Tenders, Bids & Contracts gcc roundup

Project Contractor US$m Subsector Status Start date End date

Bahrain

Bahrain 11kV Distribution Network Reinforcement Towell Al-Zawraa Engineering Services Company 1000 Overhead Line Execution Mar 2009 Feb 2013

Kuwait

KMoE - Al Zour North Phase 1 - Power 1800 Green field Bidding Jun 2010 Apr 2013
KMoE - Subiya Power Plant Hyundai Heavy Industries - General Electric (GE) 3000 Green field Execution Oct 2009 Dec 2012
MPA - Failaka Island Cogeneration Plant - Power Alstom Power 150 Green field Execution Jun 2009 Jun 2014
KMoE - Transformer Stations Industrial Buildings & Constructions Company 600 Substation Execution Nov 2007 May 2010
KMOE - Al Zour Power & Desalination Phase 2 - Power National Contracting Company (NCC) 1700 Expansion Execution Sep 2009 Dec 2012
KMOE - Al Zour Power & Desalination Phase 3 1500 Expansion Planned Nov 2014 Dec 2017
KMoE - Kuwait Solar Power 500 Green field Planned Apr 2010 May 2012
KMoEW - Jabriya Z Substation ABB Ltd. 130 Substation Execution Nov 2008 Mar 2011
KMoEW - Sulaibiya Z Substation ABB Ltd. 150 Substation Execution Jul 2009 Mar 2011
KMoEW - Fintas Z Substation ABB Ltd 142 Substation Execution Aug 2009 Mar 2011
KMoE - Al Zour North Phase 2 - Power 1800 Green field Bidding Feb 2010 Jun 2012
KMoE - Al Zour North Phase 3 - Power 968 Green field Planned Jul 2010 Aug 2012
KMoE - Al Zour North Phase 4 - Power 1090 Green field Planned Jan 2011 Feb 2013

Oman

Barka IWPP 3 - Power at Barka 1000 Expansion Bidding Feb 2010 Apr 2013
Salalah IWPP - Power Shandong Electric Power Construction Corporation 700 Brown field Execution Oct 2009 Mar 2012
PDO - Coal Fired Power Plant in Raysut ABB Ltd. 5000 Green field Execution Jun 2009 Dec 2012
Duqm Coal Power & Desalination Plant 2000 Green field Planned Dec 2010 Dec 2015
Ghubrah Power Plant 200 MW 300 Brown field Study Apr 2010 Dec 2012
PDO - Amal Power Plant 126 MW Al Hassan Engineering SAOG 150 Green field Execution Jun 2009 Jul 2011
Barka IWPP 3 - Power at Sohar 1000 Expansion Bidding Feb 2010 Apr 2013
OPAEW - Solar Power Plant in Oman 600 Green field Design Apr 2011 Dec 2013
RAEC - Solar Power Plant in South Oman 500 Green field Planned Feb 2010 Mar 2012
SAOC - Al Sawadi Substation 220/33kV & Transmission Line 220kV National Contracting Company (NCC) 45 Substation Execution Sep 2009 Oct 2011
RAEC - Duqm Power Station - Phase 2 Global Chemicals & Maintenance Systems Ltd 43.2 Green field Execution May 2009 Nov 2011
SAOC - Wadi Saa Substation132/33kV Larsen & Toubro Ltd (L&T) 42 Substation Execution May 2009 Jul 2011
Qarn Alam Power Station Phase 3 150 Expansion Bidding Mar 2010 May 2012

