1.Turn Electronic Governor Switch on. 2. Open casing drain valves 3. Check bearing oil levels 4.

Reset Over-speed Trip 5. Put bearing cooling water on 6. Crack exhaust (outlet steam header) and adjust drain valves accordingly 7. When warm crack inlet steam valve allowing turbine to run at 10rpm 8. Check bearing oil rings 9. Look for carbine seal run offs 10. When turbine is warm fully open inlet steam valve and allow governor to take control to 2200rpm 11. Use speed knob to raise speed to 3600rpm 12. Turn Field Excitation Switch on 13. Check incoming and grid voltages and match turbine generator excitation to grids voltage using the field excitation rheostat. 14. Use speed knob to reach 60hz 15. Turn on synchronization switch to the synchroscope 16. Adjust turbine speed to adjust the phase angle/frequency to a steady slow clockwise rotation on the synchroscope. 17. Close generator breaker at the 5min to 12'oclock position on the synchroscope. 18.Turn of the synchronization switch to the synchroscope. The turbine is now synchronized to the 60Hz power grid. Read more: http://wiki.answers.com/Q/Steps_of_synchronizing_steam_turbine_generator#ixzz 1CXAwsWyB

Anda mungkin juga menyukai