TQM implementation
A cultural and behavioral shift in the mind-set of all
Inhibiting factors of participants in the construction process (Kanji and
Wong, 1998; Love and Heng, 2000) especially top
implementing total or senior management is necessary if the
quality management on construction industry is to improve its performance
and competitiveness. For innovation and
construction sites continuous improvement to be encouraged and
become a norm, traditional practices need to be
unlearnt. Historically, the construction industry
Theo C. Haupt and has been reluctant to implement change. This
Daniel E. Whiteman process of change is especially difficult in the
competitive environment in which construction
takes place and where the bottom line is still the
The authors primary motivation of construction companies.
Theo C. Haupt is a Research Coordinator at the Peninsula Further, companies are prepared to only
Technikon, Bellville, South Africa. implement those aspects of total quality
Daniel E. Whiteman is President of Coastal Construction, management (TQM) programs that will provide
Miami, Florida, USA. them with competitive advantage and improve their
overall financial performance. Ironically, research
Keywords conducted by others such as Zantanidis and
Total quality management, Customer satisfaction, Tsiotras (1998) identified quality as being the most
Employees participation significant provider of competitive advantage.
Construction companies clearly have not bought
Abstract into this finding in their daily operations on site.
A review of the essential elements of TQM
Quality systems entail having the organizational structure, gained from attendance at several construction-
responsibilities, procedures, processes and resources for related TQM seminars revealed a lack of actual
implementing quality management such that there is a guiding
application of the processes that have made TQM
framework to ensure that every time a process is performed the
same information, method, skills and controls are used and
successful in other industries. These included a
practiced in a consistent manner. With its primary focus being lack of adequate budget, failure to plan adequately
the involvement of everyone, TQM has the potential to improve for quality, inadequate training at all levels except
business results, greater customer orientation and satisfaction, for top or senior management positions, and little
worker involvement and fulfilment, teamworking and better recognition given to those who strive for quality
management of workers within companies. However, the improvement on their projects.
construction industry has been slow to embrace the concept of Once a project was awarded it seemed that all
TQM. Construction firms have been continually struggling with efforts focused on getting started with construction
its implementation. Historically, construction has been an quickly, getting the subcontracts written on a
industry reluctant to implement change. Consequently, it has
timely basis, and then progressing the work in a
remained behind where it should be on the implementation of
TQM. Generally, the principles of TQM are not applied beyond manner that would produce the greatest revenue in
management levels within general contractors. This paper the shortest amount of time. Quality was primarily
reports on a study to identify those factors that hinder the achieved through the inspection process. However,
implementation of TQM principles in the actual field operations quality cannot be inspected into a product, it must
of a construction jobsite. be built into the product from the outset.
The authors conducted a study in the United
Electronic access States to identify those factors that hinder the
implementation of TQM principles in the actual
The Emerald Research Register for this journal is
field operations of a construction jobsite. These
available at
www.emeraldinsight.com/researchregister
inhibitive factors were identified through a
literature review and a survey of a sample of
The current issue and full text archive of this journal is contractors. This paper reports on these findings.
available at
www.emeraldinsight.com/0954-478X.htm
1997). The survey protocol of random sampling the annual ranking of the 400 largest construction
procedures allows a relatively small number of companies by the publication, Engineering News
people to represent a much larger population Record (ENR). For the purposes of this survey, the
(Ferber et al., 1980; May, 1997; Schuman and mailing list for the year 1998 was obtained listing
Presser, 1981; Sonquist and Dunkelberg, 1977). the name, address, and title of principal officer for
The opinions and characteristics of a population each of the firms listed.
can be explained through the use of a Within Florida, one of the leading trade
representative sample (May, 1997). organizations is the Associated General
Surveys are an effective means to gain data on Contractors (AGC), which is the oldest such
attitudes, on issues and causal relationships. organization in the country. Owing to the large
However, they can only show the strength of number of firms within this organization, a
statistical association between variables. Surveys random selection of 80 of these firms was made
do not explain changes in attitudes and views over from each of the five different geographical
time. They also provide no basis to expect that the chapters throughout the state of Florida using the
questions are correctly interpreted by the systematic sampling technique, with a total of 16
respondents (May, 1997). firms from each region selected to achieve a cross-
The authors decided that a questionnaire survey section of the entire state. A total of 480
would be appropriate for achieving the objectives questionnaires were sent out.
of this exploratory study.