Qatar

New Doha International Airport (NDIA) Project - Phase 1 - Utility Systems Bemco Contracting Company Ltd - Qatar 500 Substation Execution Feb 2006 Oct 2011
Package
Mesaieed IPP Iberdrola SA 2300 Green field Execution Oct 2006 Apr 2010
Qatalum Project - Power - Combined Cycle Plant Doosan Heavy Industries & Construction (Doosan) - Abu Dhabi 1500 Green field Execution Jun 2007 Dec 2010
QEWC - Ras Laffan IWPP C - Power 2500 Green field Execution Mar 2008 Apr 2011
Qatalum Project - Power - Rectifier Station ABB Ltd 140 Substation Execution Aug 2007 Jun 2010
QP - Ras Laffan IPP Iberdrola SA 4000 Green field Execution Mar 2009 Dec 2012
RasGas III - Trains 6 & 7 - Gas Turbine Service GE Energy - Qatar 200 Brown field Execution Jun 2008 Jun 2032
Kahramaa - West Coast IWPP 3000 Green field Planned Apr 2010 May 2013
Qatar Power Transmission Network Phase 9 - 54 Substations Riyadh Cables and Metals 4750 Substation Execution Jul 2009 Dec 2012
Qatar Power Transmission Program Phase 9 - EHV Power Cables Nexans 70 Underground Execution May 2009 Jun 2011
Cable
Kahrama - Doha First Submarine Power Cable - Qatar Prysmian Cables and Systems 195 Underground Execution Jan 2009 Dec 2010
Cable
Kahrama - Solar Power Complex - Qatar 5000 Green field Planned Feb 2010 Mar 2014
Qatar Power Transmission Network Phase 9 - 160km Overhead Lines Riyadh Cables and Metals 100 Overhead Line Execution Jul 2009 Oct 2011
Qatar Power Transmission Network Phase 9 - 375km Underground Cables Riyadh Cables and Metals 150 Underground Execution Jul 2009 Jul 2011
Cable
Qatar Petroleum - Dukhan High Voltage Power Network 150 Green field Bidding Feb 2010 Mar 2012
Kahrama - Qatar Power Transmission Program Phase 8 - 15 Substations Areva 200 Substation Execution Jan 2008 Mar 2010
Kahrama - Qatar Power Transmission Program Phase 8 - Cables 63km Prysmian Cables and Systems 195 Underground Execution Jan 2009 Dec 2010
Cable

