Note: This section may have multiple answers to a given question. Answer carefully. No
partial marks will be given.
Q1. For a normal distribution, six standard deviations on each side of the mean would
cover
a. Approximately 99.99998% of total population
Q4. When referring to a curve that tails off to the left end, you would call it
a. Symmetrical
b. Skewed right
c. Skewed left
d. All of these
e. None of these
1
d. Requires a sample to contain fewer than 30 observations
Q6. A major Automobile manufacturer has had to recall several models from its 1993 line
due to quality controlproblems that were not discovered with its random final inspection
procedures. This is an example of
a. Type I error
b. Type II error
c. Both Type I and Type II error
d. Neither type of error
Q7. If we say that Alpha = 0.10 for a particular hypothesis test, we are saying that
a.10% is our minimum standard for acceptable probability
b.10%is the risk we take of rejecting a hypothesis that is true
c.10% is the risk we take of accepting a hypothesis that is false
d. (a) and (b) only
e. (a) and (c) only
Q8. Which one of the following terms does not belong with the others?
a. Ishikawa Diagram
b. Pareto Diagram
c. Fishbone diagram
d. Cause and Effect Diagram
Q 11. A statistical technique to assess, monitor and maintain the stability of a process.
a. Pareto Chart
b. Control Chart
c. Run Chart
d. Cause and Effect Diagram
e. Histogram
Q.12. If a bar chart is seen arranged in the descending order of frequencies, then you are
seeing a
a. Pareto Chart
b. Bar Chart
c. Histogram
d. Control Chart
e. Flow Chart
f. Run Chart
2
Q13. In Statistics, ‘Mean’, ‘Median’ and ‘Mode’ are measures of
a. Central Tendency
b. Variance
c. Deviation (Standard Deviation)
d. Dispersion
Q15. Out of the following, what can be used for transforming the non-normal data?
a. Y2
b. Y3
c. 1/Y
d. Box-Cox transformation
Q17. Concluding a manager A is better than manager B when they are at the same level of
efficiency, the following error is made.
a. Type I
b. Type II
c. Type III
d. Type IV
Q18. The following are the prioritization tools for identifying the right contributors to an
out put.
a. Pareto
b. Regression
c. Correlation
d. FMEA
3
d. Defects Per Unit + 2
1. Do not apply SPC tools to processes that are known to be out of control.
2. A specification is a customer-defined tolerance for the output unit characteristics
and it can be one sided or two sided.
3. Upper and lower control limits for control charts usually represent 4.5 standard
deviations from the mean value of the variable measured.
4. Assuming a linear relationship between X and Y, there is a strong negative
relationship between them if the coefficient of correlation (r) equals -0.10.
5. The Six Sigma Management approach is based on the concept that a process should
not create more than 3.4 defects per million products produced or services rendered
which is equivalent to six standard deviations from the mean of the monitored
variable.
6. Central Tendency, Spread and Shape are the characteristics of discrete data.
7. σ total = σ process + σ measurement where σ is measurement system
variation.
8. In order to measure process capability, the process to be measured must only have
common causes of variation.
9. Discrete data does not allow understanding the process variation and needs larger
samples for analysis.
10. If the population distribution is sufficiently skewed or the sample size is
sufficiently small (<30) then the population parameter cannot be tested.
4
7. Data that is derived from counting is ________ data and data that is derived from measuring is
________ data.
8. Flow chart is for process analysis as Scatter Diagram is for ________________.
9. The best tool for analyzing the relationship, over time, between quantitative data from two
variables suspected to influence one another is _____________.
10. All possible combinations of the levels of factors are studied in ____________ designs.
Office 1 Office 2
4 7
3 2
6 3
5 4
5 7
2 4
5 2
4 4
6
5
4
Ans: The mean for Office 1 is 4.40 and Std deviation is 1.26.
Office 2 is 4.125 and Std deviation is 1.95. The range also varies from 2.49 to 5.76.
Hence Office 1 is more effective.
2. A candy bar manufacturer is interested in estimating how sales are influenced by the price of
their product. They randomly choose 6 small cities of similar characteristics and offer a candy bar
at different prices in each of them, then collect the following data as described in the table. If
candy bar sales are the dependent variable (Y) and the company conducts a simple linear
regression answer the following questions.
a) What is the estimated slope parameter for the candy bar price and sales data? 47.3
b) What is the percentage of the total variation in candy bar sales explained by the
regression model? 79.5%
c) If the price of the candy bar is set at $2, what is the value for predicted sales? 65/66
Answer:
3. A quality control analyst for a light bulb manufacturer is concerned that the time it takes to
produce a batch of light bulbs is too erratic. Accordingly, the analyst randomly surveys 10
production periods each day for 14 days and records the sample mean and range for each day:
6
5 63.7 6.2
6 57.5 6.0
7 55.0 5.4
8 54.9 6.1
9 55.0 5.9
10 62.7 5.0
11 61.9 7.1
12 60.0 6.5
13 58.3 5.9
14 52.0 5.2
a) What is the center line and Lower Control Limit if the analyst constructs an R chart of this
data to see if the variability in production times is in-control?
LCL – 3.565
CL – 6
b) Suppose the analyst constructs a control chart for the mean to see if the production process is
in-control, what will be your final conclusions for process stability and the deviations?
LCL – 45.38
CL – 58
UCL -70.62
Though the process is within control limits, the trend shows that the process is not very stable and
consistent.
4. Kailash is the Pizza Hut dispatcher for Jayanagar area. He wants pizzas delivered to the
customers within 30 minutes of leaving the kitchens. Pizzas with longer delivery times tend to be
too cold when they arrive. Each of his 10 volunteer drivers is responsible for delivering 15 Pizzas
daily. Over the past 1 month , Kailash has recorded the percentage of each day's 150 Pizzas that
were delivered on time and the data is shown below.
a) Which control chart Kailash will use to see whether the delivery process is in control?
Simple X bar chart
b) Mention the no of days when the process is out of control and which is worrying to Kailash
None.
c) What action do you recommend for Kailash?
% on % on
Day time Day time
1 89.33 16 89.33
2 81.33 17 89.33
3 95.33 18 78.67
4 88.67 19 94
5 96 20 94
6 86.67 21 99.33
7 98 22 95.33
8 84 23 94.67
7
9 90.67 24 92.67
10 80.67 25 81.33
11 88 26 89.33
12 86.67 27 99.33
13 96.67 28 90.67
14 85.33 29 92
15 78.67 30 88
Refer to the attached Case Study. This talks about an account growth six sigma project executed
in a particular organization. Criticize the approach they have taken in executing this DMAIC
project based on your knowledge learnt from this course.
DON’T write stories. Provide the bullet points for positives and negatives individually. The
case analysis should not go beyond 2 pages of the answer paper. Long answers will be penalized.
Mentioning only the tools will NOT yield any marks. Any tool usage should be justified for the
right use in the right phase.