SWOJAS HARMONY SITE AT BHANDARKAR ROAD


[QUOTATION FOR RAILING MATERIAL] Date:21/03/2011
Sr. no 1 2 3 Particular

SR-03 (TOP MOUNTED) SR-ER-003 (TOP MOUNTED) SR-20 (TOP MOUNTED)

Qty 117RFT APP 117RFT APP 117RFT APP

Rate 1435/RFT 1300/RFT 1400/RFT

Amount 167895/15210 0/163800/-

Baluster height 22 16MM 2 CENTRE PIPE + TOP HANDRAIL 38MM Brand- $-RAIL Railing Type-Modular SS 304 grade material TOTAL

TERMS & CONDITIONS


Rate may vary from site to site depending upon site conditions. Installation time 20 to 25 days from order conformation date.

Exact measurement will be as per actual installation. Electricity or scaffolding if required shall be provided by the client. Any breakage of flooring while installation will not be bearded by us. Order once confirmed will not be cancelled.
If required 50mm handrail will charge extra Rs. 125/rft.

One balustrade calculated for per 3 rft, if required extra baluster will charge extra. Payment and Rates.
Payment of material 50% advance when order is confirmed, 40% at the

time of material delivery and 10% after installation.

sree

SWOJAS HARMONY SITE AT BHANDARKAR ROAD


[QUOTATION FOR RAILING MATERIAL] Date:21/03/2011 VAT 12.5% extra as applicable on bill amount.