STATUS OF STRUCTURAL DESIGN AND SHOP DRAWING FOR MODA PROJECT-2-6-124-DAMMAM ON DATE : 16-04-2011

TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING AAPVD AAPVD AAPVD AAPVD AAPVD AAPVD AAPVD FOR FOR FOR FOR FOR FOR FOR FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA AREA01 AREA02 AREA03 AREA04 AREA05 AREA06 AREA07 01 02 03 04 05 06 07

BUILDING NAME

Total Numbers of bldgs

[A] RCC BUILDINGS


[1] BUILDING NO 2-03-(COMPANY HEAD QUARTER) [2] BUILDING NO 5-17-(NCO DORMITORY BUILDING) [3] BUILDING NO 2-48 (WATCH TOWER) [4]BUILDING NO 2-05 (MP GUARD BUILDING) [5]BUILDING NO 4-12 (INFLAMMABLE WARE HOUSE) [6]BUILDING NO 2-28 (GATE HOUSE) [7]BUILDING NO 4-49 (GENERATOR BUILDING) [8]BUILDING NO 4-08 (CAR & EQUIPMENT WASH) [9]BUILDING NO 4-52A(Irrigation pump room) [10]BUILDING NO 2-02(BATALLION HEAD QUARTER) [11]BUILDING NO 3-13 (Clinic) [12]BUILDING NO 3-18 (Laundary Building) [13]BUILDING NO 2-27(GUARD HOUSE) [14]BUILDING NO 4-51A(TRANSFER PUMP HOUSE) [15]BUILDING NO 4-34(VEHICLE AND EQUIPMENT WASH) [16] BUILDING NO 2-47 (BANQUET HALL) [17]BUILDING NO 2-04 (HEAD QUARTER COMPANY) [18]BUILDING NO 3-19(MOSQUE 500 PERSONS) 14 68 26 12 11 12 12 8 1 6 1 2 1 1 2 8 19 4
2 3 1 2 1 1 1 2 2 3 1 2 1 1 1 2 1 2 1 1 1 1 0 2 1 0 2 3 1 2 1 1 1 2 2 3 1 2 1 1 1 2 1 2 1 1 1 1 0 2 2 0 2 3 1 2 1 1 1 2 2 3 1 2 1 1 1 2 1 2 1 1 1 1 0 2 2 0 2 3 1 2 1 1 1 2 2 3 1 2 1 1 1 2 1 2 1 1 1 1 0 2 2 0 2 3 1 2 1 1 1 2 2 3 1 2 1 1 1 2 1 2 1 1 1 1 0 2 2 0 2 3 1 2 1 1 1 2 2 3 1 2 1 1 1 2 1 2 1 1 1 1 0 2 2 0 2 3 1 2 1 1 1 2 2 3 1 2 1 1 1 2 1 2 1 1 1 1 0 2 2 0

0 0 0 0 0 0 0 3 0 0

0 2 0 0 0 0 0 3 2 4

0 2 0 0 0 0 0 3 2 4

0 0 1 1 1 0 0 3 2 0

0 2 0 0 0 0 0 3 2 4

0 2 0 0 0 0 3 3 2 4

0 2 0 1 0 0 0 3 2 0

STATUS OF STRUCTURAL DESIGN AND SHOP DRAWING FOR MODA PROJECT-2-6-124-DAMMAM ON DATE : 16-04-2011
TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING AAPVD AAPVD AAPVD AAPVD AAPVD AAPVD AAPVD FOR FOR FOR FOR FOR FOR FOR FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA AREA01 AREA02 AREA03 AREA04 AREA05 AREA06 AREA07 01 02 03 04 05 06 07
0 0 0 0 0 3 0 0 0 2 1 0 0 0 0 1 1 1 25
1 1 2 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 33

BUILDING NAME

Total Numbers of bldgs

[19]BUILDING NO 2-32 (COMMUNICATION BUILDING) [20]BUILDING NO 2-46 (police detention centre) [21]BUILDING NO 3-07 (Brigade Training centre) [22]BUILDING NO 3-20 (Mosque 1800 npersons) [23]BUILDING NO2-01(BRIGADE HEAD QUARTER) [24]BUILDING NO 2-22A(COMPANY MESSHALL) [25]BUILDING NO 2-22(COMBINED MESSHALL) [26]BUILDING NO 4-51(ELEVATED WATER TANK) [27]BUILDING NO 4-53(PORTABLE WATER STORAGE) [28]BUILDING NO 4-52(Irrigation water tank) [29] BUILDING NO LPG [30]BUILDING NO 4-38(FIRE STATION) [31]BUILDING NO 4-50(SWITCHGEAR ROOM) [32]BUILDING NO 4-54(WATER TREATMENT PLANT) [33]BUILDING NO 4-55(SEWAGE TREATMENT PLANT) [34]BUILDING NO G13-G18 [35] BUILDING NO LS2-LS11 [36] BUILDING NO SS1-SS48 (SUB STATION PADS)

1 1 1 1 1 4 6 1 1 3 8 1 1 0 0 6 7 48

0 0 0 0 0 0 3 0 0 0 1 0 0 0 0 0 1 1 30

1 1 2 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 34

0 0 0 0 0 0 3 0 0 0 1 0 0 0 0 0 1 1 30

1 1 2 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 34

2 2 3 5 6 3 0 5 0 2 1 0 2 0 0 1 1 1 55

1 1 2 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 34

0 0 0 0 0 0 3 0 0 0 1 0 0 0 0 1 1 1 31

1 1 2 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 34

0 0 0 0 0 0 3 0 0 0 1 0 0 0 0 1 1 1 34

1 1 2 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 34

0 0 0 0 0 0 3 0 0 2 1 0 0 0 0 1 1 1 30

1 1 2 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 34

STATUS OF STRUCTURAL DESIGN AND SHOP DRAWING FOR MODA PROJECT-2-6-124-DAMMAM ON DATE : 16-04-2011
TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING AAPVD AAPVD AAPVD AAPVD AAPVD AAPVD AAPVD FOR FOR FOR FOR FOR FOR FOR FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA AREA01 AREA02 AREA03 AREA04 AREA05 AREA06 AREA07 01 02 03 04 05 06 07

BUILDING NAME

Total Numbers of bldgs

[A] PRE ENGINEERING BUILDINGS (A.Y.C SCOPE) [37]BUILDING NO 3-06 (CLASS ROOM BUILDING) [38]BUILDING NO 4-09 (MAINTAINANCE WORK SHOP) [39] BUILDING NO 4-11 (GENERAL WAREHOUSE-5) [40]BUILDING NO 4-16 (CAR PARKING SHADE,2 BAYS) [41]BUILDING NO 4-16A (CAR PARKING SHADE,3 BAYS) [42] BUILDING NO 4-16B(CAR PARKING SHADE,4 BAYS) [43] BUILDING NO 4-16C (CAR PARKING SHADE,5 BAYS) [44] BUILDING NO 4-16D (CAR PARKING SHADE,6 BAYS) [45] BUILDING NO 4-16E (CAR PARKING SHADE,7 BAYS) [46] BUILDING NO 4-16F (CAR PARKING SHADE,14 BAYS) [47] BUILDING NO 4-16G (CAR PARKING SHADE,15 BAYS) [48] BUILDING NO 4-30 (MILITARY EQUIPMENT PARKING SHADE) [49] BUILDING NO 4-31(WHEELED VEHICLE PARKING SHADE.8.4M BAY) [50] BUILDING NO 4-35(VEHICLE LNSPECTION BUILDING) [51]BUILDING NO 4-36(SPARE PARTS WARE HOUSE) [52] BUILDING NO 4-37(O & M BUILDING) [53] BUILDING NO 4-40(CENTRAL POLE SHADE) [54] BUILDING NO 4-42 (MAINTANANCE SUPPORT WORK SHOP) 7 11 8 3 1 1 52 1 8 2 2 9 13 1 1 1 1 1 4 4 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 4 4 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 4 1 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 4 4 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 4 4 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 4 4 0 0 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

4 0 0 0 1 0 0 0 0

4 0 0 0 1 0 0 0 0

4 0 0 0 1 1 8 2 2

4 0 0 0 1 0 0 0 0

4 0 0 0 1 0 0 0 0 0

4 1 1 1 1 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0

0 0 0 0 0 0 0

4 2 0 0 0 0 0

5 2 0 0 0 0 0

9 1 1 0 0 1

0 1 1 0

0 0 0 0

STATUS OF STRUCTURAL DESIGN AND SHOP DRAWING FOR MODA PROJECT-2-6-124-DAMMAM ON DATE : 16-04-2011
TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING AAPVD AAPVD AAPVD AAPVD AAPVD AAPVD AAPVD FOR FOR FOR FOR FOR FOR FOR FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA AREA01 AREA02 AREA03 AREA04 AREA05 AREA06 AREA07 01 02 03 04 05 06 07
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0

