N
E LC PA L PE M E T
FOR INFORMATION
Keyplan:
N
THIS DRAWING
VICTORIA EMBANKMENT
CH. 6 0 . 0 1 3 00
MAPPING REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND DATABASE RIGHT 2011. ALL RIGHTS RESERVED ORDNANCE SURVEY LICENCE
0 .0 1 2 00 CH. 6
CH. 6 1 4 00 0 .0
NUMBER 100019345
.0 00 6 0 1 1 CH.
THIS IS A WORKING DRAFT PLAN WHICH HAS BEEN PRODUCED FOR THE PURPOSE OF PHASE TWO CONSULTATION ON THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWINGS IS ILLUSTRATIVE OF WHAT WILL BE REQUIRED FOR THE PURPOSE OF CONSTRUCTING AND OPERATING THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWING MAY CHANGE AS A RESULT OF THAMES WATERS CONSIDERATION OF THE RESPONSES RECEIVED TO PHASE TWO CONSULTATION AND ANY FURTHER DESIGN DEVELOPMENT THAT IS CARRIED OUT.
CH
. 6 1 5 0 . 00 0
.0 00 6 0 1 0 CH.
MA T 1 0 1 - CHL N IE DA : R - E D G N0 0 G. o N . 0 0 00 -0 0 0 5 6
.0 00 5 0 1 9 CH.
COORDINATES ARE TO ORDNANCE SURVEY DATUM OSGB36. ALL LEVELS ARE IN METRES AND RELATE TO THE TUNNEL DATUM WHICH IS 100 METRES BELOW ORDNANCE DATUM NEWLYN.
KEY:
DRAFT HORIZONTAL TUNNEL LIMIT OF DEVIATION (LOD) - (NOTE 1) DRAFT LIMIT OF LAND TO BE ACQUIRED OR USED (LLAU) - (NOTE 2)
120.0m BLACKFRIARS BRIDGE FORESHORE DROP SHAFT 110.0m MEAN HIGH WATER SPRINGS 100.0m NOTES:
1. VERTICAL LIMIT OF DEVIATION HAS NOT YET BEEN DEFINED AND IS NOT SHOWN.
PROPOSED SHAFT
PROPOSED TUNNEL
BLACKFRIARS BRIDGE
PLAN
SCALE 1:1000
2. DRAFT LLAU SHOWS LAND TO BE ACQUIRED AND USED AT CONSTRUCTION SITES, BUT NOT THE SUBSOIL ALONG THE TUNNEL.
90.0m
EL EVATI ON
60.0m
10 m 0 100 m 1 0 5 0 5 0
Scale:
50.0m
The Point, 7th Floor, 37 North Wharf Road, Paddington, London W2 1AF
20.0m
L 314.0m R 600.0m L 174.3m L 80.0m R 600.0m L 107.3m
Project Name:
THAMES TUNNEL
Purpose:
HORIZONTAL GEOMETRY
VERTICAL GEOMETRY
5 .8 18 1 5 .3 18 1 5 .4 17 2 5 .9 18 4 5 .8 17 0 5 .6 17 7 5 .6 18 9 5 .4 18 3 5 .1 18 8 5 .9 17 3 5 .5 18 6 5 .0 18 5 5 .5 17 5
1 9 0 5 0
1 9 0 5 1
1 9 0 5 2
1 9 0 5 3
