PT.

WASKITA KARYA
KONTRAK NO : 09.PJ/131/PIKITRING SBS/2007 PEKERJAAN PONDASI & ERECTION TOWER 11 JULI 2007

PT. PLN (PERSERO)


HARI/TANGGAL:

LAPORAN HARIAN
CUACA 08.00 - 12.00 13.00 - 17.00 org org org bh bh bh - Site Manager = org - Tenaga Kerja = - Supervisor = org - Logistik = TENAGA KERJA - Pelaksana = org - B.Gudang = - Mandor = org - Theodolite = bh -Dump Truck = -Water Pass = bh - Bore pile = PERALATAN - Excavator = bh - Concrete Mixer = - Handy talky = bh KELUAR KEMBALI - Mur = bh - Mur = MATERIAL - Baut = bh - Baut = - Plat = bh - Plat = - Ring = bh - Ring = URAIAN KEGIATAN DAN BOBOT HARIAN

bh bh bh bh

HAMBATAN DAN SOLUSI

PIHAK PERTAMA

PIHAKKEDUA