Saudi Arabia

WEC - Shuqaiq IWPP Phase 2 - Power Mitsubishi Corporation - Riyadh 3000 Expansion Execution Mar 2007 Dec 2010
Marafiq - Jubail IWPP Phase 1 - Power Hyundai Heavy Industries (HHI) - Dubai 2600 Green field Execution Apr 2007 May 2010
Maaden - Al Zabirah Bauxite Development - Power & Desalination Hyundai Heavy Industries Company Ltd. (HHI) 3000 Green field Execution Oct 2009 Apr 2013
Muzahimiyah IPP 750 Green field Bidding Apr 2010 Jun 2013
Rabigh 2 Power Expansion - Phase 2 (1400 MW) General Electric (GE) 3500 Expansion Execution Oct 2009 Dec 2012
Qurayah Power Expansion 3600 MW 7200 Expansion Planned Apr 2010 Jun 2012
Riyadh IPP 2800 Expansion Bidding Feb 2010 Jun 2012
Yanbu 2 Power Plant 2400 MW 5000 Expansion Planned Feb 2010 Dec 2015
GCC Electricity Interconnection Grid - Phase 3 National Contracting Company (NCC) 1000 Overhead Line Execution May 2009 Jun 2010
Shuqaiq IPP - Phase 3 1400 Green field Design Dec 2014 Dec 2016
Muzahimiyah Bahra 500 kV Overhead Line 2500 Overhead Line Planned Feb 2010 Dec 2013
Qassim Madinah Overhead Line 500 kV Al Sharif KEC 2000 Overhead Line Execution Feb 2009 Dec 2012
Tabuk Al Jouf Overhead Line 380 kV 500 Overhead Line Planned Jun 2010 Dec 2014
Qaisumah Rafha Overhead Line 380 kV 450 Overhead Line Planned Feb 2011 Dec 2014
Yanbu Dhuba Overhead Line 380 kV 600 Overhead Line Planned Feb 2010 Dec 2013
Hawiyah Muzahimiyah Overhead Line 380 kV 500 Overhead Line Planned May 2010 Dec 2013
Hail Al Jouf Overhead Line 380 kV 500 Overhead Line Planned May 2010 Dec 2013
Shuaiba Namera 380 KV Overhead Line Al Sharif Group for Contracting & Development Trading (Holding) Ltd. 400 Overhead Line Execution Feb 2008 Jun 2010
Shuqaiq Muhayil Namera 380 KV Overhead Line National Contracting Company (NCC) 500 Overhead Line Execution Feb 2008 May 2010
Marafiq - Jubail IWPP Phase 2 - Power 4000 Expansion Planned Aug 2010 Dec 2014
KMoE - Shuaiba North - Power Doosan Heavy Industries & Construction (Doosan) - Kuwait 1300 Green field Execution Mar 2007 Jun 2010
Hail Madina Overhead Line 380kV National Contracting Company (NCC) T&D - Khobar 1500 Overhead Line Execution Jun 2009 Dec 2012
Asir IPP 300 Expansion Execution Nov 2009 Dec 2013
Tabuk Power Expansion 3 Siemens AG 400 Expansion Execution Dec 2008 Jan 2011
Marafiq - Jubail IWPP Phase 3 - Power Hyundai Heavy Industries - General Electric - Sidem JV 2000 Expansion Execution Apr 2007 May 2010
Saudi Yemen Power Interconnection 500 Substation Design May 2010 Jun 2014
Maaden - Ras Al Zour Cogeneration Plant - Power Hanwha - Saudi Oger JV 200 Green field Execution Nov 2007 Dec 2010
Saudi Egypt (Red Sea) Power Interconnection 8500 Overhead Line Bidding Feb 2010 Dec 2015
Manifa Field Development - Onshore - Package 3 (Power Plant) Tecnicas Reunidas - Khobar 500 Green field Execution Jun 2008 Dec 2011
SEC - Namera Substation 380/132 kV ABB Contracting Company Limited - Dammam 40 Substation Execution Apr 2008 Oct 2010
Rabigh 2 Power Expansion - Phase 1 (960 MW) National Contracting Company (NCC) T&D - Jeddah 1500 Expansion Execution Dec 2007 Jun 2010
GCC Nuclear Program 15000 Green field Planned Jun 2011 Dec 2016
Substation 10J 380 kV in Yanbu Arabia Electric Ltd. 150 Substation Execution Aug 2009 Jul 2012
CNIM - Waste to Energy Project - Jeddah Plant 300 Green field Execution Jun 2007 Aug 2010
CNIM - Waste to Energy Project - More Plants 2000 Green field Study Feb 2011 Dec 2021
SEC - PP10 Phase 2 3000 Green field Design Jul 2012 Aug 2016
PP10 Phase 1 - Substation 380 kV Saudi Services for Electro Mechanic Works Company (SSEM) 300 Substation Execution Mar 2008 Mar 2011
Qurayah 2 Power Combined Cycle Plant Phase 2 Arabian Bemco & Doosan JV 1850 Expansion Execution Sep 2009 Dec 2011
SEC - Qurayah IPP 2100 Green field Planned Jan 2011 Apr 2014
King Abdullah Economic City - Phase 1 - Power T&D Siemens Limited - Jeddah 1000 Substation Execution Jul 2007 Dec 2010
King Abdullah Economic City - Phase 1 - Power Generation Arabian Bemco Contracting Company Ltd. 400 Green field Execution Aug 2007 Jun 2010
Saudi Power Network National Contracting Company (NCC) 50000 Overhead Line Execution Jul 2008 May 2010
Jizan Economic City - Aluminum Complex - Power Plant China National Machinery Industry Corportion (Sinomach) 2000 Green field Execution Jun 2007 Mar 2013
Jizan Economic City - Power Plant National Contracting Company (NCC) 9000 Green field Execution Jun 2009 Feb 2011
SEC - 4 Substations 132kV in Riyadh Al Toukhi Group 80 Substation Execution Nov 2007 Nov 2010
Rabigh 2 Power Expansion - Phase 1 - Substation 380kV Al Fanar Electrical Systems 134 Substation Execution Dec 2007 Mar 2010
Rabigh 2 Power Expansion - Phase 1 - Rabigh Jeddah Overhead Line Middle East Engineering and Development Company Ltd (MEEDCO) 70 Overhead Line Execution Dec 2007 May 2010
Jubail 2 Electrical Works Saudi Services for Electro Mechanic Works Company (SSEM) 150 Execution Jun 2008 Dec 2010
Aramco - Karan Gas Field Development - Onshore - Power Generation Plant Hyundai Engineering Co. Ltd. 1500 Green field Execution Jan 2009 Mar 2011

