RENCANA ANGGARAN BIAYA TOWER AIR DAN PAGAR

NO 1 I

U R A I A N 2

VOLUME 3 50.00 0.20 0.10 0.39 0.05 0.11 0.17 0.12 0.17 0.20 1.00 4.50 10.00 2.00

SAT. 4 Btg M M M M M M M M
3 3 3 3 3 3

HARGA SATUAN (Rp.) 5 4,500.00 61,874.40 319,698.04 3,500,000.00 6,000,000.00 4,500,000.00 6,000,000.00 4,500,000.00 3,200,000.00 3,500,000.00 400,000.00 20,000.00 16,000.00 32,000.00

JUMLAH (Rp.) 6 225,000.00 12,127.38 31,330.41 1,372,000.00 270,000.00 476,280.00 1,047,600.00 553,500.00 553,190.40 686,000.00 400,000.00 90,000.00 160,000.00 64,000.00 5,941,028.19

TOWER AIR TINGGI 2 M


1 Pancang Cerucuk dia 10cm - 200 cm 2 Urugan Pasir di bawah Pondasi t. 10 cm 3 Lantai Kerja Beton Tumbuk t. 5 cm camp 1:2:3 4 Pelat pondasi Beton Betulang camp 1:2:3 5 Kolom Pondasi uk. 15x15 cm T = 50cm Beton Bertulang camp 1:2:3 6 Sloof Pondasi uk. 10x15 cm Beton Bertulang camp 1:2:3 7 Kolom Tower uk. 15x15 cm T = 1.94 m Beton Bertulang camp 1:2:3 8 Balok Plat 1 & 2 uk 10x15 cm Beton Bertulang camp 1:2:3 9 Plat Lantai 1 tebal 8cm 10 Plat Lantai 2 tebal 10 cm 11 Tangga Plat besi siku 13 Plesteran 3 sisi dinding tower 14 Pipa PVC uk 1/2" 15 Pipa PVC uk 1.5" SUB TOTAL

M3
3 3

LS M2 btg btg

II

PEKERJAAN PAGAR
1 Batako 2 Plester 3 Balok Pagar uk 10x10 SUB TOTAL TOTAL 500.00 38.52 0.11 bh m2 M3 700.00 20,000.00 4,000,000.00 350,000.00 770,400.00 428,000.00 1,548,400.00 7,489,428.19

ANALISA SATUAN HARGA UPAH DAN BAHAN


1 m Pengukuran dan Pemasangan Bouwplank (P.Ps. 02) HARGA No. URAIAN PEKERJAAN SATUAN SATUAN ( Rp. )
1
A 1 2 3 4 B TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor
1

KUANTITAS
5

BIAYA SATUAN ( Rp. )


6
0.00 0.00 0.00 0.00

3
OH OH OH OH

4
0.00 0.00 0.00 0.00

0.100 0.100 0.010 0.005

Jumlah BAHAN 1 Kayu Pancang (Dolken) d = 6-8 cm, p = 4m 2 Paku 3 Papan Kayu Kelas III Jumlah Jumlah A + B Harga Satuan

0.00
Btg Kg M
3

78,000.00 24,375.00 2,482,593.75

1.000 0.020 0.007

78,000.00 487.50 17,378.16

95,865.66
95,865.66

C D

Acuan : ABK Bangunan Gedung dan Perumahan - 6.4

95,865.66

1m2 Membersihkan Lapangan dan Perataan (P.Ps. 03) No.


1
A TENAGA 1 Pekerja 2 Mandor Jumlah B BAHAN Jumlah C D Jumlah A + B Harga Satuan

URAIAN PEKERJAAN
2

SATUAN
3
OH OH

HARGA SATUAN ( Rp. )


4
0.00 0.00

KUANTITAS
5
0.100 0.050

BIAYA SATUAN ( Rp. )


6
0.00 0.00

0.00 0.00
0.00

Acuan : ABK Bangunan Gedung dan Perumahan - 6.8

0.00

1m2 Pembuatan Direksi Keet / Gudang Bahan Bangunan dan Alat / Bedeng Pekerja (P.Ps. 04) HARGA BIAYA No. URAIAN PEKERJAAN SATUAN KUANTITAS SATUAN SATUAN ( Rp. ) ( Rp. )
1
A 1 2 3 4 B 1 2 3 4 5 C D TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Kayu Pancang (Dolken) d = 10cm, p = 4m Kayu Kelas III Paku Seng Gelombang BJLS 0.20 Triplek 4mm Jumlah Jumlah A + B Harga Satuan

3
OH OH OH OH

4
59,062.00 54,468.75 78,750.00 94,500.00

5
2.000 1.000 0.200 0.050

6
118,124.00 54,468.75 15,750.00 4,725.00

193,067.75
Btg M Kg Lbr Lbr
3

78,000.00 2,507,700.00 24,375.00 53,700.00 53,800.00

1.250 0.186 0.300 1.500 1.3500

97,500.00 466,432.20 7,312.50 80,550.00 72,630.00

724,424.70
917,492.45

Acuan : ABK Bangunan Gedung dan Perumahan - 6.9

917,492.45

1m3 Galian Tanah Biasa sedalam 1 meter (P.T. 01) No.


1
A TENAGA 1 Pekerja 2 Mandor Jumlah B BAHAN Jumlah C D Jumlah A + B Harga Satuan

URAIAN PEKERJAAN
2

SATUAN
3
OH OH

HARGA SATUAN ( Rp. )


4
0.00 0.00

KUANTITAS
5
0.400 0.040

BIAYA SATUAN ( Rp. )


6
0.00 0.00

0.00 0.00
0.00

Acuan : ABK Bangunan Gedung dan Perumahan - 6.1

0.00

1m3 Urugan Kembali (P.T. 06) No.


1
A TENAGA 1 Pekerja 2 Mandor Jumlah B BAHAN Jumlah C D Jumlah A + B Harga Satuan

URAIAN PEKERJAAN
2

SATUAN
3
OH OH

HARGA SATUAN ( Rp. )


4
0.00 0.00

KUANTITAS
5
0.192 0.019

BIAYA SATUAN ( Rp. )


6
0.00 0.00

0.00 0.00
0.00

Acuan : ABK Bangunan Gedung dan Perumahan - 6.9

0.00

1m Urugan Pasir Alas (P.T. 11) No.


1
A TENAGA 1 Pekerja 2 Mandor Jumlah B BAHAN 1 Pasir Urug Jumlah C D Jumlah A + B Harga Satuan M
3

URAIAN PEKERJAAN
2

SATUAN
3
OH OH

HARGA SATUAN ( Rp. )


4
0.00 0.00

KUANTITAS
5
0.300 0.010

BIAYA SATUAN ( Rp. )


6
0.00 0.00

0.00
117,812.50 1.250 147,265.63

147,265.63
147,265.63

Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - W. 1

147,265.63

1m Pasang Pondasi Batu Belah 1Pc : 3Ps (P.PB. 01) No.


1
A 1 2 3 4 B TENAGA Pekerja Tukang Batu Kepala Tukang Mandor Jumlah BAHAN 1 Batu Belah 10-15 cm 2 Semen Portland 3 Pasir Jumlah C D Jumlah A + B Harga Satuan M Kg 3 M
3

URAIAN PEKERJAAN
2

SATUAN
3
OH OH OH OH

HARGA SATUAN ( Rp. )


4
54,468.75 59,062.00 78,750.00 94,500.00

KUANTITAS
5
1.500 0.600 0.060 0.075

BIAYA SATUAN ( Rp. )


6
81,703.13 35,437.20 4,725.00 7,087.50

128,952.83
349,375.00 2,437.50 117,812.50 1.100 202.000 0.485 384,312.50 492,375.00 57,139.06

933,826.56
1,062,779.39

Acuan : ABK Bangunan Gedung dan Perumahan - 6.4

1,062,779.39

1m3 Pasang Pondasi Batu Belah 1Pc : 4Ps (P.PB. 02) No.
1
A 1 2 3 4 B TENAGA Pekerja Tukang Batu Kepala Tukang Mandor Jumlah BAHAN 1 Batu Belah 10-15 cm 2 Semen Portland 3 Pasir Jumlah C D Jumlah A + B Harga Satuan M Kg M
3 3

URAIAN PEKERJAAN
2

SATUAN
3
OH OH OH OH

HARGA SATUAN ( Rp. )


4
54,468.75 59,062.00 78,750.00 94,500.00

KUANTITAS
5
1.500 0.600 0.060 0.075

BIAYA SATUAN ( Rp. )


6
81,703.13 35,437.20 4,725.00 7,087.50

128,952.83
349,375.00 2,437.50 117,812.50 1.100 163.000 0.520 384,312.50 397,312.50 61,262.50

842,887.50
971,840.33

Acuan : ABK Bangunan Gedung dan Perumahan - 6.5

971,840.33

1m3 Membuat Beton Tumbuk 1Pc : 3Ps : 5Kr (P.BB. 01) HARGA No. URAIAN PEKERJAAN SATUAN SATUAN ( Rp. )
1
A 1 2 3 4 B TENAGA Pekerja Tukang Batu Kepala Tukang Mandor Jumlah BAHAN 1 Semen Portland 2 Pasir 3 Batu Belah 0,5 - 1 (Kerikil) Jumlah C D Jumlah A + B Harga Satuan Kg M M
3 3

KUANTITAS
5
1.650 0.250 0.025 0.080

BIAYA SATUAN ( Rp. )


6
89,873.44 14,765.50 1,968.75 7,560.00

3
OH OH OH OH

4
54,468.75 59,062.00 78,750.00 94,500.00

114,167.69
2,437.50 117,812.50 1,137,500.00 218.000 0.520 0.870 531,375.00 61,262.50 989,625.00

1,582,262.50
1,696,430.19

Acuan : ABK Bangunan Gedung dan Perumahan - 6.1

1,696,430.19

1m3 Pekerjaan Beton Bertulang, camp. 1 PC : 2 Ps : 3 Kr (P.BB. 02) HARGA No. URAIAN PEKERJAAN SATUAN KUANTITAS SATUAN ( Rp. )
1
A 1 2 3 4 B TENAGA Pekerja Tukang Besi Kepala Tukang Mandor

BIAYA SATUAN ( Rp. )


6
108,937.50 20,671.70 2,756.25 94,500.00

3
OH OH OH OH

4
54,468.75 59,062.00 78,750.00 94,500.00

5
2.000 0.350 0.035 1.000

Jumlah BAHAN 1 Semen Portland 2 Pasir 3 Batu Belah 0,5 - 1 (Kerikil) Jumlah C Jumlah A + B D Harga Satuan

226,865.45
Kg M 3 M
3

2,437.50 117,812.50 1,137,500.00

336.000 0.540 0.810

819,000.00 63,618.75 921,375.00

1,803,993.75
2,030,859.20

Acuan : ABK Bangunan Gedung dan Perumahan - 6.13

2,030,859.20

1Kg Pembesian dengan Besi Polos atau Ulir (P.BB. 03) No.
1
A 1 2 3 4 B TENAGA Pekerja Tukang Besi Kepala Tukang Mandor

URAIAN PEKERJAAN
2

SATUAN
3
OH OH OH OH

HARGA SATUAN ( Rp. )


4
54,468.75 59,062.00 78,750.00 94,500.00

KUANTITAS
5
0.007 0.007 0.0007 0.0003

BIAYA SATUAN ( Rp. )


6
381.28 413.43 55.13 28.35

Jumlah BAHAN 1 Besi Beton (polos/ulir) 2 Kawat Ikat Beton (bendrat) Jumlah C Jumlah A + B D Harga Satuan

878.19
Kg Kg 21,125.00 23,400.00 1.050 0.015 22,181.25 351.00

22,532.25
23,410.44

Acuan : ABK Bangunan Gedung dan Perumahan - 6.25


2

23,410.44

1m Pasang Bekesting untuk Pondasi (P.BB. 04) No.


1
A 1 2 3 4 B TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor

URAIAN PEKERJAAN
2

SATUAN
3
OH OH OH OH

HARGA SATUAN ( Rp. )


4
54,468.75 59,062.00 78,750.00 94,500.00

KUANTITAS
5
0.300 0.260 0.026 0.005

BIAYA SATUAN ( Rp. )


6
16,340.63 15,356.12 2,047.50 472.50

Jumlah BAHAN 1 Papan Mal (Kayu Kelas III) 2 Paku 2" - 5" 3 Minyak Bekesting Jumlah C Jumlah A + B D Harga Satuan

34,216.75
M Kg Lt
3

2,482,593.75 24,375.00 17,296.50

0.040 0.300 0.100

99,303.75 7,312.50 1,729.65

108,345.90
142,562.65

Acuan : ABK Bangunan Gedung dan Perumahan - 6.28

142,562.65

1m2 Pasang Bekesting untuk Sloof (P.BB. 05) No.


1
A 1 2 3 4 B TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor

URAIAN PEKERJAAN
2

SATUAN
3
OH OH OH OH

HARGA SATUAN ( Rp. )


4
54,468.75 59,062.00 78,750.00 94,500.00

KUANTITAS
5
0.300 0.260 0.026 0.005

BIAYA SATUAN ( Rp. )


6
16,340.63 15,356.12 2,047.50 472.50

Jumlah BAHAN 1 Papan Mal (Kayu Kelas III) 2 Paku 2" - 5" 3 Minyak Bekesting Jumlah C Jumlah A + B D Harga Satuan

34,216.75
M3 Kg Lt 2,482,593.75 24,375.00 17,296.50 0.045 0.300 0.100 111,716.72 7,312.50 1,729.65

120,758.87
154,975.61

Acuan : ABK Bangunan Gedung dan Perumahan - 6.29

154,975.61

1m2 Pasang Bekesting untuk Kolom (P.BB. 06.a) No.


1
A 1 2 3 4 B 1 2 3 4 C D TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor Jumlah BAHAN Paku 2" - 5" Minyak Bekesting Papan Mal Cerucuk 6 - 8cm / 4m Jumlah Jumlah A + B Harga Satuan

URAIAN PEKERJAAN
2

SATUAN
3
OH OH OH OH

HARGA SATUAN ( Rp. )


4
54,468.75 59,062.00 78,750.00 94,500.00

KUANTITAS
5
0.300 0.330 0.033 0.006

BIAYA SATUAN ( Rp. )


6
16,340.63 19,490.46 2,598.75 567.00

38,996.84
Kg Lt M3 Btg 24,375.00 17,296.50 2,482,593.75 16,900.00 0.200 0.200 0.040 2.000 4,875.00 3,459.30 99,303.75 33,800.00

141,438.05
180,434.89

Acuan : ABK Bangunan Gedung dan Perumahan - 6.30

180,434.89

1m2 Pasang Bekesting untuk Balok (P.BB. 07.a) No.


1
A 1 2 3 4 B 1 2 3 4 5 C D TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor Jumlah BAHAN Paku 2" - 5" Minyak Bekesting Balok Kayu Kelas III Papan Mal Cerucuk 6 - 8cm / 4m Jumlah Jumlah A + B Harga Satuan

URAIAN PEKERJAAN
2

SATUAN
3
OH OH OH OH

HARGA SATUAN ( Rp. )


4
54,468.75 59,062.00 78,750.00 94,500.00

KUANTITAS
5
0.320 0.330 0.033 0.006

BIAYA SATUAN ( Rp. )


6
17,430.00 19,490.46 2,598.75 567.00

40,086.21
Kg Lt M3 M3 Btg 24,375.00 17,296.50 2,507,700.00 2,482,593.75 16,900.00 0.200 0.200 0.018 0.040 2.000 4,875.00 3,459.30 45,138.60 99,303.75 33,800.00

186,576.65
226,662.86

Acuan : ABK Bangunan Gedung dan Perumahan - 6.31

226,662.86

1m Pasang Bekesting untuk Lantai (P.BB. 08.a) No.


1
A 1 2 3 4 B 1 2 3 4 5 C D TENAGA Pekerja Tukang Kayu Kepala Tukang Mandor Jumlah BAHAN Paku 2" - 5" Minyak Bekesting Balok Kayu Kelas III uk. 4/6 Papan Mal Cerucuk 6 - 8cm / 4m Jumlah Jumlah A + B Harga Satuan

URAIAN PEKERJAAN
2

SATUAN
3
OH OH OH OH

HARGA SATUAN ( Rp. )


4
54,468.75 59,062.00 78,750.00 94,500.00

KUANTITAS
5
0.320 0.330 0.033 0.006

BIAYA SATUAN ( Rp. )


6
17,430.00 19,490.46 2,598.75 567.00

40,086.21
Kg Lt M3 M3 Btg 24,375.00 17,296.50 2,507,700.00 2,482,593.75 16,900.00 0.400 0.200 0.015 0.040 6.000 9,750.00 3,459.30 37,615.50 99,303.75 101,400.00

251,528.55
291,614.76

Acuan : ABK Bangunan Gedung dan Perumahan - 6.32

291,614.76

1m2 Pasang Batako uk. 15/30/7(P.Dnd. 01) No.


1
A 1 2 3 4 B TENAGA Pekerja Tukang Batu Kepala Tukang Mandor

URAIAN PEKERJAAN
2

SATUAN
3
OH OH OH OH

HARGA SATUAN ( Rp. )


4
54,468.75 59,062.00 78,750.00 94,500.00

KUANTITAS
5
0.32 0.10 0.01 0.015

BIAYA SATUAN ( Rp. )


6
17,430.00 5,906.20 787.50 1,417.50

Jumlah BAHAN 1 Batako 15/30/7 (cetak mesin) 2 Semen Portland 3 Pasir Beton / Pasang Jumlah C Jumlah A + B D Harga Satuan

25,541.20
Bh Kg 3 M 1,950.00 2,437.50 117,812.50 22.000 7.500 0.027 42,900.00 18,281.25 3,180.94

64,362.19
89,903.39

Acuan : ABK Bangunan Gedung dan Perumahan - 6.20

89,903.39

1m2 Plasteran 1Pc : 3Ps tebal 1,5cm (P.Pls. 02) No.


