CADANGAN PEMBINAAN KOMPLEKS PANGKALAN KASTAM BAHAGIAN PENCEGAHAN DAN PERUMAHAN DI TANJUNG DAWAI, MERBOK

BIL
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40

AKTIVITI-AKTIVITI KERJA
PRELIMINARIES
DEMOBILITION WORKS
SITE PREPARATION & EARTHWORKS
Site Clearing
Geotextile
Earthworks (Filling Sand + Imported Fill)
Vertical drain
Surcharging Works
Filling
Surcharging Period
Remove Surcharge Material
Soil Instrumentations
Report
Temporary Works
PILING WORKS (Spun Piles)
Mobilisation
Bangunan Pejabat Pentadbiran
Preliminary pile (400mm)
Static load test 560kN-1nos
Pile driving Analyzer (PDA)-7nos
Working pile (400mm)
Cutting of head
Pondok Keselamatan
Preliminary pile (400mm)
Pile driving Analyzer (PDA)-1nos
Working pile (400mm)
Cutting of head
TNB Sub-station
Preliminary pile (400mm)
Pile driving Analyzer (PDA)-1nos
Working pile (400mm)
Cutting of head
Rumah Pan dan Tangki Hose Reel
Preliminary pile (400mm)
Pile driving Analyzer (PDA)-1nos
Working pile (400mm)
Cutting of head
Demobilisation
BUILDING WORKS
BANGUNAN PEJABAT PENTADBIRAN
Works Below Lowest Floor Finish

Tempoh
(hari)

Tarikh
Mula

504
14

12/04/10
17/05/10

20/11/11
01/06/10

21
45
45
60

02/06/10
24/08/10
11/09/10
16/10/10

26/06/10
14/10/10
01/11/10
23/12/10

60
155
30
60
160
30

01/12/10
09/02/11
07/07/11
25/12/10
30/12/10
26/07/11

08/02/11
08/08/11
10/08/11
03/03/11
04/07/11
29/08/11

19/07/11

21/07/11

1
4
10
14
10

23/07/11
24/07/11
31/07/11
28/07/11
08/08/11

23/07/11
27/07/11
10/08/11
13/08/11
15/08/11

2
2
2
1
2

1
1
2
2

14/08/11
15/08/11
15/08/11
17/08/11

14/08/11
15/08/11
16/08/11
18/08/11

2
2
2
2

1
1
1

1
1
2
2

17/08/11
18/08/11
18/08/11
21/08/11

17/08/11
18/08/11
20/08/11
22/08/11

2
2
2
2

1
1
1

1
1
2
2
1

21/08/11
22/08/11
22/08/11
24/08/11
27/08/11

21/08/11
22/08/11
23/08/11
25/08/11
27/08/11

2
2
2
2

1
1
1

2
4

Tools

Roller

Tools

Tools

Buldozer

Kerja
Kebakaran

Kerja Jalan

Pasang
Longkang

Kerja
Landskap

Buldozer
Operator

Tools
Kerja
Melepa

Tools

Tools
Kerja Bata

Tools

Tools
Tukang Cat

Pekerja Air
Cond

Tools
Tukang
Paip

Tools

Tools
Tukang
Jubin

Pekerja
Perabot
Kerja
Elektrikal

Tools
Tukang P.
Karpet

Tools

Tools
Siling
Tukang
Bumbung

Tools

Simen
Tukang
Besi
Tukang

Compactor

Concrete
Mixer
Comp Opr
Tukang

Roller
Operator

Machine

Backpusher

Backpushe
Operator
r

Piling
Operator
Piling

Operator
Backhoe

Excavator

Excavator
Lori

Tarikh
Siap

Backhoe

Lorry

Tools
Antitermite
Pemandu

Tools

Cutter

Mason

Bar Bender
Pekerja

Pekerja

Tukang

Jentera

Kayu

Tools

SUMBER

1
8

3
8

1
1

Operator

2
CADANGAN PEMBINAAN KOMPLEKS PANGKALAN KASTAM BAHAGIAN PENCEGAHAN DAN PERUMAHAN DI TANJUNG DAWAI, MERBOK

BIL

AKTIVITI-AKTIVITI KERJA

41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81

Excavate
Pile cap
Column stump
Anti-termite
Ground beam
Anti-termite
Ground floor Slab
Apron, Ramp & Perimeter Drain
Apron
Excavate
Hardcore
Lean Concrete
Reinforced Concrete
Ramp
Excavate
Hardcore
Lean Concrete
Reinforced Concrete
Perimeter Drain (230mm dia.)
Excavate
Reinforced Concrete
Plastering & Finishes
Frame
Column and Stiffeners
Roof Beam
Roof Structure and Roof Covering
Roof Slab
Roof Trusses
Roof Finishes
External Walls
Ground Floor
Internal Walls & Partition
Ground Floor
Doors
External Doors
Metal door frame
Door Leaf
Internal Doors
Metal door frame
Door Leaf
Ironmongeries

Tarikh
Mula

12
17
17
14
20
14
19

06/08/11
08/08/11
10/08/11
16/08/11
15/08/11
24/08/11
29/08/11

18/08/11
27/08/11
29/08/11
31/08/11
06/09/11
08/09/11
19/09/11

1
2
2
3

27/10/11
29/10/11
31/10/11
02/11/11

27/10/11
30/10/11
01/11/11
05/11/11

1
2
2
3

27/10/11
29/10/11
31/10/11
02/11/11

27/10/11
30/10/11
01/11/11
05/11/11

2
3
2

27/10/11
30/10/11
02/11/11

5
5

Tools

Roller

Tools

Tools

Buldozer

Kerja
Kebakaran

Kerja Jalan

Pasang
Longkang

Kerja
Landskap

Buldozer
Operator

Tools
Kerja
Melepa

Tools

Tools
Kerja Bata

Tools

Tools
Tukang Cat

Pekerja Air
Cond

Tools
Tukang
Paip

Tools

Tools
Tukang
Jubin

Pekerja
Perabot
Kerja
Elektrikal

Tools
Tukang P.
Karpet

Tools

Tools
Siling
Tukang
Bumbung

Tools

Simen
Tukang
Besi
Tukang

Compactor

Concrete
Mixer
Comp Opr
Tukang

Roller
Operator

Machine

Backpusher

Backpushe
Operator
r

Piling
Operator
Piling

Kayu

Backhoe

Operator
Backhoe

Lorry

12

Excavator
Lori

4
4

Tarikh
Siap

Excavator

Tempoh
(hari)