1 9 0 5 4
1 9 0 5 5
1 9 0 5 6
1 9 0 5 7
1 9 0 5 8
1 9 0 5 9
1 0 0 6 0
1 0 0 6 1
1 0 0 6 2
1 0 0 6 3
1 0 0 6 4
1 0 0 6 5
1 0 0 6 6
1 0 0 6 7
1 0 0 6 8
1 0 0 6 9
1 1 0 6 0
1 1 0 6 1
1 1 0 6 2
1 1 0 6 3
1 1 0 6 4
1 1 0 6 5
1 1 0 6 6
1 1 0 6 7
1 1 0 6 8
1 1 0 6 9
1 2 0 6 0
1 2 0 6 1
1 2 0 6 2
1 2 0 6 3
1 2 0 6 4
1 2 0 6 5
1 2 0 6 6
1 2 0 6 7
1 2 0 6 8
1 2 0 6 9
1 3 0 6 0
1 3 0 6 1
1 3 0 6 2
1 3 0 6 3
1 3 0 6 4
1 3 0 6 5
1 3 0 6 6
1 3 0 6 7
1 3 0 6 8
1 3 0 6 9
1 4 0 6 0
1 4 0 6 1
1 4 0 6 2
1 4 0 6 3
1 4 0 6 4
1 4 0 6 5
1 4 0 6 6
1 4 0 6 7
1 4 0 6 8
1 4 0 6 9
1 5 0 6 0
1 5 0 6 1
1 5 0 6 2
1 5 0 6 3
1 5 0 6 4
PROFILE
110-DA-GEN-00000-000505
c Thames Water Utilities Ltd 2008
1:2000@ A3 1:1000@ A1
1 0 0
30.0m
2 0 m 0 m
BED OF RIVER
N
Status:
FOR INFORMATION
Keyplan:
N
THIS DRAWING
M ATCHL NE I : RG . D No . 1 0 DA- EN 1 G -0 0 -0 5 0 0 00 0 0 7
S IR RA C F A K L B O IN TT SA
R E P P U
S ME A H T
T E E R T S
MAPPING REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND DATABASE RIGHT 2011. ALL RIGHTS RESERVED ORDNANCE SURVEY LICENCE NUMBER 100019345
THIS IS A WORKING DRAFT PLAN WHICH HAS BEEN PRODUCED FOR THE PURPOSE OF PHASE TWO CONSULTATION ON THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWINGS IS ILLUSTRATIVE OF WHAT WILL BE REQUIRED FOR THE PURPOSE OF CONSTRUCTING AND OPERATING THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWING MAY CHANGE AS A RESULT OF THAMES WATERS CONSIDERATION OF THE RESPONSES RECEIVED TO PHASE TWO CONSULTATION AND ANY FURTHER DESIGN DEVELOPMENT THAT IS CARRIED OUT.
MILLENIUM BRIDGE
1 8 00 CH. 6 0 . 0
CH. 6 0 . 1 9 00 0
COORDINATES ARE TO ORDNANCE SURVEY DATUM OSGB36. ALL LEVELS ARE IN METRES AND RELATE TO THE TUNNEL DATUM WHICH IS 100 METRES BELOW ORDNANCE DATUM NEWLYN.
CH. 7 0 . 1 2 00 0
.0 00 6 0 1 7 CH.
CH. 7 0 . 1 0 00 0
CH. 7 0 . 1 1 00 0
KEY:
DRAFT HORIZONTAL TUNNEL LIMIT OF DEVIATION (LOD) - (NOTE 1) DRAFT LIMIT OF LAND TO BE ACQUIRED OR USED (LLAU) - (NOTE 2)
0 0 6 0 . 1 6 0 CH.