BUILDING NAME

Total Numbers of bldgs

[55] BUILDING NO 4-43 (TRUCK PARKING SHADE) [56] BUILDING NO 4-44 MAIN WARE HOUSE

1 1

STATUS OF STRUCTURAL DESIGN AND SHOP DRAWING FOR MODA PROJECT-2-6-124-DAMMAM ON DATE : 16-04-2011
TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING AAPVD AAPVD AAPVD AAPVD AAPVD AAPVD AAPVD FOR FOR FOR FOR FOR FOR FOR FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA AREA01 AREA02 AREA03 AREA04 AREA05 AREA06 AREA07 01 02 03 04 05 06 07

BUILDING NAME

Total Numbers of bldgs

OTHER. AREA

[A] RCC BUILDINGS


[1] BUILDING NO 2-03-(COMPANY HEAD QUARTER) [2] BUILDING NO 5-17-(NCO DORMITORY BUILDING) [3] BUILDING NO 2-48 (WATCH TOWER) [4]BUILDING NO 2-05 (MP GUARD BUILDING) [5]BUILDING NO 4-12 (INFLAMMABLE WARE HOUSE) [6]BUILDING NO 2-28 (GATE HOUSE) [7]BUILDING NO 4-49 (GENERATOR BUILDING) [8]BUILDING NO 4-08 (CAR & EQUIPMENT WASH) [9]BUILDING NO 4-52A(Irrigation pump room) [10]BUILDING NO 2-02(BATALLION HEAD QUARTER) [11]BUILDING NO 3-13 (Clinic) [12]BUILDING NO 3-18 (Laundary Building) [13]BUILDING NO 2-27(GUARD HOUSE) [14]BUILDING NO 4-51A(TRANSFER PUMP HOUSE) [15]BUILDING NO 4-34(VEHICLE AND EQUIPMENT WASH) [16] BUILDING NO 2-47 (BANQUET HALL) [17]BUILDING NO 2-04 (HEAD QUARTER COMPANY) [18]BUILDING NO 3-19(MOSQUE 500 PERSONS) 14 68 26 12 11 12 12 8 1 6 1 2 1 1 2 8 19 4
2 3 1 2 1 1 1 2 2 3 1 2 1 1 1 2 1 2 1 1 1 1 0 2 1 0 2 3 1 2 1 1 1 2 2 3 1 2 1 1 1 2 1 2 1 1 1 1 0 2 2 0 2 3 1 2 1 1 1 2 2 3 1 2 1 1 1 2 1 2 1 1 1 1 0 2 2 0 2 3 1 2 1 1 1 2 2 3 1 2 1 1 1 2 1 2 1 1 1 1 0 2 2 0 2 3 1 2 1 1 1 2 2 3 1 2 1 1 1 2 1 2 1 1 1 1 0 2 2 0 2 3 1 2 1 1 1 2 2 3 1 2 1 1 1 2 1 2 1 1 1 1 0 2 2 0 2 3 1 2 1 1 1 2 2 3 1 2 1 1 1 2 1 2 1 1 1 1 0 2 2 0

1 -

0 0 0 0 0 0 0 3 0 0

0 2 0 0 0 0 0 3 2 4

0 2 0 0 0 0 0 3 2 4

0 0 1 1 1 0 0 3 2 0

0 2 0 0 0 0 0 3 2 4

0 2 0 0 0 0 3 3 2 4

0 2 0 1 0 0 0 3 2 0

STATUS OF STRUCTURAL DESIGN AND SHOP DRAWING FOR MODA PROJECT-2-6-124-DAMMAM ON DATE : 16-04-2011
TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING AAPVD AAPVD AAPVD AAPVD AAPVD AAPVD AAPVD FOR FOR FOR FOR FOR FOR FOR FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA AREA01 AREA02 AREA03 AREA04 AREA05 AREA06 AREA07 01 02 03 04 05 06 07
0 0 0 0 0 3 0 0 0 2 1 0 0 0 0 1 1 1 25
1 1 2 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 33

BUILDING NAME

Total Numbers of bldgs

OTHER. AREA

[19]BUILDING NO 2-32 (COMMUNICATION BUILDING) [20]BUILDING NO 2-46 (police detention centre) [21]BUILDING NO 3-07 (Brigade Training centre) [22]BUILDING NO 3-20 (Mosque 1800 npersons) [23]BUILDING NO2-01(BRIGADE HEAD QUARTER) [24]BUILDING NO 2-22A(COMPANY MESSHALL) [25]BUILDING NO 2-22(COMBINED MESSHALL) [26]BUILDING NO 4-51(ELEVATED WATER TANK) [27]BUILDING NO 4-53(PORTABLE WATER STORAGE) [28]BUILDING NO 4-52(Irrigation water tank) [29] BUILDING NO LPG [30]BUILDING NO 4-38(FIRE STATION) [31]BUILDING NO 4-50(SWITCHGEAR ROOM) [32]BUILDING NO 4-54(WATER TREATMENT PLANT) [33]BUILDING NO 4-55(SEWAGE TREATMENT PLANT) [34]BUILDING NO G13-G18 [35] BUILDING NO LS2-LS11 [36] BUILDING NO SS1-SS48 (SUB STATION PADS)

1 1 1 1 1 4 6 1 1 3 8 1 1 0 0 6 7 48

0 0 0 0 0 0 3 0 0 0 1 0 0 0 0 0 1 1 30

1 1 2 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 34

0 0 0 0 0 0 3 0 0 0 1 0 0 0 0 0 1 1 30

1 1 2 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 34

2 2 3 5 6 3 0 5 0 2 1 0 2 0 0 1 1 1 55

1 1 2 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 34

0 0 0 0 0 0 3 0 0 0 1 0 0 0 0 1 1 1 31

1 1 2 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 34

0 0 0 0 0 0 3 0 0 0 1 0 0 0 0 1 1 1 34

1 1 2 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 34

0 0 0 0 0 0 3 0 0 2 1 0 0 0 0 1 1 1 30

1 1 2 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 34

1 1 6 2 1

1 -

STATUS OF STRUCTURAL DESIGN AND SHOP DRAWING FOR MODA PROJECT-2-6-124-DAMMAM ON DATE : 16-04-2011
TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING AAPVD AAPVD AAPVD AAPVD AAPVD AAPVD AAPVD FOR FOR FOR FOR FOR FOR FOR FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA AREA01 AREA02 AREA03 AREA04 AREA05 AREA06 AREA07 01 02 03 04 05 06 07

BUILDING NAME

Total Numbers of bldgs

OTHER. AREA

[A] PRE ENGINEERING BUILDINGS (A.Y.C SCOPE) [37]BUILDING NO 3-06 (CLASS ROOM BUILDING) [38]BUILDING NO 4-09 (MAINTAINANCE WORK SHOP) [39] BUILDING NO 4-11 (GENERAL WAREHOUSE-5) [40]BUILDING NO 4-16 (CAR PARKING SHADE,2 BAYS) [41]BUILDING NO 4-16A (CAR PARKING SHADE,3 BAYS) [42] BUILDING NO 4-16B(CAR PARKING SHADE,4 BAYS) [43] BUILDING NO 4-16C (CAR PARKING SHADE,5 BAYS) [44] BUILDING NO 4-16D (CAR PARKING SHADE,6 BAYS) [45] BUILDING NO 4-16E (CAR PARKING SHADE,7 BAYS) [46] BUILDING NO 4-16F (CAR PARKING SHADE,14 BAYS) [47] BUILDING NO 4-16G (CAR PARKING SHADE,15 BAYS) [48] BUILDING NO 4-30 (MILITARY EQUIPMENT PARKING SHADE) [49] BUILDING NO 4-31(WHEELED VEHICLE PARKING SHADE.8.4M BAY) [50] BUILDING NO 4-35(VEHICLE LNSPECTION BUILDING) [51]BUILDING NO 4-36(SPARE PARTS WARE HOUSE) [52] BUILDING NO 4-37(O & M BUILDING) [53] BUILDING NO 4-40(CENTRAL POLE SHADE) [54] BUILDING NO 4-42 (MAINTANANCE SUPPORT WORK SHOP) 7 11 8 3 1 1 52 1 8 2 2 9 13 1 1 1 1 1 4 4 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 4 4 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 4 1 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 4 4 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 4 4 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 4 4 0 0 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -

4 0 0 0 1 0 0 0 0

4 0 0 0 1 0 0 0 0

4 0 0 0 1 1 8 2 2

4 0 0 0 1 0 0 0 0

4 0 0 0 1 0 0 0 0 0

4 1 1 1 1 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0

0 0 0 0 0 0 0

4 2 0 0 0 0 0

5 2 0 0 0 0 0

9 1 1 0 0 1

0 1 1 0

0 0 0 0

STATUS OF STRUCTURAL DESIGN AND SHOP DRAWING FOR MODA PROJECT-2-6-124-DAMMAM ON DATE : 16-04-2011
TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING AAPVD AAPVD AAPVD AAPVD AAPVD AAPVD AAPVD FOR FOR FOR FOR FOR FOR FOR FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA AREA01 AREA02 AREA03 AREA04 AREA05 AREA06 AREA07 01 02 03 04 05 06 07
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0

