1 Pembersihan Lokasi
P = 17.0
L = 15.0
1 255.0 m2
15.00 m P * L = 255.0
17.00 m
c.
2 Perhitungan Luas
P * L
L1 = 3.00 * 3.00 = 9.00 2 18.00 m2
L2 = 1.50 * 2.00 = 3.00 2 6.00 m2
L3 = 2.50 * 3.00 = 7.50 1 7.50 m2
L4 = 3.00 * 5.50 = 16.50 1 16.50 m2
L5 = 2.00 * 4.50 = 9.00 1 9.00 m2
L6 = 2.50 * 2.00 = 5.00 1 5.00 m2
L7 = 3.00 * 2.00 = 6.00 1 6.00 m2
L8 = 1.00 * 2.50 = 2.50 1 2.50 m2 2
2
L9 = 1.00 * 1.50 = 1.50 1 1.50 m a.
L10 = 0.50 * 1.50 = 0.75 1 0.75 m2
L11 = 1.00 * 3.00 = 3.00 1 3.00 m2
L12 = 2.00 * 1.50 = 3.00 1 3.00 m2
L13 = 3.00 * 1.50 = 4.50 1 4.50 m2
Total = 83.25 m2
3 Pemasangan Bowplank
P = 15.0
L = 13.0
2P + 2L = 56.00 1 56.00 m
13.00 m b.
15.00 m
B. Pekerjaan Tanah
0.85 m
Volume
= P*L*T 1 44.20 m3
= 52 * 1 * 0.85
= 44.2
1.00 m
1.00 m
2 Daun Pintu
a. Pintu 1
P = 2.16 V= 0.08
L = 0.90 1 0.08 m3
T = 0.04 A= 1.94 1.94 m2 2
b. Pintu 2
P = 2.36 V= 0.08 3
3
L = 0.80 5 0.38 m
T = 0.04 A= 1.89 9.44 m2
4
c. Pintu 3
P = 2.36 V= 0.07
L = 0.70 4 0.26 m3 5
T = 0.04 A= 1.65 6.61 m2
3 Boven 6
P = 2.64 V= 0.019
L = 0.12 1 0.02 m3
T = 0.06 7
E Pekerjaan Beton
1 Sloof
a. (15/20) G
P= 66.0 V= 1.98 1
L= 0.15 1 1.98 m3
T= 0.20 A= 26.4 26.40 m2
2
b. (15/15)
P= 21.5 V= 0.48
L= 0.15 1 0.48 m3 3
T= 0.15 A= 6.45 6.45 m2
2 Kolom (15/15) H
P= 3.5 V= 0.08 1
L= 0.15 28 2.21 m3
T= 0.15 A= 1.05 29.40 m2
2
3 Rink Balok (10/15)
P= 66.0 V= 0.99
L= 0.15 1 0.99 m3 I
T= 0.10 A= 13.2 13.20 m2 1
T= 0.08 At = 16.5 4
V= 1.32
5
Jenis Pekerjaan Uraian Perhitungan Banyak Total Satuan No.
(2) (3) (4) (5) (6) (1)
Type B 3
P= 24 a.
0.85 m
Volume
= P*L*T 1 18.36 m3
= 24 * 0.9 * 0.85
= 18.36
b.
0.90 m
Type C
P= 21.5
0.75 m
Volume c.
3
= P*L*T 1 8.06 m
= 21.5 * 0.5 * 0.75
= 8.063
0.50 m
0.55 m 52 1 10.87 m3
P=
V = P*A
0.80 m V = 52.0 * 0.21
V = 10.9
1.00 m
Type B
A = 0.45 + 0.10
0.45 m * 0.55
2.00
A = 0.15
5
0.55 m
P= 24 1 3.63 m3
V = P*A C
0.80 m V = 24.0 * 0.15
0.90 m
V = 3.6 1
a.
Type C
A = 0.23 + 0.05
0.23 m * 0.45
2.00
A = 0.06
0.45 m
P = 21.5 1 1.35 m3
V = P*A
0.45 m
0.45 m V = 21.5 * 0.06
0.50 m V = 1.4
Jenis Pekerjaan Uraian Perhitungan Banyak Total Satuan No.