1
A 1 2 3 4 B TENAGA Pekerja Tukang Batu Kepala Tukang Mandor Jumlah BAHAN 1 Semen Portland 2 Pasir Jumlah C D Jumlah A + B Harga Satuan Kg M3

URAIAN PEKERJAAN
2

SATUAN
3
OH OH OH OH

HARGA SATUAN ( Rp. )


4
54,468.75 59,062.00 78,750.00 94,500.00

KUANTITAS
5
0.200 0.150 0.015 0.010

BIAYA SATUAN ( Rp. )


6
10,893.75 8,859.30 1,181.25 945.00

21,879.30
2,437.50 117,812.50 6.480 0.019 15,795.00 2,238.44

18,033.44
39,912.74

Acuan : ABK Bangunan Gedung dan Perumahan - 6.3

39,912.74

1m2 Pasang Lantai Keramik 20 x 20cm (P.LD. 01) No.


1
A TENAGA 1 Pekerja 2 Tukang Batu 3 Kepala Tukang 4 Mandor Jumlah B BAHAN 1 Ubin Keramik 20 x 20cm Polos 2 Semen Portland 3 Pasir Pasang C D Jumlah A + B Harga Satuan Bh Kg M
3

URAIAN PEKERJAAN
2

SATUAN
3
OH OH OH OH

HARGA SATUAN ( Rp. )


4
54,468.75 59,062.00 78,750.00 94,500.00

KUANTITAS
5
0.620 0.350 0.035 0.030

BIAYA SATUAN ( Rp. )


6
33,770.63 20,671.70 2,756.25 2,835.00

60,033.58
1,960.00 2,437.50 117,812.50 25.000 11.380 0.042 49,000.00 27,738.75 4,948.13

81,686.88
141,720.45

141,720.45

Acuan : ABK Bangunan Gedung dan Perumahan - 6.44

1m2 Pasang Lantai Keramik 30 x 30cm Polos (P.LD. 02) HARGA No. URAIAN PEKERJAAN SATUAN SATUAN ( Rp. )
1
A 1 2 3 4 B TENAGA Pekerja Tukang Batu Kepala Tukang Mandor

KUANTITAS
5
0.260 0.125 0.0125 0.013

BIAYA SATUAN ( Rp. )


6
14,161.88 7,382.75 984.38 1,228.50

3
OH OH OH OH

4
54,468.75 59,062.00 78,750.00 94,500.00

Jumlah BAHAN 1 Ubin Keramik 30 x 30cm Polos 2 Semen Portland 3 Pasir Pasang Jumlah A + B Harga Satuan

23,757.50
Bh Kg M
3

6,594.44 2,437.50 117,812.50

11.870 10.000 0.0215

78,276.00 24,375.00 2,532.97

105,183.97
C D 128,941.47

Acuan : ABK Bangunan Gedung dan Perumahan - 6.2

128,941.47

1m Pasang Dinding Keramik 20 x 20cm (P.LD. 12) No.


1
A 1 2 3 4 B 1 2 3 4 C D TENAGA Pekerja Tukang Batu Kepala Tukang Mandor Jumlah BAHAN Keramik 20 x 20 cm Semen Pasir Pasang Semen Pengisi Nat Keramik Jumlah A + B Harga Satuan

URAIAN PEKERJAAN
2

SATUAN
3
OH OH OH OH

HARGA SATUAN ( Rp. )


4
54,468.75 59,062.00 78,750.00 94,500.00

KUANTITAS
5
0.600 0.450 0.045 0.030

BIAYA SATUAN ( Rp. )


6
32,681.25 26,577.90 3,543.75 2,835.00

65,637.90
Bh Kg M3 Kg 2,100.00 2,437.50 117,812.50 1,700.00 25.000 9.300 0.018 0.200 52,500.00 22,668.75 2,120.63 340.00

77,629.38
143,267.28

Acuan : ABK Bangunan Gedung dan Perumahan - 6.63


2

143,267.28

1m Pengecatan Bidang Kayu Baru (1Lapis Plamir, 1Lapis Cat Dasar, 2Lapis Cat Penutup) (P.Ct. 04) HARGA BIAYA No. URAIAN PEKERJAAN SATUAN KUANTITAS SATUAN SATUAN ( Rp. ) ( Rp. )
1
A 1 2 3 4 B 1 2 3 4 C D TENAGA Pekerja Tukang Cat Kepala Tukang Mandor Jumlah BAHAN Cat Meni Plamur (dempul kayu) Cat Dasar Kayu Cat Kilat Penutup 2 Kali Jumlah A + B Harga Satuan

3
OH OH OH OH

4
54,468.75 59,062.00 78,750.00 94,500.00

5
0.070 0.009 0.006 0.0025

6
3,812.81 531.56 472.50 236.25

5,053.12
Kg Kg Kg Kg 37,900.00 19,987.50 54,437.50 46,312.50 0.200 0.150 0.170 0.260 7,580.00 2,998.13 9,254.38 12,041.25

31,873.75
36,926.87

Acuan : ABK Bangunan Gedung dan Perumahan - 6.8

36,926.87

1m2 Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup) Dengan Cat Mutu Baik. (P.Ct. 11) HARGA BIAYA No. URAIAN PEKERJAAN SATUAN KUANTITAS SATUAN SATUAN ( Rp. ) ( Rp. )
1
A 1 2 3 4 B TENAGA Pekerja Tukang Cat Kepala Tukang Mandor

3
OH OH OH OH

4
54,468.75 59,062.00 78,750.00 94,500.00

5
0.020 0.063 0.0063 0.0025

6
1,089.38 3,720.91 496.13 236.25

Jumlah BAHAN 1 Plamur (dempul tembok) 2 Cat Dasar tembok 3 Cat Tembok Penutup 2 x Jumlah A + B Harga Satuan

5,542.66
Kg Kg Kg 19,987.50 54,437.50 113,750.00 0.100 0.120 0.260 1,998.75 6,532.50 29,575.00

38,106.25
C D 43,648.91

Acuan : ABK Bangunan Gedung dan Perumahan - 6.14

43,648.91

RENCANA ANGGARAN BIAYA


Satuan Kerja Nama Kegiatan Lokasi Tahun Anggaran : Dinas Kehewanan dan Peternakan Provinsi Kalimantan Barat : Pembangunan Jalan Lingkungan Rabat Beton Camp 1: 2 : 3 : Pontianak : 2010
84.50 m

No

Uraian Pekerjaan

Volume Nilai Sat

Harga Satuan ( Rp )

Jumlah Harga ( Rp ) 7,500,000.00 8,100,647.95

I Pekerjaan Persiapan 1 Mobilisasi/demobilisasi 1 Pembersihan Lokasi 2 Pengukuran II Pekerjaan struktur 1 Galian tanah/perataan 2 Pasir urug tebal 20 cm 3 Cerucuk dia 10 - 400 cm 3 Cor beton 1: 2 : 3 Tebal 20 cm 4 penulangan Jumlah 1 m' Dibulatkan 81.12 54.08 1,190.00 50.70 37.44 m3 m3 batang m3 kg 61,874.40 7,500.00 319,698.04 14,430.00 3,346,167.55 8,925,000.00 16,208,690.55 540,259.20 1.00 380.25 84.50 Lsm m2 m' 7,500,000.00 95,865.66

Satuan Kerja Nama Kegiatan Lokasi Tahun Anggaran

: Dinas Kehewanan dan Peternakan Provinsi Kalimantan Barat : Pembuatan Turap Batu Pecah : Pontianak : 2010
106.50 m' Harga Satuan ( Rp ) Jumlah Harga ( Rp ) 7,298,977.50

No

Uraian Pekerjaan

Volume Nilai Sat

I Pekerjaan Persiapan 1 Pembersihan Lokasi 2 Pengukuran/Pasang Patok II Pekerjaan Turap 1 Galian tanah 2 Urugan Tanah kembali 2 Cerucuk dia 10 -400 cm 3 Urugan pasir 20 cm 4 Lantai kerja tebal 5 cm camp. 1:3:5 5 Turap pas. Batu pecah camp. 1:3 6 Plesteran dinding turap camp 1 :3, tbl 1,5 cm Jumlah 1 m' Dibulatkan 79.875 18.638 112.000 39.937 7.988 101.175 95.850 m3 m3 btg m3 m3 m3 m2 7,500.00 61,874.40 1,203.33 230,716.67 1,203.33 840,000.00 2,471,077.91 9,611.62 23,342,758.59 115,339.49 123.000 106.500 m2 m' 68,535.00

CANA ANGGARAN BIAYA

Sub Total ( Rp )

15,600,647.95

29,020,117.30 44,620,765.25 1,482,000.00 1,482,000.00

Sub Total ( Rp )

7,298,977.50

26,778,787.62 34,077,765.12 1,010,000.00 1,010,000.00

DAFTAR HARGA MATERIAL BANGUNAN

NO. 1 I. 1 2 3 4 4 5 6 7 8 9 10 11 II. 1 2 III. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 IV. 1 2 V. 1 2 VI. 1 2 3 4 5 VII. 1 2 3

JENIS BAHAN / MATERIAL 2 BAHAN PASIR, BATU & TANAH Pasir Urug Pasir Pasang Pasir Beton Kerikil Sungai Royalti Batu Belah ukuran 10 - 15 cm Batu pecah ukuran 7 - 10 cm Batu pecah ukuran 5 - 7 cm Batu pecah ukuran 3 - 5 cm Batu pecah ukuran 2 - 3 cm Batu pecah ukuran 1 - 2 cm Batu pecah ukuran 0,5 - 1 cm Batako Cetak ukuran 7 x 15 x 30 cm BAHAN SEMEN, KAPUR, ASPAL Semen PC Semen Warna / Oker BAHAN KAYU Kayu belian Tidak Ketam Kayu belian Ketam Kayu Klas I (tidak Ketam) Kayu Klas I (Ketam) Kayu Klas II ketam Kayu Klas II tidak ketam Papan Kayu Klas I Papan Kayu Klas I (Ketam) Papan Kayu Klas II Papan Bekisting/Mal Kayu Klas III Kayu Cerucuk (Dolken) diameter 6 p = 4.00 m Kayu Cerucuk (Dolken) diameter 12 p = 4.00 m Kayu Cerucuk (Dolken) diameter 10 p = 4.00 m Kayu Kelas III Balok Kayu Klas III List Kayu Profil List Pintu/Jendela BAHAN LANTAI & UBIN Keramik Porselin uk. 20 x 20 polos Keramik Porselin uk. 30 x 30 polos BAHAN LANGIT-LANGIT Gypsum Board t = 9 mm GRC Board BAHAN ATAP Atap Metal Uk. uk. 1.32 x 0.42 M2, t = 0.35 mm Nok Genteng Metal Warna Polos uk. 1.00 x 0.91 M2, t = 0.35 mm Seng Datar BJLS 0,20 Seng Datar BJLS 0,30 Seng Gelombang BJLS 0,30 BAHAN KACA Kaca Bening 3 mm Kaca Bening 5 mm Kaca Rayban 5 mm

SATUAN 3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 Buah 50 Kg/Zak Kg M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 Batang Batang Batang m3 M3 M1 M1 Kotak Kotak M2 M2 Lembar Lembar Lembar Lembar lembar M2 M2 M2

HARGA SATUAN DGN JASA & PAJAK (Rp.) 4 51,562.00 63,333.33 150,000.00 200,000.00 266,666.67 291,666.67 350,000.00 400,000.00 367,647.06 2,000.00

7,400,000.00 7,650,000.00 4,100,000.00 4,500,000.00 3,625,000.00 3,750,000.00 4,900,000.00 3,525,000.00 1,200,000.00 5,000.00 70,000.00 7,500.00

50,000.00 50,000.00

85,000.00 52,000.00 80,000.00 750,000.00 85,000.00 120,000.00 145,000.00

NO. 1 VIII. 1 2 3 4 5 6 7 8 9 10 IX. 1 2 3 4 5 6 7 X. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 XI. 1 2 3 XII. 1 2 XIII. 1 2 3 4 5 XIII. 1 2 3 4

JENIS BAHAN / MATERIAL 2 BAHAN CAT Amplas Kayu/Besi/Tembok D e m p u l 4kg Cat Dasar Tembok Meni Besi Cat Kilat P l a m u r 4 kg Pelitur Cat Tembok Minyak Cat Teer/Residu BAHAN BESI, ALUMINIUM & KAWAT Besi Beton Polos Besi Beton Ulir Kawat Ikat Beton Baja Konstruksi Kawat Las Kawat Simpai Besi Plat t = 1.00 mm L = 2 cm (Besi Strip) BAHAN PENGGANTUNG, KUNCI & PEREKAT Paku campuran Paku Atap Seng/Paku Payung Paku Gypsum Paku Tripleks Baut Kunci KM / WC Kunci Pintu Biasa 2 Slaag Kunci Selot Jendela Engsel 3" Engsel 4" Kait Angin Pegangan Pintu/Jendela (Handle) Lem Kayu / Tripleks Seal Tape BAHAN SANITAIR Kloset Jongkok Merk Setara TOTO Kran Air Merk Setara San- Ei Floor Drain Merk Setara SES BAHAN SANITAIR Pipa PVC Type AW dia. 3/4" Pipa PVC Type AW dia. 1" BAHAN ELEKTRIKAL ( Electrical, Cables, Lamps ) Fitting Duduk Brocco Lampu SL Merk ( Philips ) 20 Watt Saklar Tunggal inbow Merk Broco Saklar Double Inbow Merk Broco Stop Kontak Inbow Merk Broco BAHAN BAKAR Minyak Tanah Bensin Premium Minyak Pelumas Minuak diesel/solar SPBU

SATUAN 3 Lembar Kg Kg Kaleng Kg Kg Kg Kg Liter Liter Kg Kg Kg Kg Btg Kg lembar Kg Kg Kg Kg Bh Buah Buah Buah Buah Buah Buah Buah Kg Buah Buah Buah Buah M' M' Buah Buah Buah Buah Buah Ltr Ltr Ltr Ltr

HARGA SATUAN DGN JASA & PAJAK (Rp.) 4 25,000.00 50,000.00 30,000.00 18,000.00 25,000.00 27,000.00 33,000.00 30,000.00 20,000.00 10,000.00 12,000.00 13,500.00 17,000.00 5,500.00 18,000.00 1,500,000.00 18,000.00 18,500.00 17,000.00 35,000.00

DAFTAR HARGA UPAH NO. I 1 2 3 4 5 JENIS UPAH KERJA 2 Pekerja Mandor Kepala Tukang Tukang Tukang Kepala SATUAN 3 Org / Hari Org / Hari Org / Hari Org / Hari Org / Hari CV KARYA ENDAH LESTARI HARGA SATUAN DGN JASA & PAJAK (Rp.) 4 -

H TEGUH BUDHIRAHARDJO DIREKTUR

RENCANA ANGGARAN BIAYA (RAB)

NO 1 I PEKERJAAN PERSIAPAN 1 Pembersihan Lokasi

U R A I A N 2

VOLUME 3 702.00 89.60

SAT. 4 M
2

KODE ANALISA 5 Ls PSi.02

HARGA SATUAN (Rp.) 6 8,040.00 68,535.00

JUMLAH (Rp.) 7 5,644,080.00 6,140,736.00 11,784,816.00

2 Pengukuran & Pemasangan Bouwplank SUB TOTAL II PEKERJAAN PONDASI 1 Galian Tanah Pondasi 2 Pancang Cerucuk dia 10cm - 200 cm 3 Urugan Pasir di bawah Pondasi t. 10 cm 4 Lantai Kerja Beton Tumbuk t. 5 cm K 175 5 Pelat pondasi Beton Betulang K225 6 Kolom Pondasi uk. 25x25 cm Beton Bertulang K225 7 Sloof Pondasi uk. 15x50 cm Beton Bertulang K225 8 Urugan Kembali Tanah Galian SUB TOTAL III PEKERJAAN STRUKTUR BETON BERTULANG K225 1 Balok Induk 15/40 Beton 2 Balok Anak 15/30 Beton 3 Listplank uk. 10x80 cm 4 Kolom LT. 1 uk. 25x25 cm 5 Kolom LT. 2 uk. 25x25 cm 6 Pelat Lantai 1, t =10 cm 7 Pelat Lantai 2, t = 10 cm 8 Kolom Praktis 9 Ring Balok uk. 15/25 10 Tangga Beton - Tangga N/T - Tangga Teras Depan SUB TOTAL IV PEKERJAAN RANGKA KUDA-KUDA DAN ATAP 1 Kuda-kuda Kayu Klas II 2 Gording, Nok + Ikatan Angin Kayu Klas II 3 Rangka Atap Kayu Klas II 4 Atap Genteng Metal 5 Perabung Atap Metal 0.30 6 Jurai 7 Listplank Kayu Klas I 8 Beugel 9 Baut 10 Tebing Layar (GRC) SUB TOTAL V PEKERJAAN LANTAI DAN DINDING 1 Urugan Pasir di Bawah Lantai 2 Dinding Batako Pres Mesin 2 Plesteran Dinding, Kolom & Balok 3 Plesteran Tangga camp. 1:3 4 Keramik Lantai uk. 30 x 30 cm Lt. 01 5 Keramik Lantai uk. 30 x 30 cm Lt. 02 6 Keramik Tangga uk. 30 x 30 cm

M'

114.44 384.00 6.94 1.73 6.39 2.55 16.13 96.84

M M M

PT.01 PK.48 PT.08 PBe.02 G.Sub.A G.Sub.G G.Sub.C PT.05

70,000.00 61,874.40 352,786.27 3,962,334.04 6,780,258.04 4,896,654.94 -

26,880,000.00 429,408.34 610,320.25 25,319,314.51 17,289,658.00 78,983,044.16 149,511,745.25

Btg
3

M3
3

M3 M3 M3

11.94 9.21 1.97 6.00 5.25 43.38 37.68 0.38 5.25 7.51 1.75

M3 M3 M M
3 3

G.Sub.E G.Sub.F G.Sub.L G.Sub.G G.Sub.H G.Sub.J G.Sub.K G.Sub.I G.Sub.F G.Sub.M G.Sub.J

4,009,342.24 3,436,638.04 2,942,148.04 6,780,258.04 3,798,375.04 1,117,677.04 2,947,656.04 4,209,903.04 3,707,993.14 3,006,171.34 1,117,677.04

47,871,546.33 31,651,436.33 5,796,031.64 40,681,548.23 19,941,468.95 48,484,829.93 111,067,679.53 1,599,763.15 19,466,963.98 22,576,346.75 1,955,934.82 351,093,549.63

M3 M3 M
3

M3 M3 M3 M
3

4.48 3.41 542.32 542.32 19.00 25.16 110.68 88.00 118.00 18.90

M3 M3 M2 M2 M' M' M' Bh Bh M2

PK.33 PK.17 PK.18 PPA.03' PPA.11' PK.20 PL.02"

#REF! 4,023,500.00 46,200.00 141,300.00 900.00 55,000.00 450.00 5,000.00 85,245.00

#REF! 13,720,135.00 25,055,184.00 76,629,816.00 17,100.00 1,383,800.00 49,806.00 440,000.00 1,611,130.50 #REF!

