Standard Production Times (in minutes)

Set-up Run Capacity Available Run Time Usage Available Capacity


Operation Time Time t/board Calculat. Time per board Factor Run time in Boards
PREPARATION
Artwork Gen 29 0 0 9,600 0 1.000 7,860.0 1,000,000
Inspect & S 20 0.5/panel 0.0625 9,600 0.0625 0.000 9,600.0 153,600
Punch Tooli 10 0.5/panel 0.0625 153,600 9,600 0.0625 0.000 9,600.0 153,600

IMAGE TRANSFER
Drill Holes
Manual 15 0.08/hole 40 5660.5725 67,200 40 0.899 66,390.9 5,661
CNC Dril 240 0.004/hole 2 9,600 2 0.111 8,001.6
Metallizatio 10 0.75/panel 0.09375 9,600 0.09375 0.000 9,600.0 102,400
Dry Film Photoresist
1. Panel 5 0.2/panel 0.025 5,661 9,600 0.025 1.000 9,300.0 372,000
2. Lamin 20 2/panel 0.25 9,600 0.25 0.000 9,600.0 38,400
3. Develo 20 0.2/panel 0.025 9,600 0.025 0.000 9,600.0 384,000
Electroplate 25 8.5/panel 1.0625 9,600 1.0625 0.000 9,600.0 9,035
Strip DFPR 5 0.2/panel 0.025 9,600 0.025 0.000 9,600.0 384,000
Etch & Tin S 10 0.2/panel 0.025 9,600 0.025 0.000 9,600.0 384,000

FABRICATION
Soldermask 45 1.5/panel 0.1875 5,661 9,600 0.1875 1.000 6,900.0 36,800
Solder Dip 30 0.5/panel 0.0625 9,600 0.0625 1.000 7,800.0 124,800
Profile
Punch Pr 50 1.0/board 1 5660.5725 9,600 1 1.000 6,600.0 25,800
CNC Rou 150 0.5/board 0.5 9,600 0.5 0.000 9,600.0
Inspect and 45 1.5/board 1.5 19,200 1.5 0.000 19,200.0 12,800
Note: We assume that inspect & pack has a lot of capacity (workers can chip in when idle.)

Table 2 Donner Company Capacity to Order Size function.

NUMBER O 60 CALCULATED CAPACITY: 5,661