(2) (3) (4) (5) (6) (1)
Pekerjaan Atap 6
Kuda - Kuda
P = 10.0 V= 0.096
1.8 L = 0.08 1 0.096 m3 7
m
T = 0.12
3m
8
Pemasangan Usuk dan Reng
A = 116.1 1 116 m2
Pemasangan Genteng J
2
A = 116.1 1 116 m 1
Pemasangan Bubungan 2
P = 32.64 1 32.64 m
3
Pemasangan Talang
P = 17.68 1 17.68 m
Pemasangan Plafon
A = 83.25 1 83.25 m2
List plank
P = 29.51 1 29.51 m
Pekerjaan Pengecatan
Tembok
A = 246.8 1 246.8 m2
Plafon
A = 83.25 1 83.25 m2
Pemasangan Kloset
Jumlah = 2 1 2 Buah
Pemasangan Bak Cuci Piring
Jumlah = 1 1 1 Buah
Jenis Pekerjaan Uraian Perhitungan Banyak Total Satuan No.
(2) (3) (4) (5) (6) (1)
Urugan Pasir Pondasi b.
Type A
A= L * T
A = 1.00 * 0.10
A = 0.1
0.10 m
P = 52 1 5.2 m3
1.00 m V= A * L
V = 5.20 c.
Type B
A= L * T
A = 0.90 * 0.10
A = 0.09
0.10 m P = 24 1 2.16 m3
0.90 m V= A * L
V = 2.16
Type C 2
A= L * T a.
A = 0.50 * 0.10
0.10 m A = 0.05
P = 21.5 1 1.075 m3
0.50 m
V= A * L
V = 1.08
V= A * L
1.00 m V = 10.4
Jenis Pekerjaan Uraian Perhitungan Banyak Total Satuan No.
(2) (3) (4) (5) (6) (1)
Pemasangan Bak Mandi dan Tempat Sabun
Jumlah = 2 1 2 Buah
Pembuatan Septitank
P = 1.50 V = 2.40 4.8 m3
L = 0.80 A1 = 9.2 2 18.4 m2
T = 2.00 Vp = 4.8 9.6 m3
V= A * L 4
0.90 m
V = 4.3
Type C
A= L * T
A = 0.50 * 0.20
A = 0.1
0.20 m P = 21.5 1 2.15 m3
0.50 m V= A * L
V = 2.2
5
Pasangan Batu Kali
Type A
0.30 m A = 0.30 + 0.80
* 0.8
2.00
A = 0.44 6
0.80 m
P= 52 1 22.88 m3
V = P*A D
0.80 m V = 52.0 * 0.44
V = 22.9 1
1.00 m
a.
Type B
0.30 m A = 0.30 + 0.80
* 0.8
2.00
A = 0.44
b.
P= 24 1 10.56 m3
0.80 m
V = P*A
V = 24.0 * 0.44
0.80 m V = 10.6 c.
0.90 m
Type C
A = 0.30 + 0.45
0.30 m * 0.45
2.00
A = 0.17 d.
V = P*A
V = 21.5 * 0.17 e.
0.45 m
0.50 m V = 3.6
Jenis Pekerjaan Uraian Perhitungan Banyak Total Satuan No.