Tukang

Pekerja

Tools

4
4

Jentera

Antitermite
Pemandu

Tools

Cutter

Mason

6
6

Tools

Bar Bender
Pekerja

SUMBER

1
5
5

2
5
2
12

1
4
3

2
3
5

4
1

2
3
5

29/10/11
01/11/11
03/11/11

5
5

13/09/11
19/09/11

18/09/11
24/09/11

3
3

2
2

4
4

5
5

6
3
3

25/09/11
02/10/11
05/10/11

01/10/11
04/10/11
08/10/11

25/09/11

29/09/11

16

01/10/11

05/10/11

16

5
2

25/09/11
01/10/11

29/09/11
02/10/11

3
5

5
2

17/10/11
23/10/11

22/10/11
24/10/11

1
4

6
6

7
5

Operator

3
CADANGAN PEMBINAAN KOMPLEKS PANGKALAN KASTAM BAHAGIAN PENCEGAHAN DAN PERUMAHAN DI TANJUNG DAWAI, MERBOK

BIL
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121

AKTIVITI-AKTIVITI KERJA
External Doors
Internal Doors
Windows
Windows frame
Windows
Internal Floor Finishes
Cement Rendering
Tiling
Carpet
Internal Walls Finishes
Plastering
Tiling
Painting
Internal Ceiling Finishes
Suspended Ceiling
Painting
External Finishes
External Floor Finishes
Cement Rendering
Tiling
External Wall Finishes
Plastering
Painting
External Ceiling Finishes
Fixed Ceiling Board
Painting
Cold Water Plumbing Services
Incoming Supply To Tank
Water Tank(2500mm dia. X
1000mm High)890 glln-2nos
Overflow and Scour pipe
Distribution Pipe
Pipe Fittings
Testing
Soil, Waste And Vent Pipe
Soil, Waste And Vent Pipe
Inspection Chamber
Testing
Sanitary Fittings
Fittings
Testing

5
5

5
2

17/10/11
23/10/11

22/10/11
24/10/11

8
8

2
7
5

06/10/11
13/10/11
26/11/11

08/10/11
20/10/11
30/11/11

5
5
2
5
3
2
10
2
2
5
9
2
2
8
10
5
54
14

25/09/11
01/10/11
11/10/11
01/10/11
01/10/11
04/10/11
01/10/11
06/10/11
06/10/11
01/10/11
01/10/11
01/10/11
09/10/11
03/10/11
17/11/10
26/11/11
29/09/11
29/09/11

29/09/11
05/10/11
12/10/11
05/10/11
03/10/11
05/10/11
11/10/11
08/10/11
08/10/11
05/10/11
10/10/11
02/10/11
10/10/11
11/10/11
28/11/11
30/11/11
30/11/11
15/10/11

10/10/11

17/10/11

5
20
7
2
37
20
14
5
22
19
5

18/10/11
16/10/11
21/11/11
29/11/11
05/10/11
05/10/11
26/10/11
12/11/11
10/11/11
10/11/11
30/11/11

23/10/11
07/11/11
28/11/11
30/11/11
16/11/11
27/10/11
10/11/11
16/11/11
05/11/11
01/12/11
05/12/11

6
6
6

10
7
10
12
7
5
8
5

8
7
8
5
8
5
6

8
8

Tools

Roller

Tools

Tools

Buldozer

Kerja
Kebakaran

Kerja Jalan

Pasang
Longkang

Kerja
Landskap

Buldozer
Operator

Tools
Kerja
Melepa

22/10/11
26/10/11

Tools

Tools
Kerja Bata

20/10/11
25/10/11

Tools

Tools
Tukang Cat

2
8

Pekerja Air
Cond

Tools
Tukang
Paip

Tarikh
Mula

Tools

Tools
Tukang
Jubin

Tempoh
(hari)

Pekerja
Perabot
Kerja
Elektrikal

Tools
Tukang P.
Karpet

Tools

Tools

Siling
Tukang
Bumbung

Tools

Simen
Tukang
Besi
Tukang

Compactor

Concrete
Mixer
Comp Opr
Tukang

Roller
Operator

Machine

Backpusher

Backpushe
Operator
r

Piling
Operator
Piling

Backhoe
Operator
Backhoe

Tools

Lorry
Excavator
Lori

Excavator

Tarikh
Siap

Antitermite
Pemandu

Tools

Cutter

Mason

Bar Bender
Pekerja

Pekerja

Tukang

Jentera

Kayu

Tools

SUMBER

Operator

4
CADANGAN PEMBINAAN KOMPLEKS PANGKALAN KASTAM BAHAGIAN PENCEGAHAN DAN PERUMAHAN DI TANJUNG DAWAI, MERBOK

Builders Work In Connection


Sundries
Built in furnitures
End Bangunan Pejabat Pentadbiran
PONDOK KESELAMATAN
Works Below Lowest Floor Finish
Excavate
Pile cap
Column stump
Anti-termite
Ground beam
Anti-termite
Ground floor Slab
Apron, Ramp & Perimeter Drain
Apron
Excavate
Hardcore
Lean Concrete
Reinforced Concrete
Perimeter Drain (230mm dia.)
Frame
Column and Stiffeners
Roof Beam
Roof Structure and Roof Covering
Roof Trusses
Roof Finishes
External Walls
Ground Floor
Internal Walls & Partition
Ground Floor
Doors
External Doors
Metal door frame
Door Leaf
Internal Doors
Metal door frame
Door Leaf
Ironmongeries
External Doors
Internal Doors
Windows

21
21
40

03/11/11
09/11/11
02/10/11

27/11/11
03/12/11
16/11/11

40
13
1
2
2
1
3
1
3
14
4
1
1
1
1
5
12
5
7
4
2
2
4
4
3
3
13
7
5
2
7
5
2
6
2
2
7

13/09/11
13/09/11
13/09/11
14/09/11
17/09/11
19/09/11
20/09/11
24/09/11
25/09/11
13/10/11
17/10/11
17/10/11
18/10/11
19/10/11
20/10/11
18/10/11
28/09/11
28/09/11
04/10/11
12/10/11
12/10/11
15/10/11
12/10/11
12/10/11
17/10/11
17/10/11
12/10/11
12/10/11
12/10/11
18/10/11
17/10/11
17/10/11
23/10/11
20/10/11
20/10/11
25/10/11
17/10/11

29/10/11
27/09/11
13/09/11
15/09/11
18/09/11
19/09/11
22/09/11
24/09/11
27/09/11
29/10/11
20/10/11
17/10/11
18/10/11
19/10/11
20/10/11
23/10/11
11/10/11
03/10/11
11/10/11
16/10/11
13/10/11
16/10/11
16/10/11
16/10/11
19/10/11
19/10/11
26/10/11
19/10/11
17/10/11
19/10/11
24/10/11
22/10/11
24/10/11
26/10/11
22/10/11
26/10/11
24/10/11

4
4

Tools

Roller

Tools

Tools

Buldozer

Kerja
Kebakaran

Kerja Jalan

Pasang
Longkang

Kerja
Landskap

Buldozer
Operator

Tools
Kerja
Melepa

Tools

Tools
Kerja Bata

Tools

Tools
Tukang Cat

Pekerja Air
Cond

Tools
Tukang
Paip

Tools

Tools
Tukang
Jubin

Pekerja
Perabot
Kerja
Elektrikal

Tools
Tukang P.
Karpet

Tools

Tools
Siling
Tukang
Bumbung

Tools

Simen
Tukang
Besi
Tukang

Compactor

Concrete
Mixer
Comp Opr
Tukang

Roller
Operator

Machine

Backpusher

Backpushe
Operator
r

Piling
Operator
Piling

Backhoe
Operator
Backhoe

Excavator
Lori

Lorry

Tools

3
3

Antitermite
Pemandu

2
2

Tarikh
Siap

Excavator

Tarikh
Mula

Tools

122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162

Tempoh
(hari)

