Simulasi Penentuan Geometri Tumpukan Ore

La = 5 m

Lb = 25 m

rA = 7.5 m

rB = 12.5 m T = 6 m

Masukkan nilai geometri tumpukan
 Tinggi 6.00 m
 Lebar Atas (La) 5.00 m
 Lebar Bawah (Lb) 25.00 m
 Jari‐Jari  Oval (rA) 7.50 m
 Jari‐Jari  Oval (rB) 12.50 m
Material BJ
 Saprolite 1.5
 Limonite 1.6
Pilih Jenis Tumpukan
Pilih Jenis Tumpukan
 Saprolite 1.5
Masukkan Nilai Tonase Tumpukan
 Tonase 5000 ton
 Volume 3333.33 m³
  Kapasitas Target 500000 ton
Perhitungan
  Luas Alas Kerucut (Oval) = π rA . rB
= π x 7.5 m x 12.5 m
= 294.524 m²
  Volume Kerucut = 1/3 Luas Alas x T
= 1/3 x 294.52 m² x 6 m
= 589.049 m³
  Volume Trapesium = Vol Tumpukan ‐ Vol. Kerucut
= 3333.33 m³ ‐ 589.049 m²
= 2744.28 m³
  Luas Trapesium = (L. Atas + L. Bawah) / 2 x Tinggi
= ( (5 m + 25 m ) / 2 ) x 6 m
= 90.00 m²
  Panjang Trapesium = Volume / Luas
= 2744.28 m³ / 90.00 m²
= 30.49 m
  Luas Alas Trapesium = Panjang x Lebar Bawah
= 30.49 m x 25 m
= 762.301 m²

PT ANTAM (Persero) Tbk, UBPN Maluku Utata
Divisi Explorasi dan Perencanaan Tambang |BGM Mining Operation
Geometri Tumpukan  Saprolite
  Luas Alas = Luas Alas Kerucut + Luas Alas Trapesium
= 294.524 m² + 762.301 m²
= 1056.826 m²
  Panjang = Panjang Trapesium + (2 x rA)
= 30.49 m + ( 2 x 7.5 m)
= 45.49 m
  Lebar = Lebar Bawah Trapesium
= 25.00 m

Untuk memenuhi kebutuhan kapasitas tampung stockyard 500000 ton maka
dengan pile  Saprolite 5000 ton dibutuhkan sebanyak 100 pile.

Luas alas = 1056.83 m²

P = 45.49 m

L = 25 m
T = 6 m

PT ANTAM (Persero) Tbk, UBPN Maluku Utata
Divisi Explorasi dan Perencanaan Tambang |BGM Mining Operation