
sub total I 10,371,700.00
II PEKERJAAN TANAH
1 Galian pondasi 18.09 m3 - -
2 Urugan pasir bawah pondasi 1.75 m3 150,000.00 262,500.00
3 Lantai kerja pondasi tapak 11.52 m2 33,600.00 387,072.00
4 Urugan tanah ex galian 6.03 m3 - -
5 Urugan tanah peninggian lantai & halaman 52.47 m3 146,400.00 7,681,608.00
6 Urugan pasir dibawah lantai 8.82 m3 150,000.00 1,323,000.00
sub total II 9,654,180.00
III PEKERJAAN BETON
1 Pondasi lajur belah 7.10 m3 421,375.00 2,991,762.50
2 Beton pondasi footplat (800x800) 3.75 m3 2,904,360.00 10,891,350.00
3 Beton sloof struktur (15x25) 1.90 m3 2,634,375.00 5,005,312.50
4 Beton kolom (15x40) 3.89 m3 2,913,600.00 11,333,904.00
5 Beton balok induk lantai atas 20x40 4.32 m3 3,427,200.00 14,805,504.00
6 Beton balok anak lantai atas 15x30 2.89 m3 3,112,800.00 8,995,992.00
7 Beton plat lantai atas t=12cm 20.04 m3 2,553,600.00 51,174,144.00
8 Beton ring balok 15x25 5.44 m3 2,470,800.00 13,441,152.00
9 Dak beton t=10cm 8.40 m3 2,242,800.00 18,839,520.00
10 List plank beton 1.88 m3 2,910,000.00 5,470,800.00
11 Beton kolom praktis 15x15 3.52 m3 2,594,400.00 9,132,288.00
12 Beton tangga 3.24 m3 2,343,600.00 7,593,264.00
13 Lantai kerja beton tampa tulangan t=6cm 147.00 m2 39,600.00 5,821,200.00
sub total III 165,496,193.00
IV PEKERJAAN DINDING
1 Pasangan dinding bata 549.60 m2 53,375.00 29,334,900.00
2 Plesteran dinding 1,029.20 m2 28,750.00 29,589,500.00
3 Acian dinding 1,029.20 m2 11,000.00 11,321,200.00
sub total IV 70,245,600.00
V PEKERJAAN KUSEN, PINTU & JENDELA
1 Type P1pintu utama 1.00 unit 3,660,000.00 3,660,000.00
2 Type P2 pintu rg. Tidur 8.00 unit 2,112,000.00 16,896,000.00
3 Type P3 pintu km/wcm, km pembantu 6.00 unit 1,884,000.00 11,304,000.00
4 Type PJ pintu jendela rg. Tidur utama 1.00 unit 5,208,000.00 5,208,000.00
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT SATUAN HARGA
Rp. Rp.
5 Type P1 pintu lipat 2.00 unit 6,048,000.00 12,096,000.00
6 Type PG pintu garasi 1.00 unit 7,176,000.00 7,176,000.00
7 Type J1 jendela rg. Tamu 1.00 unit 2,472,000.00 2,472,000.00
8 Type J2 jendela rg. Tidur 4.00 unit 2,676,000.00 10,704,000.00
9 Type J3 sudut rg. Tidur 1.00 unit 2,340,000.00 2,340,000.00
10 Type J4 jendela rg. Tidur 1.00 unit 1,464,000.00 1,464,000.00
11 Type J5 rg. Duduk lt. atas 1.00 unit 5,064,000.00 5,064,000.00
12 Type J6 jendela dapur, km. pembantu 3.00 unit 1,080,000.00 3,240,000.00
13 Type BV 3.00 unit 912,000.00 2,736,000.00