Survey response
Questionnaire design As a result of two mailings and a follow up phone
Several key members of Coastal Construction survey, a total of 87 questionnaires were completed
were selected to “brain-storm” the issues, which, if by the ENR 400 contractors, or a total of 21.75
implemented, could lead to more attention being percent of those surveyed. On the Florida level,
given to improvement in the quality of site there were a total of 23 completed questionnaires
operations. From this meeting of managers, the out of the 80 that were solicited, for a response rate
initial draft of the questionnaire was developed. of 28.75 percent. Overall, the response rate for the
These included a cross-section of the company 480 questionnaires mailed was 110 completed
management structure and included project questionnaires, or 22.92 percent. A review of the
executive, project manager, estimator and project responses from both the national and statewide
superintendent. surveys indicated no measurable differences in the
Construction executives from ten different respondents’ answers to the questions. The two
companies reviewed the draft questionnaire and groups were therefore combined for the analysis of
provided input. This review centered on this survey.
development of questions relating to their
companies’ current use or level of implementation
of TQM, and the obstacles or hindrances which
kept TQM from being more effectively Discussion
implemented at the field level. This pilot study was
conducted to validate and improve the Participants in the study were asked to respond to
questionnaire, in terms of its format and layout, several questions relating to the importance of
the wording of statements and the overall content. certain criteria to the successful implementation of
The draft questionnaire was revised to include the TQM in their companies. While only selected
suggestions of these participants. In short, the responses are discussed in this paper, the complete
questionnaire was validated through this process ranking of responses is shown in Table I.
and provided the authors with improvement
opportunities before launching the main survey.
Success criteria
Management commitment and involvement
Sample selection In recent times, there has been an unprecedented
It was the intent of the survey to gather preoccupation by managers in more organizations
information relating to the utilization of TQM than ever with quality issues. Top management is
from as broad a geographic area within the United one of several major critical factors or
States as possible. For this purpose, it was organizational requirements for effective quality
determined that two sources of potential management. Successful quality performance
participants would be used – one on a national requires top management to be dedicated to that
level, and one within the state of Florida. goal.
On a national level, one recognized standard for Almost all of the 109 valid[1] responses to the
measuring the size of a construction company is questionnaire survey regarded as important, the
167
Inhibiting factors of implementing total quality management The TQM Magazine
Theo C. Haupt and Daniel E. Whiteman Volume 16 · Number 3 · 2004 · 166-173
commitment and involvement of their top or completion on time, within budget, to optimum
senior management in the TQM process for its quality standards, and without loss of life or limb,
successful implementation. and exceed the needs and expectations of their
clients, both internal and external.
This finding accords with those of several other
studies (Anderson et al., 1994; Douglas and Judge, Several studies have shown that the lack of upper
2001; Kathuria and Davis, 1999; Miller, 1996; or top management involvement or commitment
Rahman, 2001; Reed et al., 2000; Saraph et al., to TQM is a stumbling block to its successful
1988; Tata and Prasad, 1998). Those in top implementation (Glover, 2000; Shriener et al.,
management must provide the initiative for 1995).