149.13 1,385.30 3,137.42 42.46 399.38 376.76 60.24

M3 M
2

PT.08 PPBC.05 PPs.05 PPs.05 PPLD.01" PPLD.01" PPLD.01"

61,874.40 46,394.00 1,203.33 1,203.33 52,660.00 52,660.00 52,660.00

9,227,329.27 64,269,608.03 3,775,361.87 51,093.53 21,031,350.74 19,840,181.55 3,172,238.39

M2 M2 M2 M2 M2

NO 1 SUB TOTAL VI

U R A I A N 2 7 Keramik Lantai & Dinding Toilet uk. 20 x 20 cm PEKERJAAN KUSEN, PINTU, JENDELA DAN VENTILASI 1 Kusen Kayu Klas I 2 Pintu Lapis Double Teakwood 3 Pintu Panel Kayu Klas I 5 Pintu Folding Gate 6 Jendela Kaca Jungkit 7 Ventilasi Kaca Mati (Kaca Rayban t. 5 mm) 8 Ventilasi Kaca Silang SUB TOTAL

VOLUME 3 64.43

SAT. 4 M
2

KODE ANALISA 5 PPLD.01'

HARGA SATUAN (Rp.) 6 52,660.00

JUMLAH (Rp.) 7 3,392,883.79 124,760,047.17

1.93 5.00 19.40 70.50 32.00 3.92 23.85

PK.14 SNI.3434-6.8 SNI.3434.6,10 F.37.c -

4,950,000.00 450,000.00 500,000.00 72,540.00 160,025.00 195,000.00

9,553,500.00 2,250,000.00 35,250,000.00 2,321,280.00 627,298.00 4,650,750.00 54,652,828.00

Unit M
2 2 2 2 2

M M M M

NO 1 VII PEKERJAAN PLAFOND

U R A I A N 2 1 Plafond Gypsum t. 9 mm Lt. 1 2 List Pafond Gypsum Lt. 1 3 Plafond Gypsum t. 9 mm Lt. 2 4 List Pafond Gypsum Lt. 2 5 Plafond GRC t. 9 mm (Kaki Atap + Toliet + teras) SUB TOTAL

VOLUME 3 354.73 150.00 375.00 200.00 161.39

SAT. 4 M M M
2

KODE ANALISA 5 PL.02' PL.02' PL.02"

HARGA SATUAN (Rp.) 6 106,556.25 15,000.00 106,556.25 15,000.00 85,245.00

JUMLAH (Rp.) 7 37,798,698.56 2,250,000.00 39,958,593.75 3,000,000.00 13,757,690.55 96,764,982.86

M'
2

M'
2

VIII PEKERJAAN INSTALASI LISTRIK 1 Instalasi Titik Lampu 2 Panel Box/Lengkap Stut MCB, Lampu Indikator, Ohm Saklar 3 Lampu SL 20 Watt Merk Philip 4 Fitting Lampu Merk Broco 5 Saklar Tunggal Merk Broco 6 Saklar Double Inbow Broco 8 Stop Kontak Inbow Broco SUB TOTAL IX PEKERJAAN PENGECATAN 1 Cat Kilat 2 Cat Teer 3 Cat Pelitur 4 Cat Tembok SUB TOTAL X PEKERJAAN PENGGANTUNG DAN PENGUNCI 1 Kunci Pintu 2 Slag 2 Engsel Pintu uk. 4 " 3 Engsel Jendela uk. 4" 4 Slot Jendela uk. 3" 5 Kait Jendela 6 Handle Jendela SUB TOTAL XI PEKERJAAN SANITAIR 1 Kloset Jongkok Merk TOTO 2 Floor Drain Merk Setara SES 3 Kran Air Merk Setara San- Ei 3 Septic Tank 4 Instalasi Air Bersih PVC Type AW 5 Instalasi Air Kotor PVC Type AW SUB TOTAL XII PEKERJAAN SALURAN 1 Galian Tanah 2 Urugan Kembali Tanah Gal;ian 3 Saluran Cor Beton Tumbuk camp. 1:2:3 4 Plesteran Saluran SUB TOTAL XIII PEKERJAAN LAIN-LAIN 1 Reiling Tangga N/T Pipa Holo 2 Ornamen/Plesteran Variasi Dinding 3 Ornamen/Cor Variasi Kolom SUB TOTAL TOTAL 226.62 116.13 0.62 M' M M
2 3

66.00 1.00 50.00 50.00 10.00 10.00 15.00

Ttk Unit Bh Bh Bh Bh Bh

125,000.00 4,500,000.00 -

8,250,000.00 4,500,000.00 12,750,000.00

217.97 108.66 5.00 4,535.85

M2 M2 M2 M2

K23+K30 SUPL.SNI.PC-6.12 PC.05 K23+K30b

#REF! 3,500.00 17,226.00 11,070.00

#REF! 380,310.00 86,130.00 50,211,859.50 #REF!

15.00 60.00 92.00 46.00 92.00 92.00

Bh Bh Bh Bh Bh Bh

PKK.01 PKK.06 PKK.07 PKK.10 PKK.08 PKK.11

5.00 5.00 5.00 3.00 5.00 5.00

Bh Bh Bh Unit Unit Unit

PSa.02 PSa.08 PSa.06 -

633.33 3,000,000.00 250,000.00 1,500,000.00

3,166.67 9,000,000.00 1,250,000.00 7,500,000.00 17,753,166.67

34.96 22.72 12.24 122.36

M3 M3 M3 M2

PT.01 PT.05 PBe.03 PPs.05

319,698.04 1,203.33

3,913,103.99 147,239.86 4,060,343.85

PPs.05 PBe.03

400,000.00 1,203.33 319,698.04

90,648,000.00 139,743.09 198,212.78 90,985,955.88 #REF!

REKAPITULASI RENCANA ANGGARAN BIAYA


NO 1 I II III IV V VI VII VIII IX X XI XII XIII PEKERJAAN PERSIAPAN PEKERJAAN PONDASI PEKERJAAN STRUKTUR BETON BERTULANG K225 PEKERJAAN RANGKA KUDA-KUDA DAN ATAP PEKERJAAN LANTAI DAN DINDING PEKERJAAN KUSEN, PINTU, JENDELA DAN VENTILASI PEKERJAAN PLAFOND PEKERJAAN INSTALASI LISTRIK PEKERJAAN PENGECATAN PEKERJAAN PENGGANTUNG DAN PENGUNCI PEKERJAAN SANITAIR PEKERJAAN SALURAN PEKERJAAN LAIN-LAIN JUMLAH PEMBULATAN U R A I A N 2 JUMLAH (Rp.) 3 11,784,816.00 149,511,745.25 351,093,549.63 #REF! 124,760,047.17 54,652,828.00 96,764,982.86 12,750,000.00 #REF! 17,753,166.67 4,060,343.85 90,985,955.88 #REF! #REF!

Pemasangan Lantai Keramik ukuran 30 x 30 cm ( m No. 1 A 1 2 3 4 B 1 2 3 4 C D URAIAN PEKERJAAN 2 TENAGA Tukang Batu/Semen Pekerja Kepala Tukang Mandor Jumlah BAHAN Keramik uk. 30 x 30 cm Semen Portland Pasir Beton/Pasang Semen Warna Jumlah Jumlah A + B Harga Satuan

) SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 KUANTITAS 5 0.350 0.620 0.035 0.030

PPLD.01" BIAYA SATUAN ( Rp. ) 6 50,000.00 2,660.00 52,660.00 52,660.00 52,660.00

Ktk Kg M3 Kg

50,000.00 63,333.33 -

1.000 11.380 0.042 0.100

Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Lantai & Dinding - 6. 44

Pemasangan Lantai Keramik ukuran 20 x 20 cm Polos ( m No. 1 A 1 2 3 4 B 1 2 3 4 C D URAIAN PEKERJAAN 2 TENAGA Tukang Batu/Semen Pekerja Kepala Tukang Mandor Jumlah BAHAN Keramik uk. 20 x 20 cm Polos Semen Portland Pasir Beton/Pasang Semen Warna Jumlah Jumlah A + B Harga Satuan

) SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 KUANTITAS 5 0.350 0.620 0.035 0.030

PPLD.01' BIAYA SATUAN ( Rp. ) 6 50,000.00 2,660.00 52,660.00 52,660.00 52,660.00

Ktk Kg M Kg
3

50,000.00 63,333.33 -

1.000 11.380 0.042 0.100

Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Lantai & Dinding - 6. 44

DIREKTORAT JENDERAL BEA DAN CUKAI KANTOR WILAYAH KALIMANTAN BARAT KANTOR PENGAWASAN DAN PELAYANAN TIPE A4 ENTIKONG
PROPINSI : KALIMANTAN BARAT Jenis Alat Tenaga Harga Umur Kerja : : : : : : Rp. KODE 61

ANALISA BIAYA PERALATAN


KABUPATEN SANGGAU : : KODE 03 DISIAPKAN TANGGAL :

KODE

E.080

ROLLER, 3 WHEELED
51 550,000,000 10 1 Tahun = HP Juta Tahun ( 1 Tahun : 300 Hari Kerja ) Atau : 1500.00 Jam 15000 Jam Faktor (CRF) : ( Pada 12,5% ) 0.18062

A. BIAYA PEMILIKAN (OWNERSHIP COST) : (Rp./jam) 1. Depresiasi : 90% x Harga Alat x (CRF) x 1 Jam/Tahun = 0.90 x 550,000,000.00 1,500.00 2. Lain-lain : = 3.30% x Harga Jam/thn 0.033 x 550,000,000.00 1,500.00 Sub Total B. BIAYA OPERASI (OPERATING COST) : (Rp./Jam) Kebutuhan Bahan Bakar dan pelumas tiap HP : Diesel Bensin Pelumas Harga : Solar Bensin Pelumas Bahan Bakar Pelumas Perbaikan dan Spareparts ( 60% x depresiasi ) Sub Total = Rp. 102,190.26 = = = = = = = = = 0.160 Liter/HP/Jam 0.170 Liter/HP/Jam 0.006 Liter/HP/Jam 6,875.00 7,500.00 33,750.00 / Liter / Liter / Liter 51 51 59,604.60 x x Rp. Rp. 6,875.00 33,750.00 = Rp. = Rp. = Rp. 56,100.00 10,327.50 35,762.76 = Rp. 71,704.60 = Rp. 12,100.00 x 0.18062 = Rp. 59,604.60

Asuransi 3%/Th. + PPn 10%

0.160 x 0.006 x 0.600 x

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT PER JAM A + B = Rp. 71,704.60 + Rp. 102,190.26 = Rp. 173,894.86

DIREKTORAT JENDERAL BEA DAN CUKAI KANTOR WILAYAH KALIMANTAN BARAT KANTOR PENGAWASAN DAN PELAYANAN TIPE A4 ENTIKONG
PROPINSI : KALIMANTAN BARAT Jenis Alat Tenaga Harga Umur Kerja : : : : : : Rp. KODE 61

ANALISA BIAYA PERALATAN


KABUPATEN SANGGAU : : KODE 03 DISIAPKAN TANGGAL :

KODE

E.084

ROLLER, PNEUMATIC
95 1,040,000,000 10 1 Tahun = HP Juta Tahun ( 1 Tahun : 300 Hari Kerja ) Atau : 1500.00 Jam 15000 Jam Faktor (CRF) : ( Pada 12,5% ) 0.18062

A. BIAYA PEMILIKAN (OWNERSHIP COST) : (Rp./jam) 1. Depresiasi : 90% x Harga Alat x (CRF) x 1 Jam/Tahun = 0.90 x 1,040,000,000.00 1,500.00 2. Lain-lain : = 3.30% x Harga Jam/thn 0.033 x 1,040,000,000.00 1,500.00 Sub Total B. BIAYA OPERASI (OPERATING COST) : (Rp./Jam) Kebutuhan Bahan Bakar dan pelumas tiap HP : Diesel Bensin Pelumas Harga : Solar Bensin Pelumas Bahan Bakar Pelumas Perbaikan dan Spareparts ( 60% x depresiasi ) Sub Total = Rp. 191,361.63 = = = = = = = = = 0.160 Liter/HP/Jam 0.170 Liter/HP/Jam 0.006 Liter/HP/Jam 6,875.00 7,500.00 33,750.00 / Liter / Liter / Liter 95 95 112,706.88 x x Rp. Rp. 6,875.00 33,750.00 = Rp. = Rp. = Rp. 104,500.00 19,237.50 67,624.13 = Rp. 135,586.88 = Rp. 22,880.00 x 0.18062 = Rp. 112,706.88

Asuransi 3%/Th. + PPn 10%

0.160 x 0.006 x 0.600 x

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT PER JAM A + B = Rp. 135,586.88 + Rp. 191,361.63 = Rp. 326,948.51

DIREKTORAT JENDERAL BEA DAN CUKAI KANTOR WILAYAH KALIMANTAN BARAT KANTOR PENGAWASAN DAN PELAYANAN TIPE A4 ENTIKONG
PROPINSI : KALIMANTAN BARAT Jenis Alat Tenaga Harga Umur Kerja : : : : : : Rp. KODE 61

ANALISA BIAYA PERALATAN


KABUPATEN SANGGAU : : KODE 03 DISIAPKAN TANGGAL :

KODE

E.153

SPRAYER SELF PROP


7 65,953,578 6 1 Tahun = HP Juta Tahun ( 1 Tahun : 300 Hari Kerja ) Atau : 750 Jam 4500 Jam Faktor (CRF) : ( Pada 12,5% ) 0.24668

A. BIAYA PEMILIKAN (OWNERSHIP COST) : (Rp./jam) 1. Depresiasi : 90% x Harga Alat x (CRF) x 1 Jam/Tahun = 0.90 x 65,953,578.00 750.00 2. Lain-lain : = 3.30% x Harga Jam/thn 0.033 x 65,953,578.00 750.00 Sub Total B. BIAYA OPERASI (OPERATING COST) : (Rp./Jam) Kebutuhan Bahan Bakar dan pelumas tiap HP : Diesel Bensin Pelumas Harga : Solar Bensin Pelumas Bahan Bakar Pelumas Perbaikan dan Spareparts ( 60% x depresiasi ) Sub Total TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT PER JAM = Rp. 20,831.49 = = = = = = = = = 0.160 Liter/HP/Jam 0.170 Liter/HP/Jam 0.006 Liter/HP/Jam 6,875.00 7,500.00 33,750.00 / Liter / Liter / Liter 7 7 19,523.31 x x Rp. Rp. 6,875.00 33,750.00 = Rp. = Rp. = Rp. 7,700.00 1,417.50 11,713.99 = Rp. 22,425.27 = Rp. 2,901.96 x 0.24668 = Rp. 19,523.31

Asuransi 3%/Th. + PPn 10%

0.160 x 0.006 x 0.600 x

A + B

Rp.

22,425.27

Rp.

20,831.49

= Rp.

43,256.76

DIREKTORAT JENDERAL BEA DAN CUKAI KANTOR WILAYAH KALIMANTAN BARAT KANTOR PENGAWASAN DAN PELAYANAN TIPE A4 ENTIKONG
PROPINSI : KALIMANTAN BARAT Jenis Alat Tenaga Harga Umur Kerja : : : : : : Rp. KODE 61

ANALISA BIAYA PERALATAN


KABUPATEN SANGGAU : : KODE 03 DISIAPKAN TANGGAL :

KODE

E.154

ASPHALT SPRAYER TOWED


6 176,928,000 6 1 Tahun = HP Juta Tahun ( 1 Tahun : 300 Hari Kerja ) Atau : 750 Jam 4500 Jam Faktor (CRF) : ( Pada 12,5% ) 0.24668

A. BIAYA PEMILIKAN (OWNERSHIP COST) : (Rp./jam) 1. Depresiasi : 90% x Harga Alat x (CRF) x 1 Jam/Tahun = 0.90 x 176,928,000.00 750.00 2. Lain-lain : = 3.30% x Harga Jam/thn 0.033 x 176,928,000.00 750.00 Sub Total B. BIAYA OPERASI (OPERATING COST) : (Rp./Jam) Kebutuhan Bahan Bakar dan pelumas tiap HP : Diesel Bensin Pelumas Harga : Solar Bensin Pelumas Bahan Bakar Pelumas Perbaikan dan Spareparts ( 60% x depresiasi ) Sub Total TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT PER JAM = Rp. 39,239.11 = = = = = = = = = 0.160 Liter/HP/Jam 0.170 Liter/HP/Jam 0.006 Liter/HP/Jam 6,875.00 7,500.00 33,750.00 / Liter / Liter / Liter 6 6 52,373.52 x x Rp. Rp. 6,875.00 33,750.00 = Rp. = Rp. = Rp. 6,600.00 1,215.00 31,424.11 = Rp. 60,158.35 = Rp. 7,784.83 x 0.24668 = Rp. 52,373.52

Asuransi 3%/Th. + PPn 10%

0.160 x 0.006 x 0.600 x

A + B

Rp.