BUILDING NAME

Total Numbers of bldgs

OTHER. AREA

[55] BUILDING NO 4-43 (TRUCK PARKING SHADE) [56] BUILDING NO 4-44 MAIN WARE HOUSE

1 1

STATUS OF STRUCTURAL DESIGN AND SHOP DRAWING FOR MODA PROJECT-2-6-124-DAMMAM ON DATE : 16-04-2011
TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING AAPVD AAPVD AAPVD AAPVD AAPVD AAPVD AAPVD FOR FOR FOR FOR FOR FOR FOR FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA AREA01 AREA02 AREA03 AREA04 AREA05 AREA06 AREA07 01 02 03 04 05 06 07

BUILDING NAME

Total Numbers of bldgs

OTHER. AREA

% of Dwg. Approved buidling wise

[A] RCC BUILDINGS


[1] BUILDING NO 2-03-(COMPANY HEAD QUARTER) [2] BUILDING NO 5-17-(NCO DORMITORY BUILDING) [3] BUILDING NO 2-48 (WATCH TOWER) [4]BUILDING NO 2-05 (MP GUARD BUILDING) [5]BUILDING NO 4-12 (INFLAMMABLE WARE HOUSE) [6]BUILDING NO 2-28 (GATE HOUSE) [7]BUILDING NO 4-49 (GENERATOR BUILDING) [8]BUILDING NO 4-08 (CAR & EQUIPMENT WASH) [9]BUILDING NO 4-52A(Irrigation pump room) [10]BUILDING NO 2-02(BATALLION HEAD QUARTER) [11]BUILDING NO 3-13 (Clinic) [12]BUILDING NO 3-18 (Laundary Building) [13]BUILDING NO 2-27(GUARD HOUSE) [14]BUILDING NO 4-51A(TRANSFER PUMP HOUSE) [15]BUILDING NO 4-34(VEHICLE AND EQUIPMENT WASH) [16] BUILDING NO 2-47 (BANQUET HALL) [17]BUILDING NO 2-04 (HEAD QUARTER COMPANY) [18]BUILDING NO 3-19(MOSQUE 500 PERSONS) 14 68 26 12 11 12 12 8 1 6 1 2 1 1 2 8 19 4
2 3 1 2 1 1 1 2 2 3 1 2 1 1 1 2 1 2 1 1 1 1 0 2 1 0 2 3 1 2 1 1 1 2 2 3 1 2 1 1 1 2 1 2 1 1 1 1 0 2 2 0 2 3 1 2 1 1 1 2 2 3 1 2 1 1 1 2 1 2 1 1 1 1 0 2 2 0 2 3 1 2 1 1 1 2 2 3 1 2 1 1 1 2 1 2 1 1 1 1 0 2 2 0 2 3 1 2 1 1 1 2 2 3 1 2 1 1 1 2 1 2 1 1 1 1 0 2 2 0 2 3 1 2 1 1 1 2 2 3 1 2 1 1 1 2 1 2 1 1 1 1 0 2 2 0 2 3 1 2 1 1 1 2 2 3 1 2 1 1 1 2 1 2 1 1 1 1 0 2 2 0

100.00% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 60% 100% 0%

1 -

0 0 0 0 0 0 0 3 0 0

0 2 0 0 0 0 0 3 2 4

0 2 0 0 0 0 0 3 2 4

0 0 1 1 1 0 0 3 2 0

0 2 0 0 0 0 0 3 2 4

0 2 0 0 0 0 3 3 2 4

0 2 0 1 0 0 0 3 2 0

STATUS OF STRUCTURAL DESIGN AND SHOP DRAWING FOR MODA PROJECT-2-6-124-DAMMAM ON DATE : 16-04-2011
TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING AAPVD AAPVD AAPVD AAPVD AAPVD AAPVD AAPVD FOR FOR FOR FOR FOR FOR FOR FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA AREA01 AREA02 AREA03 AREA04 AREA05 AREA06 AREA07 01 02 03 04 05 06 07
0 0 0 0 0 3 0 0 0 2 1 0 0 0 0 1 1 1 25
1 1 2 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 33

BUILDING NAME

Total Numbers of bldgs

OTHER. AREA

% of Dwg. Approved buidling wise

[19]BUILDING NO 2-32 (COMMUNICATION BUILDING) [20]BUILDING NO 2-46 (police detention centre) [21]BUILDING NO 3-07 (Brigade Training centre) [22]BUILDING NO 3-20 (Mosque 1800 npersons) [23]BUILDING NO2-01(BRIGADE HEAD QUARTER) [24]BUILDING NO 2-22A(COMPANY MESSHALL) [25]BUILDING NO 2-22(COMBINED MESSHALL) [26]BUILDING NO 4-51(ELEVATED WATER TANK) [27]BUILDING NO 4-53(PORTABLE WATER STORAGE) [28]BUILDING NO 4-52(Irrigation water tank) [29] BUILDING NO LPG [30]BUILDING NO 4-38(FIRE STATION) [31]BUILDING NO 4-50(SWITCHGEAR ROOM) [32]BUILDING NO 4-54(WATER TREATMENT PLANT) [33]BUILDING NO 4-55(SEWAGE TREATMENT PLANT) [34]BUILDING NO G13-G18 [35] BUILDING NO LS2-LS11 [36] BUILDING NO SS1-SS48 (SUB STATION PADS)

1 1 1 1 1 4 6 1 1 3 8 1 1 0 0 6 7 48

0 0 0 0 0 0 3 0 0 0 1 0 0 0 0 0 1 1 30

1 1 2 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 34

0 0 0 0 0 0 3 0 0 0 1 0 0 0 0 0 1 1 30

1 1 2 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 34

2 2 3 5 6 3 0 5 0 2 1 0 2 0 0 1 1 1 55

1 1 2 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 34

0 0 0 0 0 0 3 0 0 0 1 0 0 0 0 1 1 1 31

1 1 2 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 34

0 0 0 0 0 0 3 0 0 0 1 0 0 0 0 1 1 1 34

1 1 2 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 34

0 0 0 0 0 0 3 0 0 2 1 0 0 0 0 1 1 1 30

1 1 2 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 34

1 1 6 2 1

60% 60% 60% 0% 60% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

1 -

STATUS OF STRUCTURAL DESIGN AND SHOP DRAWING FOR MODA PROJECT-2-6-124-DAMMAM ON DATE : 16-04-2011
TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING AAPVD AAPVD AAPVD AAPVD AAPVD AAPVD AAPVD FOR FOR FOR FOR FOR FOR FOR FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA AREA01 AREA02 AREA03 AREA04 AREA05 AREA06 AREA07 01 02 03 04 05 06 07

BUILDING NAME

Total Numbers of bldgs

OTHER. AREA

% of Dwg. Approved buidling wise

[A] PRE ENGINEERING BUILDINGS (A.Y.C SCOPE) [37]BUILDING NO 3-06 (CLASS ROOM BUILDING) [38]BUILDING NO 4-09 (MAINTAINANCE WORK SHOP) [39] BUILDING NO 4-11 (GENERAL WAREHOUSE-5) [40]BUILDING NO 4-16 (CAR PARKING SHADE,2 BAYS) [41]BUILDING NO 4-16A (CAR PARKING SHADE,3 BAYS) [42] BUILDING NO 4-16B(CAR PARKING SHADE,4 BAYS) [43] BUILDING NO 4-16C (CAR PARKING SHADE,5 BAYS) [44] BUILDING NO 4-16D (CAR PARKING SHADE,6 BAYS) [45] BUILDING NO 4-16E (CAR PARKING SHADE,7 BAYS) [46] BUILDING NO 4-16F (CAR PARKING SHADE,14 BAYS) [47] BUILDING NO 4-16G (CAR PARKING SHADE,15 BAYS) [48] BUILDING NO 4-30 (MILITARY EQUIPMENT PARKING SHADE) [49] BUILDING NO 4-31(WHEELED VEHICLE PARKING SHADE.8.4M BAY) [50] BUILDING NO 4-35(VEHICLE LNSPECTION BUILDING) [51]BUILDING NO 4-36(SPARE PARTS WARE HOUSE) [52] BUILDING NO 4-37(O & M BUILDING) [53] BUILDING NO 4-40(CENTRAL POLE SHADE) [54] BUILDING NO 4-42 (MAINTANANCE SUPPORT WORK SHOP) 7 11 8 3 1 1 52 1 8 2 2 9 13 1 1 1 1 1 4 4 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 4 4 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 4 1 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 4 4 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 4 4 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 4 4 0 0 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

