Anda di halaman 1dari 14

PENGENALAN PERALATAN INSTRUMENTASI PABRIK

by

Rachmad Wahyudi ,S.T.


Listin Ro. Rancang Bangun
Gresik, 6 Oktober 2009

PT PETROKIMIA GRESIK
STRUKTUR ORGANISASI BIRO RANCANG BANGUN
KAKOMP ENGINEERING BAGIAN PROSES BAGIAN MESIN

DEPT. PPK

BIRO CANGUN
BIRO JASTEKON

BAGIAN LISTIN

STAF MADYA

BAGIAN SIPIL

PT. PETROKIMIA GRESIK

2005 2003

Boiler Pabrik I

2007-2008
NPK Granul II, III, IV, ROP I, ROP II RFO PF-II, Ammonia Tank, Power Plant (Coal), DAP, PA II and SA II

RFO-PF-1

2002 1998
Boiler Pabrik III Windows NT based OCS Open modular controller Web-based applications

Ammonia Tank Windows NT based OCS Open modular controller Web-based applications

1991 1971
Pneumatic Pabrik II Pabrik I (Ammurea)

1984

Electronic Pabrik III

Truly open industrial system Redundant fieldbus Redundant Ethernet control bus Industrial packaging UNIX workstations Client/server architecture Pabrik I (Ammurea)

PT. PETROKIMIA GRESIK

MANFAAT INSTRUMENTASI
CONTROL SYSTEM INTERLOCK & TRIPPING SYSTEM SAFETY (HUMAN & EQUIPMENT)

PT. PETROKIMIA GRESIK

CONTROL SYSTEM
Sensor (Pressure, Temperature, Flow Transmitter, etc) Analytical Instrument (pH,O2, Conduct, CO2, etc) Controller PLC, Electronic, MMI & DCS (P, I, D, PI, PID, etc) Final Control (Control Valve, VSD, etc)

PT. PETROKIMIA GRESIK

INTERLOCK & TRIPPING SYSTEM


Switch (Pressure, Flow, Level, Temperature Switch, etc) Relay System, PLC, SIS and DCS Tripping Equipment (ShutOff Valve, Breaker, etc)

PT. PETROKIMIA GRESIK

SAFETY (HUMAN & DEVICE)


Switch (Pressure, Flow, Level, Temperature Switch, etc) Check Valve, Safety Valve, Disk Break, etc. Fire System (Heat Sensor, Fire Break, etc)

PT. PETROKIMIA GRESIK

EQUIPMENT PICTURES

EQUIPMENT PICTURES

PT. PETROKIMIA GRESIK

DCS, SIS and MMI

PT. PETROKIMIA GRESIK

DCS, SIS and MMI

PRODUCT DESIGN

Terima kasih

Anda mungkin juga menyukai