successful quality assurance practices and must
support quality programs for them to be Customer focus
successful. Management leadership is regarded as All respondents regarded primary customer focus
one of the categories needed for adoption as as the next most important requirement for
determined by the Malcom Baldridge National successful TQM implementation. Several authors
Quality Award in the United States. Haupt (2001) by definition consider customer focus as equally
confirms the pivotal role of management important as upper management involvement and
commitment by citing Petersen (1996, p. 278) as commitment to TQM principles (Anfuso, 1994;
follows: Associated General Contractors of America, 1992;
Management’s reaction to change determines BS 4778, 1991; Kelemen, 2000). In many studies,
success. When upper management “buys in” to the the issue of customer satisfaction or focus featured
changes, it ensures success. prominently as a defining concept or critical
element of TQM implementation (Anderson et al.,
Further, management must have the capacity and
1994; Black and Porter, 1996; Douglas and Judge,
willingness to introduce and support the TQM
2001; Rahman, 2001; Shammas-Toma et al.,
process if it is to succeed. According to Petersen
1998; Tata and Prasad, 1998).
(1996, p. 266):
Another way in which behavior is strongly Participative management style
influenced is through modeling (learning by
Participative management was an important
imitation). The research on modeling tells us that if
we want to maximize approach (rather than criterion to the respondents in the implementation
avoidance) tendencies in workers, we must exhibit of TQM. This finding is well-supported in the
that behavior ourselves. literature (Ho et al., 2000; Kathuria and Davis,
1999; Stashevsky and Elizur, 2000; Yong and
The pivotal role of top management for quality
Wilkinson, 2001). The importance of participative
improvement programs is embodied in the management is suggested by the notions of
working definition of Whiteman (2002) of TQM relationship oriented practices (Kathuria and
for construction firms which states that: Davis, 1999), employee fulfilment (Anderson et al.,
TQM is a continuous process whereby the top 1994), teamwork (Black and Porter, 1996;
management of construction firms take whatever
Shammas-Toma et al., 1998), employee
steps are necessary to enable everyone in the
organization, especially construction field involvement, empowerment and teamwork (Kols
supervisors and construction workers in the course and Sherman, 1998; Tata and Prasad, 1998),
of executing all their activities on construction sites employee relations (Saraph et al., 1988), people
to establish and achieve standards, which include (Rahman, 2001; Yusof and Aspinwall, 2000), and
168
Inhibiting factors of implementing total quality management The TQM Magazine
Theo C. Haupt and Daniel E. Whiteman Volume 16 · Number 3 · 2004 · 166-173
human resource development (MBNQA). The The first six of these problem areas are briefly
lack of integration between TQM and human discussed in the next section.
resource practices has been cited as a major barrier
to achieving full-blown TQM (Glover, 2000). Too much paperwork
Most of the respondents (77 percent) regarded the
Transfer of TQM from the home office to field generation of too much paperwork through
operations implementation of TQM principles as the most
Most of the respondents had made efforts to inhibiting issue to its success in the field. Most
implement the principles of TQM within their construction projects already involve large amounts
management operations. Relatively few of these of paperwork. These include voluminous contract
firms (34 percent) had been successful in documents, records of plans and amendments,
transferring this effort to their field operations. architects’ instructions, steel bending schedules,
Unless TQM can be effectively implemented into change orders, forms to record the requisition,
field operations on site its benefits to the order, delivery and movement of material, plant and
construction industry at large will be minimal. labor, and material safety data sheets. Several
Since profits and losses are generated by authors support this view. Harari (1993a, b) was
construction activities on sites, improvement concerned about the creation of cumbersome
efforts have to be targeted at this essential area. In bureaucracies due to increases in paperwork to track
construction, most of the workers of companies are the benefits of TQM programs. Lilrank et al. (2001)
employed on construction sites. Several authors argue that excessive paperwork is prohibitive.
maintain that workers need to be empowered and
Transient nature of workforce
involved in TQM principles. They have argued for
Similarly, most of the respondents (74 percent)
a shift in power from management to field
stated that the transient nature of the workforce
operations (Richbell and Rasiatou, 1999);
was restrictive to the implementation of TQM on
increased involvement of workers and increased
construction sites. By its nature construction to a
contextual application of TQM principles (Glover,
certain degree necessitates a transient workforce.