Ctt : Bahan kayu Kamper Oven
sub total V 84,360,000.00
VI PEKERJAAN ATAP & PLAFOND
1 Kuda-kuda Baja ringan 154.30 m2 168,000.00 25,922,400.00
2 Atap genteng keramik natural glazur (KANMURI) 154.30 m2 77,280.00 11,924,304.00
3 Nok genteng keramik natural glazur (KANMURI) 41.10 m1 58,800.00 2,416,680.00
4 Talang jurai 7.00 m1 26,400.00 184,800.00
5 List plank GRC 9mm x 30cm 47.00 m1 32,250.00 1,515,750.00
6 Plafond gypsum Elephant 9 mm + rangka hollow 348.00 m2 68,400.00 23,803,200.00
7 List Plafond t=10cm 247.50 m1 9,720.00 2,405,700.00
sub total VI 68,172,834.00
VII PEKERJAAN LANTAI
1 Keramik lantai 40x40 (Ex China) 288.00 m2 208,200.00 59,961,600.00
2 Keramik lantai Km/Wc 33x33 (Ex Roman) 18.00 m2 100,320.00 1,805,760.00
3 Keramik dinding km/wc t.2.5m 25x40 (Ex Roman) 70.78 m2 110,400.00 7,814,112.00
4 Plin keramik , 10x40 202.90 m1 40,560.00 8,229,624.00
5 Keramik lantai Garasi, carport, dapur, km pemb. 75.25 m2 100,320.00 7,549,080.00
6 Keramik lantai teras atas & jemur 21.00 m2 40,560.00 851,760.00
7 Stepnozing tangga 21.00 m1 33,000.00 693,000.00
8 Water proofing km/wc & dak beton 76.00 m2 60,000.00 4,560,000.00
sub total VII 91,464,936.00
VIII PEKERJAAN FINISHING
1 Cat dinding dalam Ex Viniilex 730.70 m2 19,500.00 14,248,650.00
2 Cat dinding luar (weathercoat) Ex Mowilex 298.50 m2 24,840.00 7,414,740.00
3 Cat plafond setara Ex Viniilex 247.50 m2 18,720.00 4,633,200.00
4 Cat listplank (weathercoat) Ex Mowilex 47.00 m1 25,875.00 1,216,125.00
5 Melamik kusen 249.20 m1 52,500.00 13,083,000.00
6 Melamik daun pintu panel 68.00 m2 75,000.00 5,100,000.00
7 Melamik pintu kaca 11.00 bh 262,500.00 2,887,500.00
8 Melamik jendela kaca 27.00 bh 210,000.00 5,670,000.00
sub total VIII 54,253,215.00
IX PEKERJAAN ELEKTRICAL
1 Instalasi listrik kabel setara Eterna 77.00 titik 187,500.00 14,437,500.00
2 TV Conduit Ex Broco 3.00 titik 240,000.00 720,000.00
3 Telp. Conduit Ex Broco 2.00 titik 216,000.00 432,000.00
4 Amatur Saklar Ex Broco 49.00 buah 31,250.00 1,531,250.00
5 Amatur Stop kontak Ex Broco 28.00 buah 37,500.00 1,050,000.00
5 Lampu PLC 5.00 buah 50,000.00 250,000.00
6 Down light 30.00 buah 75,000.00 2,250,000.00
7 Lampu Baret 10.00 buah 125,000.00 1,250,000.00
8 Lampu TL 2 x 18 watt inbow 2.00 buah 168,750.00 337,500.00
9 Lampu taman 2.00 buah 156,250.00 312,500.00
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT SATUAN HARGA
Rp. Rp.
10 Power AC 5.00 buah 262,500.00 1,312,500.00
