Anda di halaman 1dari 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

REF. DWG. NO. REFERENCE DRAWING TITLE

FIRE STATION, VAI 1001 OVERALL PLANT LAYOUT

A
HEAT EXCHANGER 1302 SURFACE AREA, COORDINATES

A
N
BOILER, PIPE TRACK STORAGE UNIT B, SHAFT TOP, VUHB1T
VAOO (ABOVE GROUND
B

MEETERING EQUIPMENT GUARD HOUSE


OIL WITHIN BOUNDARY WALL) BOOSTER PUMPS
INERT GAS
TANK (IF REQUIRED)

B
GENERATOR, FLARE MAIN ENTRANCE, VAEM NOTES :-
VAOG SURGE EQUIPMENT
VAON VAF
(IF REQUIRED) FOR REFERENCE ONLY:
(IF REQUUIRED)

8
11
T- 42
ALL PERMANENT WORKS ABOVE

5
5

95

40
GROUND TO BE PERFORMED IN

7
1 10

CRANE
C

C
CRANE
1

5
0

6
FT

5
105
PART B CONTRACT.

DIRECTION

CRANE
CRANE
80
100 1
1 4 5
1 +1

60

20
0
FT

90

PREV ILING
D

D
1
0

70
5

1
9
5

2
15
0

5
9
5
hat

30
85

CRANE
ended use.
eem entt

CRANE
W IND

R1 12.
T- 16

F1
28

11.
3930
ess agr

E
8

CRANE

HINDUSTAN SHIPYARD LTD.


CRANE
0
nt
he i

FT

+1
6 SERVICE BUILDING
ort
s expr

BUILDING
0
+7
owerf

1

BOUNDARY
ower

0
9
0

35
r

2
he bor

5
r

WALL
he bor

75

55
F

F
R1 11.
ot

STL
F1
oaned on t
endert

61

8.
1220

STL
85
105

T- E
5
5 CONTROL ROOM, VACR

50
he l

15
0

STL
yl

7
ven by t

5
el

80
e m er

STL
80
PROCESS AREA
en consentgi

G
70
TED. They ar

70

45
95

CAVERN B, VAPB
50

R1 10.
1
0

80
0
(DRAINED TO API
T- 36

F1
itt

10.
ed by a wr

60
MI

SEPARATOR)

4330
A LI

4
0
+7
0
65
NDI

75
90

BOUNDARY FENCE
H

H
T- 37

60
t
NEERS I
t

7
mi

0 5
+2
ed way per

"

25
12
6
5
y ofENGI

50
70
t
mi

65 3
5
i

25
he l

55 60 5
+2
t
oper

I
WATER TREATMENT AREA
nt

50

R1 9.
45
ed orused,excepti
he pr

5
5

T- A
09
+2
5
VAT

F1
60

TP
5
et

T- 15

9.
0910
5 5
m atar

+3 10 +2 12"
3

TP

HOUSE
0 20
" 50
API SEPARATOR, VATS
or

T- 41
sf

45
35
hi

J
75

5
+2

2
t
ven on t
bi

5
0 1
+2
85
ed,exhi

0
5 40
+3
8
+1

R1 9.
30
s gi

35 PIPE TRACK

T- 1
oduced,copi

F1
51
l

8
ai

25 +1
45
gn and det

(BURIED PIPES)
80

LEGEND (FIRE WATER):


K

K
R1 9.
R2
epr

2" GUARD HOUSE


ng,desi

8 DOUBLE HEADED HYDRANT

F1
1 +1

75
5
lnotbe r

+2
"
16

2"
R2

1 ALTERNATIVE

R1 10.
40

LIGHT
T- 24
N SHED
TI
100

30
awi

MONITOR

F1
R1 10.

LIGHT
86
95
105
l

5
hey wi

+2 ENTRANCE
The dr

55

08

BLD
+1

F1
0
+2 6"
T- 39

T- 22
R1 7.
16" 5
+1

R1 9.
6
+1 VAEL

F1
t

5
+2

R1 9.

82
10

R1 8.
TP
L

L
F1
44

R1 7.
4
R2

+2

12
T- 23

66

79
110

0
0

+2

T- 21
15

10
2
0

T- 40

0
+2 20
R2

R2

15
5
9

0
0

TP
M

M
2
T- 38

25
7

0
ABONDANED BUILDING

25
0

T- T

15
3- 4

25 15
30
20

3
65
75

0
2 2007-08-24 ISSUED FOR BID PART A HP UH GE EIL
35 25

45 35 REV. DATE REVISIONS BY CHKD APPD PEM/PC


N

N
30
50
40 INDIAN STRATEGIC PETROLEUM
35
RESERVES LIMITED.
4
0

55 45
45

(Wholly owned subsidiary company of OIDB)


40

60
45
13

50
8
0
0
O

O
1
1

55
(A Govt. of India Undertaking)
8
5

5
60
9 55 50 60
5 70
6
60 5
GJRWELLSGATAN 22, P.O.BOX 34 044, S-100 26
STOCKHOLM
TELEPHONE +46 8 695 65 00, TELEFAX +46 8 695 60 60
WWW.SWECOGROUP.COM

PROCESS AREA CAVERN A, VAPA SWITCHGEAR AREA, VAH STRATEGIC STORAGE OF WBS: VG
STORAGE UNIT A CRUDE OIL AT PLOT PLAN
P

(DRAINED TO

P
SHAFT TOP, VUHA1T FIRE WATER PUMPS, VAVP 0 50 m 100 m 150 m
VISAKHAPATNAM SURFACE INSTALLATIONS

API SEPARATOR) FIRE WATER TANK, VAWT SCALE JOB NO. UNIT DIVN. DEPT. DWG. NO. REV.
HEAT EXCHANGER A1 1:1000, A3 1:2000 1:1000
1:2000 6 8 3 8 0 0 0 0 0 0 0 1 0 0 2 2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

3-1641-0501 REV.2 A1-841x594

Anda mungkin juga menyukai