2000); increased training of supervisors and hourly
Each project is built on a new construction site.
paid workers (Chandler, 2000; Kassicieh and
Usually that site is not close to where workers had
Yourstone, 1998) and increased training in
previously worked. Consequently, workers will
problem-solving and statistical process control
seek employment closer to home or have to
(Marler, 1998). relocate where this is not possible. Crosby (1990)
suggests that companies need to work as hard on
Major hindrances employee relationships as they do on their
Several key elements as shown in Table II were customer interfaces.
found to be major hindrances to the transfer of
Field employees regard TQM as irrelevant
TQM to the field operations of construction
A large proportion of respondents (79 percent of
companies.
the sample) indicated that workers on construction
regarded TQM as irrelevant to their performance.
Table II Ranking of responses to TQM problem areas Shriener et al. (1995) suggested that obsession
CV with the bottom line and viewing quality as merely
Rank Criteria Meana SD (percent) an overhead might be contributory to this attitude.
1 Too much paperwork 3.44 1.26 36.6 Further the exclusion of employees from quality
2 Subcontractors and suppliers not improvement efforts and especially decision-
interested 3.39 1.24 36.6 making relative to this improvement is a serious
3 Low bid subcontracting 3.39 1.29 38.1 problem (Chandler, 2000; Richbell and Rasiatou,
4 Difficulty in measuring results 3.35 1.33 39.7 1999; Senge et al., 1994). Other exacerbating
5 Field employees regard TQM as factors include lack of proper training and
irrelevant 3.31 1.20 36.3 continuous skills development (Katz, 1993; Reed
6 Transient work force 3.28 1.21 36.9 et al., 2000; Wruck and Jensen, 1998), difficulty in
7 Low education level of field forces 3.13 1.28 40.9
generalizing training to opportunities to apply
8 Focus on short term cost savings 3.05 1.29 42.3
what has been taught (Marler, 1998), motivation
9 Too tight scheduling 3.02 1.36 45.0
of workers to improve their work (Hackman and
10 No operations to benchmark 2.90 1.37 47.2
Wagerman, 1995; Katzenbach, 2000), and
11 TQM just a buzz word 2.83 1.39 49.1
12 Too many uncontrollable factors 2.81 1.33 47.3
effective communication and project coordination
13 Unique nature of construction 2.81 1.31 46.6 (Shammas-Toma et al., 1998). Both construction
managers and workers require a paradigm shift to a
Note: aOn the scale used, 1 = totally disagree, 2 = generally disagree, team approach (Allan and Kilmann, 2001; Reed
3 = somewhat agree, 4 = generally agree, 5 = totally agree
et al., 2000; Shammas-Toma et al., 1998).
169
Inhibiting factors of implementing total quality management The TQM Magazine
Theo C. Haupt and Daniel E. Whiteman Volume 16 · Number 3 · 2004 · 166-173
Table III Relationship between planning and subcontractors application of TQM principles in all areas of
Subcontractors operation and most of the identified TQM
Subcontracting and suppliers problem areas. In particular, as the application of
based on not interested these principles increase the prevalence should
low bid in TQM decrease of the issues of low bid subcontracting;
Pearson correlation (r) 20.319* 20.286* worker, subcontractor and supplier disinterest in
Sig. (one-tailed) 0.002 0.004 TQM; TQM being just a buzzword; and transient
n 83 83 nature of the workforce.
Note: *Correlation is significant at the 0.01 level (one-tailed) The coefficients of determination (r2) indicate
that the widespread application of TQM on
construction sites accounts for variations of 17
become less problematic as TQM planning percent of workers’ negative attitude towards
becomes more developed throughout construction TQM, 6.8 percent in the practice of low bid
companies. This finding suggests that well subcontracting, 8.0 percent in the level of interest
developed planning accounts for 10.2 percent (r2 of subcontractors and suppliers in TQM, 5.2
or coefficient of determination) of the variation in percent of TQM being a buzzword, and 5.6
the practice of low bid subcontracting, and for 8.2 percent of the transience of the workforce.
percent of the variation in the level of interest of
subcontractors and suppliers in TQM.