(2) (3) (4) (5) (6) (1)
Jenis Pekerjaan Uraian Perhitungan Banyak Total Satuan
(2) (3) (4) (5) (6)
Pasangan Trasraam Bata Merah
T = 1.50
P = 47
A= T * P 1 70.5 m2
A = 70.5
Pekerjaan Kayu
Pintu Jendela 2
P = 10.06 V= 0.724
L = 0.12 1 0.724 m3
T = 0.6 A= 13.28 13.28 m2
Jendela 1
P = 8.02 V= 0.577
L = 0.12 3 1.732 m3
T = 0.6 A= 10.59 31.76 m2
Jendela 2
P = 9.64 V= 0.694
L = 0.12 1 0.694 m3
T = 0.6 A= 12.72 12.72 m2
Jendela 3
P = 4.48 V= 0.323
L = 0.12 1 0.323 m3
T = 0.6 A= 5.914 5.914 m2
Jenis Pekerjaan Uraian Perhitungan Banyak Total Satuan
(2) (3) (4) (5) (6)
Harga
No. Biaya Jasa Satuan
Terendah Tertinggi
1 Mandor Rp. 50,000.00 55,800.00 OH
2 Kepala Tukang Rp. 42,500.00 47,400.00 OH
3 Tukang Rp. 40,000.00 44,600.00 OH
4 Pekerja Rp. 32,500.00 36,300.00 OH
B PEKERJAAN TANAH
1 1 m3 Galian tanah biasa sedalam 1 meter
Pekerja 0.400 oh 36,300.00 14,520.00
16,752.00
Mandor 0.040 oh 55,800.00 2,232.00
2 1 m3 Urugan kembali
Pekerja 0.192 oh 36,300.00 6,969.60
8,029.80
Mandor 0.019 oh 55,800.00 1,060.20
3 1 m3 Urugan Pasir
pasir urug 1.200 m3 71,300.00 85,560.00
Pekerja 0.300 oh 36,300.00 10,890.00 97,008.00
Mandor 0.010 oh 55,800.00 558.00
4 1 m3 Urugan Sirtu
Sirtu 1.200 m3 93,800.00 112,560.00
Pekerja 0.250 oh 36,300.00 9,075.00 123,030.00
Mandor 0.025 oh 55,800.00 1,395.00
C PEKERJAAN PONDASI
1 1 m3 Pasangan pondasi batu kosong
batu kali 1.200 m3 156,300.00 187,560.00
pasir urug 0.300 m3 71,300.00 21,390.00
Pekerja 0.780 oh 36,300.00 28,314.00
258,682.80
Tukang batu 0.390 oh 44,600.00 17,394.00
Kepala tukang 0.039 oh 47,400.00 1,848.60
Mandor 0.039 oh 55,800.00 2,176.20
2 1 m3 Pasangan pondasi batu kali, 1pc : 3 kp : 10ps
batu kali 1.100 m3 156,300.00 171,930.00
semen portland 61.000 kg 1,100.00 67,100.00
kapur pasang 0.147 m3 429,600.00 63,151.20
pasir pasang 0.492 m3 102,900.00 50,626.80
441,047.00
Pekerja 1.500 oh 36,300.00 54,450.00
Tukang batu 0.600 oh 44,600.00 26,760.00
Kepala tukang 0.060 oh 47,400.00 2,844.00
441,047.00
E PEKERJAAN PLESTERAN
1 1 m2 Pekerjaan Plesteran 1Pc : 5Ps, tebal 15 mm
semen portland 4.320 kg 1,100.00 4,752.00
pasir pasang 0.022 m3 102,900.00 2,263.80
Pekerja 0.200 oh 36,300.00 7,260.00
22,234.80
Tukang batu 0.150 oh 44,600.00 6,690.00
Kepala tukang 0.015 oh 47,400.00 711.00
Mandor 0.010 oh 55,800.00 558.00
2 1 m2 Pekerjaan plesteran 1pc : 3 ps, tebal 15 mm (trasraam)
semen portland 6.480 kg 1,100.00 7,128.00
pasir pasang 0.019 m3 102,900.00 1,955.10
Pekerja 0.200 oh 36,300.00 7,260.00
24,302.10
Tukang batu 0.150 oh 44,600.00 6,690.00
Kepala tukang 0.015 oh 47,400.00 711.00
Mandor 0.010 oh 55,800.00 558.00
F PEKERJAAN KAYU
1 1 m3 Pasang kusen pintu dan jendela kayu kamper
kayu kamper 1.200 m3 7,465,900.00 8,959,080.00