PROPOSED SHAFT
PROPOSED TUNNEL
BLACKFRIARS BRIDGE
PLAN
SCALE 1:1000
BLACKFRIARS BRIDGE
2. DRAFT LLAU SHOWS LAND TO BE ACQUIRED AND USED AT CONSTRUCTION SITES, BUT NOT THE SUBSOIL ALONG THE TUNNEL.
EL EVATI ON
80.0m
70.0m
60.0m
10 m 0 100 m 1 0 5 0 5 0
Scale:
50.0m UKPN BANKSI DE CABL TUNNEL E BL ACKFRI ARS TO ST PAUL GPO S TUNNEL
40.0m M ATCHL NE I
The Point, 7th Floor, 37 North Wharf Road, Paddington, London W2 1AF
20.0m
L 54.6m R 600.0m L 164.3m L 419.4m
Project Name:
THAMES TUNNEL
Purpose:
HORIZONTAL GEOMETRY
R -600.0m L 113.1m
VERTICAL GEOMETRY
5 .8 09 1 5 .3 09 1 5 .9 07 1 5 .4 07 1 5 .3 10 2 5 .4 08 2 5 .9 09 4 5 .0 08 4 5 .7 10 0 5 .5 10 7 5 .0 10 7 5 .8 08 0 5 .6 08 7 5 .1 08 7 5 .8 10 3 5 .1 10 9 5 .6 09 9 5 .4 09 3 5 .1 09 8 5 .9 08 3 5 .2 08 9 5 .7 07 9 5 .5 07 3 5 .2 07 8 5 .5 09 6 5 .6 07 6 5 .4 10 5 5 .0 09 5 5 .5 08 5 5 .1 07 5
1 5 0 6 4
1 5 0 6 5
1 5 0 6 6
1 5 0 6 7
1 5 0 6 8
1 5 0 6 9
1 6 0 6 0
1 6 0 6 1
1 6 0 6 2
1 6 0 6 3
1 6 0 6 4
1 6 0 6 5
1 6 0 6 6
1 6 0 6 7
1 6 0 6 8
1 6 0 6 9
1 7 0 6 0
1 7 0 6 1
1 7 0 6 2
1 7 0 6 3
1 7 0 6 4
1 7 0 6 5
1 7 0 6 6
1 7 0 6 7
1 7 0 6 8
1 7 0 6 9
1 8 0 6 0
1 8 0 6 1
1 8 0 6 2
1 8 0 6 3
1 8 0 6 4
1 8 0 6 5
1 8 0 6 6
1 8 0 6 7
1 8 0 6 8
1 8 0 6 9
1 9 0 6 0
1 9 0 6 1
1 9 0 6 2
1 9 0 6 3
1 9 0 6 4
1 9 0 6 5
1 9 0 6 6
1 9 0 6 7
1 9 0 6 8
1 9 0 6 9
1 0 0 7 0
1 0 0 7 1
1 0 0 7 2
1 0 0 7 3
1 0 0 7 4
1 0 0 7 5
1 0 0 7 6
1 0 0 7 7
1 0 0 7 8
1 0 0 7 9
1 1 0 7 0
1 1 0 7 1
1 1 0 7 2
1 1 0 7 3
1 1 0 7 4
1 1 0 7 5
1 1 0 7 6
1 1 0 7 7
1 1 0 7 8
PROFILE
110-DA-GEN-00000-000506
c Thames Water Utilities Ltd 2008
1:2000@ A3 1:1000@ A1
1 0 0
30.0m
2 0 m 0 m
BED OF RIVER
032 85.
022 85.
Status:
FOR INFORMATION
0 3 85. 1
03 85. 1
Keyplan:
01 85. 9
079 85.
THIS DRAWING
9 84. 83
21 84. 3
0 8 84. 1
0 84 . 76
389 84.
83. 2 97
83. 47 9
CH. 7 0 . 1 2 00 0
84 . 1 7 1
597 84.
874 84.
1 8 00 CH. 7 0 . 0
CH. 1 4 0 7 0 . 0 0
1 7 00 CH. 7 0 . 0
1 6 00 CH. 7 0 . 0
CH. 7 0 . 0 1 5 00
MAPPING REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND DATABASE RIGHT 2011. ALL RIGHTS RESERVED ORDNANCE SURVEY LICENCE
92 83. 0
NUMBER 100019345
84. 359
FOR THE PURPOSE OF PHASE TWO CONSULTATION ON THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWINGS IS ILLUSTRATIVE OF WHAT WILL BE REQUIRED FOR
84 . 20 2
2 84. 90
THE PURPOSE OF CONSTRUCTING AND OPERATING THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWING MAY CHANGE AS A RESULT OF THAMES WATERS CONSIDERATION OF THE RESPONSES RECEIVED TO PHASE TWO CONSULTATION AND ANY FURTHER DESIGN DEVELOPMENT THAT IS CARRIED OUT.