6 MEE March 2010

1003_MEE_p6-7 Tenders.indd 8 12/3/10 12:32:04


gcc roundup Tenders, Bids & Contracts

Project Contractor US$m Subsector Status Start date End date


Sharourah Power Plant Expansion Al Fanar Company 101 Expansion Execution Apr 2008 Jun 2010
SEC - West Qassim East Medina 380 kV Overhead Line Middle East Engineering and Development Company Ltd (MEEDCO) 250 Overhead Line Execution Apr 2008 Dec 2011
SEC - Qassim II to Sudair; Khuf; Hail 380 kV Overhead Line National Contracting Company (NCC) 300 Overhead Line Execution Apr 2008 Sep 2010
SEC - Qassim II Substation 380 kV Siemens Limited - Riyadh 192 Substation Execution Jun 2008 Dec 2010
SEC - Medina East Substation 380 kV Al Toukhi Group 170 Substation Execution Jun 2008 Jun 2010
SEC - Wadi Al Dawasir Power Plant Reinforcement Al Toukhi Group 170 Brown field Execution Jun 2008 Sep 2010
SEC - Jeddah KMT 12 Substation Expansion 380/110 kV Siemens LLC 50 Substation Execution May 2008 Dec 2010
Manifa Field Development - Onshore - Package 3 (Substation 380 kV) National Contracting Company (NCC) 150 Substation Execution Sep 2008 Sep 2010
Abu Hadriya Substation Expansion National Contracting Company (NCC) 60 Substation Execution Jun 2008 Sep 2011
SEC - Shuaiba Power Plant Expansion Phase 3 Archirodon & Alstom JV 1900 Brown field Execution Jun 2008 Dec 2011
SEC - 5 Substations in Buraida; First Industrial in Riyadh; Ashate; Ghernata; Al Osais Contracting Company 120 Substation Execution Jun 2008 Aug 2010
Arar
SEC - Duba Power Plant Expansion Najm Al Jazira For Trading; Contracting & Agriculture 120 Green field Execution Jun 2008 Jun 2010
SEC - Sharurah Power Plant Expansion in Najran Al Fanar Company 100 Expansion Execution Jul 2008 May 2010
Six Substations 132KV Reinforcement - Saudi Arabia Industrial Services Company Saudi Arabia (Iscosa) 100 Substation Execution Sep 2008 Dec 2010
SEC - Tabuk Power Expansion 6 Najm Al Jazira For Trading; Contracting & Agriculture 175 Expansion Execution Sep 2008 Nov 2010
SEC - Rabigh 7 Power Expansion 700 Expansion Design Apr 2010 Jun 2012
Daba IPP - Phase 1 1100 Green field Planned Dec 2010 Dec 2014
Daba IPP - Phase 2 1100 Green field Planned Dec 2012 Dec 2016
Jeddah South IPP - Phase 3 2900 Green field Planned Dec 2014 Dec 2016
Jeddah South IPP - Phase 4 2900 Green field Planned Dec 2016 Dec 2020
Jubail IPP - Phase 1 2900 Green field Planned Dec 2011 Dec 2015
Jubail IPP - Phase 2 2900 Green field Planned Dec 2012 Dec 2016
Ras Al Zour IPP - Phase 1 2900 Green field Planned Dec 2011 Dec 2015
Ras Al Zour IPP - Phase 2 2900 Green field Planned Dec 2012 Dec 2016
Al Uqair IPP - Phase 3 2900 Green field Planned Dec 2015 Dec 2019
Al Uqair IPP - Phase 4 2900 Green field Planned Dec 2017 Dec 2021
Salwa IPP - Phase 3 2900 Green field Planned Dec 2015 Dec 2019
Salwa IPP - Phase 4 2900 Green field Planned Dec 2017 Dec 2021
Yanbu Industrial City 250 MW Power Plant Hanwha Engineering & Construction 720 Green field Execution Jul 2009 Dec 2011