Pekerja 6.000 oh 36,300.00 217,800.00
Tukang kayu 18.000 oh 44,600.00 802,800.00 10,091,220.0
kepala tukang kayu 2.000 oh 47,400.00 94,800.00
mandor 0.300 oh 55,800.00 16,740.00
2 1 m2 Pasang pintu dan jendela kaca kayu kamper
kayu kamper 0.035 m3 7,800,000.00 273,000.00
Pekerja 0.800 oh 36,300.00 29,040.00
Tukang kayu 2.000 oh 44,600.00 89,200.00 402,952.00
402,952.00
kepala tukang kayu 0.200 oh 47,400.00 9,480.00
mandor 0.040 oh 55,800.00 2,232.00
L PEKERJAAN PENGECATAN
1 1 m2 Pengecatan bidang kayu baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
cat meni 0.200 kg 23,300.00 4,660.00
plamir 0.150 kg 18,700.00 2,805.00
cat dasar 0.170 kg 32,000.00 5,440.00
cat penutup 2 kali 0.260 kg 72,000.00 18,720.00
34,991.30
Pekerja 0.070 oh 36,300.00 2,541.00
Tukang cat 0.009 oh 44,600.00 401.40
Kepala tukang 0.006 oh 47,400.00 284.40
Mandor 0.0025 oh 55,800.00 139.50
2 1 m2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
plamir 0.100 kg 12,000.00 1,200.00
cat dasar 0.100 kg 4,700.00 470.00
cat penutup 2 kali 0.260 kg 48,000.00 12,480.00
Pekerja 0.020 oh 36,300.00 726.00 18,123.92
Tukang cat 0.063 oh 44,600.00 2,809.80
Kepala tukang 0.0063 oh 47,400.00 298.62
Mandor 0.0025 oh 55,800.00 139.50
G PEKERJAAN BETON
1 1 m3 Membuat beton bertulang 1pc : 2ps : 3 kr
semen portland 232.00 kg 1,100.00 255,200.00
pasir beton 0.520 m3 113,900.00 59,228.00
koral beton 0.780 m3 125,100.00 97,578.00
Pekerja 1.650 oh 36,300.00 59,895.00 488,700.00
Tukang batu 0.250 oh 44,600.00 11,150.00
Kepala tukang 0.025 oh 47,400.00 1,185.00
Mandor 0.080 oh 55,800.00 4,464.00
2 1 kg Pembesian dengan besi polos atau besi ulir
besi beton (polos/ulir) 1.050 kg 17,200.00 18,060.00
kawat beton 0.015 kg 14,000.00 210.00
Pekerja 0.007 oh 36,300.00 254.10
18,886.22
Tukang besi 0.007 oh 44,600.00 312.20
Kepala tukang 0.0007 oh 47,400.00 33.18
Mandor 0.0003 oh 55,800.00 16.74
/100 kg = 1,888,622.00
I PEKERJAAN LANGIT-LANGIT
1 1 m2 Langit-langit plywood (60x120) cm, tebal 4 mm
plywood 4"x8"x4mm 0.375 lbr 23,500.00 8,812.50
paku 0.030 kg 17,900.00 537.00
Pekerja 0.070 oh 36,300.00 2,541.00
17,019.80
Tukang kayu 0.100 oh 44,600.00 4,460.00
Kepala tukang 0.010 oh 47,400.00 474.00
Mandor 0.004 oh 55,800.00 195.30
J PEKERJAAN SANITASI
1 Memasang 1 buah kloset duduk/monoblok
kloset duduk/monoblok 1.000 bh 1,484,900.00 1,484,900.00
perlengkapan 6.000 % harga 89,094.00 89,094.00
Pekerja 3.300 oh 36,300.00 119,790.00
1,751,819.40
Tukang batu 1.100 oh 44,600.00 49,060.00
Kepala tukang 0.001 oh 47,400.00 47.40
Mandor 0.160 oh 55,800.00 8,928.00
2 Memasang 1 buah bak mandi fibreglass 1 m3 air
bak fibreglass 1.000 bh 283,100.00 283,100.00
perlengkapan 12.000 % harga 33,972.00 33,972.00
Pekerja 3.000 oh 36,300.00 108,900.00