4 0 0 0 1 0 0 0 0

4 0 0 0 1 0 0 0 0

4 0 0 0 1 1 8 2 2

4 0 0 0 1 0 0 0 0

4 0 0 0 1 0 0 0 0 0

4 1 1 1 1 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0

0 0 0 0 0 0 0

4 2 0 0 0 0 0

5 2 0 0 0 0 0

9 1 1 0 0 1

0 1 1 0

0 0 0 0

STATUS OF STRUCTURAL DESIGN AND SHOP DRAWING FOR MODA PROJECT-2-6-124-DAMMAM ON DATE : 16-04-2011
TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING AAPVD AAPVD AAPVD AAPVD AAPVD AAPVD AAPVD FOR FOR FOR FOR FOR FOR FOR FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA AREA01 AREA02 AREA03 AREA04 AREA05 AREA06 AREA07 01 02 03 04 05 06 07
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0

BUILDING NAME

Total Numbers of bldgs

OTHER. AREA

% of Dwg. Approved buidling wise

[55] BUILDING NO 4-43 (TRUCK PARKING SHADE) [56] BUILDING NO 4-44 MAIN WARE HOUSE

1 1

0% 0%

STATUS OF STRUCTURAL DESIGN AND SHOP DRAWING FOR MODA PROJECT-2-6-124-DAMMAM ON DATE : 16-04-2011
TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING AAPVD AAPVD AAPVD AAPVD AAPVD AAPVD AAPVD FOR FOR FOR FOR FOR FOR FOR FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA AREA01 AREA02 AREA03 AREA04 AREA05 AREA06 AREA07 01 02 03 04 05 06 07

BUILDING NAME

Total Numbers of bldgs

OTHER. AREA

% of Dwg. Approved buidling wise

[A] RCC BUILDINGS


[1] BUILDING NO 2-03-(COMPANY HEAD QUARTER) [2] BUILDING NO 5-17-(NCO DORMITORY BUILDING) [3] BUILDING NO 2-48 (WATCH TOWER) [4]BUILDING NO 2-05 (MP GUARD BUILDING) [5]BUILDING NO 4-12 (INFLAMMABLE WARE HOUSE) [6]BUILDING NO 2-28 (GATE HOUSE) [7]BUILDING NO 4-49 (GENERATOR BUILDING) [8]BUILDING NO 4-08 (CAR & EQUIPMENT WASH) [9]BUILDING NO 4-52A(Irrigation pump room) [10]BUILDING NO 2-02(BATALLION HEAD QUARTER) [11]BUILDING NO 3-13 (Clinic) [12]BUILDING NO 3-18 (Laundary Building) [13]BUILDING NO 2-27(GUARD HOUSE) [14]BUILDING NO 4-51A(TRANSFER PUMP HOUSE) [15]BUILDING NO 4-34(VEHICLE AND EQUIPMENT WASH) [16] BUILDING NO 2-47 (BANQUET HALL) [17]BUILDING NO 2-04 (HEAD QUARTER COMPANY) [18]BUILDING NO 3-19(MOSQUE 500 PERSONS) 14 68 26 12 11 12 12 8 1 6 1 2 1 1 2 8 19 4
2 3 1 2 1 1 1 2 2 3 1 2 1 1 1 2 1 2 1 1 1 1 0 2 1 0 2 3 1 2 1 1 1 2 2 3 1 2 1 1 1 2 1 2 1 1 1 1 0 2 2 0 2 3 1 2 1 1 1 2 2 3 1 2 1 1 1 2 1 2 1 1 1 1 0 2 2 0 2 3 1 2 1 1 1 2 2 3 1 2 1 1 1 2 1 2 1 1 1 1 0 2 2 0 2 3 1 2 1 1 1 2 2 3 1 2 1 1 1 2 1 2 1 1 1 1 0 2 2 0 2 3 1 2 1 1 1 2 2 3 1 2 1 1 1 2 1 2 1 1 1 1 0 2 2 0 2 3 1 2 1 1 1 2 2 3 1 2 1 1 1 2 1 2 1 1 1 1 0 2 2 0

100.00% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 60% 100% 0%

1 -

0 0 0 0 0 0 0 3 0 0

0 2 0 0 0 0 0 3 2 4

0 2 0 0 0 0 0 3 2 4

0 0 1 1 1 0 0 3 2 0

0 2 0 0 0 0 0 3 2 4

0 2 0 0 0 0 3 3 2 4

0 2 0 1 0 0 0 3 2 0

STATUS OF STRUCTURAL DESIGN AND SHOP DRAWING FOR MODA PROJECT-2-6-124-DAMMAM ON DATE : 16-04-2011
TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING AAPVD AAPVD AAPVD AAPVD AAPVD AAPVD AAPVD FOR FOR FOR FOR FOR FOR FOR FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA AREA01 AREA02 AREA03 AREA04 AREA05 AREA06 AREA07 01 02 03 04 05 06 07
0 0 0 0 0 3 0 0 0 2 1 0 0 0 0 1 1 1 25
1 1 2 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 33

BUILDING NAME

Total Numbers of bldgs

OTHER. AREA

% of Dwg. Approved buidling wise

[19]BUILDING NO 2-32 (COMMUNICATION BUILDING) [20]BUILDING NO 2-46 (police detention centre) [21]BUILDING NO 3-07 (Brigade Training centre) [22]BUILDING NO 3-20 (Mosque 1800 npersons) [23]BUILDING NO2-01(BRIGADE HEAD QUARTER) [24]BUILDING NO 2-22A(COMPANY MESSHALL) [25]BUILDING NO 2-22(COMBINED MESSHALL) [26]BUILDING NO 4-51(ELEVATED WATER TANK) [27]BUILDING NO 4-53(PORTABLE WATER STORAGE) [28]BUILDING NO 4-52(Irrigation water tank) [29] BUILDING NO LPG [30]BUILDING NO 4-38(FIRE STATION) [31]BUILDING NO 4-50(SWITCHGEAR ROOM) [32]BUILDING NO 4-54(WATER TREATMENT PLANT) [33]BUILDING NO 4-55(SEWAGE TREATMENT PLANT) [34]BUILDING NO G13-G18 [35] BUILDING NO LS2-LS11 [36] BUILDING NO SS1-SS48 (SUB STATION PADS)

1 1 1 1 1 4 6 1 1 3 8 1 1 0 0 6 7 48

0 0 0 0 0 0 3 0 0 0 1 0 0 0 0 0 1 1 30

1 1 2 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 34

0 0 0 0 0 0 3 0 0 0 1 0 0 0 0 0 1 1 30

1 1 2 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 34

2 2 3 5 6 3 0 5 0 2 1 0 2 0 0 1 1 1 55

1 1 2 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 34

0 0 0 0 0 0 3 0 0 0 1 0 0 0 0 1 1 1 31

1 1 2 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 34

0 0 0 0 0 0 3 0 0 0 1 0 0 0 0 1 1 1 34

1 1 2 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 34

0 0 0 0 0 0 3 0 0 2 1 0 0 0 0 1 1 1 30

1 1 2 0 4 2 0 0 0 0 0 0 0 0 0 0 0 0 34

1 1 6 2 1

60% 60% 60% 0% 60% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

1 -

STATUS OF STRUCTURAL DESIGN AND SHOP DRAWING FOR MODA PROJECT-2-6-124-DAMMAM ON DATE : 16-04-2011
TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING AAPVD AAPVD AAPVD AAPVD AAPVD AAPVD AAPVD FOR FOR FOR FOR FOR FOR FOR FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA AREA01 AREA02 AREA03 AREA04 AREA05 AREA06 AREA07 01 02 03 04 05 06 07

BUILDING NAME

Total Numbers of bldgs

OTHER. AREA

% of Dwg. Approved buidling wise

[A] PRE ENGINEERING BUILDINGS (A.Y.C SCOPE) [37]BUILDING NO 3-06 (CLASS ROOM BUILDING) [38]BUILDING NO 4-09 (MAINTAINANCE WORK SHOP) [39] BUILDING NO 4-11 (GENERAL WAREHOUSE-5) [40]BUILDING NO 4-16 (CAR PARKING SHADE,2 BAYS) [41]BUILDING NO 4-16A (CAR PARKING SHADE,3 BAYS) [42] BUILDING NO 4-16B(CAR PARKING SHADE,4 BAYS) [43] BUILDING NO 4-16C (CAR PARKING SHADE,5 BAYS) [44] BUILDING NO 4-16D (CAR PARKING SHADE,6 BAYS) [45] BUILDING NO 4-16E (CAR PARKING SHADE,7 BAYS) [46] BUILDING NO 4-16F (CAR PARKING SHADE,14 BAYS) [47] BUILDING NO 4-16G (CAR PARKING SHADE,15 BAYS) [48] BUILDING NO 4-30 (MILITARY EQUIPMENT PARKING SHADE) [49] BUILDING NO 4-31(WHEELED VEHICLE PARKING SHADE.8.4M BAY) [50] BUILDING NO 4-35(VEHICLE LNSPECTION BUILDING) [51]BUILDING NO 4-36(SPARE PARTS WARE HOUSE) [52] BUILDING NO 4-37(O & M BUILDING) [53] BUILDING NO 4-40(CENTRAL POLE SHADE) [54] BUILDING NO 4-42 (MAINTANANCE SUPPORT WORK SHOP) 7 11 8 3 1 1 52 1 8 2 2 9 13 1 1 1 1 1 4 4 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 4 4 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 4 1 0 0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 4 4 0 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 4 4 0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 4 4 0 0 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