SOUTHWARK BRIDGE
84 . 8 07
84. 29 1
84 . 55 1
COORDINATES ARE TO ORDNANCE SURVEY DATUM OSGB36. ALL LEVELS ARE IN METRES AND RELATE TO THE TUNNEL DATUM WHICH IS 100 METRES BELOW ORDNANCE DATUM NEWLYN.
83. 3 9
83 . 97
84. 003
KEY:
DRAFT HORIZONTAL TUNNEL LIMIT OF DEVIATION (LOD) - (NOTE 1) DRAFT LIMIT OF LAND TO BE ACQUIRED OR USED (LLAU) - (NOTE 2)
. 421
83. 43 4
83 . 46 1
83 . 466
83. 481
83
. 48 0
83 . 88 1
83 . 304
83 . 37
83 . 407
C IKS R E L N T E T
83 . 31 2
90.0m
O L BE NEW G K W AL
PROPOSED SHAFT
83. 45
83 . 43 9
83
83
. 43 6
PROPOSED TUNNEL
PLAN
SCALE 1:1000
SOUTHWARK BRIDGE
2. DRAFT LLAU SHOWS LAND TO BE ACQUIRED AND USED AT CONSTRUCTION SITES, BUT NOT THE SUBSOIL ALONG THE TUNNEL.
EL EVATI ON
70.0m
60.0m
1 0 5 0 5 0
Scale:
40.0m M ATCHL NE I
The Point, 7th Floor, 37 North Wharf Road, Paddington, London W2 1AF
20.0m
R 600.0m L 49.5m L 118.7m L 471.7m
Project Name:
THAMES TUNNEL
R -600.0m L 120.3m
Purpose:
HORIZONTAL GEOMETRY
VERTICAL GEOMETRY
5 .2 02 1 5 .3 00 1 5 .7 02 2 5 .3 01 2 5 .8 00 2 4 .4 99 2 5 .3 02 4 5 .9 00 4 4 .0 99 4 5 .7 01 0 5 .2 01 0 5 .0 01 7 4 .8 99 0 4 .6 99 7 4 .1 99 7 5 .5 02 9 5 .0 02 8 5 .8 01 3 5 .5 01 8 5 .6 00 9 5 .4 00 3 5 .1 00 8 4 .9 99 3 4 .2 99 9 5 .4 02 6 5 .9 01 6 5 .5 00 6 5 .4 01 5 5 .0 00 5 4 .5 99 5
1 1 0 7 8
1 1 0 7 9
1 2 0 7 0
1 2 0 7 1
1 2 0 7 2
1 2 0 7 3
1 2 0 7 4
1 2 0 7 5
1 2 0 7 6
1 2 0 7 7
1 2 0 7 8
1 2 0 7 9
1 3 0 7 0
1 3 0 7 1
1 3 0 7 2
1 3 0 7 3
1 3 0 7 4
1 3 0 7 5
1 3 0 7 6
1 3 0 7 7
1 3 0 7 8
1 3 0 7 9
1 4 0 7 0
1 4 0 7 1
1 4 0 7 2
1 4 0 7 3
1 4 0 7 4
1 4 0 7 5
1 4 0 7 6
1 4 0 7 7
1 4 0 7 8
1 4 0 7 9
1 5 0 7 0
1 5 0 7 1
1 5 0 7 2
1 5 0 7 3
1 5 0 7 4
1 5 0 7 5
1 5 0 7 6
1 5 0 7 7
1 5 0 7 8
1 5 0 7 9
1 6 0 7 0
1 6 0 7 1
1 6 0 7 2
1 6 0 7 3
1 6 0 7 4
1 6 0 7 5
1 6 0 7 6
1 6 0 7 7
1 6 0 7 8
1 6 0 7 9
1 7 0 7 0
1 7 0 7 1
1 7 0 7 2
1 7 0 7 3
1 7 0 7 4