11 Box sekring + MCB 2.00 buah 537,500.00 1,075,000.00
sub total VIII 24,958,250.00
X PEKERJAAN PENGGANTUNG
1 Kunci pintu utama Ex Solid 1.00 set 720,000.00 720,000.00
2 Kunci pintu rg. Tidur Ex Solid 9.00 set 300,000.00 2,700,000.00
3 Kunci pintu km/wc Ex Solid 5.00 set 240,000.00 1,200,000.00
4 Engsel pintu Ex Solid 15.00 set 50,000.00 750,000.00
5 Engsel jendela Ex Solid 29.00 set 31,250.00 906,250.00
6 Ram bucis Ex Solid 29.00 buah 25,000.00 725,000.00
7 Hak angin Ex Solid 29.00 buah 31,250.00 906,250.00
8 Engsel pintu lipat include acesories Ex Wina 2.00 unit 3,300,000.00 6,600,000.00
9 Engsel pintu garasi include acesories Ex Wina 1.00 unit 4,400,000.00 4,400,000.00
sub total X 18,907,500.00
XI PEKERJAAN SANITAIR
1 Pasang Monoblock Toto standard 4.00 buah 1,320,000.00 5,280,000.00
2 Pasang coset jonggkok Toto standard 1.00 buah 150,000.00 150,000.00
3 Pasang bathtube 1.00 buah 1,870,000.00 1,870,000.00
4 Pasang Washtafel dinding Toto standard 2.00 buah 960,000.00 1,920,000.00
5 Jet Sower 4.00 buah 120,000.00 480,000.00
6 Kran shower Ex Waser 4.00 buah 330,000.00 1,320,000.00
7 Floor drain 5.00 buah 90,000.00 450,000.00
8 Kran taman, cuci 5.00 buah 90,000.00 450,000.00
9 Pipa AW 1" 40.00 m1 17,400.00 696,000.00
10 Pipa AW 3/4" 44.00 m1 12,600.00 554,400.00
11 Pipa AW 1/2" 24.00 m1 9,000.00 216,000.00
12 Pipa air cucian/hujan D 4" 48.00 m1 27,000.00 1,296,000.00
13 Pipa air kotor D 4" 44.00 m1 27,000.00 1,188,000.00
14 Pipa air cucian/hujan D 3" 48.00 m1 19,800.00 950,400.00
15 Pipa air kotor D 3" 12.00 m1 19,800.00 237,600.00
16 Septiktank 1.00 unit 3,000,000.00 3,000,000.00
17 Acesories dan fitting 1.00 ls 1,500,000.00 1,500,000.00
sub total XI 21,558,400.00
XII PEKERJAAN LAIN-LAIN
1 Railing besi tangga dan void 28.00 m1 375,000.00 10,500,000.00
2 Ornament / profilan 37.00 m2 187,500.00 6,937,500.00
3 Meja beton dapur kotor, dinding lapis keramik 5.00 m1 968,750.00 4,843,750.00
4 Lemari kabinet dapur kotor, teakblock diduco - m1 - -
5 Zink ex lokal 1 lubang + kran Toto - set - -
6 Tanggki air 1000 lt + tower 1.00 ls 3,600,000.00 3,600,000.00
7 Jembatan beton (deuker) - m1 383,040.00 -
8 Canopy kaca carport + void 16.00 m2 540,000.00 8,640,000.00
9 Canopy polycarbonate tangga service 7.00 m2 420,000.00 2,940,000.00
10 Pasang pagar depan - m1 375,000.00 -
11 Pintu pagar depan - m1 480,000.00 -
12 Pembersihan sisa pekerjaan 1.00 ls 2,000,000.00 2,000,000.00
sub total XII 39,461,250.00