60,158.35

Rp.

39,239.11

= Rp.

99,397.46

DIREKTORAT JENDERAL BEA DAN CUKAI KANTOR WILAYAH KALIMANTAN BARAT KANTOR PENGAWASAN DAN PELAYANAN TIPE A4 ENTIKONG
PROPINSI : KALIMANTAN BARAT Jenis Alat Tenaga Harga Umur Kerja : : : : : : Rp. KODE 61

ANALISA BIAYA PERALATAN


KABUPATEN SANGGAU : : KODE 03 DISIAPKAN TANGGAL :

KODE

E.212

DUMP TRUCK 5 TON


145 523,260,000 6 1 Tahun = HP Juta Tahun ( 1 Tahun : 300 Hari Kerja ) Atau : 1500.00 Jam 9000 Jam Faktor (CRF) : ( Pada 12,5% ) 0.24668

A. BIAYA PEMILIKAN (OWNERSHIP COST) : (Rp./jam) 1. Depresiasi : 90% x Harga Alat x (CRF) x 1 Jam/Tahun = 0.90 x 523,260,000.00 1,500.00 2. Lain-lain : = 3.30% x Harga Jam/thn 0.033 x 523,260,000.00 1,500.00 Sub Total B. BIAYA OPERASI (OPERATING COST) : (Rp./Jam) Kebutuhan Bahan Bakar dan pelumas tiap HP : Diesel Bensin Pelumas Harga : Solar Bensin Pelumas Bahan Bakar Pelumas Perbaikan dan Spareparts ( 60% x depresiasi ) Sub Total = Rp. 235,330.50 = = = = = = = = = 0.160 Liter/HP/Jam 0.170 Liter/HP/Jam 0.006 Liter/HP/Jam 6,875.00 7,500.00 33,750.00 / Liter / Liter / Liter 145 145 77,446.67 x x Rp. Rp. 6,875.00 33,750.00 = Rp. = Rp. = Rp. 159,500.00 29,362.50 46,468.00 = Rp. 88,958.39 = Rp. 11,511.72 x 0.24668 = Rp. 77,446.67

Asuransi 3%/Th. + PPn 10%

0.160 x 0.006 x 0.600 x

TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT PER JAM A + B = Rp. 88,958.39 + Rp. 235,330.50 = Rp. 324,288.89

DIREKTORAT JENDERAL BEA DAN CUKAI KANTOR WILAYAH KALIMANTAN BARAT KANTOR PENGAWASAN DAN PELAYANAN TIPE A4 ENTIKONG
PROPINSI : KALIMANTAN BARAT Jenis Alat Tenaga Harga Umur Kerja : : : : : : KODE 61

KODE

ANALISA BIAYA PERALATAN


KABUPATEN SANGGAU : : KODE 03 DISIAPKAN TANGGAL :

E.221

FLATBED TRUCK 4 TON


Rp. 80 289,560,000 6 HP Juta Tahun ( 1 Tahun : 300 Hari Kerja ) 1 Tahun = Atau : 9000 Jam 1500.00 Jam Faktor (CRF) : ( Pada 12,5% ) 0.24668

A. BIAYA PEMILIKAN (OWNERSHIP COST) : (Rp./jam) 1. Depresiasi : 90% x Harga Alat x (CRF) x 1 Jam/Tahun = Rp. 42,857.20

0.90

289,560,000.00 1,500.00

0.24668

2. Lain-lain

: = 3.30% x Harga Jam/thn 289,560,000.00 1,500.00 = Rp. 6,370.32

Asuransi 3%/Th. + PPn 10%

0.033

Sub Total B. BIAYA OPERASI (OPERATING COST) : (Rp./Jam) Kebutuhan Bahan Bakar dan pelumas tiap HP : Diesel = 0.160 Liter/HP/Jam Bensin = 0.170 Liter/HP/Jam Pelumas = 0.006 Liter/HP/Jam Harga : Solar Bensin Pelumas = = = = = = 6,875.00 7,500.00 33,750.00 / Liter / Liter / Liter 80 80 42,857.20 x x Rp. Rp. 6,875.00 33,750.00

= Rp.

49,227.52

Bahan Bakar Pelumas Perbaikan dan Spareparts ( 60% x depresiasi )

0.160 x 0.006 x 0.600 x

= Rp. = Rp. = Rp.

88,000.00 16,200.00 25,714.32

Sub Total TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT PER JAM A + B = Rp. 49,227.52 + Rp. 129,914.32

= Rp.

129,914.32

= Rp.

179,141.83

DIREKTORAT JENDERAL BEA DAN CUKAI KANTOR WILAYAH KALIMANTAN BARAT KANTOR PENGAWASAN DAN PELAYANAN TIPE A4 ENTIKONG
PROPINSI : KALIMANTAN BARAT Jenis Alat Tenaga Harga Umur Kerja : : : : : : KODE 61

KODE

ANALISA BIAYA PERALATAN


KABUPATEN SANGGAU : : KODE 03 DISIAPKAN TANGGAL :

E.253

FLATBED TRUCK 4 TON


Rp. 20 146,479,310 5 HP Juta Tahun ( 1 Tahun : 300 Hari Kerja ) 1 Tahun = Atau : 7500 Jam 1500.00 Jam Faktor (CRF) : ( Pada 12,5% ) 0.28085

A. BIAYA PEMILIKAN (OWNERSHIP COST) : (Rp./jam) 1. Depresiasi : 90% x Harga Alat x (CRF) x 1 Jam/Tahun = Rp. 24,683.23

0.90

146,479,310.00 1,500.00

0.28085

2. Lain-lain

: = 3.30% x Harga Jam/thn 146,479,310.00 1,500.00 = Rp. 3,222.54

Asuransi 3%/Th. + PPn 10%

0.033

Sub Total B. BIAYA OPERASI (OPERATING COST) : (Rp./Jam) Kebutuhan Bahan Bakar dan pelumas tiap HP : Diesel = 0.160 Liter/HP/Jam Bensin = 0.170 Liter/HP/Jam Pelumas = 0.006 Liter/HP/Jam Harga : Solar Bensin Pelumas = = = = = = 6,875.00 7,500.00 33,750.00 / Liter / Liter / Liter 20 20 24,683.23 x x Rp. Rp. 6,875.00 33,750.00

= Rp.

27,905.77

Bahan Bakar Pelumas Perbaikan dan Spareparts ( 60% x depresiasi )

0.160 x 0.006 x 0.600 x

= Rp. = Rp. = Rp.

22,000.00 4,050.00 14,809.94

Sub Total TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT PER JAM A + B = Rp. 27,905.77 + Rp. 40,859.94

= Rp.

40,859.94

= Rp.

68,765.71

DIREKTORAT JENDERAL BEA DAN CUKAI KANTOR WILAYAH KALIMANTAN BARAT KANTOR PENGAWASAN DAN PELAYANAN TIPE A4 ENTIKONG
PROPINSI : KALIMANTAN BARAT Jenis Alat Tenaga Harga Umur Kerja : : : : : : KODE 61

KODE

ANALISA BIAYA PERALATAN


KABUPATEN SANGGAU : : KODE 03 DISIAPKAN TANGGAL :

E.341

PUMP. WATER (5CM)


Rp. 8 20,230,440 4 HP Juta Tahun ( 1 Tahun : 300 Hari Kerja ) 1 Tahun = Atau : 3000 Jam 750.00 Jam Faktor (CRF) : ( Pada 12,5% ) 0.33271

A. BIAYA PEMILIKAN (OWNERSHIP COST) : (Rp./jam) 1. Depresiasi : 90% x Harga Alat x (CRF) x 1 Jam/Tahun = Rp. 8,077.04

0.90

20,230,440.00 750.00

0.33271

2. Lain-lain

: = 3.30% x Harga Jam/thn 20,230,440.00 750.00 = Rp. 890.14

Asuransi 3%/Th. + PPn 10%

0.033

Sub Total B. BIAYA OPERASI (OPERATING COST) : (Rp./Jam) Kebutuhan Bahan Bakar dan pelumas tiap HP : Diesel = 0.160 Liter/HP/Jam Bensin = 0.170 Liter/HP/Jam Pelumas = 0.006 Liter/HP/Jam Harga : Solar Bensin Pelumas = = = = = = 6,875.00 7,500.00 33,750.00 / Liter / Liter / Liter 8 8 8,077.04 x x Rp. Rp. 6,875.00 33,750.00

= Rp.

8,967.18

Bahan Bakar Pelumas Perbaikan dan Spareparts ( 60% x depresiasi )

0.160 x 0.006 x 0.600 x

= Rp. = Rp. = Rp.

8,800.00 1,620.00 4,846.23

Sub Total TOTAL BIAYA PEMILIKAN DAN BIAYA OPERASI ALAT PER JAM A + B = Rp. 8,967.18 + Rp. 15,266.23

= Rp.

15,266.23

= Rp.

24,233.41

Rekapitulasi Harga Sewa Peralatan Per jam


Propinsi Kabupaten No 1 1 2 3 4 5 6 7 8 : Kalimantan Barat : Sanggau Jenis / Kapasitas Alat 2 Roller, 3 Wheeled Roller, Pneumatic Spayer, Self Prop Aspalt Sprayer Towed Dump Truck 5 Ton Flatbed Truck 4 Ton Conc. Mixer 0.50 M3 Pump, Water (5 Cm) 51 95 7 6 145 80 20 8 HP HP HP HP HP HP HP HP Kode 3 E.080 E.084 E.153 E.154 E.212 E.221 E.253 E.341

( 61 ) ( 03 )
Harga Pokok 4 550,000,000.00 1,040,000,000.00 65,953,578.00 176,928,000.00 523,260,000.00 289,560,000.00 146,479,310.00 20,230,440.00 Jarak Angkut ke Lokasi ( KM ) 5 120 120 120 120 120 120 120 120 Ongkos Angkut ( Rp. ) 6 Total Harga (Rp.) 7=4+6 550,000,000.00 1,040,000,000.00 65,953,578.00 176,928,000.00 523,260,000.00 289,560,000.00 146,479,310.00 20,230,440.00 Biaya Operasi Per Jam (Rp.) 8 173,894.86 326,948.51 43,256.76 99,397.46 324,288.89 179,141.83 68,765.71 24,233.41

TABEL B.2 FAKTOR BIAYA PENGEMBALIAN MODAL (CRF)

NILAI N FAKTOR BIAYA PENGEMBALIAN MODAL UMUR 10% 12.5% PEMAKAIAN Umur 12 Tahun 0.14676 0.16519 Umur 11 Tahun 0.15396 0.17211 Umur 10 Tahun 0.16275 0.18062 Umur 9 Tahun 0.17364 0.19126 Umur 8 Tahun 0.18744 0.20483 Umur 7 Tahun 0.20541 0.22260 Umur 6 Tahun 0.22961 0.24668 Umur 5 Tahun 0.26300 0.28085 Umur 4 Tahun 0.31547 0.33271 Umur 3 Tahun 0.40211 0.41993 Umur 2 Tahun 0.57619 0.59559 Umur 1 Tahun 1.10000 0.12500

15% 0.18448 0.19107 0.19925 0.20957 0.22285 0.24036 0.26424 0.29832 0.35027 0.43798 0.61512 0.15000 #REF! #REF! #REF!

#REF! #REF!

DIREKTORAT JENDERAL BEA DAN CUKAI KANTOR WILAYAH KALIMANTAN BARAT KANTOR PENGAWASAN DAN PELAYANAN TIPE A4 ENTIKONG
PROPINSI : KALIMANTAN BARAT
PROSES
1. 2. 3. Semua material dikirim oleh leveransir Mempergunakan tenaga orang produksi campuran 100t/ hari Hasil produksi diangkut dengan Dump Truck ke lokasi penghamparan

ANALISA HARGA SATUAN


MEMPRODUKSI CAMPURAN LATASIR (MENGGUNAKAN BURUH) KABUPATEN SANGGAU
ANGGAPAN :
1. Latasir dihasilkan secara manual produksi 100 t/hari 2. Aspal bitumen dipanaskan agar tersedia pada waktunya 3. Hasil produksi termasuk pengangkutan s/d 10 km dari tempat penggorengan 4. Hasil produksi dimuat dalam dump truk 5 ton dan dikirim ke tempat pekerjaan 5. Rata-rata umur alat bantu 1 sebulan/orang/set

KODE

K.020.A
TANGGAL :

: :

KODE ( 61 )

: :

KODE 03

DISIAPKAN OLEH :

6. Sesuai spesifikasi BM Nomor : 12/PT/B/1983

P E K E R J A

PEKERJA

VOL

HARI

KODE

TOTAL VOL (org/hari) 5.00 4.00 83.00 6.00 6.00

UPAH (Rp./org/hari) #REF! #REF! #REF! #REF! #REF!

BIAYA (Rp.) #REF! #REF! #REF! #REF! #REF!

SUB TOTAL (Rp.)

Mandor Lapangan Supir Material/truck Buruh Lapangan Tak Terlatih Buruh Lapangan Agak Terlatih Operator Semi terlatih

5.00 4.00 83.00 6.00 6.00

1.00 1.00 1.00 1.00 1.00

L 061 L 091 L 101 L 103 L 082

PEKERJA M A T E R I A L Pasir ayak untuk beton Aspal bitumen Semen Kayu bakar Alat bantu Stonedust M3 Kg 50 Kg M3 Set M3 HARI KERJA 1.00 1.00 M 041 M 061 M 080 M 070 M 170 45.00 9000.00 70.40 90.00 3.00 7.50 JAM KERJA 24.00 15.00 #REF! #REF! #REF! HARGA (Rp./Jam) 324,288.89 68,765.71 63,333.33 #REF! #REF! #REF! #REF! MATERIAL P E R A L A T A N PERALATAN TOTAL (Rp.) Dumptruk 5 ton/145 HP Alat pengaduk beton 0,5 M3/20 HP 4.00 3.00 E 212 E 253 7,782,933.26 1,031,485.66 PEKERJA JUMLAH KODE BIAYA (Rp.) 2,849,999.85 #REF! MATERIAL JUMLAH SATUAN KODE TOTAL VOL HARGA (Rp./Unit) BIAYA (Rp.)

#REF! SUB TOTAL (Rp.)

#REF! SUB TOTAL (Rp.)

8,814,418.91 #REF!

VOLUME :

100.00

SATUAN :

Ton

HARGA SATUAN

Rp.

#REF!

per

Ton

DIREKTORAT JENDERAL BEA DAN CUKAI KANTOR WILAYAH KALIMANTAN BARAT KANTOR PENGAWASAN DAN PELAYANAN TIPE A4 ENTIKONG
PROPINSI : KALIMANTAN BARAT
URAIAN : 1. Material disiapkan dilokasi pekerjaan 2. Menghampar pasir setebal 5 cm Batu pecah berukuran besar (10-15 cm) disusun berdiri 3. Batu pecah yang lebih kecil mengisi rongga diatasnya sehingga rata kemudian dipadatkan/digilas dengan mesin gilas

ANALISA HARGA SATUAN


KONSTRUKSI LAPIS PONDASI BAWAH (LPB) TELPORD (MENGGUNAKAN BURUH) KABUPATEN SANGGAU
ANGGAPAN : 1. Menggunakan tenaga manusia 400 m2 per hari 2. Material-material dikirim ke tempat pekerjaan oleh leveransir 3. Batu sudah dipecah 4. Tanah dasar sudah disiapkan 5. Dipadatkan sampai setebal 20 cm

KODE

K.516
TANGGAL :

: :

KODE ( 61 )

: :

KODE 03

DISIAPKAN OLEH :

P E K E R J A

PEKERJA

VOL

HARI

KODE

TOTAL VOL (org.hari) 3.00 1.00 99.00

UPAH (Rp./org/hari) #REF! #REF! #REF!

BIAYA (Rp.) #REF! #REF! #REF!

SUB TOTAL (Rp.)

Mandor Lapangan Operator Telatih Buruh Lapangan Tak Terlatih

3.00 1.00 99.00

1.00 1.00 1.00

L 061 L 081 L 101

PEKERJA M A T E R I A L MATERIAL P E R A L A T A N PERALATAN TOTAL (Rp.) Mesin Gilas 3 Roda 51 HP 1.00 1.00 E 080 5.00 173,894.86 869,474.30 PEKERJA JUMLAH HARI KERJA KODE JAM KERJA HARGA (Rp./Jam) BIAYA (Rp.) Batu Belah 10/15 Batu Pecah 5-7 cm Pasir Urug / Timbun Alat Bantu M3 M3 M3 Set M 020 M 022 M 040 M 170 50.00 20.00 30.00 4.00 200,000.00 266,666.67 51,562.00 #REF! 10,000,000.00 5,333,333.40 1,546,860.00 #REF! MATERIAL JUMLAH SATUAN KODE TOTAL VOL HARGA (Rp./Unit) BIAYA (Rp.)

#REF! SUB TOTAL (Rp.)

#REF! SUB TOTAL (Rp.)

869,474.30 #REF!

VOLUME :

80.00

SATUAN :

M3

HARGA SATUAN

Rp.