Cutter

AKTIVITI-AKTIVITI KERJA

Mason

BIL

Bar Bender
Pekerja

Pekerja

Tukang

Jentera

Kayu

Tools

SUMBER

4
4
8

1
1
4

4
4

4
4

1
1
4

4
4

2
2

3
3

3
3
4

4
4
4
4
4

4
3
4
3
3
3

Operator

5
CADANGAN PEMBINAAN KOMPLEKS PANGKALAN KASTAM BAHAGIAN PENCEGAHAN DAN PERUMAHAN DI TANJUNG DAWAI, MERBOK

BIL
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202

AKTIVITI-AKTIVITI KERJA
Windows frame
Windows
Internal Floor Finishes
Tiling
Internal Walls Finishes
Plastering
Tiling
Painting
Internal Ceiling Finishes
Suspended Ceiling
Painting
External Finishes
External Floor Finishes
Cement Rendering
External Wall Finishes
Plastering
Painting
External Ceiling Finishes
Fixed Ceiling Board
Painting
Cold Water Plumbing Services
Incoming Supply To Tank
Water Tank(2500mm dia. X
1000mm High)890 glln-2nos
Overflow and Scour pipe
Distribution Pipe
Pipe Fittings
Testing
Soil, Waste And Vent Pipe
Soil, Waste And Vent Pipe
Inspection Chamber
Testing
Sanitary Fittings
Fittings
Testing
TNB SUB-STATION
Works Below Lowest Floor Finish
Excavate
Pile cap
Column stump
Anti-termite

24/10/11

25/10/11

1
3
2
1
7
3
3
1
3
2
1
62
20
1
3
3
1

26/10/11
17/10/11
20/10/11
27/10/11
18/10/11
18/10/11
22/10/11
25/10/11
06/10/11
06/10/11
09/10/11
21/08/11
21/08/11
21/08/11
22/08/11
25/08/11
28/08/11

26/10/11
19/10/11
22/10/11
27/10/11
25/10/11
20/10/11
24/10/11
25/10/11
09/10/11
08/10/11
09/10/11
31/10/11
12/09/11
21/08/11
24/08/11
27/08/11
28/08/11

4
4
4

3
3
4
4
4
2
4
2

4
5
2
4
2
4

1
3

1
4
4

2
2

3
3

4
4
3

Tools

Roller

Tools

Tools

Buldozer

Kerja
Kebakaran

Kerja Jalan

Pasang
Longkang

Kerja
Landskap

Buldozer
Operator

Tools
Kerja
Melepa

22/10/11
24/10/11
20/10/11
20/10/11
12/11/11
29/09/11
05/10/11
12/10/11
05/10/11
03/10/11
05/10/11
11/10/11
08/10/11
08/10/11
10/10/11
02/10/11
10/10/11
11/10/11
04/10/11
11/10/11
27/10/11
23/10/11

Tools

Tools
Kerja Bata

17/10/11
23/10/11
13/10/11
13/10/11
25/09/11
25/09/11
01/10/11
11/10/11
01/10/11
01/10/11
04/10/11
01/10/11
06/10/11
06/10/11
01/10/11
01/10/11
09/10/11
03/10/11
03/10/11
11/10/11
17/10/11
18/10/11

Tools

Tools
Tukang Cat

5
2
7
7
16
5
5
2
5
3
2
10
2
2
9
2
2
8
2
1
10
5

Pekerja Air
Cond

Tools
Tukang
Paip

Tarikh
Mula

Tools

Tools
Tukang
Jubin

Tempoh
(hari)

Pekerja
Perabot
Kerja
Elektrikal

Tools
Tukang P.
Karpet

Tools

Tools

Siling
Tukang
Bumbung

Tools

Simen
Tukang
Besi
Tukang

Compactor

Concrete
Mixer
Comp Opr
Tukang

Roller
Operator

Machine

Backpusher

Backpushe
Operator
r

Piling
Operator
Piling

Backhoe
Operator
Backhoe

Excavator

Tarikh
Siap

Excavator
Lori

Lorry

Tools
Antitermite
Pemandu

Tools

Cutter

Mason

Bar Bender
Pekerja

Pekerja

Tukang

Jentera

Kayu

Tools

SUMBER

Operator

6
CADANGAN PEMBINAAN KOMPLEKS PANGKALAN KASTAM BAHAGIAN PENCEGAHAN DAN PERUMAHAN DI TANJUNG DAWAI, MERBOK

203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243

Ground beam
Anti-termite
Trenches
Ground floor Slab
Apron, Ramp & Perimeter Drain
Apron
Excavate
Hardcore
Lean Concrete
Reinforced Concrete
Ramp
Excavate
Hardcore
Lean Concrete
Reinforced Concrete
Perimeter Drain (230mm dia.)
Excavate
Reinforced Concrete
Plastering & Finishes
Frame
Column and Stiffeners
Roof Beam
Roof Structure and Roof Covering
Roof Slab
Roof Trusses
Roof Finishes
External Walls
Ground Floor
Internal Walls & Partition
Ground Floor
Doors
External Doors
Metal door frame
Door Leaf
Ironmongeries
External Doors
Windows
Windows frame
Windows
Internal Floor Finishes
Cement Rendering

3
1
7
3
6
4
1
1
1
1
4
1
1
1
1
6
2
2
2
10
5
5
12
6
3
3
5
5
5
5
9
7
5
2
2
2
7
5
2
5
5

29/08/11
28/08/11
01/09/11
10/09/11
09/10/11
09/10/11
09/10/11
10/10/11
11/10/11
12/10/11
09/10/11
09/10/11
10/10/11
11/10/11
12/10/11
09/10/11
09/10/11
11/10/11
13/10/11
13/09/11
13/09/11
19/09/11
25/09/11
25/09/11
02/10/11
05/10/11
25/09/11
25/09/11
01/10/11
01/10/11
25/09/11
25/09/11
25/09/11
01/10/11
03/10/11
03/10/11
01/10/11
01/10/11
06/10/11
16/10/11
16/10/11

31/08/11
28/08/11
08/09/11
12/09/11
15/10/11
12/10/11
09/10/11
10/10/11
11/10/11
12/10/11
12/10/11
09/10/11
10/10/11
11/10/11
12/10/11
15/10/11
10/10/11
12/10/11
15/10/11
24/09/11
18/09/11
24/09/11
08/10/11
01/10/11
04/10/11
08/10/11
29/09/11
29/09/11
05/10/11
05/10/11
04/10/11
02/10/11
29/09/11
02/10/11
04/10/11
04/10/11
08/10/11
05/10/11
08/10/11
20/10/11
20/10/11