Table IV indicates weak to modest negative
relationships between participative management Conclusion
style and low bid subcontracting and attitudes of
workers, subcontractors and suppliers towards It is apparent that if TQM is to be implemented
TQM. These issues will be less problematic as successfully on construction sites the inhibitive
participative management pervades all areas of issues that have been identified from the literature
operation and especially those on construction and the contractor survey need to be addressed on
sites. Evidently, this form of management accounts a comprehensive and integrative basis. The
for variations of 6.1 percent in the practice of low principles of TQM should be applied beyond
bid subcontracting, 8.4 percent of workers’ management levels and include workers on
negative attitude towards TQM, and 4.0 percent construction sites. These workers must be
in the level of interest of subcontractors and empowered, involved and trained in problem
suppliers in TQM. solving. Companies need to work on improving
Similarly, the correlations in Table V show worker relationships in the same way that they do
modest negative relationships between the for their external customers. Through effective
Table V Relationship between application of TQM on sites and TQM problem areas
Field Subcontractors
employees Subcontracting and suppliers
regard TQM based on not interested TQM just a Transient
as irrelevant low bid in TQM buzzword workforce
Pearson correlation (r) 20.412** 2 0.261** 2 0.282** 2 0.227* 20.236*
Sig. (one-tailed) 0.000 0.009 0.005 0.019 0.016
n 83 83 83 83 83
Notes: *Correlation is significant at the 0.05 level (one-tailed); **Correlation is significant at the 0.01 level (one-tailed)
171
Inhibiting factors of implementing total quality management The TQM Magazine
Theo C. Haupt and Daniel E. Whiteman Volume 16 · Number 3 · 2004 · 166-173
communication and improved project Ferber, R., Sheatsley, P., Turner, A. and Waksberg, J. (1980), What
coordination, workers must be motivated to Is a Survey?, American Statistical Association,
improve their work. Contractors must move away Washington, DC.
George, S. and Weimerskirch, A. (1998), Total Quality
from their obsession with the bottom line. They
Management: Strategies and Technologies Proven at
need to bind all parties together including Today’s Most Successful Companies, Wiley, New York, NY.
subcontractors by mutually set and internalised Glover, L. (2000), “Neither poison nor panacea: shopfloor
goals. However, any attempt to bring about responses to TQM”, Employee Relations, Vol. 22 No. 1/2,
meaningful change with respect to implementing pp. 121-41.
TQM on construction sites will only succeed if top Hackman, R. and Wagerman, R. (1995), “Total quality
or senior management commit and involve management: empirical, conceptual, and practical issues”,
themselves in the TQM process. Administrative Science Quarterly, Vol. 40, pp. 203-70.
Harari, O. (1993a), “Ten reasons why TQM doesn’t work”,
After correlation of the five success criteria with
Management Review, Vol. 82 No. 1, pp. 33-8.
the TQM problem areas, weak to modest negative Harari, O. (1993b), “The 11th reason why TQM doesn’t work”,
relationships were identified that suggest that high Management Review, Vol. 82 No. 5, pp. 26-9.
levels of management actions would lead to Haupt, T.C. (2001), “The performance approach to construction
reduced prevalence of the problems as TQM was worker safety and health” PhD dissertation, University of
deployed on construction sites. This finding serves Florida, Gainesville, FL.
to confirm the pivotal role of top management in Ho, D.C.K., Cheng, E.W.L. and Fong, P.S.W. (2000), “Integration
TQM implementation. of value analysis and total quality management: the way
ahead in the next millennium”, Total Quality
The authors are currently investigating the
Management, Vol. 11 No. 2, pp. 179-86.
strategies followed by construction firms that have Kale, S. and Arditi, D. (2001), “General contractors’ relationships
implemented TQM widely to overcome the with subcontractors: a strategic asset”, Construction
hindrances identified in this study. Management and Economics, Vol. 19 No. 5, pp. 541-50.