#REF!

per

M3

DIREKTORAT JENDERAL BEA DAN CUKAI KANTOR WILAYAH KALIMANTAN BARAT KANTOR PENGAWASAN DAN PELAYANAN TIPE A4 ENTIKONG
PROPINSI : KALIMANTAN BARAT
URAIAN : 1. Semprotkan Aspal Bitumen Tack coat 0,8 l/m3 2. Hamparkan agregat pokok 3-5,25 m2/m3 dan padatkan 3. Hamparkan split 2-3; 45 m2/m3 dan padatkan 4. Semprotkan Aspal Bitumen (2,5 kg/m2) 5. Hamparkan Agregat pengunci split 1 2; 90 m2/m3 dan padatkan 6. Semprotkan Aspal Bitumen 1,5 kg/m & gilas 7. Taburkan pasir rata-rata 400 m2/m3

ANALISA HARGA SATUAN


LAPIS PENETRASI MACADAM 5 CM (LAPEN) (MENGGUNAKAN BURUH) KABUPATEN SANGGAU
ANGGAPAN :
1. Menggunakan tenaga buruh 2. Harga material (agregat pokok, agregat pengunci, agregat penutup, aspal bitumen) adalah harga dilokasi proyek 3.Volume aspal bitumen cair untuk tack coat/prime coat 0,8 lt/m2 4. Tebal lapisan penetrasi kurang lebih 5 cm 5. Agregat dikirim sampai tempat pekerjaan oleh leveransir

KODE

K.618
TANGGAL :

: :

KODE ( 61 )

: :

KODE 03

DISIAPKAN OLEH :

P E K E R J A

PEKERJA

VOL

HARI

KODE

TOTAL VOL (org.hari) 6.00 6.00 1.00 198.00 6.00

UPAH (Rp./org/hari) #REF! #REF! #REF! #REF! #REF!

BIAYA (Rp.) #REF! #REF! #REF! #REF! #REF!

SUB TOTAL (Rp.)

Mandor Lapangan Operator Terlatih Sopir Buruh Lapangan Tak Terlatih Buruh Lapangan Terlatih

2.00 2.00 1.00 66.00 2.00

3.00 3.00 3.00 3.00 3.00

L 061 L 081 L 091 L 101 L 106

PEKERJA M A T E R I A L Batu pecah 3-5 cm Batu pecah 2-3 cm Batu pecah 1-2 cm Pasir ayak untuk beton Aspal bitumen Minyak tanah Alat Bantu M3 M3 M3 M3 Kg Lt Set HARI KERJA 1.00 1.00 1.00 M 023 M 024 M 025 M 041 M 061 M 065 M 170 56.00 31.00 15.50 3.50 6270.00 450.00 8.10 JAM KERJA 15.00 15.00 15.00 #REF! HARGA (Rp./Jam) 173,894.86 43,256.76 179,141.83 291,666.67 350,000.00 400,000.00 63,333.33 #REF! #REF! MATERIAL P E R A L A T A N PERALATAN TOTAL (Rp.) Mesin Gilas 3 Roda 51 HP Sprayer 7 HP Dump Truck (4 T/80 HP) 1.00 1.00 1.00 E 080 E 153 E 221 2,608,422.90 648,851.41 2,687,127.52 PEKERJA JUMLAH KODE BIAYA (Rp.) 16,333,333.52 10,850,000.00 6,200,000.00 221,666.66 #REF! MATERIAL JUMLAH SATUAN KODE TOTAL VOL HARGA (Rp./Unit) BIAYA (Rp.)

#REF! SUB TOTAL (Rp.)

#REF! SUB TOTAL (Rp.)

5,944,401.82 #REF!

VOLUME :

1400.00

SATUAN :

M2

HARGA SATUAN

Rp.

#REF!

per

M2

DIREKTORAT JENDERAL BEA DAN CUKAI KANTOR WILAYAH KALIMANTAN BARAT KANTOR PENGAWASAN DAN PELAYANAN TIPE A4 ENTIKONG
PROPINSI : KALIMANTAN BARAT
URAIAN :
1. 2. 3. 4. Memberikan permukaan aspal bitumen lama Melapisi dengan Tack Coat Hamparkan pasir aspal bitumen dengan tenaga manusia Digilas sampai padat

ANALISA HARGA SATUAN


LAPIS TIPIS ASPAL PASIR 20 MM (LATASIR) (MENGGUNAKAN BURUH) KABUPATEN SANGGAU
ANGGAPAN :
1. Menggunakan tenaga manusia (1600 m2/hari) 2. Campuran dikirim ke tempat pekerjaan oleh leveransir 3. BJ padat 1,9 t/m3 4. Tack Coat 0,6 l/m2 5. Menurut spec BM No. 02/PT/B/1983

KODE

K.638
TANGGAL :

: :

KODE ( 61 )

: :

KODE 03

DISIAPKAN OLEH :

P E K E R J A

PEKERJA

VOL

HARI

KODE

TOTAL VOL (org.hari) 1.00 3.00 10.00 8.00 1.00

UPAH (Rp./org/hari) #REF! #REF! #REF! #REF! #REF!

BIAYA (Rp.) #REF! #REF! #REF! #REF! #REF!

SUB TOTAL (Rp.)

Mandor Lapangan Operator Terlatih Buruh Lapangan Tak Terlatih Buruh Lapangan Agak Terlatih Sopir

1.00 3.00 10.00 8.00 1.00

1.00 1.00 1.00 1.00 1.00

L 061 L 081 L 101 L 103 L 091

PEKERJA M A T E R I A L MATERIAL P E R A L A T A N PERALATAN TOTAL (Rp.) Mesin Gilas Roda Karet 8 - 15 T Sprayer Aspal 200 T 1.00 1.00 1.00 1.00 E 084 E 154 5.00 5.00 326,948.51 99,397.46 1,634,742.54 496,987.31 PEKERJA JUMLAH HARI KERJA KODE JAM KERJA HARGA (Rp./Jam) BIAYA (Rp.) Aspal Bitumen Minyak Tanah Alat Bantu Campuran LATASIR Kayu Bakar Kg Ltr Set Tonne M3 M 061 M 065 M 170 K 020 A M 070 480.00 480.00 4.00 60.00 4.48 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! MATERIAL JUMLAH SATUAN KODE TOTAL VOL HARGA (Rp./Unit) BIAYA (Rp.)

#REF! SUB TOTAL (Rp.)

#REF! SUB TOTAL (Rp.)

2,131,729.85 #REF!

VOLUME :

1600.00

SATUAN :

M2

HARGA SATUAN

Rp.

#REF!

per

M2

DIREKTORAT JENDERAL BEA DAN CUKAI KANTOR WILAYAH KALIMANTAN BARAT KANTOR PENGAWASAN DAN PELAYANAN TIPE A4 ENTIKONG
PROPINSI : KALIMANTAN BARAT
URAIAN :
1. 2. 3. Material ditimbun dilokasi pekerjaan oleh pemasok Pekerja membawa batu pecah ke tempat tukang kepala pekerja Tukang kepala memasang batu pecah dengan adukan pasir semen

ANALISA HARGA SATUAN


PENGHAMPARAN DAN PEMADATAN LATASTON (MENGGUNAKAN ALAT) KABUPATEN SANGGAU
ANGGAPAN :
1. Dilakukan untuk pekerjaan gorong-gorong, jembatan, dinding penahan tanah dan struktur lainnya yang menggunakan konstruksi pasangan batu 2. Material-material dikirim ke tempat pekerjaan oleh pemasok 3. Tidak termasuk galian/timbunan

KODE

K.810
TANGGAL :

: :

KODE ( 61 )

: :

KODE 03

DISIAPKAN OLEH :

4. Biaya alat bantu tambahan sudah termasuk biaya kira-kira ekivalen dari bambu untuk lubang drainase

P E K E R J A

PEKERJA

VOL

HARI

KODE

TOTAL VOL (org.hari) 1.00 4.00 12.00

UPAH (Rp./org/hari) #REF! #REF! #REF!

BIAYA (Rp.) #REF! #REF! #REF!

SUB TOTAL (Rp.)

Mandor Lapangan Tukang Buruh Lapangan Tak Terlatih

1.00 4.00 12.00

1.00 1.00 1.00

L 061 L. 079 L 101

PEKERJA M A T E R I A L MATERIAL P E R A L A T A N PERALATAN TOTAL (Rp.) Pompa Air (dia. 50 mm) 30 m3/jam 1.00 1.00 E 341 2.00 24,233.41 48,466.82 PEKERJA JUMLAH HARI KERJA KODE JAM KERJA HARGA (Rp./Jam) BIAYA (Rp.) Batu Gunung atau Quary Pasir ayak untuk beton Semen Alat Bantu M3 M3 50 Kg Tonne M 010 M 041 M 080 M 170 5.00 1.25 15.20 0.75 #REF! #REF! 63,333.33 #REF! #REF! 79,166.66 MATERIAL JUMLAH SATUAN KODE TOTAL VOL HARGA (Rp./Unit) BIAYA (Rp.)

#REF! SUB TOTAL (Rp.)

#REF! SUB TOTAL (Rp.)

48,466.82 #REF!

VOLUME :

5.00

SATUAN :

M3

HARGA SATUAN

Rp.

#REF!

per

M3

Rekapitulasi Daftar Harga Analisa Biaya

No
1 2 3 4 5

Jenis Pekerjaan
MEMPRODUKSI CAMPURAN LATASIR KONSTRUKSI LAPIS PONDASI BAWAH (LPB) KLAS TELFORD LAPIS PENETRASI MAKADAM 5 CM (LAPEN) LAPIS TIPIS ASPAL PASIR 20 mm (LATASIR) KONSTRUKSI PASANGAN BATU ( MENGGUNAKAN BURUH ) ( MENGGUNAKAN BURUH ) ( MENGGUNAKAN BURUH ) ( MENGGUNAKAN BURUH ) ( MENGGUNAKAN BURUH )

Satuan
TONNE M M M M
3 2 2 3

Kode
K. 020 A K. 516 K. 618 K. 638 K. 810

Harga Satuan (Rp.)


#REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF!

#REF! #REF!

RENCANA DAFTAR USULAN KEGIATAN

Satuan Kerja

: Dinas Kehewanan dan Peternakan Provinsi Kalimantan Barat

Nama Kegiatan : Lokasi : Pontianak

Tahun Anggaran : 2010

No

Uraian Pekerjaan

Volume Nilai Sat

Harga Satuan ( Rp )

Jumlah Harga ( Rp )

Sub Total ( Rp )

I STANDAR 1 Pembangunan Rumah Type B 2 Pagar Keliling II NON STANDAR 1 Pembangunan Jalan Lingkungan Rabat Beton Campuran 1: 2 : 3 2 Pembuatan Turap Batu Pecah Jumlah Dibulatkan Terbilang : Tujuh ratus dua puluh delapan juta empat ratus tiga puluh ribu rupiah 106.50 m' 1,010,000.00 107,565,000.00 728,430,500.00 728,430,000.00 84.50 m' 1,482,000.00 125,229,000.00 120.00 84.50 m2 m' 3,217,000.00 1,297,000.00 386,040,000.00 109,596,500.00

Pontianak, Mengetahui Kepala Dinas Kehewanan Dan Peternakan Propinsi Kalimantan Barat

Maret 2009

Dibuat oleh : Konsultan Perencana CV KARYA ENDAH LESTARI

Drh. H. ABDUL MANAF MUSTAFA NIP. 080 067 459

H TEGUH BUDIRAHARDJO DIREKTUR

DAFTAR ANALISA HARGA SATUAN PEKERJAAN


Satuan Kerja : Dinas Kehewanan dan Peternakan Provinsi Kalimantan Barat Nama Kegiatan : Lokasi : Pontianak Tahun Anggaran : 2010
Pengukuran dan Pemasangan Bouwplank ( m' ) HARGA NO. 1 A 1 2 3 4 B 1 2 3 C D URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Kayu Kelas II Paku Papan Kayu Kelas II Jumlah Jumlah A + B Harga Satuan
Acuan : SNI.2835.a - 6.4

SATUAN 3 OH OH OH OH

SATUAN ( Rp. ) 4 -

KUANTITAS 5 0.100 0.100 0.010 0.005

PSi.02 BIAYA SATUAN ( Rp. ) 6 43,500.00 360.00 24,675.00 68,535.00 68,535.00 68,535.00

M3 Kg M3

3,625,000.00 18,000.00 3,525,000.00

0.012 0.020 0.007

Pembuatan Direksi Keet, Gudang Bahan Bangunan dan Alat, dan/atau Bedeng Pekerjaan (m ) HARGA NO. URAIAN PEKERJAAN SATUAN SATUAN ( Rp. ) 1 2 3 4 A TENAGA 1 Tukang Kayu OH 2 Pekerja OH 3 Kepala Tukang OH 4 Mandor OH Jumlah B BAHAN 1 Kayu Cerucuk (Dolken) d=10, p=4 m Btg 7,500.00 2 Kayu Kelas III M3 3 Paku Kg 18,000.00 4 Paku Payung Kg 18,500.00 5 Seng Gelombang BJLS 0.20 Lbr 750,000.00 6 Papan Kayu Kelas III 1,200,000.00 M3 Jumlah C Jumlah A + B D Harga Satuan
Acuan : SNI.2835.a - 6.9

KUANTITAS 5 2.000 1.000 0.200 0.050

PSi.04 BIAYA SATUAN ( Rp. ) 6 9,375.00 2,700.00 2,775.00 1,125,000.00 93,312.00 1,233,162.00 1,233,162.00 1,233,162.00

1.250 0.186 0.150 0.150 1.500 0.07776

Plesteran t = 1,5 cm, camp.1 PC : 3 Ps ( m2 ) No.


1

URAIAN PEKERJAAN
2

SATUAN
3

HARGA SATUAN ( Rp. )


4

KUANTITAS
5

PPs.05 BIAYA SATUAN ( Rp. )


6

A 1 2 3 4 B 1 2 C D

TENAGA Tukang Semen Pekerja Kepala Tukang Mandor Jumlah BAHAN Semen Portland Pasir Beton/Pasang Jumlah Jumlah A + B Harga Satuan
Acuan : SNI.2837.b - 6.3

OH OH OH OH

0.150 0.200 0.015 0.010

1,203.33 1,203.33 1,203.33 1,203.33

Kg M3

63,333.33

6.480 0.019

Galian Tanah Biasa Sedalam 1 meter ( m 3 ) NO. 1 A 1 2 B URAIAN PEKERJAAN 2 TENAGA Pekerja Mandor Jumlah BAHAN Jumlah Jumlah A + B Harga Satuan
Acuan : SNI.2835.b - 6.6

PT.01 SATUAN 3 OH OH HARGA SATUAN ( Rp. ) 4 KUANTITAS 5 0.400 0.040 BIAYA SATUAN ( Rp. ) 6 -

C D

Urugan Kembali Tanah Galian ( m 3 ) NO. 1 A 1 2 B URAIAN PEKERJAAN 2 TENAGA Pekerja Mandor Jumlah BAHAN Jumlah Jumlah A + B Harga Satuan
Acuan : A.16

PT.05 SATUAN 3 OH OH HARGA SATUAN ( Rp. ) 4 KUANTITAS 5 0.192 0.0192 BIAYA SATUAN ( Rp. ) 6 -

C D

Urugan Pasir di Bawah Lantai Bangunan, Terhitung Penyiramannya ( m 3 ) HARGA NO. 1 A 1 2 B 1 C D URAIAN PEKERJAAN 2 TENAGA Pekerja Mandor Jumlah BAHAN Pasir Urug Jumlah Jumlah A + B Harga Satuan
Acuan : SNI.2835.b - 6.11

PT.08 SATUAN ( Rp. ) 4 KUANTITAS 5 0.300 0.010 BIAYA SATUAN ( Rp. ) 6 61,874.40 61,874.40 61,874.40 61,874.40

SATUAN 3 OH OH

51,562.00

1.200

Pasangan Batu Kali uk.10 - 15 cm, camp. 1 PC : 3 Ps ( m 3 ) HARGA No. 1 A 1 2 3 4 B 1 2 3 C D TENAGA Tukang Batu Pekerja Kepala Tukang Mandor Jumlah BAHAN Semen Portland Pasir Beton/Pasang Batu Belah 10 -15 cm Jumlah Jumlah A + B Harga Satuan
Acuan : G.26 + G.32.i

PPBC.11 BIAYA KUANTITAS 5 0.600 1.500 0.060 0.075 SATUAN ( Rp. ) 6 Kg M


3

URAIAN PEKERJAAN 2

SATUAN 3 OH OH OH OH

SATUAN ( Rp. ) 4

63,333.33 200,000.00

202.000 0.485 1.000

30,716.67 200,000.00 230,716.67 230,716.67 230,716.67 PBe.04 BIAYA SATUAN ( Rp. ) 6 14,175.00 255.00 14,430.00 14,430.00 14,430.00

M3

Pekerjaan Pembesian dengan Besi Polos atau Besi Ulir ( kg ) No. 1 A 1 2 3 4 B 1 2 C D URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Besi Beton (Polos/Ulir) Kawat Ikat Beton Jumlah Jumlah A + B Harga Satuan SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 KUANTITAS 5 0.007 0.007 0.0007 0.0003

Kg Kg

13,500.00 17,000.00

1.050 0.015

Acuan : ABK Bangunan Gedung & Perumahan utk Pek.Beton - 6.25

Pekerjaan Beton Bertulang, camp. 1 PC : 2 Ps : 3 Kr ( m3 ) No. 1 A 1 2 3 4 B 1 2 3 C D URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Semen Portland Pasir Beton/Pasang Batu Belah 0,5 - 1 Jumlah Jumlah A + B Harga Satuan SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 KUANTITAS 5 0.250 1.650 0.025 0.080