1 7 0 7 5
1 7 0 7 6
1 7 0 7 7
1 7 0 7 8
1 7 0 7 9
1 8 0 7 0
1 8 0 7 1
1 8 0 7 2
PROFILE
110-DA-GEN-00000-000507
c Thames Water Utilities Ltd 2008
1:2000@ A3 1:1000@ A1
1 0 0
30.0m
N
Status:
FOR INFORMATION
CH. 8 0 . 0 1 1 00
Keyplan:
N
1 0 00 CH. 8 0 . 0
CH. 8 1 2 00 0 .0
1 9 00 CH. 7 0 . 0
THIS DRAWING
83. 47 9
84. 59 3
92 83. 0
8 3. 972
3 84. 02
83 . 6 4 6
83
. 461
83 . 42
83
. 43
83 . 43 6
83
. 45 8
83 . 43
83 . 30 4
83. 374
83. 407
L AN E
HA YS
EL EVATI ON
80.0m
70.0m
60.0m
10 m 0 100 m 1 0 5 0 5 0
Scale:
40.0m M ATCHL NE I
The Point, 7th Floor, 37 North Wharf Road, Paddington, London W2 1AF
20.0m
R 1000.0m L 183.7m
Project Name:
THAMES TUNNEL
Purpose:
HORIZONTAL GEOMETRY
VERTICAL GEOMETRY
4 .2 93 1 4 .3 91 1 4 .2 94 2 4 .7 93 2 4 .3 92 2 4 .8 91 2 4 .8 93 4 4 .3 93 4 4 .9 91 4 4 .4 91 4 4 .6 94 0 4 .1 94 0 4 .9 93 7 4 .7 92 0 4 .2 92 0 4 .0 92 7 4 .7 94 3 4 .4 94 8 4 .5 93 9 4 .0 93 8 4 .8 92 3 4 .5 92 8 4 .6 91 9 4 .1 91 8 4 .9 90 3 4 .4 93 6 4 .9 92 6 4 .5 91 6 4 .0 91 6 4 .3 94 5 4 .4 92 5
1 8 0 7 1
1 8 0 7 2
1 8 0 7 3
1 8 0 7 4
1 8 0 7 5
1 8 0 7 6
1 8 0 7 7
1 8 0 7 8
1 8 0 7 9
1 9 0 7 0
1 9 0 7 1
1 9 0 7 2
1 9 0 7 3
1 9 0 7 4
1 9 0 7 5
1 9 0 7 6
1 9 0 7 7
1 9 0 7 8
1 9 0 7 9
1 0 0 8 0
1 0 0 8 1
1 0 0 8 2
1 0 0 8 3
1 0 0 8 4
1 0 0 8 5
1 0 0 8 6
1 0 0 8 7
1 0 0 8 8
1 0 0 8 9
1 1 0 8 0
1 1 0 8 1
1 1 0 8 2
1 1 0 8 3
1 1 0 8 4
1 1 0 8 5
1 1 0 8 6
1 1 0 8 7
1 1 0 8 8
1 1 0 8 9
1 2 0 8 0
1 2 0 8 1
1 2 0 8 2
1 2 0 8 3
1 2 0 8 4
1 2 0 8 5
1 2 0 8 6
1 2 0 8 7
1 2 0 8 8
1 2 0 8 9
1 3 0 8 0
1 3 0 8 1
1 3 0 8 2
1 3 0 8 3
1 3 0 8 4
1 3 0 8 5
1 3 0 8 6
1 3 0 8 7
1 3 0 8 8
1 3 0 8 9
1 4 0 8 0
1 4 0 8 1
1 4 0 8 2
1 4 0 8 3
1 4 0 8 4
1 4 0 8 5
PROFILE
110-DA-GEN-00000-000508
c Thames Water Utilities Ltd 2008
1:2000@ A3 1:1000@ A1
1 0 0
30.0m
2 0 m 0 m
1 8 00 CH. 7 0 . 0
CH. 8 1 3 0 0 .0 0
2 3 84. 1
01 84. 8
076 84 .