Kanji, G. and Wong, A. (1998), “Quality culture in the
construction industry”, Total Quality Management, Vol. 9
No. 4/5, pp. 133-40.
Note
Kassicieh, S.K. and Yourstone, S.A. (1998), “Training,
performance evaluation, rewards, and TQM
1 SPSS labels those respondents “valid” that are included in
implementation success”, Journal of Quality
the analysis after adjustment for non-responses.
Management, Vol. 3 No. 1, pp. 25-38.
Kathuria, R. and Davis, E.B. (1999), “Quality and workforce
management: from manufacturing managers’
perspective”, Journal of Quality Management, Vol. 4 No. 2,
References pp. 147-66.
Katz, A. (1993), “Eight TQM pitfalls”, Journal for Quality and
Allen, R.S. and Kilmann, R.H. (2001), “Aligning reward practices Participation, Vol. 16 No. 4, pp. 24-7.
in support of total quality management”, Business Katzenbach, J.R. (2000), Peak Performance, Harvard Business
Horizons, Vol. 44 No. 3, pp. 77-84. Press, Boston, MA..
Anderson, J.C., Rungtunsanatham, M. and Schroeder, R.G. Kelemen, M. (2000), “Too much or too little ambiguity? The
(1994), “A theory of quality management underlying the language of total quality management”, Journal of
Deming management method”, Academy of Management
Management Studies, Vol. 37 No. 4, pp. 485-98.
Review, Vol. 19 No. 3, pp. 472-509.
Kols, A.J. and Sherman, J.E. (1998), “Principles of quality
Anfuso, D. (1994), “L.L. Bean’s TQM efforts put people before
management”, Population Reports, Vol. 26 No. 3,
processes”, Personnel Journal, pp. 72-83.
pp. 13-16.
(The) Associated General Contractors of America (1992), An
Lahndt, L. (1999), “TQM tools for the construction industry”,
Introduction to Total Quality Management, AGC of
Engineering Management Journal, Vol. 11 No. 2, pp. 23-7.
America, Washington, DC.
Black, S.A. and Porter, L.J. (1996), “Identification of the critical Lilrank, P., Shani, A.B. and Lindberg, P. (2001), “Continuous
factors of TQM”, Decision Sciences, Vol. 27, pp. 1-21. improvement: exploring alternative organizational
BS 4778:Part 2 (1991), Quality Vocabulary: Quality Concepts and designs”, Total Quality Management, Vol. 12 No. 1,
Related Definitions, British Standards Institution, London. pp. 41-54.
Chandler, G.N. (2000), “Human resource management, TQM and Love, P.E.D. and Heng, L. (2000), “Total quality management and
firm performance in small and medium-sized enterprises”, the learning organization: a dialogue for change in
Entrepreneurship: Theory and Practice, Vol. 25 No. 1, construction”, Construction Management and Economics,
pp. 43-57. Vol. 18 No. 3, pp. 321-31.
Chartered Institute of Building (1995), Time for Real Marler, J.H. (1998), “The effect of TQM training, flexible work,
Improvement: Learning from Best Practice in Japanese and flexible technology on continuous improvement”,
Construction, Research and Development Report, CIOB, Journal of Quality Management, Vol. 3 No. 2, pp. 241-66.
Ascot. May, T. (1997), Social Research: Issues, Methods and Process,
Crosby, P. (1990), Let’s Talk Quality, McGraw-Hill, New York, NY. Open University Press, Buckingham.
