Quotation To / Mr. The Army (Shahien Camp) Sub.

/ Drilling New Well *Regarding your request for drilling new well at Hatta area (Shahien Camp), we give you our best offer as follows: S.No ITEMS 1. Drilling with 8.5 till 1000FT 2. Installing conductor pipe 8.5 10FT Total Rate 40 100 Amount 40,000 1000 AED 41,000

Conditions For Conduct: 1. The permission from the municipality for drilling is also required. 2. Any extra requirements or if the depth of the wells is increased more than as mentioned in the above quotation will be charged later on. 3. Any authorized person from your side will be totally responsible for calculating the total number of pipes at the time of removal and for the final inspection of the borehole as we wont be responsible for any problems later on.

4. Our company also doesnt take the responsibility if any collapsing occurs during or after completion of work, and we are not responsible for water quantities also. Also we can stop the work at will if more collapsing occurs which can lead to disturbance in continuation of work. 5. In case the water quantity is very high before reaching the desired depth, which could lead to difficult drilling conditions, we shall stop the work immediately. 6. The payment is to be done (50% in Advance), the balance after the completion of the work instantly. 7. When this quotation is approved, please send your L.P.O at our Fax No: (06-8823748), (06-8825110) or you could contact Mr. Satnam Gosal (0506465824). 8. The work will start within (10 days) from the date of your agreement. 9. Present quotes are valid only for a period of 15 days and could vary later according to market conditions.

Thank you & best regards. Al-Jabal For Drilling And Install Pumps EST.

Anda mungkin juga menyukai