4 0 0 0 1 0 0 0 0

4 0 0 0 1 0 0 0 0

4 0 0 0 1 1 8 2 2

4 0 0 0 1 0 0 0 0

4 0 0 0 1 0 0 0 0 0

4 1 1 1 1 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0

0 0 0 0 0 0 0

4 2 0 0 0 0 0

5 2 0 0 0 0 0

9 1 1 0 0 1

0 1 1 0

0 0 0 0

STATUS OF STRUCTURAL DESIGN AND SHOP DRAWING FOR MODA PROJECT-2-6-124-DAMMAM ON DATE : 16-04-2011
TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL TOTAL DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING DRAWING AAPVD AAPVD AAPVD AAPVD AAPVD AAPVD AAPVD FOR FOR FOR FOR FOR FOR FOR FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA FOR AREA AREA01 AREA02 AREA03 AREA04 AREA05 AREA06 AREA07 01 02 03 04 05 06 07
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0

BUILDING NAME

Total Numbers of bldgs

OTHER. AREA

% of Dwg. Approved buidling wise

[55] BUILDING NO 4-43 (TRUCK PARKING SHADE) [56] BUILDING NO 4-44 MAIN WARE HOUSE

1 1

0% 0%

AL-YAMAMA COMPANY
FOR TRADING & CONTRACTING P.O BOX 2110 DAMMAM - 31451 KSA

STATUS OF ARCHITECTURAL DESIGN AND SHOP DRAWING FOR MODA PROJECT-2-6-124-DAMMAM ON DATE : 16-04-2011

BUILDING NAME
Sr. no. Building no. [A] RCC BUILDINGS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 2-03 5-17 2-48 2-05 4-12 2-28 4-49 4-08 4-52 2-02 3-13 3-18 2-27 4-51 4-34 2-47 2-04 3-19 2-32 2-46 3-07 3-20 2-01 2-22A [1] BUILDING NO 2-03-(COMPANY HEAD QUARTER) [2] BUILDING NO 5-17-(NCO DORMITORY BUILDING) [3] BUILDING NO 2-48 (WATCH TOWER) [4]BUILDING NO 2-05 (MP GUARD BUILDING) [5]BUILDING NO 4-12 (INFLAMMABLE WARE HOUSE) [6]BUILDING NO 2-28 (GATE HOUSE) [7]BUILDING NO 4-49 (GENERATOR BUILDING) [8]BUILDING NO 4-08 (CAR & EQUIPMENT WASH) [9]BUILDING NO 4-52A(Irrigation pump room) [10]BUILDING NO 2-02(BATALLION HEAD QUARTER) [11]BUILDING NO 3-13 (Clinic) [12]BUILDING NO 3-18 (Laundary Building) [13]BUILDING NO 2-27(GUARD HOUSE) [14]BUILDING NO 4-51A(TRANSFER PUMP HOUSE) [15]BUILDING NO 4-34(VEHICLE AND EQUIPMENT WASH) [16] BUILDING NO 2-47 (BANQUET HALL) [17]BUILDING NO 2-04 (HEAD QUARTER COMPANY) [18]BUILDING NO 3-19(MOSQUE 500 PERSONS) [19]BUILDING NO 2-32 (COMMUNICATION BUILDING) [20]BUILDING NO 2-46 (police detention centre) [21]BUILDING NO 3-07 (Brigade Training centre) [22]BUILDING NO 3-20 (Mosque 1800 npersons) [23]BUILDING NO2-01(BRIGADE HEAD QUARTER) [24]BUILDING NO 2-22A(COMPANY MESSHALL)

Total Numbers of bldgs


14 68 26 12 11 12 12 8 1 6 1 2 1 1 2 8 19 4 1 1 1 1 1 4

% of dwg approved of AREA01


100% 100% 100% 100% 100% 100% 100% 100%

% of dwg approved of AREA02


100% 100% 100% 100% 100% 100% 100% 100%

% of dwg approved of AREA03


100% 100% 100% 100% 100% 100% 100% 100%

% of dwg approved of AREA04


100% 100% 100% 100% 100% 100% 100% 100%

% of dwg approved of AREA05


100% 100% 100% 100% 100% 100% 100% 100%

% of dwg approved of AREA06


100% 100% 100% 100% 100% 100% 100% 100%

% of dwg approved of AREA07


100% 100% 100% 100% 100% 100% 100% 100%

% of dwg approved of other AREA

% of Dwg. approved

Status

100% 100% 100% 100% 100% 100% 100% 100%


100%

100% 100% 100%

100%

100% 100% 100% 100%

100%

100%

100%

100%

100% 100%
100%

100% 100%

100% 60% 60% 100% 0% 60% 100% 0% 60% 60% 60% 0% 60% 0% 0% 60% 100% 60% 100% 0% 60% 100% 0% 60% 100%

60% 100% 0% 60% 60% 60% 0% 60% 0%

25 26 27 28 29 30 31 31 32 33 34 35 36

2-22 4-51 4-53 4-52 LPG 4-38 4-39 4-50 4-54 4-55 G,PADS

[25]BUILDING NO 2-22(COMBINED MESSHALL) [26]BUILDING NO 4-51(ELEVATED WATER TANK) [27]BUILDING NO 4-53(PORTABLE WATER STORAGE) [28]BUILDING NO 4-52(Irrigation water tank) [29] BUILDING NO LPG [30]BUILDING NO 4-38(FIRE STATION) [31]BUILDING NO 4-38(CENTRAL POL SHED) [32]BUILDING NO 4-50(SWITCHGEAR ROOM) [33]BUILDING NO 4-54(WATER TREATMENT PLANT) [34]BUILDING NO 4-55(SEWAGE TREATMENT PLANT) [35]BUILDING NO G13-G18

6 1 1 3 8 1 0% 0%

60%

60% 0%

60%

60%

60%

60% 0%
0%

0% 0%

0% 0% 0% 0% 0% 0%

0% 0% 0% 0%

0% 0%

1 1 1 6 7 48 0% 0% 0% 57.333% 11.611% 0% 0% 70.000% 14.176% 0% 0% 70.000% 14.176%

0% 0% 0% 0% 0% 0% 57.692% 11.684% 0% 0% 0% 65.882% 13.342% 0% 0% 0% 67.778% 13.726% 0% 71.765% 14.534% 33.333% 6.751% 0%

0% 0% 0% 0% 0% 0%

[36] BUILDING NO LS2-LS11 LIFT STATIONS SUB STN. PADS [37] BUILDING NO SS1-SS48 (SUB STATION PADS) PERCENT OF DRAWING APPROVED AREAWISE PERCENT OF DRAWING APPROVED OF WHOLE PROJECT

[A] PRE ENGINEERING BUILDINGS


3-06 4-09 4-11 4-16 4-16A 4-16B 4-16C 4-16D 4-16E 4-16F 4-16G 4-30 4-31 4-35 4-36 4-37 4-40 4-42 4-43 4-44 [37]BUILDING NO 3-06 (CLASS ROOM BUILDING) [38]BUILDING NO 4-09 (MAINTAINANCE WORK SHOP) [39] BUILDING NO 4-11 (GENERAL WAREHOUSE-5) [40]BUILDING NO 4-16 (CAR PARKING SHADE,2 BAYS) [41]BUILDING NO 4-16A (CAR PARKING SHADE,3 BAYS) [42] BUILDING NO 4-16B(CAR PARKING SHADE,4 BAYS) [43] BUILDING NO 4-16C (CAR PARKING SHADE,5 BAYS) [44] BUILDING NO 4-16D (CAR PARKING SHADE,6 BAYS) [45] BUILDING NO 4-16E (CAR PARKING SHADE,7 BAYS) [46] BUILDING NO 4-16F (CAR PARKING SHADE,14 BAYS) [47] BUILDING NO 4-16G (CAR PARKING SHADE,15 BAYS) [48] BUILDING NO 4-30 (MILITARY EQUIPMENT PARKING SHADE) [49] BUILDING NO 4-31(WHEELED VEHICLE PARKING SHADE.8.4M BAY) [50] BUILDING NO 4-35(VEHICLE LNSPECTION BUILDING) [51]BUILDING NO 4-36(SPARE PARTS WARE HOUSE) [52] BUILDING NO 4-37(O & M BUILDING) [53] BUILDING NO 4-40(CENTRAL POLE SHADE) [54] BUILDING NO 4-42 (MAINTANANCE SUPPORT WORK SHOP) [55] BUILDING NO 4-43 (TRUCK PARKING SHADE) [56] BUILDING NO 4-44 MAIN WARE HOUSE 7 11 8 3 1 1 52 1 8 2 2 9 13 1 1 1 1 1 1 1

0% 0% 0%
100%

0% 0% 0%
100%

0% 0% 0%
100%

0% 0% 0%
100%

0% 0% 0%
100%

0% 0% 0%
100%

0% 0% 0%

0% 0%
100%

100% 100% 100% 100%


0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

100% 100% 100% 100% 100% 100% Under review Under review Under review Under review 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 100% 100% 100%

PERCENT OF DRAWING APPROVED AREAWISE PERCENT OF DRAWING APPROVED OF WHOLE PROJECT

66.667% 13.501%

66.667% 13.501%

66.667% 13.501%

#VALUE! #VALUE!

