ESTERN BRANCH
SUEZ CENTRAL WORKSHOP QC / QA DEPT.
Date
: 23/06/2008 : : 1 of 2 0
SH Rev
WPS No. Welding Process (es) Types: (Manual , Automatic, Semi Auto)
: : :
embed MSDraw \* mergeformat embed MSDraw \* mergeformat embed MSDraw \* mergeformat embed MSDraw \* mergeformat embed MSDraw \* mergeformat embed MSDraw \* mergeformat
12mm 25mm ST 37/2 25mm
embed MSDraw \* mergeformat embed MSDraw \* mergeformat embed MSDraw \* mergeformat embed MSDraw \* mergeformat
BASE METALS
MATERIALS SPECIFICATION TYPE OR GRADE : DN 17100 : ST 37-2 to ST 37-2
PWHT
TEMPERATURE (C) TIME (Min) HEATING RATE (C/HR) COOLING RATE: (C/HR) OTHER : : N. A. N. A. N. A. N. A. NONE
THICKNESS OF TEST COUPON(mm) : 12 / 25 DIAMETER OF TEST COUPON (mm) : PLATE OTHER : NONE
:
: :
FILLER METALS
PROCESS (ES) SFA SPECIFICATION AWS CLASSIFICATION FILLER METAL F-NO WELD METAL A-NO. : : SAW A 5.17
GAS
SHIELDING TRAILING BACKING : : :
None
----------
: F7A4 EM12K : : 6 1
ELECTRICAL CHARACTERISTICS
CURRENT & POLARITY AMPS. & VOLTS : : See Below Table See Below Table N.A See Below Table
SIZE OF FILLER METAL (mm) : 4.00 BRAND NAME DEPOSIT WELD METAL (mm) TH. / PASS OTHER : ESAB : 8mm : 8mm (minimum) : NONE
TECHNIQUE
TRAVEL SPEED (MM/SEC) STRING OF WEAVE BEAD : See Below Table : String
POSITION
POSITION WELD PROGRESSION (UP - DOWN) OTHER : : : 2F N/A NONE
OSCILLATION (mm) MULTI PASS OR SINGLE PASS (Per Side) SINGLE OR MULTIPLE ELECTRODES AC ANGULAR ORIENTATION OF GUN DC ANGULAR ORIENTATION OF GUN
PREHEAT
PREHEAT TEMP
: : :
PETROJET
ESTERN BRANCH
SUEZ CENTRAL WORKSHOP QC / QA DEPT.
Date SH Rev
: 23/06/2008 : : 2 of 2 0
TENSILE TEST
Specimen No. Width mm Thickness mm Area mm2 Ultimate total load ,KN Ultimate Unit Stress N/mm2 Type of Failure & Location
Guided-Bend Test
Type and Figure No. Result
Toughness Test
Specimen No.
Notch Location
Notch Type
Test Temp.
Specimen SIZE
Drop Weigh
Break
No Break
(c)
Welding Parameter
Filler Metal Weld Layer Proce ss Current
Classificati on
Diamet er mm
Polarit y
Amps
Volt s
1 1"
SAW SAW
4.00 4.00
DCEP DCEP
700 700
33 34
11.10 11.10
2081 2144
30 55
Other Tests
OP2
Test conducted by: Faculty of engineering - Cairo university (MTL). We certify that the statement in this record are correct and that the test welds were prepared, welded and tested in accordance with the requirements of AWS D 1.1 Code (2006). PETROJET-SUEZ CENTRAL WORKSHOP Date:-23/06/2008
: OP1 /
CLIENT
THIRD PARTY