B. UPAH KERJA 350.00 M2 500,000.00 175,000,000.00


REKAPITULASI ANGGARAN BIAYA
PROYEK : RUNAH TINGGAL
LOKASI :CIPUTAT

NO. URAIAN PEKERJAAN TOTAL

A. MATERIAL Rp. 658,904,058.00

I PEKERJAAN PERSIAPAN Rp. 10,371,700.00


II PEKERJAAN TANAH Rp. 9,654,180.00
III PEKERJAAN BETON Rp. 165,496,193.00
IV PEKERJAAN DINDING Rp. 70,245,600.00
V PEKERJAAN KUSEN, PINTU & JENDELA Rp. 84,360,000.00
VI PEKERJAAN ATAP & PLAFOND Rp. 68,172,834.00

VII PEKERJAAN LANTAI Rp. 91,464,936.00

VIII PEKERJAAN FINISHING Rp. 54,253,215.00

IX PEKERJAAN ELEKTRICAL Rp. 24,958,250.00

X PEKERJAAN PENGGANTUNG Rp. 18,907,500.00

XI PEKERJAAN SANITAIR Rp. 21,558,400.00

XII PEKERJAAN LAIN-LAIN Rp. 39,461,250.00

B. UPAH KERJA Rp. 175,000,000.00

JUMLAH ( A + B ) Rp. 833,904,058.00

DIBULATKAN Rp. 833,900,000.00

TERBILANG : TUJUH RATUS DELAPAN PULUH TUJUH JUTA TUJUH RATUS RIBU RUPIAH

Jakarta, Januari 2008

2,382,583.02

(__________________________)
TABEL JUMLAH VOLUME MATRIAL UTAMA PEKERJAAN STRUKTUR
PROYEK :
LOKASI :
7900 7900 7900 7900 7900
7895 7911.4 6081.1 7772.4 7035.6
2.66 4.74 7.4 12.48 10.66
21000 37500 45000 97000 75000
21014 37446 58460 98592 84214
98500
12mm
Jumlah Dimensi Besi dia. Bekisting
No. Jenis Pekerjaan 6mm 8mm 10mm 13 13mm Multiplex ky 4x6 ky 5x7
P L T btg btg btg btg btg 9mm (lbr) (m3) (m3)
1 Pondasi 16.75 25.33 5.13 0.24 0.23
- Tapak 12 1 1 0.2 10.00 0.15 13.33 1.67 0.0576 0.0115

- kolom pondasi 12 0.15 0.4 1.5 6.75 8 12.00 6.88 0.3456 0.3780

2 Sloof 68.50 0.15 0.2 1 14.27 4 22.83 4.76 0.3288

3 Kolom 40.25 15.00 80.50 25.00 13.85 1.0123 0.8681

Kolom 15x50cm base 12 0.15 0.4 2.5 15.00 10 25.00 6.30 0.32 0.35

kebutuhan 11.46 0.5760 0.6300

bekas kolom 5.16 0.26 0.28

Kolom 15x40cm lt.1 0.15 0.4 3.75 - 10 - - - -

kebutuhan - - -

bekas kolom #REF! #REF! #REF!

Kolom 15x30cm lt.2 0.15 0.3 3.5 - 6 - bekas bekas bekas

Kolom praktis 69.00 0.15 0.15 3.5 40.25 80.50 7.55 0.6955 0.5216
4 Balok 34.92 47.83 16.24 0.61 2.28

- Balok 15x40 lt.1 54.50 0.15 0.4 1 27.25 8 36.33 17.98 0.7848 1.9075

- Balok 15x25 lt.1 23.00 0.15 0.25 1 7.67 6 11.50 5.19 0.3312 0.8050

kebutuhan 23.17 1.12 2.71

bekas kolom 6.92 0.51 0.43

balok lantai 1 16.24 0.61 2.28

- Balok 20x40 lt.2 0.2 0.5 1 - 4 - - - -

- Balok 15x40 lt.1 0.15 0.4 1 - 6 - - - -

5 Plat Lantai tbl 12 cm 87.69 6.35 0.11 1.70

Plat Lt.1 91.50 76.25 31.77 0.5490 0.8006

Exra 11.44 7.6860

Plat Lt.2 - (25.42) (0.44) (0.64)

Exra - (6.1488)

kebutuhan lt2 - - -

bekas lantai bawah 25.42 0.4392 0.6405

6.1488

6 Plat Lantai tbl 10 cm 15.33 bekas bekas bekas

Plat Lt.1 32.00 13.33 11.11 0.3840 1.4000

Exra 2.00
7 Listplank tbl 8 cm 14.14 bekas bekas bekas

Plat Lt.1 29.50 12.29 4.29 50.9760 -

Exra 1.84

8 Tangga 9.67 5.00 6.67 bekas bekas bekas

- Plat Tangga 12 1 1 0.2 5.00 5.00 0.15 6.67 4.17 0.0360 0.5250

- Anak Tangga 14 1 0.3 0.18 2.33 0.88 0.0336 0.0360

Exra 2.33

9 Ring balok 20.00 26.67 bekas bekas bekas

Ring balok 80.00 0.15 0.25 1 20.00 4 26.67 6.94 0.3840

Jumlah 49.92 203.96 85.50 154.33 46.33 2.3027 5.0776


Pembulatan 49.00 203.00 85.00 - 154.00 46.00 2.00 5.00

Ctt : Beton plat 12 cm dikurangi kalau menggunakan beton readymix


Besi beton dia 13mm dan 16mm besi beton ulir
Kaso 5x7 berkurang bila perancah plat menggunakan scafolding