66.667% 13.501%

66.667% 13.501%

133.333% 27.002%

0.000% 0.000%

AL-YAMAMA COMPANY
FOR TRADING & CONTRACTING P.O BOX 2110 DAMMAM - 31451 KSA

STATUS OF ARCHITECTURAL SHOP DRAWING (RCC DWGS.) SUBMITTAL FOR MODA PROJECT-2-6-124-DAMMAM AS ON DATE :

SUMMARY OF DRAWINGS : DESCRIPTIONS GENERAL DETAILS


[1] BUILDING NO 2-03-(COMPANY HEAD QUARTER) [2] BUILDING NO 5-17-(NCO DORMITORY BUILDING) [3] BUILDING NO 2-47 (BANQUET HALL) [4] BUILDING NO 2-48 (WATCH TOWER) [5]BUILDING NO 2-04 (HEAD QUARTER COMPANY) [6]BUILDING NO 2-05 (MP GUARD BUILDING) [7]BUILDING NO 4-12 (INFLAMMABLE WARE HOUSE) [8]BUILDING NO 2-28 (GATE HOUSE) [9]BUILDING NO 4-49 (GENERATOR BUILDING) [10]BUILDING NO 4-08 (CAR & EQUIPMENT WASH) [11]BUILDING NO 4-52(Irrigation water tank) [12]BUILDING NO 4-52A(Irrigation pump room) [13]BUILDING NO 2-02(BATALLION HEAD QUARTER) [14]BUILDING NO 3-19(MOSQUE 500 PERSONS) [15]BUILDING NO 2-32 (COMMUNICATION BUILDING)) [16]BUILDING NO 2-46 (police detention centre) [17] BUILDING NO LPG [18]BUILDING NO 3-07 (Brigade Training centre) 14 68 8 26 19 12 11 12 12 8 3 1 6 4 1 1 8 1 6 6 6 4 6 5 2 4 3 4 2 2 6 6 5 6 1 6 3 4 2 4 2 2 2 3 2 0 0 0 1 0 1 1 0 0 3 1 2 0 4 2 0 1 1 4 2 2 5 5 1 3 1 4 0 1 2 0 0 1 0 0 0 0 0 0 0 1 3 2 1 2 NO.OF BUILDING Total no of dwgs. Number of drawing Approved Number of drawing to be submit Number of drawing under review % Finished

50.00 67 33.33 100.00 33.33 40.00 100.00 75.00 66.67 0.00 0.00 0.00 16.67 0.00 20.00 16.67 0.00 0.00

[19]BUILDING NO 3-13 (Clinic) [20]BUILDING NO 3-18 (Laundary Building) [21]BUILDING NO 3-20 (Mosque 1800 npersons) [22]BUILDING NO2-01(BRIGADE HEAD QUARTER) [23]BUILDING NO 2-22A(COMPANY MESSHALL) [24]BUILDING NO 2-22(COMBINED MESSHALL) [25]BUILDING NO 4-34(VEHICLE AND EQUIPMENT WASH) [26]BUILDING NO 4-50(SWITCHGEAR ROOM) [27]BUILDING NO 4-51(ELEVATED WATER TANK) [28]BUILDING NO 4-51A(TRANSFER PUMP HOUSE) [29]BUILDING NO 4-53(PORTABLE WATER STORAGE) [30]BUILDING NO 4-54(WATER TREATMENT PLANT) [31]BUILDING NO 4-55(SEWAGE TREATMENT PLANT) [32]BUILDING NO B-52(SITE WORKS) [33]BUILDING NO G13-G18 [34] BUILDING NO LS2-LS11 [35] BUILDING NO SS1-SS48 Total no. of RCC drawings :

1 2 1 1 4 6 2 1 1 1 1 1 1 1 6 7 43 295

6 6 6 6 6 6 4 1 1 2

4 3 0 0 0 0 0 0 0 0

2 2 6 6 4 4 4 1 1 1

0 1 0 0 2 0 0 0 0 1

66.67 50.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

124 100

34 27.42

72 58.06

17 13.71 41.13

% Percentage

PRE ENGINEERED BUILDING


[36]BUILDING NO 4-09 (MAINTAINANCE WORK SHOP) [37] BUILDING NO 4-11 (GENERAL WAREHOUSE-5) [38]BUILDING NO 4-12 (INFLAMMABLE WAREHOUSE) [39]BUILDING NO 4-16 (CAR PARKING SHADE,2 BAYS) [40]BUILDING NO 4-16A (CAR PARKING SHADE,3 BAYS) [41] BUILDING NO 4-16B(CAR PARKING SHADE,4 BAYS) [42] BUILDING NO 4-16C (CAR PARKING SHADE,5 BAYS) [43] BUILDING NO 4-16D (CAR PARKING SHADE,6 BAYS) [44] BUILDING NO 4-16E (CAR PARKING SHADE,7 BAYS) [45] BUILDING NO 4-16F (CAR PARKING SHADE,14 BAYS) [46] BUILDING NO 4-16G (CAR PARKING SHADE,15 BAYS) [47] BUILDING NO 4-30 (MILITARY EQUIPMENT PARKING SHADE) [48] BUILDING NO 4-31(WHEELED VEHICLE PARKING SHADE.8.4M BAY) [49] BUILDING NO 4-35(VEHICLE LNSPECTION BUILDING) [50]BUILDING NO 4-36(SPARE PARTS WARE HOUSE) [51] BUILDING NO 4-37(O & M BUILDING) [52]BUILDING NO 4-38(FIRE STATION) [53] BUILDING NO 4-39(CENTRAL POL OFFICE) 11 8 11 3 1 1 52 1 8 2 2 9 13 1 1 1 1 1

[54] BUILDING NO 4-40(CENTRAL POLE SHADE) [55] BUILDING NO 4-42 (MAINTANANCE SUPPORT WORK SHOP) [56] BUILDING NO 4-43 (TRUCK PARKING SHADE) [57] BUILDING NO 4-44 MAIN WARE HOUSE Total no. of PE drawings :

1 1 1 1 131

Total no. of drawings :

426

AMAMA COMPANY

MMAM - 31451 KSA

2.419 3.226 1.613 3.226 1.613 1.613 1.613 2.419 1.613 0.000 0.000 0.000 0.806 0.000 0.806 0.806 0.000 0.000

3.226 2.419 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
27.419

STATUS OF ARCHITECTURAL DESIGN AND SHOP DRAWING FOR

BUILDING NAME

Total Numbers of bldgs


14 68 26 12 11 12 12 8 1 6 1 2 1 1 2 8 19

% of dwg approved of AREA01

% of dwg approved of AREA02

[A] RCC BUILDINGS


[1] BUILDING NO 2-03-(COMPANY HEAD QUARTER) [2] BUILDING NO 5-17-(NCO DORMITORY BUILDING) [3] BUILDING NO 2-48 (WATCH TOWER) [4]BUILDING NO 2-05 (MP GUARD BUILDING) [5]BUILDING NO 4-12 (INFLAMMABLE WARE HOUSE) [6]BUILDING NO 2-28 (GATE HOUSE) [7]BUILDING NO 4-49 (GENERATOR BUILDING) [8]BUILDING NO 4-08 (CAR & EQUIPMENT WASH) [9]BUILDING NO 4-52A(Irrigation pump room) [10]BUILDING NO 2-02(BATALLION HEAD QUARTER) [11]BUILDING NO 3-13 (Clinic) [12]BUILDING NO 3-18 (Laundary Building) [13]BUILDING NO 2-27(GUARD HOUSE) [14]BUILDING NO 4-51A(TRANSFER PUMP HOUSE) [15]BUILDING NO 4-34(VEHICLE AND EQUIPMENT WASH) [16] BUILDING NO 2-47 (BANQUET HALL) [17]BUILDING NO 2-04 (HEAD QUARTER COMPANY) 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

100%

0%

0% 0%

[18]BUILDING NO 3-19(MOSQUE 500 PERSONS) [19]BUILDING NO 2-32 (COMMUNICATION BUILDING) [20]BUILDING NO 2-46 (police detention centre) [21]BUILDING NO 3-07 (Brigade Training centre) [22]BUILDING NO 3-20 (Mosque 1800 npersons) [23]BUILDING NO2-01(BRIGADE HEAD QUARTER) [24]BUILDING NO 2-22A(COMPANY MESSHALL) [25]BUILDING NO 2-22(COMBINED MESSHALL) [26]BUILDING NO 4-51(ELEVATED WATER TANK) [27]BUILDING NO 4-53(PORTABLE WATER STORAGE) [28]BUILDING NO 4-52(Irrigation water tank) [29] BUILDING NO LPG [30]BUILDING NO 4-38(FIRE STATION) [31]BUILDING NO 4-50(SWITCHGEAR ROOM) [32]BUILDING NO 4-54(WATER TREATMENT PLANT) [33]BUILDING NO 4-55(SEWAGE TREATMENT PLANT) [34]BUILDING NO G13-G18 [35] BUILDING NO LS2-LS11 [36] BUILDING NO SS1-SS48 (SUB STATION PADS) PERCENT OF DRAWING APPROVED AREAWISE PERCENT OF DRAWING APPROVED OF WHOLE PROJECT

