Anda di halaman 1dari 5

DAFTAR ISI

Halaman Judul
Lembar Pengesahan Jurusan................................................................................................

Lembar Pengesahan Perusahaan..........................................................................................

ii

Kata Pengantar.....................................................................................................................

iii

UcapanTerima Kasih...........................................................................................................

iv

Daftar Isi ...........................................................................................................................

Daftar Gambar.....................................................................................................................

xi

Daftar Tabel.........................................................................................................................

xv

BAB I PENDAHULUAN

1.1 LATAR BELAKANG ...

1.2 TUJUAN KERJA PRAKTEK ....

1.3 WAKTU DAN TEMPAT.

1.4 RUMUSAN MASALAH..

1.5 BATASAN MASALAH .................................

1.5 SISTEMATIKA PENULISAN LAPORAN ..

BAB II TINJAUAN UMUM PERUSAHAAN

2.1 Tentang PT. Bakrie Telecom...

2.2 Visi dan Misi.

2.3 Network dan Coverage....

2.4 PT. Bakrie Telecom sebagai Pelopor Fixed Wireless.

2.5 Sejarah PT. Bakrie Telecom...................

BAB III DASAR TEORI.......

3.1 Definisi Teknik Multiple Access.....

3.2 Konsep Dasar Sistem Spektral Tersebar. ..

10

3.3 Definisi Sistem Spektral Tersebar....

10

3.4 Kinerja Sistem Spektral Tersebar ..

12

3.5 Konsep Dasar Sistem CDMA2000 1x..... 14


3.6

Arsitektur Jaringan CDMA 2000 1x ..

15

3.7 Model Kanal pada Sistem CDMA2000 1x ............

18

Laporan Kerja Praktek PT.Bakrie Telecom (esia)

3.7.1 Kanal Reverse..


3.7.2 Kanal Forward..
3.8 Kontrol Daya..
3.9 KapasitasSistem CDMA2000 1x...
BAB IV PENGENALAN SISTEM PERANGKAT BTS AIRBRIDGE..
4.1 Fungsi BTS 3606 .
4.2 Posisi BTS 3606 pada jaringan CDMA
4.3

Interface BTS 3606 ..

4.4

Struktur Fisik Sistem


4.4.1

Kabinet

4.4.2

Subrack

4.4.3

Board dan Module..

4.5 Struktur Logic system


4.5.1 Baseband Subsystem.
4.5.2 RF Subsystem
4.5.3 Power Supply Subsystem.
4.5.4 Antena Subsystem.
4.6 Port Fisik.
4.7 Tipe-tipe BTS.
4.8 Power Control dan Rate Control
4.8.1 Forward Power Control..
4.8.2 Reverse power Cotrol..
4.8.3 Rate Control.
4.9 Handoff
4.10 Radio Configuration..
4.11

Channel Configuration...

4.11.1

Kanal pada CDMA 2000 1x

4.11.2

Kanal pada CDMA 2000 1x EV-DO..

4.12 Alur Sinyal BTS ..


4.12.1 Aliran sinyal pada kanal trafik.
4.12.2 Aliran kanal pada common signaling channel.
4.12.3 Aliran sinyal O&M
Laporan Kerja Praktek PT.Bakrie Telecom (esia)

vi

4.12.4 Aliran sinyal Clock


BAB V MAINTENANCE BTS 3606..
5.1

Klasifikasi Routine Maintenance. .

5.2 Maintenance Tools.


5.3 Routine Maintenance Record.....
5.4 Instruksi-instruksi dalam routine Maintenance...
BAB VI PENUTUP..
6.1 KESIMPULAN..
6.2 SARAN
6.2 Gambar selama Kerja Praktek...................................................

DAFTAR PUSTAKA...

Laporan Kerja Praktek PT.Bakrie Telecom (esia)

vii

DAFTAR GAMBAR
Gambar 2.1Coverage Area PT. Bakrie Telecom.
Gambar 3.1 Blok pemancar DS-SS.
Gambar 3.2 Blok penerima DS-SS.
Gambar 3.3 Arsitektur CDMA2000 1x
Gambar 3.4 Struktur Kanal Reverse yang ditransmisikan oleh MS
Gambar 3.5 Kode pendek yang dihasilkan Generator PN.
Gambar 3.6 Struktur Kanal Forward yang ditransmitkan oleh BTS.
Gambar 4.1 Jaringan sistem CDMA 2000 1X/1X EV-DO Huawei...............
Gambar 4.3 Kabinet BTS 3606 dan bagian-bagiannya..................................
Gambar 4.4 CDDU.........................................................................................
Gambar 4.5 Combine Subrack
Gambar 4.6 Power Supply Unit..
Gambar 4.7 Struktur logik BTS 3606.
Gambar 4.8 Struktur Fungsional Baseband Subsystem.
Gambar 4.9 Struktur Fungsional RF Subsystem
Gambar 4.10 Struktur Power Supply Subsystem
Gambar 4.11 Struktur Fungsional Power Supply Subsystem........................
Gambar 4.12 Struktur Sistem Antena RF......................................................
Gambar 4.13 Struktur Sistem Antena Sinkronisasi Satelit............................
Gambar 4.14 Prinsip Open-Loop Power Control.
Gambar 4.15 Prinsip Closed-Loop Power Control
Gambar 4.16 Struktur Kanal Forward pada Sistem CDMA 2000 1x...........
Gambar 4.17 Forward Pilot Channel.
Gambar 4.18 Forward Synchronization Channel.
Gambar 4.19 Forward Paging Channel
Gambar 4.20Forward Traffic Channel.
Gambar 4.21 Struktur Kanal Reverse pada Sistem CDMA 2000 1x
Gambar 4.22 Reverse Access Channel..
Gambar 4.23 Reverse traffic Channel..
Gambar 4.24 Aliran sinyal pada BTS
Laporan Kerja Praktek PT.Bakrie Telecom (esia)

viii

DAFTAR TABEL
Tabel 4.1. Fungsi masing-masing elemen pada jaringan CDMA...............................
Tabel 4.2. Interface BTS 3606 dan propertinya.........................................................
Tabel 4.3. Board dan Module pada BTS 3606...........................................................
Tabel 4.4. Port Fisik pada BTS 3606.........................................................................
Tabel 4.5. Tipe-tipe BTS 3606..................................................................................
Tabel 5.1. Laporan Maintenance apabila terjadi kerusakan tiba-tiba
Tabel 5.2. Laporan Maintenance Harian
Tabel 5.3. Laporan Maintenance Mingguan...
Tabel 5.4. Laporan Maintenance Bulanan..
Tabel 5.5. Laporan Maintenance 3 Bulanan
Tabel 5.6. Laporan Maintenance Tahunan...

Laporan Kerja Praktek PT.Bakrie Telecom (esia)

ix

Anda mungkin juga menyukai