No. Jenis Pekerjaan

1 Pasangan bata
2 plesteran
3 Acian

Jumlah
Pembulatan
KEBUTUHAN KAYU UNTUK KUSEN, PINTU & JENDELA

KUBIKASI
PJG LUAS Uk. 6/15 Uk. 4/20 Uk. 4/10
URAIAN PEKERJAAN TIANG AMBANG
(M1) (M2) KUSEN PINTU JENDELA

0.009 M3/ 0.040 M3/ 0.040 M3/M2


1 Type P 1 1 Unit
Kusen 1 Unit 2 2.60 1 2.00 7.20 0.065 M3
Daun pintu PANEL 2 Unit 2.50 0.80 4.00 0.160 M3
2 Type P2 8 Unit
Kusen 1 Unit 2 2.60 1 1.10 6.30 0.454 M3
Daun pintu PANEL 1 Unit 2.50 0.80 2.00 0.640 M3
3 Type P3 6 Unit
Kusen 1 Unit 2 2.60 1 1.00 6.20 0.335 M3
Daun pintu PANEL km/wc 1 Unit 2.50 0.70 1.75 0.420 M3
4 Type PJ 1 Unit
Kusen 1 Unit 5 2.60 2 3.00 19.00 0.171 M3
Frame daun pintu 1 Unit 2 2.50 2 0.80 6.60 0.99 0.040 M3
Daun jendela 3 Unit 2 2.40 2 0.60 18.00 1.80 0.072 M3
5 Type PL 2 Unit
Kusen 1 Unit 2 2.60 1 3.50 8.70 0.157 M3
Frame daun pintu 5 Unit 2 2.50 2 0.70 32.00 9.60 0.768 M3
6 Type Pg 1 Unit
Kusen 1 Unit 2 2.60 1 3.50 8.70 0.078 M3
Frame daun pintu 5 Unit 2 2.50 2 0.70 32.00 4.80 0.192 M3
Krapyak 1X7 cm 5 Unit 50 0.50 125.00 10.00 0.200 M3
7 Type J1 1 Unit
Kusen 1 Unit 3 2.50 1 5.80 13.30 0.120 M3
Daun jendela 3 Unit 2 0.60 2 0.80 8.40 0.84 0.034 M3
8 Type J2 4 Unit
Kusen 1 Unit 3 2.50 2 1.70 10.90 0.392 M3
Daun jendela 2 Unit 2 2.30 2 0.70 12.00 1.20 0.192 M3
9 Type J3 1 Unit
Kusen 1 Unit 3 2.50 2 2.20 11.90 0.107 M3
Daun jendela 1 Unit 2 2.30 2 0.70 6.00 0.60 0.024 M3
10 Type J4 1 Unit
Kusen 1 Unit 2 2.50 2 3.20 11.40 0.103 M3
Daun jendela 1 Unit 2 2.30 2 0.70 6.00 0.60 0.024 M3
11 Type J5 1 Unit
Kusen 1 Unit 5 2.50 2 3.20 18.90 0.170 M3
Daun jendela 4 Unit 2 2.30 2 0.70 24.00 2.40 0.096 M3
12 Type J6 3 Unit
Kusen 1 Unit 2 1.80 2 0.90 5.40 0.146 M3
Daun jendela 1 Unit 2 1.60 2 0.70 4.60 0.46 0.055 M3
13 Type BV 3 Unit
Kusen 1 Unit 3 0.50 2 1.70 4.90 0.132 M3
Daun jendela 2 Unit 2 0.60 2 0.70 5.20 0.52 0.062 M3

JUMLAH 2.429 M3 2.420 M3 0.559 M3


TOTAL 5.408 M3 = 6.000 M3
M3/M2
REAL COST
RENOVASI RUMAH TINGGAL DI BINTARO SEKTOR 7

I PEKERJAAN PERSIAPAN 1 LS 50,000,000.00 50,000,000.00


Bongkar dan buang puing, keamanan

II PEKERJAAN LANTAI BAWAH

1 PEKERJAAN TANGGA
a Utama 1 bh 20,000,000.00 20,000,000.00
b Service 1 bh 12,000,000.00 12,000,000.00

2 PEKERJAAN PASANGAN DINDING & KUSEN (Kayu Kamper finish melamik)


a Dinding hebel 30 m2 250,000.00 7,500,000.00
b Kusen jendela 35 m2 1,000,000.00 35,000,000.00
c Kusen pintu 17.5 m2 1,500,000.00 26,250,000.00
d Pintu lipat 12.5 1,000,000.00 12,500,000.00
e Rel 1 ls 5,000,000.00 5,000,000.00

