List of Information/Document Requirement for Environmental Assessment

1. Profile of Company (vision, mission, shareholding, organogram, etc.,)


2. Highlights of Project Feasibility Study
3. Environmental Policy of Company
4. Safety Policy of Company
5. Project Justification and Objectives

6. Site Plan
7. Land Ownership
8. Block/layout plan of the Site
9. Size of Land/Plot
10. Description of Undertaken
11. Technology intended to be used
12. List of Equipment/ Machinery
13. Expected Install Capacity
14. Expected Operating capacity (1st yr, 2nd yr, etc.)
15. Type of product
16. Unit processes (flow process diagram
17. List of Raw Materials
18. List of Chemicals (Source, types, quantities)
19. Storage Facilities
20. Wastes/by-product (Solid, liquid, gaseous)
21. Size of Labour force
22. Expected market (% Local, %External)
23. Expected Water Consumption
24. Expected Electrical Energy Consumption (type, source, quantity)
25. Expected fuel consumption (type, source, quantity)

26. Description of Proposed Wastewater Treatment Plan (WWTP)


27. Technology and specification of WWTP
28. Plant In-fluent Parameters (BOD, COD, Oil, pH, etc.)
29. WWTP Effluent Parameters (BOD, COD, Oil, pH, etc.)

30. Technology and specification of Boiler


31. Expected fuel consumption (type, source, quantity)
32. Expected flue gas parameters (Carbon Monoxide, Sulphur Dioxide, Nitrogen
Dioxide, etc)

33. Fire Report


34. Soil/Geotechnical Report of the Site