4
4
4

2
2

3
3

1
1

1
4

1
2
4

1
4
3
4
4

2
2

3
3

4
4

5
5
6

5
4
4
4
4
5

Tools

Roller

Tools

Tools

Buldozer

Kerja
Kebakaran

Kerja Jalan

Pasang
Longkang

Kerja
Landskap

Buldozer
Operator

Tools
Kerja
Melepa

Tools

Tools
Kerja Bata

3
3

Tools

Tools
Tukang Cat

Pekerja Air
Cond

Tools
Tukang
Paip

4
4

Tools

Tools
Tukang
Jubin

4
3

Pekerja
Perabot
Kerja
Elektrikal

Tools
Tukang P.
Karpet

Tools

Tools
Siling
Tukang
Bumbung

Tools

Simen
Tukang
Besi
Tukang

Compactor

Concrete
Mixer
Comp Opr
Tukang

Roller
Operator

Machine

Backpusher

Backpushe
Operator
r

Piling
Operator
Piling

Backhoe
Operator
Backhoe

Excavator
Lori

Lorry

Tools

Antitermite
Pemandu

Tarikh
Siap

Excavator

Tarikh
Mula

Tools

Tempoh
(hari)

Cutter

AKTIVITI-AKTIVITI KERJA

Mason

BIL

Bar Bender
Pekerja

Pekerja

Tukang

Jentera

Kayu

Tools

SUMBER

Operator

7
CADANGAN PEMBINAAN KOMPLEKS PANGKALAN KASTAM BAHAGIAN PENCEGAHAN DAN PERUMAHAN DI TANJUNG DAWAI, MERBOK

BIL
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284

AKTIVITI-AKTIVITI KERJA

Internal Walls Finishes


Plastering
Painting
Internal Ceiling Finishes
Skim Coat
Painting
External Finishes
External Floor Finishes
Cement Rendering
External Wall Finishes
Plastering
Painting
External Ceiling Finishes
Fixed Ceiling Board
Painting
Builders Work In Connection
RUMAH PAM DAN TANGKI HOSE REEL
Works Below Lowest Floor Finish
Excavate
Pile cap
Column stump
Anti-termite
Ground beam
Anti-termite
Ground floor Slab
Apron, Ramp & Perimeter Drain
Apron
Excavate
Hardcore
Lean Concrete
Reinforced Concrete
Frame
Column and Stiffeners
Roof Beam
Roof Structure and Roof Covering
Roof Slab
Roof Trusses
Roof Finishes
External Walls
Ground Floor
Doors

22
5
2
7
5
2
15
5
5
15
3
2
5
5
2
14
56
22
1
5
5
1
5
1
5
10
4
1
1
1
1
10
5
5
8
7
3
5
5
5
9

Tarikh
Mula
06/10/11
06/10/11
30/10/11
12/10/11
12/10/11
18/10/11
12/10/11
22/10/11
22/10/11
12/10/11
12/10/11
27/10/11
16/10/11
16/10/11
27/10/11
06/10/11
01/09/11
01/09/11
01/09/11
03/09/11
08/09/11
14/09/11
15/09/11
14/09/11
21/09/11
18/10/11
18/10/11
18/10/11
19/10/11
20/10/11
22/10/11
27/09/11
27/09/11
03/10/11
09/10/11

31/10/11
11/10/11
31/10/11
19/10/11
17/10/11
19/10/11
29/10/11
26/10/11
26/10/11
29/10/11
15/10/11
29/10/11
20/10/11
20/10/11
29/10/11
22/10/11
05/11/11
26/09/11
01/09/11
07/09/11
13/09/11
14/09/11
20/09/11
14/09/11
26/09/11
29/10/11
22/10/11
18/10/11
19/10/11
20/10/11
22/10/11
08/10/11
02/10/11
08/10/11
17/10/11

09/10/11
12/10/11
09/10/11
09/10/11
09/10/11

11/10/11
17/10/11
13/10/11
13/10/11
18/10/11

4
3

4
4

2
2

3
3

1
4
4
3
4
3
4

1
1

4
4

4
4

2
2

3
3

4
4

4
5
5
6

Tools

Roller

Tools

Tools

Buldozer

Kerja
Kebakaran

Kerja Jalan

Pasang
Longkang

Kerja
Landskap

Buldozer
Operator

Tools
Kerja
Melepa

Tools

Tools
Kerja Bata

5
4

Tools

Tools
Tukang Cat

Pekerja Air
Cond

Tools
Tukang
Paip

4
4

Tools

Tools
Tukang
Jubin

5
4

Pekerja
Perabot
Kerja
Elektrikal

Tools
Tukang P.
Karpet

Tools

Tools

Siling
Tukang
Bumbung

Tools

Simen
Tukang
Besi
Tukang

Compactor

Concrete
Mixer
Comp Opr
Tukang

Roller
Operator

Machine

Backpusher

Backpushe
Operator
r

Piling
Operator
Piling

Backhoe
Operator
Backhoe

Excavator
Lori

Lorry

Tools
Antitermite
Pemandu

Tools

Cutter

Mason

Tarikh
Siap

Excavator

Tempoh
(hari)

Bar Bender
Pekerja

Pekerja

Tukang

Jentera

Kayu

Tools

SUMBER

Operator

8
CADANGAN PEMBINAAN KOMPLEKS PANGKALAN KASTAM BAHAGIAN PENCEGAHAN DAN PERUMAHAN DI TANJUNG DAWAI, MERBOK

BIL
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324

AKTIVITI-AKTIVITI KERJA

External Doors
7
Metal door frame
5
Door Leaf
2
Windows
7
Windows frame
5
Windows
2
Internal Floor Finishes
7
Cement Rendering
7
Internal Walls Finishes
10
Plastering
5
Painting
2
Internal Ceiling Finishes
5
Skim Coat
5
Painting
External Finishes
14
External Floor Finishes
5
Cement Rendering
5
Tiling
3
External Wall Finishes
3
Plastering
2
Painting
1
Builders Work In Connection
14
End RUMAH PAM DAN TANGKI HOSE REEL
JETTY HEAD/APPROACH BRIDGE
244
Temporary supported
35
JETTY HEAD
244
Piling Works
3
Mobilisation
3
Jetty Head
33
Preliminary
3
Preliminary pile
load(500mm)
test
(Group of 2nos)1000kN5
1nos
Subsequent load test (single)1000kN-1nos
5
Pile driving Analyzer (PDA)-10nos
5
Working pile (500mm)-20nos
15
Cutting of head
10
Marine Works
183
Production of Precast Compenents
63
Pile Cap Shell
10
Lower Wale Beam
10
Trapezoidal shell Beam
10

Tarikh
Mula
09/10/11
09/10/11
15/10/11
09/10/11
09/10/11
15/10/11
23/10/11
23/10/11
15/10/11
15/10/11
24/10/11
20/10/11
20/10/11

16/10/11
13/10/11
16/10/11
16/10/11
13/10/11
16/10/11
30/10/11
30/10/11
25/10/11
19/10/11
25/10/11
25/10/11
25/10/11

