0 penilaian0% menganggap dokumen ini bermanfaat (0 suara)
290 tayangan2 halaman
HLPE Site Jubail, KSA Inadequacies Inadequate or improper PPE Defective tools, equipment or materials Congestion or restricted access. KEY BEHAVIOURAL INDICES Operating Equipment without authority Failure to Warn Failure to Secure Operating at improper speed Making safety devices inoperable Using equipment improperly improper loading improper placement improper lifting improper position for task Servicing equipment in operation Horseplay Under influence of alcohol / drugs Behavioral
HLPE Site Jubail, KSA Inadequacies Inadequate or improper PPE Defective tools, equipment or materials Congestion or restricted access. KEY BEHAVIOURAL INDICES Operating Equipment without authority Failure to Warn Failure to Secure Operating at improper speed Making safety devices inoperable Using equipment improperly improper loading improper placement improper lifting improper position for task Servicing equipment in operation Horseplay Under influence of alcohol / drugs Behavioral
Hak Cipta:
Attribution Non-Commercial (BY-NC)
Format Tersedia
Unduh sebagai DOC, PDF, TXT atau baca online dari Scribd
HLPE Site Jubail, KSA Inadequacies Inadequate or improper PPE Defective tools, equipment or materials Congestion or restricted access. KEY BEHAVIOURAL INDICES Operating Equipment without authority Failure to Warn Failure to Secure Operating at improper speed Making safety devices inoperable Using equipment improperly improper loading improper placement improper lifting improper position for task Servicing equipment in operation Horseplay Under influence of alcohol / drugs Behavioral
Hak Cipta:
Attribution Non-Commercial (BY-NC)
Format Tersedia
Unduh sebagai DOC, PDF, TXT atau baca online dari Scribd
ACCIDENT/INCIDENT ROOT CAUSE ANALYSIS: Date: Inc. Rep. No.
: 26-4-2011
Site: HLPE Site Jubail, KSA Incident Title: Unloading steel material from flatbed trailer 26-4-2011
KEY BEHAVIOURAL INDICES Inadequacies HAZARDOUS CONDITIONS Inadequacies
Operating Equipment without authority Inadequate guards or barriers Failure to Warn Inadequate or improper PPE Failure to Secure Defective tools, equipment or materials Operating at improper speed Congestion or restricted access Making safety devices inoperable Inadequate warning system Removing Safety Devices Fire & Explosion hazards Using Defective Equipment Poor Housekeeping; disorder Using equipment improperly No apreciation of dnamic shifting Hazardous environmental conditions Failure to use PPE properly Noise exposures Improper loading Improper unloading Radiation exposures Very hot day 40 deg C Improper placement High/low temperature exposures Improper lifting Inadequate or excess illumination Improper position for task Yes should have been to one side Inadequate ventilation Servicing equipment in operation No lockout/tagouts Horseplay No Permit to Work Under influence of alcohol/drugs Fall hazard Behavioral / Personal Factors Inadequacies Job / Equipment Factors Inadequacies No Safety Observations Conducted No Plant Risk Assessment conducted Lack of skill Inadequate maintenance system Lack of knowledge Inadequate engineering controls Inadequate capability (physical) No Procedures Not for this specific task Improper motivation Inadequate purchasing Inadequate leadership/supervision No foreman or supervisor present Inadequate tools/equipment Stress/morale Hot temperature Inadequate work standards Abuse/misuse Inadequate design/labelling/signage Lack of incentive to work safely Not under supervision Inadequate Inspections Physiological deficiency Poor Records/Document Control Improper attempt to save time Inadequate Training Yes must be improved Communication (English skills) Lack of comms.amongst workers and Inadequate Emergency Systems/PPE supervisory staff (in any language) System Failures Recommendations System Failures Recommendations Inadequate leadership/supervision yes Inadequate work standards Tool box and tarining to be given Inadequate design/labelling/signage