4 1 1 1 1 1 4 6 1 1 3 8 1 1 1 1 6 7 48 0% 0% 0% 53.333% 13.046% 0% 0% 0%

0%

0%

0%

0% 0% 56.250% 13.760%

[A] PRE ENGINEERING BUILDINGS


[37]BUILDING NO 3-06 (CLASS ROOM BUILDING) 7 4 0

[38]BUILDING NO 4-09 (MAINTAINANCE WORK SHOP) [39] BUILDING NO 4-11 (GENERAL WAREHOUSE-5) [40]BUILDING NO 4-16 (CAR PARKING SHADE,2 BAYS) [41]BUILDING NO 4-16A (CAR PARKING SHADE,3 BAYS) [42] BUILDING NO 4-16B(CAR PARKING SHADE,4 BAYS) [43] BUILDING NO 4-16C (CAR PARKING SHADE,5 BAYS) [44] BUILDING NO 4-16D (CAR PARKING SHADE,6 BAYS) [45] BUILDING NO 4-16E (CAR PARKING SHADE,7 BAYS) [46] BUILDING NO 4-16F (CAR PARKING SHADE,14 BAYS) [47] BUILDING NO 4-16G (CAR PARKING SHADE,15 BAYS) [48] BUILDING NO 4-30 (MILITARY EQUIPMENT PARKING SHADE) [49] BUILDING NO 4-31(WHEELED VEHICLE PARKING SHADE.8.4M BAY) [50] BUILDING NO 4-35(VEHICLE LNSPECTION BUILDING) [51]BUILDING NO 4-36(SPARE PARTS WARE HOUSE) [52] BUILDING NO 4-37(O & M BUILDING) [53] BUILDING NO 4-40(CENTRAL POLE SHADE) [54] BUILDING NO 4-42 (MAINTANANCE SUPPORT WORK SHOP) [55] BUILDING NO 4-43 (TRUCK PARKING SHADE) [56] BUILDING NO 4-44 MAIN WARE HOUSE

11 8 3 1 1 52 1 8 2 2 9 13 1 1 1 1 1 1 1

4 4 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0

% of dwg approved of AREA01


PERCENT OF DRAWING APPROVED OF WHOLE PROJECT 13.046%

% of dwg approved of AREA02


13.760%

8.154%

14.390%

13.590%

12.951%

GN AND SHOP DRAWING FOR MODA PROJECT-2-6-124-DAMMAM ON DATE : 16-04-2011 % of dwg approved of AREA03 % of dwg approved of AREA04 % of dwg approved of AREA05 % of dwg approved of AREA06 % of dwg approved of AREA07 % of dwg approved of other AREA

% of Dwg. approved

100% 100% 100% 100% 100% 100% 100% 100%

100% 100% 100% 100% 100% 100% 100% 100%

100% 100% 100% 100% 100% 100% 100% 100%

100% 100% 100% 100% 100% 100% 100% 100%

100% 100% 100% 100% 100% 100% 100% 100% 100%

100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100%

100% 100% 100% 100%

100%

100%

100%

100%

100% 100% 100% 100% 100%

100% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0%

0% 0% 0% 0% 0% 0% 0% 0% 0%

0%

0%

0% 0% 0% 0% 0% 0% 0%

0%

0%

0%

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

0% 0% 0% 0% 0%

0% 0% 0%

0%

0% 0% 0% 56.250% 13.760% 0% 0% 42.308% 10.349%

0% 0% 0% 52.941% 12.951%

0% 0% 0% 55.556% 13.590%

0%

0% 58.824% 14.390% 33.333% 8.154%

0%

4 4 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0

1 4 0 0 0 1 1 8 2 2 4 2 0 0 0 0 0 0 0

0 0 0 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0

4 4 0 0 0 1 0 0 0 0 5 2 0 0 0 0 0 0 0

0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0

4 4 0 0 0 1 0 0 0 0 0 9 1 1 0 0 1 0 0

% of dwg approved of AREA03


13.760%

% of dwg approved of AREA04


10.349%

% of dwg approved of AREA05


12.951%

% of dwg approved of AREA06


13.590%

% of dwg approved of AREA07


14.390%

% of dwg approved of other AREA


8.154%

8.154% 13.046%

% of dwg approved of AREA01 % of dwg approved of AREA02 % of dwg approved of AREA03 % of dwg approved of AREA04 % of dwg approved of AREA05 % of dwg approved of AREA06

13.760%

13.760% 12.951% 10.349%

AL-YAMAMA COMPANY
FOR TRADING & CONTRACTING P.O BOX 2110 DAMMAM - 31451 KSA

Status

100.000%

0%

0 0 0 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 0

4 4 1 1 1 1 0 0 0 0 0 0 0 0 1 1 0 1 1

0 0 0 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0 0

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0%

[29] BUILDING NO LPG [34]BUILDING NO G13-G18 [35] BUILDING NO LS2-LS11 [36] BUILDING NO SS1-SS48 (SUB STATION PADS)

8 6 7 48

1 1 1 1 25

0 0 0 0 17

[A] PRE ENGINEERING BUILDINGS (A.Y.C SCOPE) [37]BUILDING NO 3-06 (CLASS ROOM BUILDING) [38]BUILDING NO 4-09 (MAINTAINANCE WORK SHOP) [39] BUILDING NO 4-11 (GENERAL WAREHOUSE-5) [40]BUILDING NO 4-16 (CAR PARKING SHADE,2 BAYS) [41]BUILDING NO 4-16A (CAR PARKING SHADE,3 BAYS) [42] BUILDING NO 4-16B(CAR PARKING SHADE,4 BAYS) 7 11 8 3 1 1 1

1 -

[29] BUILDING NO LPG [35] BUILDING NO LS2-LS11 [36] BUILDING NO SS1-SS48 (SUB STATION PADS)

8 7 48

[A] PRE ENGINEERING BUILDINGS (A.Y.C SCOPE) [37]BUILDING NO 3-06 (CLASS ROOM BUILDING) [38]BUILDING NO 4-09 (MAINTAINANCE WORK SHOP) [39] BUILDING NO 4-11 (GENERAL WAREHOUSE-5) 7 11 8

[29] BUILDING NO LPG [35] BUILDING NO LS2-LS11 [36] BUILDING NO SS1-SS48 (SUB STATION PADS)

8 7 48

[A] PRE ENGINEERING BUILDINGS (A.Y.C SCOPE) [37]BUILDING NO 3-06 (CLASS ROOM BUILDING) [38]BUILDING NO 4-09 (MAINTAINANCE WORK SHOP) [39] BUILDING NO 4-11 (GENERAL WAREHOUSE-5) [40]BUILDING NO 4-16 (CAR PARKING SHADE,2 BAYS) 7 11 8 3

PERCENTAGE OF R.C.C BUILDING DRAWINGS APPROVED FOR AREA 04


1.2

1 1

0.8

0.6

0.4

0.2

0 14

[29] BUILDING NO LPG [34]BUILDING NO G13-G18 [35] BUILDING NO LS2-LS11 [36] BUILDING NO SS1-SS48 (SUB STATION PADS)

8 6 7 48

[A] PRE ENGINEERING BUILDINGS (A.Y.C SCOPE) [37]BUILDING NO 3-06 (CLASS ROOM BUILDING) [38]BUILDING NO 4-09 (MAINTAINANCE WORK SHOP) [39] BUILDING NO 4-11 (GENERAL WAREHOUSE-5) [40]BUILDING NO 4-16 (CAR PARKING SHADE,2 BAYS) [41]BUILDING NO 4-16A (CAR PARKING SHADE,3 BAYS) 7 11 8 3 1

[34]BUILDING NO G13-G18 [35] BUILDING NO LS2-LS11 [36] BUILDING NO SS1-SS48 (SUB STATION PADS)

6 7 48

[A] PRE ENGINEERING BUILDINGS (A.Y.C SCOPE) [37]BUILDING NO 3-06 (CLASS ROOM BUILDING) [38]BUILDING NO 4-09 (MAINTAINANCE WORK SHOP) [39] BUILDING NO 4-11 (GENERAL WAREHOUSE-5) [40]BUILDING NO 4-16 (CAR PARKING SHADE,2 BAYS) [41]BUILDING NO 4-16A (CAR PARKING SHADE,3 BAYS) [42] BUILDING NO 4-16B(CAR PARKING SHADE,4 BAYS) [43] BUILDING NO 4-16C (CAR PARKING SHADE,5 BAYS) [44] BUILDING NO 4-16D (CAR PARKING SHADE,6 BAYS) [45] BUILDING NO 4-16E (CAR PARKING SHADE,7 BAYS) [46] BUILDING NO 4-16F (CAR PARKING SHADE,14 BAYS) [47] BUILDING NO 4-16G (CAR PARKING SHADE,15 BAYS) 7 11 8 3 1 1 52 1 8 2 2