20/10/11
31/10/11
31/10/11

05/11/11
05/11/11
05/11/11

20/10/11
20/10/11
23/10/11
15/10/11

23/10/11
22/10/11
23/10/11
30/10/11

01/06/11
01/06/11
01/06/11
01/06/11
01/06/11
05/06/11
05/06/11

11/03/12
11/07/11
11/03/12
04/06/11
04/06/11
12/07/11
07/06/11

26/06/11

30/06/11

02/07/11
26/06/11
08/06/11
02/07/11
11/08/11
11/08/11
11/08/11
21/08/11
30/08/11

06/07/11
30/06/11
25/06/11
12/07/11
11/03/11
23/10/11
22/08/11
31/08/11
10/09/11

2
4
4
4

5
5
6
3

4
4
4

2
2
2

1
1

3
3
3

3
3
3

Tools

Roller

Tools

Tools

Buldozer

Kerja
Kebakaran

Kerja Jalan

Pasang
Longkang

Kerja
Landskap

Buldozer
Operator

Tools
Kerja
Melepa

4
4

Tools

Tools
Kerja Bata

6
4

Tools

Tools
Tukang Cat

Pekerja Air
Cond

Tools
Tukang
Paip

4
4

Tools

Tools
Tukang
Jubin

6
4

Pekerja
Perabot
Kerja
Elektrikal

Tools
Tukang P.
Karpet

Tools

Tools
Siling
Tukang
Bumbung

Tools

Simen
Tukang
Besi
Tukang

Compactor

Concrete
Mixer
Comp Opr
Tukang

Roller
Operator

Machine

Backpusher

Backpushe
Operator
r

Piling
Operator
Piling

Backhoe
Operator
Backhoe

Excavator
Lori

Lorry

Tools
Antitermite
Pemandu

Tools

Cutter

Mason

Tarikh
Siap

Excavator

Tempoh
(hari)

Bar Bender
Pekerja

Pekerja

Tukang

Jentera

Kayu

Tools

SUMBER

Operator

9
CADANGAN PEMBINAAN KOMPLEKS PANGKALAN KASTAM BAHAGIAN PENCEGAHAN DAN PERUMAHAN DI TANJUNG DAWAI, MERBOK

08/09/11
18/09/11
27/09/11
06/10/11
16/10/11
18/10/11
18/10/11
22/10/11
24/10/11
26/10/11
29/10/11
31/10/11
02/11/11
06/11/11
06/11/11
14/11/11
16/11/11
19/11/11
22/11/11
24/11/11
24/11/11
28/11/11
30/11/11
03/12/11
05/12/11
07/12/11
10/12/11
13/12/11
13/12/11
17/12/11
19/12/11
21/12/11
24/12/11
26/12/11
28/12/11
01/10/12
01/01/12
14/01/12
29/01/12
04/02/11
12/02/11

19/09/11
28/09/11
08/10/11
17/10/11
23/10/11
05/11/11
20/10/11
23/10/11
25/10/11
27/10/11
30/10/11
01/11/11
05/11/11
23/11/11
08/11/11
15/11/11
17/11/11
21/11/11
23/11/11
12/12/11
27/11/11
29/11/11
01/12/11
04/12/11
06/12/11
08/12/11
12/12/11
31/12/11
15/12/11
18/12/11
20/12/11
22/12/11
25/12/11
27/12/11
31/12/11
11/02/11
15/01/12
30/01/12
05/02/11
11/02/11
05/03/12

2
2
2

3
3
3

3
3
3
3

Tools

Tools

Roller

Tools

Tools

Buldozer

Kerja
Kebakaran

Kerja Jalan

Pasang
Longkang

Kerja
Landskap

Buldozer
Operator

Tools

Pekerja Air
Cond

Tools

Tools

Pekerja
Perabot
Kerja
Elektrikal

Kerja
Melepa

Simen
Tukang
Besi
Tukang

Operator
Piling

Operator
Backhoe

Backhoe

Lorry
Excavator
Lori

Antitermite
Pemandu

5
4
4
4
4

Tools

3
3
3
3
3
3
3

Tools

3
3
3
3
3
3
3

Kerja Bata

2
2
2
2
2
2
2

Tukang Cat

4
4
4
4
4
4
4

Tools

3
3
3
3
3
3
3

Tools

3
3
3
3
3
3
3

Tukang
Paip

2
2
2
2
2
2
2

Tukang
Jubin

4
4
4
4
4
4
4

Tools

3
3
3
3
3

Tukang P.
Karpet

3
3
3
3
3

Tools

2
2
2
2
2

Tools

4
4
4
4
4

Siling
Tukang
Bumbung

3
3
3
3
3
3
3

Comp Opr
Tukang

3
3
3
3
3
3
3

Roller
Operator

2
2
2
2
2
2
2

Tools

Compactor

Concrete
Mixer

Machine

4
4
4
4
4
4
4

Backpushe
Operator
r

3
3
3
3
3

Piling

3
3
3
3
3

Tools

2
2
2
2
2

Tools

4
4
4
4
4

Tarikh
Siap

Excavator

10
10
10
10
7
16
3
2
2
2
2
2
3
16
3
2
2
3
2
16
3
2
2
2
2
2
3
16
3
2
2
2
2
2
3
36
13
15
7
7
20

Tools

U-Shell Beam
Fender Beam
Rectangular Beam
Plank
Staircase
Pier A-Pier B
Pile Cap Shell
Lower Wale Beam
Trapezoidal shell Beam
U-Shell Beam
Fender Beam
Rectangular Beam
Plank
Pier B-Pier D
Pile Cap Shell
Fender Beam
Rectangular Beam
Plank
Staircase
Pier D-Pier F
Pile Cap Shell
Lower Wale Beam
Trapezoidal shell Beam
U-Shell Beam
Fender Beam
Rectangular Beam
Plank
Pier F-Pier G
Pile Cap Shell
Lower Wale Beam
Trapezoidal shell Beam
U-Shell Beam
Fender Beam
Rectangular Beam
Plank
Deck Slab
Reinforcement Bar
Formwork
Concrete
50mm Thick Floor Finish
Handrails

Tarikh
Mula

Cutter

325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365

Tempoh
(hari)

Mason

AKTIVITI-AKTIVITI KERJA

Bar Bender
Pekerja

BIL

Kayu

Pekerja

Tukang

Jentera

Backpusher

SUMBER

Operator

10
CADANGAN PEMBINAAN KOMPLEKS PANGKALAN KASTAM BAHAGIAN PENCEGAHAN DAN PERUMAHAN DI TANJUNG DAWAI, MERBOK

BIL
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405

AKTIVITI-AKTIVITI KERJA

Fender System
Bollard
Cat Ladder
Painting To Concrete Structure
Marine Growth Preventer Systems
Semi Covered roofing & Architectural
Base Plate
Column & Stiffener
Beam
Roof Beam
"C" Channel Purlin
Metal Decking
APPROACH BRIDGE
Piling Works
Mobilisation
Approach Bridge
Preliminary
Preliminary pile
load(500mm)
test