CH. 8 1 4 0 0 .0 0
MAPPING REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND DATABASE RIGHT 2011. ALL RIGHTS RESERVED ORDNANCE SURVEY LICENCE NUMBER 100019345
THIS IS A WORKING DRAFT PLAN WHICH HAS BEEN PRODUCED FOR THE PURPOSE OF PHASE TWO CONSULTATION ON THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWINGS IS ILLUSTRATIVE OF WHAT WILL BE REQUIRED FOR THE PURPOSE OF CONSTRUCTING AND OPERATING THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWING MAY CHANGE AS A RESULT OF THAMES WATERS CONSIDERATION OF THE RESPONSES RECEIVED TO PHASE TWO CONSULTATION AND ANY FURTHER DESIGN DEVELOPMENT THAT IS CARRIED OUT.
COORDINATES ARE TO ORDNANCE SURVEY DATUM OSGB36. ALL LEVELS ARE IN METRES AND RELATE TO THE TUNNEL DATUM WHICH IS 100 METRES BELOW ORDNANCE DATUM NEWLYN.
KEY:
DRAFT HORIZONTAL TUNNEL LIMIT OF DEVIATION (LOD) - (NOTE 1) DRAFT LIMIT OF LAND TO BE ACQUIRED OR USED (LLAU) - (NOTE 2)
T EQ H U E E N SWA L K
PROPOSED SHAFT
PROPOSED TUNNEL
T O O LY E S T R E E T
PLAN
SCALE 1:1000
120.0m NOTES:
1. VERTICAL LIMIT OF DEVIATION HAS NOT YET BEEN DEFINED AND IS NOT SHOWN.
2. DRAFT LLAU SHOWS LAND TO BE ACQUIRED AND USED AT CONSTRUCTION SITES, BUT NOT THE SUBSOIL ALONG
100.0m
THE TUNNEL.
90.0m
BED OF RIVER
N
Status:
FOR INFORMATION
Keyplan:
N
THIS DRAWING
CH. 8 0 1 9 00 .0
.0 1 8 00 CH. 8 0
0 0 .0 1 7 0 CH. 8
C H. 1 0 9 0 00 .0
0 0 .0 1 6 0 CH. 8
MA 1 0 TCH 1 LN IE DA - E : G N- DRG 0 0 . 0 0 No . 00 -0 0 1 5 0
0 0 .0 1 5 0 CH. 8
MAPPING REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO. ' CROWN COPYRIGHT AND DATABASE RIGHT 2011. ALL RIGHTS RESERVED ORDNANCE SURVEY LICENCE NUMBER 100019345
C H . 9 1 1 0 . 00 0
THIS IS A WORKING DRAFT PLAN WHICH HAS BEEN PRODUCED FOR THE PURPOSE OF PHASE TWO CONSULTATION ON THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWINGS IS ILLUSTRATIVE OF WHAT WILL BE REQUIRED FOR THE PURPOSE OF CONSTRUCTING AND OPERATING THE THAMES TUNNEL PROJECT. THE INFORMATION SHOWN ON THE DRAWING MAY CHANGE AS A RESULT OF THAMES WATERS CONSIDERATION OF THE RESPONSES RECEIVED TO PHASE TWO CONSULTATION AND ANY FURTHER DESIGN DEVELOPMENT THAT IS CARRIED OUT.