PBe.03 BIAYA SATUAN ( Rp. ) 6 32,933.33 286,764.71 319,698.04 319,698.04 319,698.04

Kg M3 M3

63,333.33 367,647.06

323.000 0.520 0.780

Acuan : ABK Bangunan Gedung & Perumahan utk Pek.Beton - 6.5

Galian Tanah Biasa Sedalam 1 meter ( m NO. 1 A 1 2 B

) SATUAN 3 OH OH HARGA SATUAN ( Rp. ) 4 KUANTITAS 5 0.400 0.040 BIAYA SATUAN ( Rp. ) 6

PT.01

URAIAN PEKERJAAN 2 TENAGA Pekerja Mandor Jumlah BAHAN Jumlah Jumlah A + B Harga Satuan Galian sedalam > 1 meter
Acuan : SNI.2835.b - 6.1

C D E

1.315

Urugan Kembali Tanah Galian ( m NO. 1 A 1 2 B

) SATUAN 3 OH OH HARGA SATUAN ( Rp. ) 4 KUANTITAS 5 0.192 0.0192 BIAYA SATUAN ( Rp. ) 6

PT.05

URAIAN PEKERJAAN 2 TENAGA Pekerja Mandor Jumlah BAHAN Jumlah Jumlah A + B Harga Satuan
Acuan : SNI.2835.b - 6.9

C D

Urugan Pasir di Bawah Lantai Bangunan, Terhitung Penyiramannya ( m 3 ) NO. 1 A 1 2 B 1 C D URAIAN PEKERJAAN 2 TENAGA Pekerja Mandor Jumlah BAHAN Pasir Urug Jumlah Jumlah A + B Harga Satuan
Acuan : SNI.2835.b - 6.11

PT.08 HARGA SATUAN ( Rp. ) 4 KUANTITAS 5 0.300 0.010 BIAYA SATUAN ( Rp. ) 6 61,874.40 61,874.40 61,874.40 61,874.40

SATUAN 3 OH OH

M3

51,562.00

1.200

Pasangan Batako tebal 1/2 bata, camp. 1 PC : 3 Ps ( m No. 1 A 1 2 3 4 B 1 2 3 C D URAIAN PEKERJAAN 2 TENAGA Tukang Batu Pekerja Kepala Tukang Mandor Jumlah BAHAN Bata Merah Semen Portland Pasir Beton/Pasang Jumlah Jumlah A + B Harga Satuan
Acuan : G.33.i

) SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 KUANTITAS 5 0.150 0.450 0.015 0.0225

PPBC.05 BIAYA SATUAN ( Rp. ) 6 44,000.00 2,394.00 46,394.00 46,394.00 46,394.00

Bh Kg M
3

2,000.00 63,333.33

22.000 15.750 0.0378

Pasangan Batu Kali uk.10 - 15 cm, camp. 1 PC : 3 Ps ( m No. 1 A 1 2 3 4 B 1 2 3 C D TENAGA Tukang Batu Pekerja Kepala Tukang Mandor Jumlah BAHAN Semen Portland Pasir Beton/Pasang Batu Belah 10 -15 cm Jumlah Jumlah A + B Harga Satuan
Acuan : G.26 + G.32.i

) HARGA SATUAN 3 OH OH OH OH SATUAN ( Rp. ) 4 KUANTITAS 5 0.600 1.500 0.060 0.075

PPBC.11 BIAYA SATUAN ( Rp. ) 6 -

URAIAN PEKERJAAN 2

Kg M
3

63,333.33 200,000.00

202.000 0.485 1.000

30,716.67 200,000.00 230,716.67 230,716.67 230,716.67

M3

No.
1

Dinding Plesteran Simpai t = 3 cm, Simpai Kawat, camp.1 PC : 3 Ps ( m2 ) HARGA URAIAN PEKERJAAN SATUAN SATUAN ( Rp. )
2 3 4

KUANTITAS
5

PPs.01 BIAYA SATUAN ( Rp. )


6

A 1 2 3 4 B 1 2 3 4 5 C D

TENAGA Tukang Semen Pekerja Kepala Tukang Mandor Jumlah BAHAN Semen Portland Pasir Beton/Pasang Besi Simpai Kawat Papan Mal Kayu Kls.III Paku Jumlah Jumlah A + B Harga Satuan
Acuan : G.51.h

OH OH OH OH

0.120 0.360 0.012 0.018

15,404.90 2,457.33 17,862.23 17,862.23 17,862.23

Kg M3 Kg M3 Kg

1,180.00 63,333.33 12,000.00 1,200,000.00 18,000.00

13.055 0.0388 -

Plesteran t = 1,5 cm, camp.1 PC : 3 Ps ( m2 ) No.


1

URAIAN PEKERJAAN
2

SATUAN
3

HARGA SATUAN ( Rp. )


4

KUANTITAS
5

PPs.05 BIAYA SATUAN ( Rp. )


6

A 1 2 3 4 B 1 2 C D

TENAGA Tukang Semen Pekerja Kepala Tukang Mandor Jumlah BAHAN Semen Portland Pasir Beton/Pasang Jumlah Jumlah A + B Harga Satuan

OH OH OH OH

0.150 0.200 0.015 0.010

1,203.33 1,203.33 1,203.33 1,203.33

Kg M3

63,333.33

6.480 0.019

Acuan : SNI.2837.b - 6.3

Pemasangan Ventilasi Kaca ( m ) 2 2 Setiap luas 1 m bidang daun ventilasi, luas kacanya adalah 0,60 m No. 1 A 1 2 3 4 B 1 2 3 C D URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Kaca Rayban t = 5 mm List Kayu Profil Paku Tripleks Jumlah Jumlah A + B Harga Satuan Pemasangan Pintu dan Jendela Kaca ( Hidup ) dari Kayu Kelas I ( m 2 ) 2 2 Setiap luas 1 m bidang daun pintu atau jendela, luas kacanya adalah 0.60 m HARGA URAIAN PEKERJAAN SATUAN SATUAN ( Rp. ) 2 3 4 TENAGA Tukang Kayu OH Pekerja OH Kepala Tukang OH Mandor OH Jumlah BAHAN 3 M Papan Kayu Kelas I (Ketam), t = 2 cm List Pintu/Jendela M' M2 Kaca Rayban tebal 5 mm 120,000.00 Paku Kg 18,000.00 Jumlah Jumlah A + B Harga Satuan SATUAN 3 OH OH OH OH M2 M' Kg HARGA SATUAN ( Rp. ) 4 KUANTITAS 5 2.000 0.500 0.200 0.025

F.37.c BIAYA SATUAN ( Rp. ) 6 159,500.00 525.00 160,025.00 160,025.00 160,025.00

145,000.00 35,000.00

1.100 8.000 0.015

No. 1 A 1 2 3 4 B 1 2 3 4 C D

KUANTITAS 5 2.000 0.800 0.200 0.040

SNI.3434.6,10 BIAYA SATUAN ( Rp. ) 6 72,000.00 540.00 72,540.00 72,540.00 72,540.00

0.035 8.000 0.600 0.030

Pemasangan Pintu dan Jendela Kaca Kayu Klas I (Hidup) ( m2) No.
1

URAIAN PEKERJAAN
2

SATUAN
3

HARGA SATUAN ( Rp. )


4

KUANTITAS
5

SNI.3434-6,10 BIAYA SATUAN ( Rp. )


6

A 1 2 3 4 B 1 2 3 4 C D

TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Papan Kayu Kelas I (Ketam) List Pintu/Jendela Kaca Rayban tebal 5 mm Paku Jumlah Jumlah A + B Harga Satuan OH OH OH OH 2.000 0.800 0.200 0.040 M3 M' M2 Kg 120,000.00 18,000.00 0.035 8.000 0.600 0.030 72,000.00 540.00 72,540.00 72,540.00 72,540.00

Pemasangan Kusen Pintu dan Jendela Kayu Kelas I ( m3 )

PK.14

No. 1 A 1 2 3 4 B 1 C D

URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Kayu Kelas I (Ketam) Jumlah Jumlah A + B Harga Satuan
Acuan : SNI.3434 - 6.2

SATUAN 3 OH OH OH OH

HARGA SATUAN ( Rp. ) 4 -

KUANTITAS 5 18.000 6.000 2.000 0.300

BIAYA SATUAN ( Rp. ) 6 4,950,000.00 4,950,000.00 4,950,000.00 4,950,000.00

4,500,000.00

1.100

Pemasangan Pintu Panel Kayu Kelas I ( m ) No.


1

URAIAN PEKERJAAN
2

SATUAN
3

HARGA SATUAN ( Rp. )


4

KUANTITAS
5

SNI.3434-6.8 BIAYA SATUAN ( Rp. )


6

A 1 2 3 4 B 1 C D

TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Papan Kayu Kelas I (Ketam), t = 2 cm Jumlah Jumlah A + B Harga Satuan
Acuan : SNI.3434 - 6.8

OH OH OH OH

2.500 1.000 0.250 0.050

M3

0.040

Pemasangan Pintu dan Jendela Kaca , Ventilasi dari Rangka Kayu Kelas I ( m ) 2 2 Setiap Luas 1 M Bidang, Luas Kacanya adalah 0.60 M No.
1

URAIAN PEKERJAAN
2

SATUAN
3

HARGA SATUAN ( Rp. )


4

KUANTITAS
5

SNI.3434-6.10 BIAYA SATUAN ( Rp. )


6

A 1 2 3 4 B 1 2 3 4 C D

TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Papan Kayu Kelas I (Ketam), t = 2 cm List Pintu/Jendela Kaca Polos tebal 5 mm Paku Jumlah Jumlah A + B Harga Satuan
Acuan : SNI.3434 - 6.10

OH OH OH OH

2.000 0.800 0.200 0.040

72,000.00 540.00 72,540.00 72,540.00 72,540.00

M3 M' M2 Kg

120,000.00 18,000.00

0.035 8.000 0.600 0.030

Pemasangan Pintu dan Jendela Kaca , Ventilasi dari Rangka Kayu Kelas I ( m ) Setiap Luas 1 M2 Bidang, Luas Kacanya adalah 0.60 M2 No.
1

URAIAN PEKERJAAN
2

SATUAN
3

HARGA SATUAN ( Rp. )


4

KUANTITAS
5

SNI.3434-6.10' BIAYA SATUAN ( Rp. )


6

A 1 2 3 4 B 1 2 3 4 C D

TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Papan Kayu Kelas I (Ketam), t = 2 cm List Pintu/Jendela Kaca Rayban tebal 5 mm Paku Jumlah Jumlah A + B Harga Satuan
Acuan : SNI.3434 - 6.10

OH OH OH OH

2.000 0.800 0.200 0.040

87,000.00 540.00 87,540.00 87,540.00 87,540.00

M M'

M Kg

145,000.00 18,000.00

0.035 8.000 0.600 0.030

Pemasangan Jendela Kaca ( Mati ) dengan Kaca Polos t = 5 mm ( m ) No. 1 A 1 2 3 4 B 1 2 3 C D URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Kaca Polos t = 5 mm List Kayu Profil Paku Tripleks Jumlah Jumlah A + B Harga Satuan SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 KUANTITAS 5 0.150 0.015 0.015 0.00075

PK.23 BIAYA SATUAN ( Rp. ) 6 132,000.00 525.00 132,525.00 132,525.00 132,525.00

M2 M' Kg

120,000.00 35,000.00

1.100 8.000 0.015

Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Kunci dan Kaca - 6.16

Pemasangan Jendela Kaca ( Mati ) dengan Kaca Rayban t = 5 mm ( m ) No. 1 A 1 2 3 4 B 1 2 3 C D URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Kaca Rayban t = 5 mm List Kayu Profil Paku Tripleks Jumlah Jumlah A + B Harga Satuan SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 KUANTITAS 5 0.150 0.015 0.015 0.00075

PK.23' BIAYA SATUAN ( Rp. ) 6 159,500.00 525.00 160,025.00 160,025.00 160,025.00

M2 M' Kg

145,000.00 35,000.00

1.100 8.000 0.015

Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Kunci dan Kaca - 6.16

Pemasangan Ventilasi Kaca ( m2 ) Setiap Luas 1 M2 Bidang Daun Ventilasi, Luas Kacanya adalah 0,60 m2 No. 1 A 1 2 3 4 B 1 2 3 C D URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN List Kayu Kaca Polos t = 5 mm Paku Tripleks Jumlah Jumlah A + B Harga Satuan SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 KUANTITAS 5 2.000 0.500 0.200 0.025

F.37c BIAYA SATUAN ( Rp. ) 6 72,000.00 1,750.00 73,750.00 73,750.00 73,750.00

M' M2 Kg

120,000.00 35,000.00

8.000 0.600 0.050

Acuan : F.37.c

Pemasangan Ventilasi Kaca ( m ) Setiap Luas 1 M2 Bidang Daun Ventilasi, Luas Kacanya adalah 0,60 m2 No. 1 A 1 2 3 4 B 1 2 3 C D URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN List Kayu Kaca Rayban t = 5 mm Paku Tripleks Jumlah Jumlah A + B Harga Satuan
Acuan : F.37.c

SATUAN 3 OH OH OH OH

HARGA SATUAN ( Rp. ) 4 -

KUANTITAS 5 2.000 0.500 0.200 0.025

F.37c' BIAYA SATUAN ( Rp. ) 6 87,000.00 1,750.00 88,750.00 88,750.00 88,750.00

M' M Kg
2

145,000.00 35,000.00

8.000 0.600 0.050

Pekerjaan Konstruksi Rangka Kuda-kuda dengan Bentangan > 7 meter ( m3 ) Untuk memasang kembali kuda-kuda bongkaran, harga satuan pekerjaan diambil 1/3 dari analisa ini HARGA No. URAIAN PEKERJAAN SATUAN KUANTITAS SATUAN 1 A 1 2 3 4 B 1 2 3 4 C D 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Kayu Kelas II Besi Strip Baut Paku Jumlah Jumlah A + B Harga Satuan
Acuan : F.23

PK.33 BIAYA SATUAN ( Rp. ) 6 3,987,500.00 #REF! 14,400.00 #REF! #REF! #REF!

3 OH OH OH OH

( Rp. ) 4 -

5 18.000 6.000 1.800 0.300

M3 Btg Bh Kg

3,625,000.00 #REF! 18,000.00

1.100 15.000 41.000 0.800

Pemasangan Kuda-Kuda Kayu Klas II ( m2) No.


1

URAIAN PEKERJAAN
2

SATUAN
3

HARGA SATUAN ( Rp. )


4

KUANTITAS
5

PK.33 BIAYA SATUAN ( Rp. )


6

A 1 2 3 4 B 1 2 3

TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Kayu Kelas II Besi Strip Baut OH OH OH OH 18.000 6.000 1.800 0.300 3,987,500.00 22,500,000.00 #REF!

M3 Btg Bh

3,625,000.00 1,500,000.00 #REF!

1.100 15.000 41.000

4 C D

Paku Jumlah Jumlah A + B Harga Satuan


Acuan : F.23

Kg

18,000.00

0.800

14,400.00 #REF! #REF! #REF!

Pemasangan Gording, Nok, Ikatan Angin ( m ) No.


1

URAIAN PEKERJAAN
2

SATUAN
3

HARGA SATUAN ( Rp. )


4

KUANTITAS
5

PK.17 BIAYA SATUAN ( Rp. )


6

A 1 2 3 4 B 1 2 C D

TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Kayu Kelas II Paku Jumlah Jumlah A + B Harga Satuan
Acuan : F.22.a

OH OH OH OH

18.000 6.000 1.800 0.300

3,987,500.00 36,000.00 4,023,500.00 4,023,500.00 4,023,500.00

M Kg

3,625,000.00 18,000.00

1.100 2.000

Pemasangan Kasau + Reng ( m2 ) No.


1

URAIAN PEKERJAAN
2

SATUAN
3

HARGA SATUAN ( Rp. )


4

KUANTITAS
5

PK.18 BIAYA SATUAN ( Rp. )


6

A 1 2 3 4 B 1 2 C D

TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Kayu Kelas II Paku Jumlah Jumlah A + B Harga Satuan
Acuan : F.17

OH OH OH OH

0.100 0.100 0.010 0.005

43,500.00 2,700.00 46,200.00 46,200.00 46,200.00

M3 Kg

3,625,000.00 18,000.00

0.012 0.150

Pemasangan Listplang uk.2 x ( 2 x 20 ) cm, Kayu Kelas I ( m' ) No.