SEC - 3 Substations 110 kV in Mecca ABB Ltd. 100 Substation Execution May 2009 Dec 2011
SEC - Badr Substation 110/33/13.8‎ kV Advanced Energy 31 Substation Execution Sep 2009 Dec 2011
Jubail Industrial City - 380/115KV Substation Abdullah AM Al Khodari Sons Company 19 Substation Execution Mar 2009 Mar 2011
Rabigh 6 Power Expansion Doosan Heavy Industries & Construction (Doosan) 2000 Expansion Execution Dec 2009 Dec 2014
SEC - Substation 380 kV at Holy Mosque in Mecca Al Fanar Company 120 Substation Execution Jan 2009 Jun 2011
Al Kandarah 380/110/13.8kV Substation Al Fanar Company 130 Substation Execution Dec 2008 Jun 2010
SEC - 110 KV in Quwaizah 2,Al Nuzhah,Mina 3,Tiyam and Tuwal Substa- ABB Ltd. 98 Substation Execution Feb 2009 Jun 2011
tions
SEC - Sudair & Ghournath Substations Reinforcement ABB Ltd. 42 Substation Execution Feb 2009 Jun 2011
SEC - Al Hofuf & Al Mazawi &Jubail Substations - 33 Switchgears ABB Ltd. 30 Execution Feb 2009 Jun 2011
SEC - Ghazlan 3 Power Plant 3000 Green field Planned Dec 2012 Dec 2016
SEC - Jeddah South Power Plant 3000 Green field Planned Dec 2012 Dec 2016
SEC - Shuqaiq Power Plant - Phase 1 2000 Green field Planned Dec 2011 Dec 2015
SEC - Shuqaiq Power Plant - Phase 2 1000 Green field Planned Dec 2013 Dec 2016
SEC - Manifa Substation 380/115 KV National Contracting Company (NCC) 81 Substation Execution Jun 2008 Sep 2011
Al Masader Field - Overhead Electricity Lines National Contracting Company (NCC) T&D - Khobar 200 Overhead Line Execution Sep 2009 Jul 2011
SEC - Tabuk Transmission Line 123KV National Contracting Company (NCC) 15 Overhead Line Execution May 2009 Jun 2011
SEC - Medina Double Circuit Line National Power Construction Company (NPCC) 20 Overhead Line Execution May 2009 May 2011
SEC - 3 Substations in Quwaizah Nuzhah Mena - Cabling 110 kV Mohammed Al Ojaimi Contracting Establishment 51 Underground Execution May 2009 May 2011
Cable
SEC - Dhiba Substation Expansion Najm Al Jazira For Trading; Contracting & Agriculture 100 Substation Execution Jun 2009 Jun 2010
SEC - Dhahran South Substation 380/115kV Saudi Services for Electro Mechanic Works Company (SSEM) 90 Substation Execution Jun 2009 Oct 2011
Sudair Industrial City - Phase 1 - Electricity Grid Package Trading & Developing Partnership 37 Substation Execution Jan 2009 Mar 2011
SEC - West Makkah Substation 380 KV Al Fanar Company 120 Substation Execution Dec 2008 Jun 2011
SEC - 380kV cables Linking Al Kindara Substation with Two Substations Saudi Services for Electro Mechanic Works Company (SSEM) 60 Underground Execution May 2009 May 2012
in Jeddah Cable
Jazan Substation 13.8kV Al Fanar Company 48 Substation Execution Aug 2009 Dec 2011
Kind Abdulaziz Medical City Substation 13.8kV Al Fanar Company 48 Substation Execution Aug 2009 Dec 2011
SEC - PP9 Power Plant to Hittin Overhead Line 380kV Al Sharif Group & KEC International JV 64 Overhead Line Execution Nov 2009 Apr 2012
Princess Norah University - 3 Substations ABB Ltd. 120 Substation Execution Nov 2009 Dec 2011

