Measurement of Tower footing resistance.

Sr. No. Name of line Location No. Earth resistance value Remark
(4 Nos. of legs)

VP/E/My Document/Details of various maint. work for EHV lines & SS./Sh.1
Proposal / Scheme for work of providing of surge arrestors on 100KV line where earth wire is
borken, LA failed as well as critical locations.

VP/E/My Document/Details of various maint. work for EHV lines & SS./Sh.7
Proposal for renovation of earth mat at critical S/stn. is to be submitted along with earth
resistance value of earth pit at S/stn.

VP/E/My Document/Details of various maint. work for EHV lines & SS./Sh.2
Replacement of earth wire.

Sr. Name of line Location No. Earth wire existing or Earth wire and required Remark
No. other wise with condition accessories are available or
of earth wire other wise

VP/E/My Document/Details of various maint. work for EHV lines & SS./Sh.5
Replacement of Faulty insulators.

Sr. Name of line Location No. Faulty insulator to be Insulator and required Remark
No. replaced as per PID hardware are available
report. otherwise

VP/E/My Document/Details of various maint. work for EHV lines & SS./Sh.4
Providing of Danger board, Number plate, phase plate and anti climbing devices (at approachable and theftfrom area)

Sr. Name of line Location No. Anti climbing Danger board to Number plate to Phase plate to Remark
No. devices to be be provided be provided be provided
provided

VP/E/My Document/Details of various maint. work for EHV lines & SS./Sh.6
Construction of additional bays at S/stn.

Sr. Name of S/stn. Additional bays Reason for Whether work is to be carried Any additional work such as bus Remark
No. of 11/22/33KV additional out under sanctioned scheme strengthening / extension of bus /
required requirement or R&M crimping work etc.

VP/E/My Document/Details of various maint. work for EHV lines & SS./Sh.3