H D H M S S A T A E
STREET
CURL W E
120.0m NOTES: TOWER BRIDGE 110.0m MEAN HIGH WATER SPRINGS 100.0m
1. VERTICAL LIMIT OF DEVIATION HAS NOT YET BEEN DEFINED AND IS NOT SHOWN.
COORDINATES ARE TO ORDNANCE SURVEY DATUM OSGB36. ALL LEVELS ARE IN METRES AND RELATE TO THE TUNNEL DATUM WHICH IS 100 METRES BELOW ORDNANCE DATUM NEWLYN.
TOWER BRIDGE
KEY:
DRAFT HORIZONTAL TUNNEL LIMIT OF DEVIATION (LOD) - (NOTE 1) DRAFT LIMIT OF LAND TO BE ACQUIRED OR USED (LLAU) - (NOTE 2)
PROPOSED SHAFT
PROPOSED TUNNEL
PLAN
SCALE 1:1000
2. DRAFT LLAU SHOWS LAND TO BE ACQUIRED AND USED AT CONSTRUCTION SITES, BUT NOT THE SUBSOIL ALONG THE TUNNEL.
EL EVATI ON
80.0m
70.0m
60.0m
10 m 0 100 m 1 0 5 0 5 0
Scale:
50.0m
The Point, 7th Floor, 37 North Wharf Road, Paddington, London W2 1AF
20.0m
L 558.5m R 600.0m L 274.6m
Project Name:
THAMES TUNNEL
Purpose:
HORIZONTAL GEOMETRY
VERTICAL GEOMETRY
4 .1 86 1 4 .6 85 1 4 .2 84 1 4 .6 86 2 4 .7 84 2 4 .3 83 2 4 .2 86 4 4 .3 84 4 4 .9 82 4 4 .3 86 7 4 .1 85 0 4 .9 84 7 4 .4 84 7 4 .7 83 0 4 .2 83 0 4 .0 83 7 4 .4 86 9 4 .9 85 9 4 .7 85 3 4 .4 85 8 4 .2 85 3 4 .5 84 9 4 .0 84 8 4 .8 83 3 4 .5 83 8 4 .8 85 6 4 .9 83 6 4 .3 85 5 4 .8 84 5 4 .4 83 5
1 4 0 8 5
1 4 0 8 6
1 4 0 8 7
1 4 0 8 8
1 4 0 8 9
1 5 0 8 0
1 5 0 8 1
1 5 0 8 2
1 5 0 8 3
1 5 0 8 4
1 5 0 8 5
1 5 0 8 6
1 5 0 8 7
1 5 0 8 8
1 5 0 8 9
1 6 0 8 0
1 6 0 8 1
1 6 0 8 2
1 6 0 8 3
1 6 0 8 4
1 6 0 8 5
1 6 0 8 6
1 6 0 8 7
1 6 0 8 8
1 6 0 8 9
1 7 0 8 0
1 7 0 8 1
1 7 0 8 2
1 7 0 8 3
1 7 0 8 4
1 7 0 8 5
1 7 0 8 6
1 7 0 8 7
1 7 0 8 8
1 7 0 8 9
1 8 0 8 0
1 8 0 8 1
1 8 0 8 2
1 8 0 8 3
1 8 0 8 4
1 8 0 8 5
1 8 0 8 6
1 8 0 8 7
1 8 0 8 8
1 8 0 8 9
1 9 0 8 0
1 9 0 8 1
1 9 0 8 2
1 9 0 8 3
1 9 0 8 4
1 9 0 8 5
1 9 0 8 6
1 9 0 8 7
1 9 0 8 8
1 9 0 8 9
1 0 0 9 0
1 0 0 9 1
1 0 0 9 2
1 0 0 9 3
1 0 0 9 4
1 0 0 9 5
1 0 0 9 6
1 0 0 9 7
1 0 0 9 8
1 0 0 9 9
PROFILE
110-DA-GEN-00000-000509
c Thames Water Utilities Ltd 2008
1:2000@ A3 1:1000@ A1
1 0 0
30.0m
2 0 m 0 m
BED OF RIVER