Anda di halaman 1dari 3

DATE: PROJECT: ADDRESS: OWNER: SUBJECT:

November 26, 2011 RESTORATION OF TWO (2) STOREY RESIDENTIAL HOUSE Block 8 Lot 11 Hills of Maia Alta, Antipolo City

As Stated

ATTN:

Sir/Madam, I would like to quote you the amount of Three Hundred Ninety Three Thousand Pesos Only (Php 393,000.00). This includes labor and materials consumable, equipment and technical supervision for the abovementioned project.

Scope of works: A. Ground floor a. Replace main door (panel type 1x2.10) duco finish b. Electrical works (damaged by fire) c. Casement window re-alignment with clear glass d. Ceiling repair e. Flooring re-grouting f. Toilet repair and accessories g. Total repainting works (interior and exterior) h. Stairs leading to 2nd floor and handrails i. Steel balusters repair and repainting

j.

Kitchen retouching and tile re-grouting

k. Other minor works l. Kitchen cabinet repairs (up and down

B. 2ND Floor a. Roofing-use tile span (choice color) i. Gutter-Spanish type ii. Flashing- Spanish type iii. Facia Board- use 2x8 C-Purlins iv. Ridge roll-Spanish type b. Trusses-use C-Purlins and 1.5x1.5 angle bars i. Restoration of existing trusses c. Ceiling-use metal furring d. 2 bedrooms- use metal studs partition with thick marine plywood e. Electrical works (new wiring) L.O. and C.O. f. Doors-flush type .80x2.10 g. Re-alignment of casement window and glass installation with glass putty h. Flooring use: 12x12 vinyl wood type i. j. Interior painting- use Boysen (4 coats) white Exterior painting- use elastomeric paint (4 coats) choice color

k. Interior walling repair damaged by fire l. Canopy restoration in front side

m. Sanitary/plumbing works n. Installation of wood cornish at ceiling

o. Re-painting of main gate grills (black) p. Other minor repairs if needed

Terms of Payment: 50% down payment Balance: progress billing Php 196,500.00

Total Manpower:

1 architect 1 foreman 11 workers

Completion work:

30 working days