0 penilaian0% menganggap dokumen ini bermanfaat (0 suara)
14 tayangan3 halaman
This document outlines the work breakdown structure (WBS) of a project with 40 total activities organized across 5 main sections: introduction, general description documents, system requirements, detailed design, and testing. Each activity is assigned an ID number and linked to its predecessor and successor activities to define the order of work.
This document outlines the work breakdown structure (WBS) of a project with 40 total activities organized across 5 main sections: introduction, general description documents, system requirements, detailed design, and testing. Each activity is assigned an ID number and linked to its predecessor and successor activities to define the order of work.
Hak Cipta:
Attribution Non-Commercial (BY-NC)
Format Tersedia
Unduh sebagai XLSX, PDF, TXT atau baca online dari Scribd
This document outlines the work breakdown structure (WBS) of a project with 40 total activities organized across 5 main sections: introduction, general description documents, system requirements, detailed design, and testing. Each activity is assigned an ID number and linked to its predecessor and successor activities to define the order of work.
Hak Cipta:
Attribution Non-Commercial (BY-NC)
Format Tersedia
Unduh sebagai XLSX, PDF, TXT atau baca online dari Scribd