719,552.00
Tukang batu 4.500 oh 44,600.00 200,700.00
719,552.00
5.3700
7.7533
12.5567
13.7429
11.8457
18.4638
10.0044
7.8631
2.0813
26.4931
11.997
8.244
7.333
143.748
207
WAKTU BOBOT Bulan 1
No NAMA PEKERJAAN
(HARI) Minggu 1 Minggu 2 Minggu 3
(1) (2) (3) (4) 1 2 3 4 5 6 7 8 9 10 11 12 13 14
JUMLAH BOBOT 100.00% 0.29 0.29 0.29 0.29 0.29 0.19 0.19 0.19 0.19 0.61 0.61 0.42 0.42 0.42
KOMULATIF HARIAN 0.29 0.58 0.86 1.15 1.44 1.63 1.83 2.02 2.21 2.82 3.43 3.85 4.27 4.69
RENCANA TIAP MINGGU 1.63 2.22 2.51
RENCANA KUMULATIF 1.63 3.85 6.36
0.29 0.58 0.86 1.15 1.44 1.63 1.83 2.02 2.21 2.82 3.43 3.85 4.27 4.69
Bulan 1 Bulan 2
Minggu 3 Minggu 4 Minggu 5 Minggu 6 Minggu 7
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
0.19 0.19
0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13 1.13
0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88 0.88
0.42 0.42 0.42 0.42 0.42 0.42 0.42 0.61 1.08 0.88 0.88 0.88 1.39 2.52 2.52 2.52 1.64 1.64 1.64 1.64 1.64 1.64 1.64 1.64 1.39 1.39
5.11 5.52 5.94 6.36 6.78 7.20 7.61 8.22 9.30 10.2 11.1 11.9 13.3 15.9 18.4 20.9 22.5 24.2 25.8 27.4 29.1 30.7 32.3 34.0 35.4 36.8
2.51 3.82 10.71 9.82 8.31
6.36 10.18 20.89 30.71 39.02
5.11 5.52 5.94 6.36 6.78 7.20 7.61 8.22 9.30 10.2 11.1 11.9 13.3 15.9 18.4 20.9 22.5 24.2 25.8 27.4 29.1 30.7 32.3 34.0 35.4 36.8
KURVA S
Bulan 3
Minggu 7 Minggu 8 Minggu 9 Minggu 10 Minggu 11
41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66
0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17 0.17
0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
1.13 1.13 1.13 0.39 0.39 0.39 0.39 0.39 0.39 0.39 0.39 2.17 2.17 1.04 1.04 0.97 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14 1.14
37.9 39.0 40.2 40.5 40.9 41.3 41.7 42.1 42.5 42.9 43.3 45.5 47.6 48.7 49.7 50.7 51.8 53.0 54.1 55.2 56.4 57.5 58.7 59.8 61.0 62.1
8.31 3.09 6.54 6.59 6.86
39.02 42.11 48.65 55.24 62.10
37.9 39.0 40.2 40.5 40.9 41.3 41.7 42.1 42.5 42.9 43.3 45.5 47.6 48.7 49.7 50.7 51.8 53.0 54.1 55.2 56.4 57.5 58.7 59.8 61.0 62.1
Bulan 4
Minggu 12 Minggu 13 Minggu 14 Minggu 15 Minggu 16
67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92
0.17 0.17
0.17 0.17
0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
1.14 1.14 2.11 2.11 2.11 1.04 1.04 1.04 1.15 1.15 0.97 0.97 0.34 0.34 0.34 0.34 0.34 0.34 0.34 0.34 1.62 1.62 1.62 1.62 1.62 1.62
63.2 64.4 66.5 68.6 70.7 71.7 72.8 73.8 75.0 76.1 77.1 78.1 78.4 78.7 79.1 79.4 79.7 80.1 80.4 80.8 82.4 84.0 85.6 87.2 88.9 90.5
9.64 6.31 2.03 7.16 9.73
71.75 78.06 80.09 87.25 96.98
63.2 64.4 66.5 68.6 70.7 71.7 72.8 73.8 75.0 76.1 77.1 78.1 78.4 78.7 79.1 79.4 79.7 80.1 80.4 80.8 82.4 84.0 85.6 87.2 88.9 90.5
Bulan 5
Minggu 16 Minggu 17
93 94 95 96 97 98