1

URAIAN PEKERJAAN
2

SATUAN
3

HARGA SATUAN ( Rp. )


4

KUANTITAS
5

PK.20 BIAYA SATUAN ( Rp. )


6

A 1 2 3 4 B 1 2 C D

TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Papan Kayu Kelas I (Ketam) Paku Jumlah Jumlah A + B Harga Satuan
Acuan : SNI.3434 - 6.52

OH OH OH OH

0.100 0.100 0.010 0.050

450.00 450.00 450.00 450.00

M3 Kg

18,000.00

0.010 0.025

Pekerjaan Cerucuk diameter 10 cm, p = 2 meter ( batang ) Memasukkan kayu cerucuk kedalam tanah dengan menggunakan alat bantu HARGA No. URAIAN PEKERJAAN SATUAN KUANTITAS BIAYA PK.48

No. 1 A 1 2 3 4 B 1 C D TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor

URAIAN PEKERJAAN 2

SATUAN 3 OH OH OH OH

SATUAN ( Rp. ) 4 -

KUANTITAS 5 0.900 0.300 0.090 0.015

SATUAN ( Rp. ) 6 -

Jumlah BAHAN Kayu Cerucuk diam.10, p = 2 m Jumlah Jumlah A + B Harga Satuan


Acuan : F.60

Btg

70,000.00

1.000

70,000.00 70,000.00 70,000.00 70,000.00

Uraian Pekerjaan Pembersihan Lokasi Pengukuran & Pemasangan Bouwplank Galian Tanah Pondasi Pancang Cerucuk Jongger dia 10cm - 200 cm Urugan Pasir Bawah Pondasi t. 10 cm Lantai Kerja t. 5 cm camp.1:3:5 Plat Pondasi Beton Bertulang camp. 1:2:3 Kolom Pondasi 30/30 Beton Bertulang camp. 1:2:3 Sloof Pondasi15/50 Beton Bertulang camp. 1:2:3 Urugan Kembali Tanah Galian

Volume Sat 375.00 M2 80 M' 158.4 384.00 9.6 2.7 9.99 3.672 16.13 132.438 M3 Btg M3 M3 M3 M3 M3 M3

24.00

215.00

Balok Induk 20/40 Beton Bertulang camp. 1:2:3 Balok Anak 15/40 Beton Bertulang camp. 1:2:3 Kolom 30/30 Beton Bertulang camp. 1:2:3 Ring Balok 15/30 Beton Bertulang camp. 1:2:3 Plat Lantai Beton Bertulang camp. 1:2:3 Tangga Beton Bertulang K225 Urugan Pasir Bawah Lantai t. 35 cm Dinding Pas. Batako Plesteran Sloof + Balok Tepi Plesteran Dinding & Kolom Pas. Keramik Lantai uk. 30 x 30 cm Keramik Lantai & Dinding Toilet 20 x 20 cm Kusen Kayu Klas I Pintu Panel Kayu Klas I Pintu Folding Gate Jendela Kaca Jungkit Ventilasi Kaca Mati (Kaca Rayban t. 5 mm) Ventilasi Kaca Silang Rangka Plafond Kayu Klas II Plafond Gypsum t. 9 mm Plafond GRC (toilet+kaki atap) Cat Kilat Cat Tembok Cat Pelitur Cat Teer

15.824 12.23 16.20 6.3 75

M3 M3 M3 M3 M3 M3 M3 M2 M2 M2 M2 M2 M3 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 M2

197.80 203.75 140.00

136 1,385.30

1,490.00

25.93

729.5 51.57 1.75 19.40 70.5 32.00 3.92 23.85 729.5 729.5 123.89

729.50 51.57 J1 1.75 19.40 32.00 23.85 78.25

14.95 4.60

729.50 13.13

110.76

Kunci Pintu 2 Slaag Kunci Pintu 1 Slaag Engsel Pintu

Bh Bh Bh

Engsel Jendela Kait Jendela Handle Jendela Slot Jendela Kloset Jongkok Kran Air Floor Drain Bak Air Batako Septic Tank Instalasi Air Bersih Pipa PVC type AW Instalasi Air Kotor Pipa PVC type AW Reiling Tangga N/T Pipa Holo Ornamen/Plesteran Variasi Dinding Ornamen/Cor Variasi Dinding Ornamen Variasi Kolom 5 5 5 11.6 5 5 5

Bh Bh Bh Bh Bh Bh Bh M2 Unit Unit Unit M' M2 M3 Unit

11.60

6.00

13.05

J2 77.40

J3 26.20

P1 33.20 9.20

P2

P3 34.2 10.20

P4 5.6

V1 62.00

V2 19.00

V3 13.5

70.50 11.76 3.92 5.29 1.84 1.84 2.04 9.20 2.36 1.978

lisplank + konsul + kusen + pintu panel kayu + ventilasi ram kayu + tembok + plafond+ list plafond plafond renglat + Pintu Lapis Double Teakwood + Kaca Polos

349.35

Pemasangan Atap Genteng Metal Warna Polos ( m ) No. 1 A 1 2 3 4 B 1 2 C D URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Genteng Metal Warna Polos Paku Jumlah Jumlah A + B Harga Satuan SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 KUANTITAS 5 0.100 0.200 0.010 0.001

PPA.03' BIAYA SATUAN ( Rp. ) 6 137,700.00 3,600.00 141,300.00 141,300.00 141,300.00

Bh Kg

85,000.00 18,000.00

1.620 0.200

Pemasangan Bubungan / Nok Atap Genteng Metal Polos ( m 1 ) No. 1 A 1 2 3 4 B 1 2 C D URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Bumbungan/Nok Genteng Metal Warna Polos Paku Jumlah Jumlah A + B Harga Satuan
Acuan :SNI.3436 - 6.36

SATUAN 3 OH OH OH OH

HARGA SATUAN ( Rp. ) 4 -

KUANTITAS 5 0.150 0.250 0.015 0.013

PPA.11' BIAYA SATUAN ( Rp. ) 6 900.00 900.00 900.00 900.00

M' Kg

18,000.00

1.100 0.050

Pekerjaan Beton Tumbuk, camp. 1 PC : 3 Ps : 5 Kr Kerikil ( m3 ) No. 1 A 1 2 3 4 B 1 2 3 C D URAIAN PEKERJAAN 2 TENAGA Tukang Semen Pekerja Kepala Tukang Mandor Jumlah BAHAN Semen Portland Pasir Beton/Pasang Kerikil Sungai Jumlah Jumlah A + B Harga Satuan SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 KUANTITAS 5 0.250 1.650 0.025 0.080

PBe.01 BIAYA SATUAN ( Rp. ) 6 32,933.33 130,500.00 163,433.33 163,433.33 163,433.33

Kg M 3 M
3

63,333.33 150,000.00

218.000 0.520 0.870

Pekerjaan Beton Tumbuk, camp. 1 PC : 3 Ps : 5 Kr Batu Pecah ( m ) No. 1 A 1 2 3 4 B 1 2 3 C D URAIAN PEKERJAAN 2 TENAGA Tukang Semen Pekerja Kepala Tukang Mandor Jumlah BAHAN Semen Portland Pasir Beton/Pasang Batu Belah 0,5 - 1 Jumlah Jumlah A + B Harga Satuan SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 KUANTITAS 5 0.250 1.650 0.025 0.080

PBe.02 BIAYA SATUAN ( Rp. ) 6 32,933.33 319,852.94 352,786.27 352,786.27 352,786.27

Kg M M3
3

63,333.33 367,647.06

218.000 0.520 0.870

Acuan : ABK Bangunan Gedung & Perumahan utk Pek.Beton - 6.4

Pekerjaan Beton Bertulang, camp. 1 PC : 2 Ps : 3 Kr ( m3 ) No. 1 A 1 2 3 4 B 1 2 3 C D URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Semen Portland Pasir Beton/Pasang Batu Belah 0,5 - 1 Jumlah Jumlah A + B Harga Satuan SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 KUANTITAS 5 0.250 1.650 0.025 0.080

PBe.03 BIAYA SATUAN ( Rp. ) 6 32,933.33 286,764.71 319,698.04 319,698.04 319,698.04

Kg M3 M3

63,333.33 367,647.06

323.000 0.520 0.780

Acuan : ABK Bangunan Gedung & Perumahan utk Pek.Beton - 6.5

Pekerjaan Pembesian dengan Besi Polos atau Besi Ulir ( kg ) No. 1 A 1 2 3 4 B 1 2 C D URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Besi Beton (Polos/Ulir) Kawat Ikat Beton Jumlah Jumlah A + B Harga Satuan SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 KUANTITAS 5 0.007 0.007 0.0007 0.0003

PBe.04 BIAYA SATUAN ( Rp. ) 6 14,175.00 255.00 14,430.00 14,430.00 14,430.00

Kg Kg

13,500.00 17,000.00

1.050 0.015

Acuan : ABK Bangunan Gedung & Perumahan utk Pek.Beton - 6.25

Pemasangan Bekisting / Cetakan Beton ( m2 ) No. 1 A 1 2 3 4 B 1 2 3 C D URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Papan Kayu Bekisting Paku Minyak Bekisting Jumlah Jumlah A + B Harga Satuan SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 KUANTITAS 5 0.260 0.300 0.026 0.005

PBe.06 BIAYA SATUAN ( Rp. ) 6 48,000.00 5,400.00 1,500.00 54,900.00 54,900.00 54,900.00

M3 Kg Ltr

1,200,000.00 18,000.00 15,000.00

0.040 0.300 0.100

Acuan : ABK Bangunan Gedung & Perumahan utk Pek.Beton - 6.28

Pemasangan Bekisting untuk Pondasi ( m2 ) No. 1 A 1 2 3 4 B 1 2 3 C D URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Papan Kayu Bekisting Paku Minyak Bekisting Jumlah Jumlah A + B Harga Satuan SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 KUANTITAS 5 0.260 0.300 0.026 0.005

PBe.06.A BIAYA SATUAN ( Rp. ) 6 48,000.00 5,400.00 1,500.00 54,900.00 54,900.00 54,900.00

M Kg Ltr

1,200,000.00 18,000.00 15,000.000

0.040 0.300 0.100

Acuan : ABK Bangunan Gedung & Perumahan utk Pek.Beton - 6.29

Pemasangan Bekisting untuk Sloof ( m2 ) No. 1 A 1 2 3 4 B 1 2 3 C D URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Papan Kayu Bekisting Paku Minyak Bekisting Jumlah Jumlah A + B Harga Satuan SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 KUANTITAS 5 0.260 0.300 0.026 0.005

PBe.06.B BIAYA SATUAN ( Rp. ) 6 54,000.00 5,400.00 1,500.00 60,900.00 60,900.00 60,900.00

M3 Kg Ltr

1,200,000.00 18,000.00 15,000.000

0.045 0.300 0.100

Acuan : ABK Bangunan Gedung & Perumahan utk Pek.Beton - 6.29

Pemasangan Bekisting untuk Kolom ( m2 ) No. 1 A 1 2 3 4 B 1 2 3 4 C D URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Papan Kayu Bekisting Paku Minyak Bekisting Cerucuk dia. 6 - 8 cm / 4 m Jumlah Jumlah A + B Harga Satuan SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 KUANTITAS 5 0.330 0.300 0.033 0.006

PBe.06.C BIAYA SATUAN ( Rp. ) 6 48,000.00 3,600.00 3,000.00 15,000.00 69,600.00 69,600.00 69,600.00

M3 Kg Ltr Btg

1,200,000.00 18,000.00 15,000.000 7,500.00

0.040 0.200 0.200 2.000

Acuan : ABK Bangunan Gedung & Perumahan utk Pek.Beton - 6.29

Pemasangan Bekisting untuk Balok ( m ) No. 1 A 1 2 3 4 B 1 2 3 4 4 C D URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Papan Kayu Bekisting Paku Minyak Bekisting Balok Kayu Kleas III uk. 4/6 Cerucuk dia. 6 - 8 cm / 4 m Jumlah Jumlah A + B Harga Satuan SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 KUANTITAS 5 0.330 0.320 0.033 0.006

PBe.06.D BIAYA SATUAN ( Rp. ) 6 48,000.00 3,600.00 3,000.00 15,000.00 69,600.00 69,600.00 69,600.00

M3 Kg Ltr M3 Btg

1,200,000.00 18,000.00 15,000.000 7,500.00

0.040 0.200 0.200 0.018 2.000

Acuan : ABK Bangunan Gedung & Perumahan utk Pek.Beton - 6.29

Pemasangan Bekisting untuk Lantai ( m2 ) No. 1 A 1 2 3 4 B 1 2 3 4 4 URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Papan Kayu Bekisting Paku Minyak Bekisting Balok Kayu Kleas III uk. 4/6 Cerucuk dia. 6 - 8 cm / 4 m SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 KUANTITAS 5 0.330 0.320 0.033 0.006

PBe.06.E BIAYA SATUAN ( Rp. ) 6 48,000.00 7,200.00 3,000.00 45,000.00

M3 Kg Ltr M3 Btg

1,200,000.00 18,000.00 15,000.000 7,500.00

0.040 0.400 0.200 0.015 6.000

C D

Jumlah Jumlah A + B Harga Satuan


Acuan : ABK Bangunan Gedung & Perumahan utk Pek.Beton - 6.29

103,200.00 103,200.00 103,200.00

Pekerjaan Beton Bertulang (G.Sub / M3) No. 1 URAIAN PEKERJAAN 2


3

SATUAN 3
3

HARGA SATUAN ( Rp. ) 4 319,698.04 54,900.00 14,430.00

KUANTITAS 5 1.000 0.640 250.000

BIAYA SATUAN ( Rp. ) 6 319,698.04 35,136.00 3,607,500.00 3,962,334.04 319,698.04 1,055,397.00 2,332,898.10 3,707,993.14 319,698.04 128,620.80 4,448,336.10 4,896,654.94 319,698.04 1,101,768.00 2,587,876.20 4,009,342.24 319,698.04 1,160,232.00 1,956,708.00 3,436,638.04 319,698.04 111,360.00 6,349,200.00 6,780,258.04 319,698.04 1,113,600.00 2,365,077.00 3,798,375.04

G.Sub.A Pondasi Beton Bertulang (M ) 3 Beton camp. 1:2:3 (PBe. 03 / M ) 2 Bekisting (PBe.06.A x 10 M ) Pembesian (PBe. 04 / Kg) Jumlah G.Sub.B Ring Balok 15/25 Beton Bertulang (M3) Beton camp. 1:2:3 (PBe. 03 / M ) Bekisting (PBe.06.B x 10 M2) Pembesian (PBe. 04 / Kg) Jumlah G.Sub.C Sloof 10/15 Beton Bertulang (M3) 3 Beton camp. 1:2:3 (PBe. 03 / M ) 2 Bekisting (PBe.06.B x 10 M ) Pembesian (PBe. 04 / Kg) Jumlah G.Sub.E Balok Induk 15/40 Beton Bertulang (M3) Beton camp. 1:2:3 (PBe. 03 / M ) Bekisting (PBe.06.D x 10 M2) Pembesian (PBe. 04 / Kg) Jumlah G.Sub.F Balok Anak15/30 Beton Bertulang (M3) 3 Beton camp. 1:2:3 (PBe. 03 / M ) 2 Bekisting (PBe.06.D x 10 M ) Pembesian (PBe. 04 / Kg) Jumlah G.Sub.G Kolom 15/15 Beton Bertulang (M3) Beton camp. 1:2:3 (PBe. 03 / M ) Bekisting (PBe.06.C x 10 M2) Pembesian (PBe. 04 / Kg) Jumlah G.Sub.H Kolom Lt. 2 25/25 Beton Bertulang (M3) Beton camp. 1:2:3 (PBe. 03 / M3) Bekisting (PBe.06.C x 10 M2) Pembesian (PBe. 04 / Kg) Jumlah
3 3 3

M 2 M Kg

M M2 Kg

319,698.04 60,900.00 14,430.00

1.000 17.330 161.670

M M2 Kg

319,698.04 60,900.00 14,430.00

1.000 2.112 308.270

M M2 Kg

319,698.04 69,600.00 14,430.00

1.000 15.830 179.340

M M2 Kg

319,698.04 69,600.00 14,430.00

1.000 16.670 135.600

M M2 Kg

319,698.04 69,600.00 14,430.00

1.000 1.600 440.000

M3 M2 Kg

319,698.04 69,600.00 14,430.00

1.000 16.000 163.900

No. 1 G.Sub.I

URAIAN PEKERJAAN 2 Kolom Praktis Beton Bertulang (M3) 3 Beton camp. 1:2:3 (PBe. 03 / M ) Bekisting (PBe.06 x 10 M2) Pembesian (PBe. 04 / Kg) Jumlah

SATUAN 3 M M2 Kg
3

HARGA SATUAN ( Rp. ) 4 319,698.04 54,900.00 14,430.00

KUANTITAS 5 1.000 20.000 193.500

BIAYA SATUAN ( Rp. ) 6 319,698.04 1,098,000.00 2,792,205.00 4,209,903.04 319,698.04 797,979.00 1,117,677.04 319,698.04 1,032,000.00 1,595,958.00 2,947,656.04 319,698.04 1,482,480.00 1,139,970.00 2,942,148.04 319,698.04 1,215,912.00 1,470,561.30 3,006,171.34 PBA.01 BIAYA SATUAN ( Rp. ) 6 #REF! #REF! #REF! #REF!

G.Sub.J Plat Lantai Dasar Beton Bertulang (M3) 3 Beton camp. 1:2:3 (PBe. 03 / M ) Pembesian (PBe. 04 / Kg) Jumlah G.Sub.K Plat Lantai 2 Beton Bertulang (M3) Beton camp. 1:2:3 (PBe. 03 / M ) 2 Bekisting (PBe.06.E x 10 M ) Pembesian (PBe. 04 / Kg) Jumlah G.Sub.L Listplank Beton Bertulang (M3) Beton camp. 1:2:3 (PBe. 03 / M3) 2 Bekisting (PBe.06.D x 10 M ) Pembesian (PBe. 04 / Kg) Jumlah G.Sub.M Tangga Beton Bertulang (M3) Beton camp. 1:2:3 (PBe. 03 / M ) Bekisting (PBe.06.D x 10 M2) Pembesian (PBe. 04 / Kg) Jumlah Pekerjaan Konstruksi Baja ( kg ) No. 1 A 1 2 3 B 1 2 C D URAIAN PEKERJAAN 2 TENAGA Tukang Besi Konstruksi Pekerja Kepala Tukang Jumlah BAHAN Baja Konstruksi Kawat Las Jumlah Jumlah A + B Harga Satuan
3 3

M Kg

319,698.04 14,430.00

1.000 55.300

M 2 M Kg

319,698.04 103,200.00 14,430.00

1.000 10.000 110.600

M3 2 M Kg

319,698.04 69,600.00 14,430.00

1.000 21.300 79.000

M M2 Kg

319,698.04 69,600.00 14,430.00

1.000 17.470 101.910

SATUAN 3 OH OH OH

HARGA SATUAN ( Rp. ) 4 -

KUANTITAS 5 0.00375 0.015 0.0225

Kg Kg

#REF!

