Location
Owner
Date Started
Date
Subject
SCOPE OF WORK
ROOM
GROUND FLOOR
LOBBY
RECEPTION
RAMP
ROOM
SECOND FLOOR
LOBBY
RECEPTION
RAMP
ROOM
THIRD FLOOR
LOBBY
RECEPTION
RAMP
TOTAL
68.74
123.21
415.78
225.00
446.00
10
1
1
1
1
68.74
123.21
415.78
225.00
446.00
10
1
1
1
1
68.74
123.21
415.78
225.00
446.00
10
1
1
1
1
95.00
95.00
95.00
95.00
95.00
SUBTOTAL
95.00
95.00
95.00
95.00
95.00
SUBTOTAL
125.00
125.00
125.00
125.00
125.00
SUBTOTAL
65,303.00
11,704.95
39,499.10
21,375.00
42,370.00
180,252.05
65,303.00
11,704.95
39,499.10
21,375.00
42,370.00
180,252.05
85,925.00
15,401.25
51,972.50
28,125.00
55,750.00
237,173.75
597,677.85
Note: ROOFTOP not included. Finishes and partitions not yet discussed.
Prepared By:
Engr. Jeff Lorin
Project Engineer
Topsteel Builders