Tarikh
Mula

30
20
20
14
20
23
4
7

31/01/12
12/02/11
12/02/12
12/02/12
12/02/12
14/02/12
14/02/12
19/02/12

05/03/12
05/03/12
05/03/12
27/02/12
05/03/12
11/03/12
18/02/12
26/02/12

27/02/12

05/03/12

5
183
3
3
33
3

06/03/12
12/07/11
12/07/11
12/07/11
16/07/11
16/07/11

11/03/12
09/02/12
14/07/11
14/07/11
22/08/11
18/07/11

06/08/11

10/08/11

11/08/11
11/08/11
19/07/11
11/08/11
20/07/11
20/07/11
20/07/11
31/07/11
10/08/11
21/08/11
31/08/11
11/09/11
23/08/11
23/08/11
27/08/11
29/08/11
06/09/11
17/09/11
27/09/11
29/09/11
29/09/11

16/08/11
13/08/11
04/08/11
22/08/11
09/02/11
26/09/11
04/08/11
15/08/11
25/08/11
05/09/11
15/09/11
26/09/11
28/09/11
25/08/11
28/08/11
30/08/11
07/09/11
19/09/11
28/09/11
12/10/11
02/10/11

2
4
4
4

(Group of 2nos)1000kN5
1nos
Subsequent load test (single)1000kN-1nos
5
Pile driving Analyzer (PDA)-10nos
2
Working pile (500mm)-21nos
15
Cutting of head
10
Marine Works
176
Production of Precast Compenents
59
Pile Cap Shell
14
Lower Wale Beam
14
Rectangular Beam
14
U-Shell Beam
14
Single Tee
14
Utility Channel
14
Pier 1-Pier 2
32
Pile Cap Shell
3
Lower Wale Beam
2
Rectangular Beam
2
U-Shell Beam
2
Single Tee
3
Utility Channel
2
Pier 2-Pier 3
12
Pile Cap Shell
3
Lower Wale Beam

4
4
4
4

2
2
2

5
3
3
3
4

4
4
4
5

1
1

4
4
4
4
4
4

2
2
2
2
2
2

3
3
3
3
3
3

3
3
3
3
3
3

4
4
4
4
4
4

2
2
2
2
2
2

3
3
3
3
3
3

3
3
3
3
3
3

4
4

2
2

3
3

3
3

Tools

Roller

Tools

Tools

Buldozer

Kerja
Kebakaran

Kerja Jalan

Pasang
Longkang

Kerja
Landskap

Buldozer
Operator

Tools
Kerja
Melepa

Tools

Tools
Kerja Bata

Tools

Tools
Tukang Cat

Pekerja Air
Cond

Tools
Tukang
Paip

5
5

Tools

Tools
Tukang
Jubin

6
6
6

Pekerja
Perabot
Kerja
Elektrikal

Tools
Tukang P.
Karpet

Tools

Tools
Siling
Tukang
Bumbung

Tools

Simen
Tukang
Besi
Tukang

Compactor

Concrete
Mixer
Comp Opr
Tukang

Roller
Operator

Machine

Backpusher

Backpushe
Operator
r

Piling
Operator
Piling

Backhoe
Operator
Backhoe

Excavator
Lori

Lorry

Tools
Antitermite
Pemandu

Tools

Cutter

Mason

Tarikh
Siap

Excavator

Tempoh
(hari)

Bar Bender
Pekerja

Pekerja

Tukang

Jentera

Kayu

Tools

SUMBER

Operator

11
CADANGAN PEMBINAAN KOMPLEKS PANGKALAN KASTAM BAHAGIAN PENCEGAHAN DAN PERUMAHAN DI TANJUNG DAWAI, MERBOK

03/10/11
05/10/11
08/10/11
11/10/11
13/10/11
13/10/11

04/10/11
06/10/11
10/10/11
12/10/11
26/10/11
16/10/11

2
2
3
2
12
3

19/10/11
19/10/11
22/10/11
25/10/11
27/10/11
27/10/11

20/10/11
20/10/11
24/10/11
26/10/11
09/11/11
30/10/11

2
2
3
2
12
3

31/10/11
02/11/11
05/11/11
08/11/11
10/11/11
10/11/11

01/11/11
03/11/11
07/11/11
09/11/11
23/11/11
13/11/11

2
2
3
2
14
3
2
2
2
3
2
49
14
14
14
7
7
6
7
18

14/11/11
16/11/11
19/11/11
22/11/11
24/11/11
24/11/11
28/11/11
30/11/11
03/12/11
05/12/11
08/12/11
11/12/11
11/12/11
27/12/11
12/01/12
29/01/12
29/01/12
31/01/12
25/01/12
17/01/12

15/11/11
17/11/11
21/11/11
23/11/11
10/12/11
27/11/11
29/11/11
01/12/11
04/12/11
07/12/11
10/12/11
05/02/11
26/12/11
11/01/12
28/01/12
05/02/12
05/02/12
06/02/12
01/02/12
06/02/12

4
5
4
4
4
5

Tools

Tools

Roller

Tools

Tools

Buldozer

Kerja
Kebakaran

Kerja Jalan

Pasang
Longkang

Kerja
Landskap

Buldozer
Operator

Tools

Pekerja Air
Cond

Tools

Tools

4
5

Pekerja
Perabot
Kerja
Elektrikal

Kerja
Melepa

Simen
Tukang
Besi
Tukang

Operator
Piling

Operator
Backhoe

Backhoe

Lorry
Excavator
Lori

Antitermite
Pemandu

Tools

3
3
3
3
3
3

Tools

3
3
3
3
3
3

Kerja Bata

2
2
2
2
2
2

Tukang Cat

4
4
4
4
4
4

Tools

3
3
3
3
3
3

Tools

3
3
3
3
3
3

Tukang
Paip

2
2
2
2
2
2

Tukang
Jubin

4
4
4
4
4
4

Tools

3
3
3
3
3
3

Tukang P.
Karpet

3
3
3
3
3
3

Tools

2
2
2
2
2
2

Tools

4
4
4
4
4
4

Siling
Tukang
Bumbung

3
3
3
3
3
3

Comp Opr
Tukang

3
3
3
3
3
3

Roller
Operator

2
2
2
2
2
2

Tools

Compactor

Concrete
Mixer

Machine

4
4
4
4
4
4

Backpushe
Operator
r

3
3
3
3

Piling

3
3
3
3

Tools

2
2
2
2

Tools

4
4
4
4

Tarikh
Siap

Excavator

2
2
3
2
12
3

Tools

Tarikh
Mula

Cutter

Rectangular Beam
U-Shell Beam
Single Tee
Utility Channel
Pier 3-Pier 4
Pile Cap Shell
Lower Wale Beam
Rectangular Beam
U-Shell Beam
Single Tee
Utility Channel
Pier 4-Pier 5
Pile Cap Shell
Lower Wale Beam
Rectangular Beam
U-Shell Beam
Single Tee
Utility Channel
Pier 5-Pier 6
Pile Cap Shell
Lower Wale Beam
Rectangular Beam
U-Shell Beam
Single Tee
Utility Channel
Pier 6-Pier 7
Pile Cap Shell
Lower Wale Beam
Rectangular Beam
U-Shell Beam
Single Tee
Utility Channel
Deck Slab
Reinforcement Bar
Formwork
125mm Thick G40 In situ Concrete
50mm Thick Floor Finish
Expansion Joint
Concrete Cover
Parapet Wall
Timber Fender