3 BONGKAR, PASANG LANTAI (Keramik China, Roman)


a R.Tamu, R.Keluarga, R.tidur & Pantry 160 m2 300,000.00 48,000,000.00
b Service 35 m2 200,000.00 7,000,000.00
c Teras dan carport 55 m2 250,000.00 13,750,000.00

4 PEKERJAAN PLAFOND (Gypsum board) 227 m2 100,000.00 22,700,000.00

5 PENGECATAN ( Cat Ex Dulux)


a Dinding Dalam 450 m2 15,000.00 6,750,000.00
b Luar 100 m2 25,000.00 2,500,000.00
c Plafond 227 m2 15,000.00 3,405,000.00

6 PEKERJAAN KM/WC (Keramik Roman, Closet Toto standard, acesories Toto)


a Km/wc besar 1 bh 7,000,000.00 7,000,000.00
b Km/wc kecil 2 bh 4,000,000.00 8,000,000.00

7 PEKERJAAN INSTALASI LISTRIK/AIR 200 M2 150,000.00 30,000,000.00

III PEKERJAAN LANTAI ATAS

1 PEKERJAAN BETON
a Lantai beton 35 m2 500,000.00 17,500,000.00
b Dak beton 65 m2 400,000.00 26,000,000.00

2 PEKERJAAN PASANGAN DINDING & KUSEN


a Dinding bata 186 m2 250,000.00 46,500,000.00
b Kusen jendela 45 m2 1,000,000.00 45,000,000.00
c Kusen pintu 22.5 m2 1,500,000.00 33,750,000.00
d Penyekat r.tidur utama 12 2,000,000.00 24,000,000.00

3 BONGKAR PASANG LANTAI


a R.Tidur, R. duduk & hall 180 m2 300,000.00 54,000,000.00
b Service 15 m2 200,000.00 3,000,000.00
c Balkon 8 m2 250,000.00 2,000,000.00

4 PEKERJAAN PLAFOND & ATAP


a Plafdon 258 m2 100,000.00 25,800,000.00
b Atap 206 m2 300,000.00 61,800,000.00
5 PENGECATAN
a Dalam 492 m2 15,000.00 7,380,000.00
b Luar 135 m2 25,000.00 3,375,000.00
c Plafond 258 m2 15,000.00 3,870,000.00

6 PEKERJAAN KM/WC
a Km/wc besar 3 bh 7,000,000.00 21,000,000.00
b Km/wc kecil 2 bh 4,000,000.00 8,000,000.00

7 PEKERJAAN INSTALASI LISTRIK/AIR 195 M2 150,000.00 29,250,000.00

JUMLAH 729,580,000.00

IV PEKERJAAN LAIN- LAIN 5% 729,580,000.00 36,479,000.00


766,059,000.00

TOTAL 802,538,000.00

KEUNTUNGAN 0
OVERHEAD 0
REKAPITULASI ANGGARAN BIAYA
PROYEK : RUNAH TINGGAL
LOKASI :CIPUTAT

NO. URAIAN PEKERJAAN TOTAL

A. MATERIAL Rp. 658,904,058.00

I PEKERJAAN PERSIAPAN Rp. 10,371,700.00


II PEKERJAAN TANAH Rp. 9,654,180.00
III PEKERJAAN BETON Rp. 165,496,193.00
IV PEKERJAAN DINDING Rp. 70,245,600.00
V PEKERJAAN KUSEN, PINTU & JENDELA Rp. 84,360,000.00
VI PEKERJAAN ATAP & PLAFOND Rp. 68,172,834.00

VII PEKERJAAN LANTAI Rp. 91,464,936.00

VIII PEKERJAAN FINISHING Rp. 54,253,215.00

IX PEKERJAAN ELEKTRICAL Rp. 24,958,250.00

X PEKERJAAN PENGGANTUNG Rp. 18,907,500.00

XI PEKERJAAN SANITAIR Rp. 21,558,400.00

XII PEKERJAAN LAIN-LAIN Rp. 39,461,250.00

B. UPAH KERJA Rp. 175,000,000.00

JUMLAH ( A + B ) Rp. 833,904,058.00

DIBULATKAN Rp. 833,900,000.00

TERBILANG : TUJUH RATUS DELAPAN PULUH TUJUH JUTA TUJUH RATUS RIBU RUPIAH

Jakarta, Januari 2008

2,382,583.02

(__________________________)