[34]BUILDING NO G13-G18 [35] BUILDING NO LS2-LS11 [36] BUILDING NO SS1-SS48 (SUB STATION PADS)

6 7 48

[A] PRE ENGINEERING BUILDINGS (A.Y.C SCOPE) [37]BUILDING NO 3-06 (CLASS ROOM BUILDING) [38]BUILDING NO 4-09 (MAINTAINANCE WORK SHOP) [39] BUILDING NO 4-11 (GENERAL WAREHOUSE-5) [40]BUILDING NO 4-16 (CAR PARKING SHADE,2 BAYS) [41]BUILDING NO 4-16A (CAR PARKING SHADE,3 BAYS) [42] BUILDING NO 4-16B(CAR PARKING SHADE,4 BAYS) [43] BUILDING NO 4-16C (CAR PARKING SHADE,5 BAYS) [44] BUILDING NO 4-16D (CAR PARKING SHADE,6 BAYS) [45] BUILDING NO 4-16E (CAR PARKING SHADE,7 BAYS) 7 11 8 3 1 1 52 1 8

AL-YAMAMA COMPANY
FOR TRADING & CONTRACTING P.O BOX 2110 DAMMAM - 31451 KSA

STATUS OF STRUCTURAL DESIGN AND SHOP DRAWING FOR MODA PROJECT-2-6-124TOTAL DRAWI Total TOTAL NG Numbe BUILDING NAME DRAWING FOR AAPVD rs of AREA04 FOR bldgs AREA 04

Status

[A] RCC BUILDINGS


[1] BUILDING NO 2-03-(COMPANY HEAD QUARTER) [2] BUILDING NO 5-17-(NCO DORMITORY BUILDING) [3] BUILDING NO 2-48 (WATCH TOWER) [4]BUILDING NO 2-05 (MP GUARD BUILDING) [5]BUILDING NO 4-12 (INFLAMMABLE WARE HOUSE) [6]BUILDING NO 2-28 (GATE HOUSE) [7]BUILDING NO 4-49 (GENERATOR BUILDING) 14 2
2

68

26

12

11

12

12

[8]BUILDING NO 4-08 (CAR & EQUIPMENT WASH) [11]BUILDING NO 3-13 (Clinic) [12]BUILDING NO 3-18 (Laundary Building) [13]BUILDING NO 2-27(GUARD HOUSE)

[16] BUILDING NO 2-478(BANQUET HALL) 3 [17]BUILDING NO 2-04 (HEAD 19 2 QUARTER COMPANY) [19]BUILDING NO 2-32 1 2 (COMMUNICATI ON BUILDING) [20]BUILDING NO 2-46 (police detention centre) [21]BUILDING NO 3-07 (Brigade Training centre) [22]BUILDING NO 3-20 (Mosque 1800 npersons) [23]BUILDING NO2-01(BRIGADE HEAD QUARTER) 1 2

[24]BUILDING NO 2-22A(COMPANY MESSHALL) [26]BUILDING NO 4-51(ELEVATED WATER TANK) [28]BUILDING NO 4-52(Irrigation water tank) [29] BUILDING NO LPG [31]BUILDING NO 450(SWITCHGEAR ROOM) [34]BUILDING NO G13-G18 [35] BUILDING NO LS2-LS11 [36] BUILDING NO SS1-SS48 (SUB STATION PADS)

6 7

1 1

0 0

48

1
0

53 [A] PRE ENGINEERING BUILDINGS (A.Y.C SCOPE) [37]BUILDING NO 3-06 (CLASS 7 1 ROOM BUILDING) [38]BUILDING NO 4-09 11 1 (MAINTAINANCE WORK SHOP) [39] BUILDING NO 4-11 8 (GENERAL 1 WAREHOUSE-5) [40]BUILDING NO 4-16 (CAR 3 PARKING SHADE,2 BAYS)

25

[41]BUILDING NO 4-16A (CAR PARKING SHADE,3 BAYS) [42] BUILDING NO 4-16B(CAR PARKING SHADE,4 BAYS) [43] BUILDING NO 4-16C (CAR PARKING SHADE,5 BAYS) [44] BUILDING NO 4-16D (CAR PARKING SHADE,6 BAYS) [45] BUILDING NO 4-16E (CAR PARKING SHADE,7 BAYS) [46] BUILDING NO 4-16F (CAR PARKING SHADE,14 BAYS) [47] BUILDING NO 4-16G (CAR PARKING SHADE,15 BAYS) [48] BUILDING NO 4-30 (MILITARY EQUIPMENT PARKING SHADE) [49] BUILDING NO 431(WHEELED VEHICLE PARKING SHADE.8.4M BAY)

52

10

9 4

13

[50] BUILDING NO 4-35(VEHICLE LNSPECTION BUILDING) [51]BUILDING NO 4-36(SPARE PARTS WARE HOUSE) [52] BUILDING NO 4-37(O & M BUILDING) [53] BUILDING NO 440(CENTRAL POLE SHADE) [54] BUILDING NO 4-42 (MAINTANANCE SUPPORT WORK SHOP) [55] BUILDING NO 4-43 (TRUCK PARKING SHADE) [56] BUILDING NO 4-44 MAIN WARE HOUSE

1 1 1 1 -

1 -

1 1 -

R.C.C STRUCTURES DRAWING STATUS BY AREA (STRUCTURAL)


AREA 7
30

20

68%

AREA 6

34 19

AREA 5

31 19

A R E A N U M B E R

AREA 4

55 30

TOTAL NO. OF SHOP DRAWINGS TO BE SUBMITTED


AREA 3
30

TOTAL NO. SHOP DRAWINGS APPROVED

19

AREA 2

30 19

AREA 1

25
17

0 TOTAL NO. OF SHOP DRAWINGS TO BE SUBMITTED


TOTAL NO. SHOP DRAWINGS APPROVED

10 AREA 1 25
17

20 AREA 2 30
19

30 AREA 4 55
30

40 AREA 5 31
19

50 AREA 6 34
19

60 AREA 7 30
20

AREA 3 30
19

NUMBER OF DRAWINGS

AREA AREA 1 AREA 2 AREA 3 AREA 4 AREA 5 AREA 6 AREA 7

PERCENTAGE 68.00% 63.33% 63.33% 54.55% 61.30% 55.90% 66.67%

34 32
AREA 1 AREA 2 AREA 3 AREA 4 AREA 5 AREA 6 AREA 7

39 32 50 30 30 53 32 35 37

39 32 22 18 18 25 18 18 19

59 32
44.00% 60.00% 60.00% 47.17% 56.25% 51.43% 51.35%

40 32

44 32

37 32

total appvd Area

AREA 7

19

AREA 6

18

AREA 5

32 18

AREA 4

25

AREA 3

30 18

AREA 2

30 18

AREA 1

22

10

20

30

TOTAL NO. OF SHOP DRAWINGS TO BE SUBMITTED TOTAL NO. SHOP DRAWINGS APPROVED PERCENTAGE FINISHED

37

35

32

53

TOTAL NO. SHOP DRAWINGS APPROVED TOTAL NO. OF SHOP DRAWINGS TO BE SUBMITTED

50

50

40

50

60

DRAWINGS TO BE SUBMITTED WINGS APPROVED

GS TO BE SUBMITTED

34 32
AREA 1 AREA 2 AREA 3 AREA 4 AREA 5 AREA 6 AREA 7

39 32 25 30 30 55 31 34 30

39 32 17 18 18 29 18 18 19

59 32
68.00% 60.00% 60.00% 52.73% 58.06% 52.94% 63.33%

40 32

44 32

37 32

total appvd Area

R.C.C STRUCTURES DRAWING STATUS B

19 AREA 7

18 AREA 6

18

A R E A N U M B

AREA 5

AREA 4

B E R

18 AREA 3

18 AREA 2

17 AREA 1 25

10

20

NUMBER OF DRAWINGS

TOTAL NO. OF SHOP DRAWINGS TO BE SUBM TOTAL NO. SHOP DRAWINGS APPROVED PERCENTAGE FINISHED

DRAWING STATUS BY AREA (STRUCTURAL)

30

34

31

29 55

TOTAL NO. SHOP DRAWINGS APPROVED TOTAL NO. OF SHOP DRAWINGS TO BE SUBMITTED

30

30

30

40

50

60

MBER OF DRAWINGS

OP DRAWINGS TO BE SUBMITTED DRAWINGS APPROVED

DRAWINGS APPROVED

OP DRAWINGS TO BE SUBMITTED