Tempoh
(hari)

Mason

406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446

AKTIVITI-AKTIVITI KERJA

Bar Bender
Pekerja

BIL

Kayu

Pekerja

Tukang

Jentera

Backpusher

SUMBER

Operator

12
CADANGAN PEMBINAAN KOMPLEKS PANGKALAN KASTAM BAHAGIAN PENCEGAHAN DAN PERUMAHAN DI TANJUNG DAWAI, MERBOK

BIL
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487

AKTIVITI-AKTIVITI KERJA
Painting To Concrete Structure
Marine Growth Preventer Systems
Testing
REVETMENT
Trim slope
Geotextile
Secondary Layer (20-35kg)
Primary Layer (190-330kg)
Filter Layer (6-9kg)
EXTERNAL WORKS
Surface Water Drainage
300mm X 300mm drain
600mm X 600mm drain
Mild Steel Railing
Precast slab Cover
Box Culvert
Detention Pond
Sumps
Connection
Testing
Sewerage
Excavate Trench
Clay Pipe And Fitting
Spreading,Leveling and Compacting
Man Holes
Cast Iron Grating
Septic Tank
EXCAVATION
CONSTRUCTION OF BASE
INSTALLATION OF TANK
BACKFILLING
PIPING SYSTEM C/W AIR BLOWER
Testing
External Water Reticulation System
Excavate Trench
Mild steel pipe
High Density polyethylene
Cast Iron
Valve Chamber
Bulk Meter
Sluice Valve And Scour valve Marker

Tarikh
Mula

6
45

01/02/12
20/12/11

07/12/12
09/02/12

158
30
30
45
45
30
132
77
28
28
21
21
28
25
14
7
3
68
18
21
21
25
20
45
5
14
5
7
14
3
64
30
28
28

06/06/11
06/06/11
03/07/11
01/08/11
17/09/11
02/11/11
04/07/11
10/08/11
10/08/11
28/08/11
18/09/11
28/09/11
29/09/11
09/10/11
12/10/11
29/10/11
06/11/11
12/09/11
12/09/11
21/09/11
28/09/11
15/10/11
13/11/11
03/10/11
03/10/11
09/10/11
25/10/11
31/10/11
08/11/11
27/11/11
17/09/11
17/09/11
04/10/11
16/10/11

06/12/11
10/07/11
06/08/11
21/09/11
07/11/11
06/12/11
04/12/11
07/11/11
11/09/11
28/09/11
11/10/11
22/10/11
31/10/11
06/11/11
27/10/11
05/11/11
07/11/11
29/11/11
02/10/11
15/10/11
22/10/11
12/11/11
26/11/11
23/11/11
08/10/11
24/10/11
30/10/11
07/11/11
23/11/11
29/11/11
29/11/11
20/11/11
05/11/11
16/11/11

21
3
7

31/10/11
26/11/11
12/11/11

23/11/11
28/11/11
19/11/11

Tools

Roller

Tools

Tools

Buldozer

Kerja
Kebakaran

Kerja Jalan

Pasang
Longkang

Kerja
Landskap

Buldozer
Operator

Tools
Kerja
Melepa

Tools

Tools
Kerja Bata

Tools

Tools
Tukang Cat

Pekerja Air
Cond

Tools
Tukang
Paip

Tools

Tools
Tukang
Jubin

Pekerja
Perabot
Kerja
Elektrikal

Tools
Tukang P.
Karpet

Tools

Tools
Siling
Tukang
Bumbung

Simen
Tukang
Besi
Tukang

Tools

Compactor

Concrete
Mixer
Comp Opr
Tukang

Roller
Operator

Machine

Backpusher

Backpushe
Operator
r

Piling
Operator
Piling

Operator
Backhoe

Excavator
Lori

Backhoe

Lorry

Tools
Antitermite
Pemandu

Tools

Cutter

Mason

Tarikh
Siap

Excavator

Tempoh
(hari)

Bar Bender
Pekerja

Pekerja

Tukang

Jentera

Kayu

Tools

SUMBER

4
6

4
4
4
4

3
3
3
3

5
5

4
4
4
4
3
3
3

4
5
5
1
2

3
3

1
3

1
5
3
2

1
1

1
4
4

1
4

2
4

4
2

1
5
5
5
5
5
5

Operator

13
CADANGAN PEMBINAAN KOMPLEKS PANGKALAN KASTAM BAHAGIAN PENCEGAHAN DAN PERUMAHAN DI TANJUNG DAWAI, MERBOK

BIL
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527

AKTIVITI-AKTIVITI KERJA

Fire Hydrant
14
Garden Tab
Sucktion Tank
28
Main connection
7
Testing
1
Roads And Hardstanding
62
NEW ROADS AND CAR PARKS
58
REMOVE OF SURCHARGE
5
EXCAVATE OVERSITE TO REDUCE LEVEL10
100MM THICK COMPACTED SAND
14
300MM THICK CRUSHER RUN
14
ROAD KERB
18
60MM THICK Binder
7
40MM THICK Wearing
7
ROAD MARKING
7
ROAD SIGNAGE
5
REINSTATEMENT AND JOINTING
10
TO EXISTING ROAD
SCRAP EXISTING ROAD PREMIX
4
TACK COAT
1
40MM THICK Wearing
5
Flag Post
15
Excavate
3
Footing
4
hardcore
2
Concrete
Slab
2
Homogeneous floor
2
Flag pole
2
Underground Petrol Tank
62
EXCAVATION
10
CONSTRUCTION OF BASE
14
INSTALLATION OF PETROL TANK
35
TESTING
3
Fencing And Gates
34
Fencing
30
Excavate
12
Trench for kerb
11
Post footing
11
Mild Steel Post
11
Chain Link
9

Tarikh
Mula
06/11/11
27/10/11
17/11/11
29/11/11
24/09/11
24/09/11
24/09/11
24/09/11
02/10/11
12/10/11
19/10/11
31/10/11
08/11/11
16/11/11
24/11/11

28/11/11
24/11/11
29/11/11
04/12/11
29/11/11
28/09/11
04/10/11
17/10/11
27/10/11
08/11/11
07/11/11
15/11/11
23/11/11
29/11/11

23/11/11

04/12/11

23/11/11
28/11/11
29/11/11
05/10/11
05/10/11
09/10/11
13/10/11

27/11/11
28/11/11
04/12/11
22/10/11
08/10/11
12/10/11
15/10/11

16/10/11
18/10/11
20/10/11
04/07/11
04/07/11
16/07/11
01/08/11
11/09/11
23/10/11
23/10/11
23/10/11
30/10/11
05/11/11
10/11/11
16/11/11

17/10/11
19/10/11
22/10/11
13/09/11
14/07/11
31/07/11
10/09/11
13/09/11
30/11/11
26/11/11
05/11/11
10/11/11
16/11/11
22/11/11
26/11/11