1.100 0.020

Pemasangan Langit-langit Gypsum Board t = 9 mm + Rangka Kayu Kelas II ( m ) HARGA No. URAIAN PEKERJAAN SATUAN SATUAN ( Rp. )
1 2 3 4

KUANTITAS
5

PL.02' BIAYA SATUAN ( Rp. )


6

A 1 2 3 4 B 1 2 3 C D E

TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Kayu Kelas II Gypsum Board t = 9 mm Paku Gypsum Jumlah Jumlah A + B Harga Satuan Harga Satuan

OH OH OH OH

0.400 0.270 0.040 0.0135

83,375.00 1,870.00 85,245.00 85,245.00 85,245.00 106,556.25

M3 2 M Bh

3,625,000.00 17,000.00

0.023 0.364 0.110

1.250

Pemasangan Langit-langit GRC Board t = 9 mm + Rangka Kayu Kelas II ( m ) No.


1

URAIAN PEKERJAAN
2

SATUAN
3

HARGA SATUAN ( Rp. )


4

KUANTITAS
5

PL.02" BIAYA SATUAN ( Rp. )


6

A 1 2 3 4 B 1 2 3 C D

TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Kayu Kelas II GRC Board Paku Jumlah Jumlah A + B Harga Satuan
Acuan : SNI.2838 - 6.24

OH OH OH OH

0.400 0.270 0.040 0.0135

83,375.00 1,870.00 85,245.00 85,245.00 85,245.00

M M2 Bh

3,625,000.00 17,000.00

0.023 0.364 0.110

Pemasangan Kloset Duduk / Monoblok ( bh ) No. 1 A 1 2 3 4 B 1 2 C D URAIAN PEKERJAAN 2 TENAGA Tukang Batu Pekerja Kepala Tukang Mandor Jumlah BAHAN Kloset Duduk / Monoblok Perlengkapan Jumlah Jumlah A + B Harga Satuan SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 KUANTITAS 5 1.100 3.300 0.001 0.160

PSa.01 BIAYA SATUAN ( Rp. ) 6 #REF! #REF! #REF! #REF! #REF!

Bh Ls

#REF! #REF!

1.000
6% Harga Kloset

Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Sanitasi - 6.1

Pemasangan Kloset Jongkok Standar ( bh ) No. 1 A 1 2 3 4 B 1 2 3 C D URAIAN PEKERJAAN 2 TENAGA Tukang Batu Pekerja Kepala Tukang Mandor Jumlah BAHAN Kloset Jongkok Standar Semen Portland Pasir Beton / Pasang Jumlah Jumlah A + B Harga Satuan SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 KUANTITAS 5 1.500 1.000 1.500 0.160

PSa.02 BIAYA SATUAN ( Rp. ) 6 633.33 633.33 633.33 633.33

Bh Kg M
3

63,333.33

1.000 6.000 0.010

Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Sanitasi - 6.2

Pemasangan Urinoir ( bh ) No. 1 A 1 2 3 4 B 1 2 3 4 C D URAIAN PEKERJAAN 2 TENAGA Tukang Batu Pekerja Kepala Tukang Mandor Jumlah BAHAN Urinoir Perlengkapan Semen Portland Pasir Beton / Pasang Jumlah Jumlah A + B Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Sanitasi - 6.2

SATUAN 3 OH OH OH OH

HARGA SATUAN ( Rp. ) 4 -

KUANTITAS 5 1.000 1.000 0.100 0.100

PSa.03 BIAYA SATUAN ( Rp. ) 6 #REF! #REF! 633.33 #REF! #REF! #REF!

Bh Ls Kg M3

#REF! #REF! 63,333.33

1.000 0.300 6.000 0.010

Pemasangan Wastafel ( bh ) No.


1

URAIAN PEKERJAAN
2

SATUAN
3

HARGA SATUAN ( Rp. )


4

KUANTITAS
5

PSa.04 BIAYA SATUAN ( Rp. )


6

A 1 2 3 4 B 1 2 3 4 C D

TENAGA Tukang Batu Pekerja Kepala Tukang Mandor Jumlah BAHAN Wastafel Keramik Perlengkapan Semen Portland Pasir Beton / Pasang Jumlah Jumlah A + B Harga Satuan

OH OH OH OH

1.450 1.200 0.150 0.100

#REF! #REF! 633.33 #REF! #REF! #REF!

Bh Ls Kg M
3

#REF! #REF! 63,333.33

1.000
12% Harga Wastafel

6.000 0.010

Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Sanitasi - 6.5

Pemasangan Kran Air ( bh ) No.


1

PSa.06 SATUAN
3

URAIAN PEKERJAAN
2

HARGA SATUAN ( Rp. )


4

KUANTITAS
5

BIAYA SATUAN ( Rp. )


6

A 1 2 3 4 B 1 2 C D

TENAGA Tukang Batu Pekerja Kepala Tukang Mandor Jumlah BAHAN Kran Air Seal Tape Jumlah Jumlah A + B Harga Satuan

OH OH OH OH

0.100 0.010 0.010 0.005

Bh Bh

1.000 0.025

Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Sanitasi - 6.35

Pemasangan Floor Drain ( bh ) No.


1

URAIAN PEKERJAAN
2

SATUAN
3

HARGA SATUAN ( Rp. )


4

KUANTITAS
5

PSa.08 BIAYA SATUAN ( Rp. )


6

A 1 2 3 4 B 1 C D

TENAGA Tukang Batu Pekerja Kepala Tukang Mandor Jumlah BAHAN Floor Drain Jumlah Jumlah A + B Harga Satuan

OH OH OH OH

0.100 0.010 0.010 0.005

Bh

1.000

Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Sanitasi - 6.36

Pengadaan & Pemasangan Pipa PVC (AW) dia. 3/4" (M') No.
1

URAIAN PEKERJAAN
2

SATUAN
3

HARGA SATUAN ( Rp. )


4

KUANTITAS
5

PPi.02' BIAYA SATUAN ( Rp. )


6

A 1 2 3 4 B 1 C D

TENAGA Tukang Pipa Pekerja Kepala Tukang Mandor Jumlah BAHAN Pipa PVC Type AW dia. 3/4" Jumlah Jumlah A + B Harga Satuan

OH OH OH OH

0.060 0.036 0.006 0.0018

M'

1.000

Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Sanitasi - 6.27

Pengadaan & Pemasangan Pipa PVC (AW) dia. 1" (M') No.
1

URAIAN PEKERJAAN
2

SATUAN
3

HARGA SATUAN ( Rp. )


4

KUANTITAS
5

PPi.02" BIAYA SATUAN ( Rp. )


6

A 1 2 3 4 B 1 C D

TENAGA Tukang Pipa Pekerja Kepala Tukang Mandor Jumlah BAHAN Pipa PVC Type AW dia. 1" Jumlah Jumlah A + B Harga Satuan

OH OH OH OH

0.060 0.036 0.006 0.0018

M'

1.000

Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Sanitasi - 6.27

Pemasangan Ventilasi Kaca ( m ) 2 2 Setiap luas 1 m bidang daun ventilasi, luas kacanya adalah 0,60 m No. 1 A 1 2 3 4 B URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN 1 List Pintu/Jendela 2 Kaca Polos t = 5 mm 3 Paku Tripleks Jumlah C D Jumlah A + B Harga Satuan M' M2 Kg 120,000.00 35,000.00 8.000 0.600 0.050 SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 KUANTITAS 5 2.000 0.500 0.200 0.025

F.37.c BIAYA SATUAN ( Rp. ) 6 72,000.00 1,750.00 73,750.00 73,750.00 73,750.00

Pemasangan Kunci Pintu 2 Slag ( bh ) No. 1 A 1 2 3 4 B 1 C D URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Kunci Pintu 2 slag Jumlah Jumlah A + B Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Kunci & Kaca - 6.1

SATUAN 3 OH OH OH OH

HARGA SATUAN ( Rp. ) 4 -

KUANTITAS 5 0.600 0.060 0.060 0.003

PKK.01 BIAYA SATUAN ( Rp. ) 6 -

Bh

1.000

Pemasangan Kunci Kamar Mandi/Toilet 1 Slaag ( bh ) No. 1 A 1 2 3 4 B 1 C D URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Kunci Pintu 1 slag Jumlah Jumlah A + B Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Kunci & Kaca - 6.3

SATUAN 3 OH OH OH OH

HARGA SATUAN ( Rp. ) 4 -

KUANTITAS 5 0.500 0.005 0.005 0.0025

PKK.03 BIAYA SATUAN ( Rp. ) 6 -

Bh

1.000

Pemasangan Engsel Pintu ( bh ) No. URAIAN PEKERJAAN SATUAN HARGA SATUAN ( Rp. ) KUANTITAS

PKK.06 BIAYA SATUAN ( Rp. )

1 A 1 2 3 4 B 1 C D

2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Engsel Pintu Jumlah Jumlah A + B Harga Satuan

3 OH OH OH OH

4 -

5 0.150 0.015 0.015 0.00075

6 -

Bh

1.000

Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Kunci & Kaca - 6.5

Pemasangan Engsel Jendela Kupu-kupu ( bh ) No. 1 A 1 2 3 4 B 1 C D URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Engsel Jendela Jumlah Jumlah A + B Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Kunci & Kaca - 6.6

SATUAN 3 OH OH OH OH

HARGA SATUAN ( Rp. ) 4 -

KUANTITAS 5 0.100 0.010 0.010 0.0005

PKK.07 BIAYA SATUAN ( Rp. ) 6 -

Bh

1.000

Pemasangan Kait Jendela / Ramskar ( bh ) No. 1 A 1 2 3 4 B 1 C D URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Kait Jendela / Ramskar Jumlah Jumlah A + B Harga Satuan SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 KUANTITAS 5 0.150 0.015 0.015 0.00075

PKK.08 BIAYA SATUAN ( Rp. ) 6 -

Bh

1.000

Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Kunci & Kaca - 6.9

Pemasangan Kunci Selot Jendela ( bh ) No. 1 A 1 2 3 4 B 1 C D URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Kunci Selot Jendela Jumlah Jumlah A + B Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Kunci & Kaca - 6.11.a

SATUAN 3 OH OH OH OH

HARGA SATUAN ( Rp. ) 4 -

KUANTITAS 5 0.200 0.020 0.020 0.001

PKK.10 BIAYA SATUAN ( Rp. ) 6 -

Bh

1.000

Pemasangan Pegangan Jendela, Handle ( bh ) No. 1 A 1 2 3 4 B 1 C D URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Pegangan Pintu/Jendela (Handle) Jumlah Jumlah A + B Harga Satuan SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 KUANTITAS 5 0.150 0.015 0.015 0.00075

PKK.11 BIAYA SATUAN ( Rp. ) 6 -

Bh

1.000

Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Kunci & Kaca - 6.12

Pemasangan Kaca Polos t = 3 mm ( m 2 ) No. 1 A 1 2 3 4 B 1 C D URAIAN PEKERJAAN 2 TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Kaca Polos t = 3 mm Jumlah Jumlah A + B Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Kunci & Kaca - 6.16

SATUAN 3 OH OH OH OH

HARGA SATUAN ( Rp. ) 4 -

KUANTITAS 5 0.150 0.015 0.015 0.00075

PKK.16 BIAYA SATUAN ( Rp. ) 6 93,500.00 93,500.00 93,500.00 93,500.00

85,000.00

1.100

Pemasangan Kaca Rayban t = 5 mm ( m 2 ) HARGA No. 1 A 1 2 3 4 B 1 C D TENAGA Tukang Kayu Pekerja Kepala Tukang Mandor Jumlah BAHAN Kaca Rayban t = 5 mm Jumlah Jumlah A + B Harga Satuan
Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Kunci & Kaca - 6.19.b

PKK.20 BIAYA KUANTITAS 5 0.250 0.025 0.025 0.00125 SATUAN ( Rp. ) 6 M2 145,000.00 1.100 159,500.00 159,500.00 159,500.00 159,500.00 SATUAN 3 OH OH OH OH SATUAN ( Rp. ) 4

URAIAN PEKERJAAN 2

Pelaburan Bidang Kayu dengan Residu atau Ter ( m 2 ) No. 1 A 1 2 B 1 C D URAIAN PEKERJAAN 2 TENAGA Tukang Cat Kepala Tukang Jumlah BAHAN Residu atau Ter Jumlah Jumlah A + B Harga Satuan SATUAN 3 OH OH HARGA SATUAN ( Rp. ) 4 KUANTITAS 5 0.100 0.006

SUPL.SNI.PC-6.12 BIAYA SATUAN ( Rp. ) 6 3,500.00 3,500.00 3,500.00 3,500.00

Ltr

10,000.00

0.350

Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Pengecatan - 6.12

Pelaburan Bidang Kayu dengan Pelitur ( m 2 ) No. 1 A 1 2 3 B 1 C D URAIAN PEKERJAAN 2 TENAGA Tukang Cat Kepala Tukang Mandor Jumlah BAHAN Pelitur Jumlah Jumlah A + B Harga Satuan SATUAN 3 OH OH OH HARGA SATUAN ( Rp. ) 4 KUANTITAS 5 0.060 0.016 0.0025

PC.05 BIAYA SATUAN ( Rp. ) 6 17,226.00 17,226.00 17,226.00 17,226.00

Ltr

33,000.00

0.522

Pengecatan Permukaan Besi/Baja dengan Meni Besi ( m 2 ) No. 1 A 1 2 3 4 B 1 2 C D URAIAN PEKERJAAN 2 TENAGA Tukang Cat Pekerja Kepala Tukang Mandor Jumlah BAHAN Meni Besi Minyak Cat/Thinner Jumlah Jumlah A + B Harga Satuan SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 KUANTITAS 5 0.200 0.020 0.020 0.010

PC.07 BIAYA SATUAN ( Rp. ) 6 1,800.00 24.00 1,824.00 1,824.00 1,824.00

Kg Ltr

18,000.00 20,000.00

0.100 0.0012

Acuan : ABK Bangunan Gedung & Perumahan utk Pek. Pengecatan - 6.20

2 x Mencat Kilat ( 10 m 2 ) No. 1 A 1 2 URAIAN PEKERJAAN 2 TENAGA Tukang Cat Pekerja SATUAN 3 OH OH HARGA SATUAN ( Rp. ) 4 KUANTITAS 5 0.750 0.500

2K6+K23 BIAYA SATUAN ( Rp. ) 6 -

3 4 B 1 2 3 C D E

Kepala Tukang Mandor Jumlah BAHAN Cat Kilat Minyak Cat Amplas Jumlah Jumlah A + B Harga Satuan Harga Satuan

OH OH

0.075 0.025

65,000.00 10,000.00 25,000.00 100,000.00 100,000.00 100,000.00 10,000.00

Kg Ltr Lbr

25,000.00 20,000.00 25,000.00

2.600 0.500 1.000

10 M2 M2

Mendempul dan 1 x Cat Dasar (Baru) ( 10 M ) No. 1 A 1 2 3 4 B 1 2 3 4 C D E URAIAN PEKERJAAN 2 TENAGA Tukang Cat Pekerja Kepala Tukang Mandor Jumlah BAHAN Cat Dasar Kayu Dempul Minyak Cat Amplas Jumlah Jumlah A + B Harga Satuan Harga Satuan SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 KUANTITAS 5 0.750 0.500 0.075 0.025

1,5K2+K30+K23 BIAYA SATUAN ( Rp. ) 6 #REF! 40,000.00 10,000.00 50,000.00 #REF! #REF! #REF! #REF!

Kg Kg Ltr Lbr

#REF! 50,000.00 20,000.00 25,000.00

2.250 0.800 0.500 2.000

10 M M2

Mendasar, Menggosok 2 x Cat Kilat ( 10 M2 ) No. 1 1 2 URAIAN PEKERJAAN 2 2K6+K23 1,5K2+K30+K23 Jumlah Harga Satuan SATUAN 3 M2 M2 M2 HARGA SATUAN ( Rp. ) 4 10,000.00 #REF! KUANTITAS 5 -

K23+K30 BIAYA SATUAN ( Rp. ) 6 10,000.00 #REF! #REF! #REF!

Mencat 2 x dengan Cat Tembok ( 10 m 2 ) No. 1 A 1 2 3 4 B 1 C D E URAIAN PEKERJAAN 2 TENAGA Tukang Cat Pekerja Kepala Tukang Mandor Jumlah BAHAN Cat Tembok Jumlah Jumlah A + B Harga Satuan Harga Satuan SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 KUANTITAS 5 0.750 0.500 0.075 0.025

G.54ia BIAYA SATUAN ( Rp. ) 6 15,600.00 15,600.00 15,600.00 15,600.00 1,560.00

Kg

6,000.00

2.600

10 M 2 M

Pek. Plamur Dinding Tembok dan 1 x Cat Dasar ( 10 M ) No. 1 A 1 2 3 4 B 1 2 3 4 C D E URAIAN PEKERJAAN 2 TENAGA Tukang Cat Pekerja Kepala Tukang Mandor Jumlah BAHAN Cat Dasar Tembok Plamur Minyak Cat Amplas Jumlah Jumlah A + B Harga Satuan Harga Satuan SATUAN 3 OH OH OH OH HARGA SATUAN ( Rp. ) 4 KUANTITAS 5 0.750 0.500 0.075 0.025

2K6+K23 BIAYA SATUAN ( Rp. ) 6 13,500.00 21,600.00 10,000.00 50,000.00 95,100.00 95,100.00 95,100.00 9,510.00

Kg Kg Ltr Lbr

6,000.00 27,000.00 20,000.00 25,000.00

2.250 0.800 0.500 2.000

10 M2 M2

Mendasar, Menggosok 2 x Cat Tembok ( 10 M2 ) No. 1 1 2 URAIAN PEKERJAAN 2 G.54ia 2K6+K23 Jumlah Harga Satuan SATUAN 3 M M2 M2
2

HARGA SATUAN ( Rp. ) 4 1,560.00 9,510.00

KUANTITAS 5 -

K23+K30b BIAYA SATUAN ( Rp. ) 6 1,560.00 9,510.00 11,070.00 11,070.00

#REF! #REF! #REF!

#REF!

#REF!

Anda mungkin juga menyukai