Douglas, T.J. and Judge, W.Q. Jr (2001), “Total quality Miller, W.J. (1996), “A working definition for TQM researchers”,
management implementation and competitive advantage: Journal of Quality Management, Vol. 1, pp. 149-59.
the role of structural control and exploration”, Academy of Petersen, D. (1996), Human Error Reduction and Safety
Management Journal, Vol. 44 No. 1, pp. 158-69. Management, Van Nostrand Reinhold, New York, NY.
172
Inhibiting factors of implementing total quality management The TQM Magazine
Theo C. Haupt and Daniel E. Whiteman Volume 16 · Number 3 · 2004 · 166-173
Rahman, S. (2001), “Total quality management practices and individual performance”, Journal of Quality Management,
business outcome evidence from small and medium Vol. 5 No. 1, pp. 53-65.
enterprises in Western Australia”, Total Quality Tata, J. and Prasad, S. (1998), “Cultural and structural
Management, Vol. 12 No. 2, pp. 201-10. constraints on total quality management
Reed, R., Lemak, D.J. and Mero, N.P. (2000), “Total quality implementation”, Total Quality Management, Vol. 9 No. 8,
management and sustainable competitive advantage”, pp. 703-10.
Journal of Quality Management, Vol. 5 No. 1, pp. 5-26. Ulrich, D., Zenger, J. and Smallwood, N. (1999), Results-Based
Richbell, S. and Ratsiatou, I. (1999), “Establishing a shared Leadership, Harvard Business School Press, Boston, MA.
vision under total quality management; theory and Whalen, M.J. and Rahim, M.A. (1994), “Common barriers to
practice”, Total Quality Management, Vol. 10 No. 4/5, implementation and development of a TQM program”,
pp. 684-9. Total Quality Management, Vol. 5, pp. 19-21.
Saraph, J.V., Benson, P.G. and Schroeder, R.G. (1988), “An Whiteman, D.E. (2002), “The application of total quality
instrument for measuring the critical factors of quality management in construction field operations”,
management”, Decision Sciences, Vol. 20, pp. 810-28. unpublished PhD dissertation, University of Florida,
Schuman, H. and Presser, S. (1981), Questions and Answers in Gainesville, FL.
Attitude Surveys – Experiments on Question Form, Wong, A. and Fung, P. (1999), “Total quality management in the
Wording, and Context, Academic Press, New York, NY. construction industry: a supply chain management
Senge, P., Kleimer, A., Roberts, C. and Smith, B. (1994), The Fifth perspective”, Total Quality Management, Vol. 10 No. 2,
Discipline Handbook, Bantam Doubleday Dell Publishing pp. 199-208.
Group, New York, NY. Wruck, K.H. and Jensen, M.C. (1998), “The two key principles
Shammas-Toma, M., Seymour, D.E. and Clark, L.A. (1998), behind effective TQM programs”, European Financial
“Obstacles to implementing total quality management in Management, Vol. 4 No. 3, pp. 401-22.
the UK construction industry”, Construction Management Yong, J. and Wilkinson, A. (2001), “Rethinking total quality
and Economics, Vol. 16 No. 2, pp. 177-93. management”, Total Quality Management, Vol. 12 No. 2,
Shriener, Angelo and McManamy (1995), “Total quality pp. 247-58.
management struggles into a low orbit”, ENR, pp. 24-8. Yusof, S.M. and Aspinwall, E. (2000), “Total quality management
Sonquist, J.A. and Dunkelberg, W.C. (1977), Survey and Opinion implementation frameworks: comparison and review”,
Research: Procedures for Processing and Analysis, Total Quality Management, Vol. 11 No. 3, pp. 281-94.
Prentice-Hall, Inc., Englewood Cliffs, NJ. Zantanidis, S. and Tsiotras, G. (1998), “Quality management: a
Stashevsky, S. and Elizur, D. (2000), “The effect of quality new challenge for the Greek construction industry”, Total
management and participation in decision making on Quality Management, Vol. 9 No. 7, pp. 619-32.
173