0 penilaian0% menganggap dokumen ini bermanfaat (0 suara)
21 tayangan2 halaman
This document outlines the configuration settings for an ARCB circuit breaker located at Trashiyangtse in Bhutan. It details the hardware, control, protection, and monitoring settings including clock settings, trip thresholds, reclosing parameters, time-current curves, cold load pickup settings, and diagnostic reset commands. The settings are configured for a 50Hz system with a 500:1 CT ratio to protect distribution feeders.
This document outlines the configuration settings for an ARCB circuit breaker located at Trashiyangtse in Bhutan. It details the hardware, control, protection, and monitoring settings including clock settings, trip thresholds, reclosing parameters, time-current curves, cold load pickup settings, and diagnostic reset commands. The settings are configured for a 50Hz system with a 500:1 CT ratio to protect distribution feeders.
Hak Cipta:
Attribution Non-Commercial (BY-NC)
Format Tersedia
Unduh sebagai DOC, PDF, TXT atau baca online dari Scribd
This document outlines the configuration settings for an ARCB circuit breaker located at Trashiyangtse in Bhutan. It details the hardware, control, protection, and monitoring settings including clock settings, trip thresholds, reclosing parameters, time-current curves, cold load pickup settings, and diagnostic reset commands. The settings are configured for a 50Hz system with a 500:1 CT ratio to protect distribution feeders.
Hak Cipta:
Attribution Non-Commercial (BY-NC)
Format Tersedia
Unduh sebagai DOC, PDF, TXT atau baca online dari Scribd
Write CLPU Time: 60 [secs] Write CLPU Phase Operations to Lockout: 3 Write CLPU Earth Operations to Lockout: 3
ADVANCED CONTROL SETTINGS
Write Earth HCLO Multiple: 30 [Amps/Amps] Write Phase HCLO Multiple: 30 [Amps/Amps] Write Sequence Coordination On/Off: On Write Earth Trip Precedence On/Off: On Write Target Reset on Reclose On/Off: On Write Operation Counter On/Off: On Write Event Recorder On/Off: On Write Interrupter Duty On/Off: On Write Earth HCLO On/Off: On Write Phase HCLO On/Off: On Write HCLO Phase Operation 1 Flag On Write HCLO Phase Operation 2 Flag Off Write HCLO Phase Operation 3 Flag Off Write HCLO Phase Operation 4 Flag Off Write HCLO Earth Operation 1 Flag On Write HCLO Earth Operation 2 Flag Off Write HCLO Earth Operation 3 Flag Off Write HCLO Earth Operation 4 Flag Off
DIAGNOSTICS
METERING, COUNTERS, AND CONTROL STATE
Reset Earth Targets Reset Phase 1-2 Targets Reset Phase 3-4 Targets Reset Phase 5-6 Targets Reset Sensitive Earth Fault Targets Reset Operation Counter Reset Events Since Last Reset Reset Auxiliary Events Since Last Reset Reset Earth Maximum Thermal Current Reset Phase 1-2 Maximum Thermal Current Reset Phase 3-4 Maximum Thermal Current Reset Phase 5-6 Maximum Thermal Current Write Maximum Thermal Demand Update Interval: 15 [minutes] Write Phase Thermal Demand Integration Time: 15 [minutes] Write Earth Thermal Demand Integration Time: 5 [minutes] Reset Target Flag-Earth Reset Target Flag-Phase 1-2 Reset Target Flag-Phase 3-4 Reset Target Flag-Phase 5-6 Reset Target Flag-Sensitive Earth Fault