Pra Rancangan Pabrik Semen

Putih

LAMPIRAN A
NERACA MASSA
Dasar Perencanaan Produksi
1.

Unit Packing
300.000 ton/tahun

(Produk Semen)

= 300.000 ton/tahun x 1.000 kg/ton


330 hari/tahun x 24 jam/hari
= 37.879 kg/jam
2.

Fresh Feed
Fresh Feed

3.

56814.09 kg/jam

Neraca Massa

ICD (Impact Crusher Dryer)

EP

AS
1,5 % H2O 12%
2
4

Fresh Feed

-Neraca Massa-

2%

2%
5

ICD
(Impact Crusher
Dryer)

EP

Lampiran A- 1

Pra Rancangan Pabrik Semen


Putih

Kompo
nen

masuk
(kg/jam)

Daur
Ulang

Aliran 1

Aliran 4

Keluar (kg/jam)
Aliran
2

SiO2

8692.56

171.76

2.09

Al2O3

2386.19

47.15

0.57

CaCO3

42894.64

847.60

10.29

MgCO3

1931.68

38.17

0.46

909.03

17.96

0.22

H2O
Total

56814.09
1122.65
57936.74

13.64

Alira
n3

Alira
n5

Aliran
6

1041.
02
285.7
7
5137.
06
231.3
4
108.8
6

171.7
6

7649.45

47.15
847.6
0

2099.85
37747.2
8

38.17

1699.88

17.96

799.94

6804. 1122.
06
65
57936.74

49996.
40

Air Separator

2%

10%

AS

SP

12%

ICD

Unit Air
Separator
Aliran 3
Aliran 4
Aliran 7
Total

-Neraca Massa-

Masuk

Keluar

6804.06
1122.65
5681.41
6804.06

6804.06

Lampiran A- 2

Pra Rancangan Pabrik Semen


Putih

EP 1

0,5 %

EP 1

SP

1,5%
2%

ICD

Unit EP

Masuk

Aliran 5
Aliran 8
Aliran 9

Keluar

1122.65
280.66
841.98

Total

1122.65

1122.65

Suspension Preheater

SP

-Neraca Massa-

9
1
0

Kiln

Lampiran A- 3

Pra Rancangan Pabrik Semen


Putih

Clinker

Aliran 6 + Aliran 7 + Aliran 9

49996.40 + 5681.41 +841.98

56519.79 kg/ jam

Air yang teruapkan = (1 0,015) x 0,016 x 56519.79 kg/jam


= 889.85 kg/jam

Kompo
nen
SiO2
Al2O3
CaCO3
MgCO3
CaO
MgO
CO2
total
H2O
Total

Masuk (kg/jam)
Aliran
Alira
Alira
6
n7
n9
7651.4
4
2100.4
0
37757.
10
1700.3
2

869.4
8
238.6
8
4290.
58
193.2
2

Keluar (kg/jam)
Aliran 10 ( Aliran
Kiln )
10

128.8
6
35.37
635.8
6

8649.78

8649.78

2374.45

2374.45
42683.5
5

28.63

1922.17
23902.79
915.32

787.14

89.45

13.26

49996 5681.
.40
41
56519.79

841.
98

1
1

4%

889.85
35842.33

56519.
79

Kiln

1
0

-Neraca Massa-

Kiln

1
2

Lampiran A- 4

Pra Rancangan Pabrik Semen


Putih

Unit Kiln

F.

Masuk

Aliran 10
Aliran 11
Aliran 12

35842.33

Total

35842.33

Keluar
1433.69
34408.64
35842.33

EP 2

13
14

EP 2
11

Unit EP 2

Masuk

Aliran 11
Aliran 13
Aliran 14

1433.69
537.64
896.06

Total

G.

Keluar

1433.69

1433.69

Clinker Silo

1
4
1
2

-Neraca Massa-

Clinker Silo

1
5

Lampiran A- 5

Pra Rancangan Pabrik Semen


Putih

Unit Clinker
Silo
Aliran 12
Aliran 14
Aliran 15

Keluar

34408.64
896.06
35304.70

Total

H.

Masuk

35304.70

35304.70

Finish Mill
4%

2%
1
8

1
6
1
5

Finish Mill

Unit Finish Mill


Aliran
Aliran
Aliran
Aliran

15
16
17
18

Masuk

1
7

2
1

Keluar

35304.70
1441.01
36025.20
720.50

Total

36745.71

Masuk
Aliran 17
Aliran 20
Aliran 21

-Neraca Massa-

2
0

Total

36745.71

Keluar

36025.20
1080.76
37105.96
37105.96

37105.96

Lampiran A- 6

Pra Rancangan Pabrik Semen


Putih

Unit EP 3

Masuk

Aliran 18
Aliran 19
Aliran 20

I.

Keluar

720.50
180.13
540.38

Total

720.50
1
9

720.50

0.5%
2
0

1
8

Over All

1,5 %

EP1

Air Separator

10%

1,5%

2%
9

5
7

12%
4

1,5% H2O
3

-Neraca Massa1

Fresh Feed
H2O 1,6%

ICD

SP

1
0

LampiranKiln
A- 7

Pra Rancangan Pabrik Semen


Putih

1
3

1,5%

EP2

0,5%

EP3

1
4
2,5%

4%

1,5%

1
1
1
2

-Neraca Massa-

1
6

Clinker Silo

1
9

1
5

4%

2
0

2%
1
8

Clinker Silo

1
7

2
1

Lampiran A- 8

Pra Rancangan Pabrik Semen


Putih

Komponen
Fresh Feed
Gypsum
H2O dari ICD
Dust dari EP1
Dust dari Kiln
H2O dari SP
CO2 dari SP
Dust dari EP2
Semen Putih
Total

-Neraca Massa-

Masuk

Keluar

56814.09
1441.01
13.64
280.66
537.64
889.85
19787.61
180.13
36565.58
58255.10

58255.10

Lampiran A- 9