United Arab Emirates

ADWEA - Qidfa Power & Desalination Plant Expansion Phase 2 - Power Bemco - Iberdrola JV 700 Expansion Execution Dec 2007 Mar 2010
Zawra Power & Water Plant - Power General Electric (GE) 400 Green field Execution Feb 2009 Dec 2010
DEWA - Jebel Ali Station M Phase 1 Fisia Italimpianti - Dubai 1800 Green field Execution Mar 2007 Jun 2010
DEWA - Wind Farm Power Project in Dubai 1000 Green field Bidding Dec 2012 Jul 2009
ADWEA - Fujairah IWPP 2 - Power Alstom Power - Sharjah 2000 Brown field Execution Aug 2007 Jun 2010
Taqa - Coal Fired Power Plant in Abu Dhabi 1000 Green field Study Apr 2010 Dec 2012
ADWEA - Shuweihat IWPP S2 - Power 1500 Green field Execution Jul 2008 Mar 2012
Masdar - Hydrogen Power Plant in Abu Dhabi 2000 Green field FEED Aug 2010 Dec 2014
Hamriya Power & Desalination Plant - Phase 2 - Power General Electric (GE) 121 Brown field Execution Jul 2008 Jul 2010
DEWA - Jebel Ali Station M Phase 2 Doosan Heavy Industries & Construction (Doosan) - Abu Dhabi 513 Brown field Execution May 2007 Jun 2010
DEWA - Hassyan Power Plant (Station P) - Phase 3 4000 Brown field Planned Jun 2011 Oct 2017
Iran Dubai Power Interconnection 400 Bidding Jun 2010 Dec 2012
DEWA - 16 Substations 132/11kV & 1 Substation 132/33kV Larsen & Toubro Limited (L&T) 250 Substation Execution Jul 2008 Dec 2010
DEWA - Hassyan Power Plant (Station P) - Substation 400kV Mitsubishi Electric 100 Substation Execution Jul 2008 Dec 2010
DEWA - Hassyan Power & Desalination Plant (Station P) - Phase 2 - Power 1000 Green field Bidding Jan 2010 Dec 2012
Emirates Aluminium (Emal) - Power Island GE Energy - Dubai 490 Green field Execution Jan 2008 Dec 2010
Shams 1 Solar Power Plant in Madinat Zayed 550 Green field Bidding Mar 2010 Dec 2012
DEWA - Hydrogen Power and Desalination Plant - Ras Hassyan 3000 Green field Execution Nov 2009 Dec 2011
DEWA - Two 400 kV Substations - Barsha and Horse Race Areva - Hyundai Heavy Industries 234 Substation Execution Mar 2008 Mar 2010
Palm Deira - Three Substations 132/22 kV Areva - Dubai 76 Substation Execution Feb 2008 Dec 2010
Emirates Aluminium (Emal) - Power - Rectifier Station Sojitz - Fuji Electric Systems Co. Ltd. 136 Utilities Execution Mar 2008 May 2010
ADWEA - Shuweihat IWPP S3 - Power 2000 Green field Planned Feb 2010 May 2013
Coal-fired Power Plant in Dubai 5000 Green field Study Mar 2010 Dec 2012
Ajman Coal Fired Power Plant 2000 Green field Execution Jul 2008 Mar 2012
DEWA - Solar Power Plant in Dubai 350 Green field Planned Sep 2010 Dec 2012
ENEC - Nuclear Power Plant Kepco - Hyundai - Samsung JV 15000 Green field Execution Dec 2009 Dec 2019
12 Substations 132/11KV in Dubai ABB Ltd. 200 Substation Execution Jun 2009 Feb 2011
DEWA - Hassyan Power & Desalination Plant (Station Q) - Phase 1 - Power 2600 Green field Planned Jul 2010 Jan 2013
12 Substations 132/11KV in Dubai - Cable Laying Works ETA Ascon 55 Underground Execution Jun 2009 Feb 2011
Cable
Al Masirah Island Power and Desalination Plant - Additional Generation Oman National Engineering & Investment Company 100 Green field Execution Jul 2009 May 2010
19 Substations 132/11KV and 9 substations 132/22KV - Cable Laying ETA Power Projects Division 120 Underground Execution Aug 2009 Dec 2011
Works Cable
Takreer - Ruwais Utilities and Power Plant Expansion 500 Green field Bidding Mar 2010 Dec 2012
Adnoc - Air Separation Plant in Ruwais - Substation 220 kV Siemens AG 83 Substation Execution May 2009 Dec 2010
DEWA - Al Mamzar Beach Substation Siemens Power Transmission and Distribution (PTD) 80 Substation Execution Aug 2009 Jun 2011
Mina Saqr 1 Coal Fired Power Plant MMC Corporation Berhad 1000 Green field Execution Nov 2009 Dec 2011
RAKIA - Al Hamra 2 Power Plant 200 Green field Study Feb 2010 Mar 2012
ADDC - 33KV Power Transmission Network Expansion Larsen & Toubro Ltd (L&T) 67 Execution Feb 2009 Dec 2010
RAKIA - Coal Fired Power Plant in Ras Al Khaimah 1000 Green field Planned Feb 2010 Mar 2012
ADWEA - Taweelah C IWPP - Power 1200 Green field Study May 2011 Dec 2013
SEWA - Al Wasit Power Station Conversion 1100 Brown field Study Aug 2010 Sep 2012
SCADIA - Abu Dhabi International Airport Standby - Two Power Plants Alstom Power 300 Green field Execution Oct 2009 Dec 2010
Shams 2 Solar Power Plant in Madinat Zayed 550 Green field Planned May 2010 Jun 2013
Transco - Ras Al Khaimah Transmission Tower Manufacturing Facilities KEC International Ltd. (KECIL) 75 Brown field Execution Mar 2009 Mar 2011

Data courtesy of Proleads, http://www.projectsandleads.com