Tools

Roller

Tools

Tools

Buldozer

Kerja
Kebakaran

Kerja Jalan

Pasang
Longkang

Kerja
Landskap

Buldozer
Operator

Tools
Kerja
Melepa

Tools

Tools
Kerja Bata

Tools

Tools
Tukang Cat

Pekerja Air
Cond

Tools
Tukang
Paip

Tools

Tools
Tukang
Jubin

21/11/11

Pekerja
Perabot
Kerja
Elektrikal

Tools
Tukang P.
Karpet

Tools

Tools
Siling
Tukang
Bumbung

Simen
Tukang
Besi
Tukang

Tools

Compactor

Concrete
Mixer
Comp Opr
Tukang

Roller
Operator

Machine

Backpusher

Backpushe
Operator
r

Piling
Operator
Piling

Operator
Backhoe

Excavator
Lori

Backhoe

Lorry

Tools
Antitermite
Pemandu

Tools

Cutter

Mason

Tarikh
Siap

Excavator

Tempoh
(hari)

Bar Bender
Pekerja

Pekerja

Tukang

Jentera

Kayu

Tools

SUMBER

6
2
6
6

4
4
4
4

1
1
1
1

1
1
1
1

1
1
5
6
6
4
4

3
6
6
1
4

4
1

1
4
4
5

5
1
4

2
4

4
4

2
2
2
4

3
3

1
4

1
4
4
3

Operator

14
CADANGAN PEMBINAAN KOMPLEKS PANGKALAN KASTAM BAHAGIAN PENCEGAHAN DAN PERUMAHAN DI TANJUNG DAWAI, MERBOK

Gates
Decorative Wall Fencing
Excavate
Strip footing
Hardcore
Concrete
Column
Brick Walls
Plastering
Painting
Gates
Pair mild steel gate
Painting
Turfing
Close turfing
Spot turfing
ENVIRONMENTAL PROTECTION WORKS
PROVISIONAL SUM
Landscape Works
Entrance and Building Signage
Works Outside Boundary
Builders Work In Connection for
Mechanical & Electrical Services
PRIME COST SUM
Electrical Services
Conduit/Piping Works
Wiring
MSB/SB
Lighting & Fitting
Testing
External Electrical
Cabling
Street Lighting
Fider Piller
Testing
Mechanical Services
Aircon
Conduit/Piping Works
Wiring
Air-con Unit/Split Unit
Testing

549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567

34
22
3
5
2
2
2
5
3
2
4
2
2
46
30
30
451
60
45
45
60

23/10/11
23/10/11
23/10/11
26/10/11
01/11/11
03/11/11
06/11/11
08/11/11
12/11/11
15/11/11
27/11/11
27/11/11
29/11/11
08/10/11
08/10/11
26/10/11
21/06/10
25/09/11
11/10/11
11/10/11
25/09/11

30/11/11
16/11/11
25/10/11
31/10/11
02/11/11
05/11/11
07/11/11
10/11/11
14/11/11
16/11/11
30/11/11
28/11/11
30/11/11
29/11/11
10/11/11
29/11/11
28/11/11
03/12/11
01/12/11
01/12/11
03/12/11

60

25/09/11

03/12/11

167
128
90
75
38
30
3
41
25
21
7
3
159
120
90
35
30
3

15/10/11
15/10/11
24/10/11
28/11/11
22/01/12
02/02/12
08/03/12
15/10/11
15/10/11
03/11/11
14/11/11
28/11/11
24/10/11
24/10/11
24/10/11
19/01/12
02/02/12
08/03/12

31/03/12
11/03/12
05/02/12
22/02/12
05/03/12
07/03/12
11/03/12
30/11/11
12/11/11
27/11/11
21/11/11
30/11/11
31/03/11
11/03/12
05/02/12
28/02/12
07/03/12
11/03/12

Tools

Roller

Tools

Tools

Buldozer

Kerja
Kebakaran

Kerja Jalan

Pasang
Longkang

Kerja
Landskap

Buldozer
Operator

Tools
Kerja
Melepa

Tools

Tools
Kerja Bata

Tools

Tools
Tukang Cat

Pekerja Air
Cond

Tools
Tukang
Paip

Tools

Tools
Tukang
Jubin

Pekerja
Perabot
Kerja
Elektrikal

Tools
Tukang P.
Karpet

Tools

Tools
Siling
Tukang
Bumbung

Tools

Simen
Tukang
Besi
Tukang

Compactor

Concrete
Mixer
Comp Opr
Tukang

Roller
Operator

Machine

Backpusher

Backpushe
Operator
r

Piling
Operator
Piling

Operator
Backhoe

Excavator
Lori

Backhoe

Lorry

Tools

Antitermite
Pemandu

Tarikh
Siap

Excavator

Tarikh
Mula

Tools

528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
547
548

Tempoh
(hari)

Cutter

AKTIVITI-AKTIVITI KERJA

Mason

BIL

Bar Bender
Pekerja

Pekerja

Tukang

Jentera

Kayu

Tools

SUMBER

1
4

1
4

1
4
4
5
6
4
3
4

7
7
6

6
8
8

11
11
11
11

11
11
6

12
12
12

Operator

15
CADANGAN PEMBINAAN KOMPLEKS PANGKALAN KASTAM BAHAGIAN PENCEGAHAN DAN PERUMAHAN DI TANJUNG DAWAI, MERBOK

BIL
568
569
570
571
572
573
574
575
576
577
578
579
580

AKTIVITI-AKTIVITI KERJA
Fire Protection
Fire Fighting
Conduit
Piping Works
Wiring
Fittings
Portable Fire Ext.
Testing
Booster Pump
Piping Work
Installation Booster Pump
Testing
Sistem Pam Minyak

Tarikh
Mula

120
120
90
45
30
28
14
3
22
14
7
1

24/10/11
24/10/11
24/10/11
27/12/11
23/01/12
05/02/12
11/02/12
08/03/12
24/10/11
24/10/11
09/11/11
17/11/11

45
9,325
361

05/03/12

11/03/12
11/03/12
05/02/12
16/02/12
26/01/12
07/03/12
26/02/12
11/03/12
17/11/11
08/11/11
16/11/11
17/11/11
31/03/12

Tools

Roller

Tools

Tools

Buldozer

Kerja
Kebakaran

Kerja Jalan

Pasang
Longkang

Kerja
Landskap

Buldozer
Operator

Tools
Kerja
Melepa

Tools

Tools
Kerja Bata

Tools

Tools
Tukang Cat

Pekerja Air
Cond

Tools
Tukang
Paip

Tools

Tools
Tukang
Jubin

Pekerja
Perabot
Kerja
Elektrikal

Tools
Tukang P.
Karpet

Tools

Tools
Siling
Tukang
Bumbung

Tools

Simen
Tukang
Besi
Tukang

Compactor

Concrete
Mixer
Comp Opr
Tukang

Roller
Operator

Machine

Backpusher

Backpushe
Operator
r

Piling
Operator
Piling

Backhoe
Operator
Backhoe

Excavator
Lori

Lorry

Tools
Antitermite
Pemandu

Tools

Cutter

Mason

Tarikh
Siap

Excavator

Tempoh
(hari)

Bar Bender
Pekerja

Pekerja

Tukang

Jentera

Kayu

Tools

SUMBER

8
8
8
8
8

8
8
4

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

Anda mungkin juga menyukai