Anda di halaman 1dari 18

No. Mata Pembayaran a 1.2 2.1 2.2 2.3 (1) 2.3 (2) 2.3 (3) 2.3 (4) 2.

3 (5) 2.3 (6) 2.3 (7) 2.4 (1) 2.4 (2) 2.4 (3) 3.1 (1) 3.1 (2) 3.1 (3) 3.1 (4) 3.1 (5) 3.1 (6) 3.1 (7) 3.1 (8) 3.2 (1) 3.2 (2) 3.2 (3) 3.3 4.2 (1) 4.2 (2) 4.2 (3) 4.2 (4) 4.2 (5) 4.2 (6) 4.2 (7) 5.1 (1) 5.1 (2) 5.2 (1) 5.4 (1) 5.4 (2) 6.1 (1) 6.1 (2) 6.2 (1) 6.2 (2) 6.2 (3) 6.3 (1) 6.3 (2) 6.3 (3) 6.3 (4) 6.3 (5) 6.3 (6) 6.4 (1) 6.4 (2) 6.4 (3) 6.4 (4) 6.4 (5) 6.4 (6) 6.5 (1) 6.6 7.1 (1) 7.1 (2) 7.1 (3) 7.1 (4) 7.1 (5) Mobilisasi

Uraian

Satuan

Perkiraan Kuantitas d -

Harga Satuan (Rupiah) e 24,700,000 31,893 472,415 226,524 362,409 748,937 10,690,000 207,355 37,675 191,034 23,058 146,023 74,993 84,260 89,047 109,657 88,400 80,950 3,850 217,030 165,617 70,275 1,480,131 8,810 10,036 8,634 232,778 178,582 156,986 1,636,313 82,725 8,742 9,815 4,380 5,909 9,904 39,867 31,738 54,662 1,709,021 72,866 1,526,231 7,603 3,313 4,247 3,075,000 6,847,745 1,645,231 1,124,030 1,187,562 1,111,015 1,077,586 977,304 888,837

% Thd. Total Biaya (%) f #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

c LS M3 M3 M1 M1 M1 Ton M1 M1 M1 M3 M2 M1 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M2 M3 M3 M3 Ton M2 Liter Liter M3 M3 M3 Ton M3 Liter Liter M2 M2 Liter M2 M2 M2 M3 M2 M3 M3 M2 M2 Ton Ton Liter M3 M3 M3 M3 M3 M3 M3

Pekerjaan Galian untuk Selokan Drainase dan Saluran Air Pekerjaan Pasangan Batu dengan Mortar Gorong-Gorong Pipa Beton Bertulang, Diameter Dalam < 45 cm Gorong-Gorong Pipa Beton Bertulang, Diameter Dalam 45-75 cm Gorong-Gorong Pipa Beton Bertulang, Diameter Dalam 75-120 cm Gorong-Gorong Pipa Baja Bergelombang Gorong-Gorong Pipa Beton Tanpa Tulang Diameter Dalam 20 Cm Gorong-Gorong Pipa Beton Tanpa Tulang Diameter Dalam 25 Cm Gorong-Gorong Pipa Beton Tanpa Tulang Diameter Dalam 30 Cm Timbunan Porus atau Bahan Penyaring Anyaman Filter Plastik Pipa Berlubang Banyak Untuk Pek. Drainase di Bawah Permukaan Galian Biasa Galian Batu Galian Struktur dengan Kedalaman 0 - 2 meter Galian Struktur dengan Kedalaman 2 - 4 meter Galian Struktur dengan Kedalaman 4 - 6 meter Galian Perkerasan Beraspal Dengan Cold Milling Machine Galian Perkerasan Beraspal Tanpa Cold Milling Machine Biaya Tambahan untuk Galian Struktur Bila Lokasi Galian Berair Timbunan Biasa Timbunan Pilihan Timbunan Pilihan di Atas Tanah Rawa (diukur di atas bak truk) Penyiapan Badan Jalan Lapis Pondasi Agregat Kelas A Lapis Pondasi Agregat Kelas B Lapis Pondasi Semen Tanah Semen Untuk Lapis Pondasi Semen Tanah Agregat Penutup BURTU Bahan Aspal Untuk Pekerjaan Pelaburan Lapis Resap Pengikat Lapis Pondasi Agregat Kelas A Lapis Pondasi Agregat Kelas B Lapis Pondasi Agregat Kelas C Semen Untuk Lapis Pondasi Semen Tanah Lapis Pondasi Semen Tanah Lapis Resap Pengikat Lapis Perekat Agregat Penutup BURTU Agregat Penutup BURDA Bahan Aspal untuk Pekerjaan Laburan Latasir (SS) Kelas A Latasir (SS) Kelas B Lataston (HRS) Asphalt Treated Base (ATB) Lapis Aus Aspal Beton (AC-WC) Lapis Aus Aspal Beton (AC-BC) Super Lasbutag (Kabungka) Latasbusir Kelas A Latasbusir Kelas B Bitumen Asbuton Bitumen Bahan Peremaja Bahan Anti-Stripping Aspal Campuran Dingin Lapis Penetrasi Macadam Perata (Levelling) Beton K500 Beton K400 Beton K350 Beton K300 Beton K250

File : 86763136.xls.ms_office

7.1 (6) 7.1 (7) 7.1 (8) 7.2 (1) 7.2 (2) 7.2 (3) 7.2 (4) 7.2 (5) 7.2 (6) 7.2 (7) 7.2 (8) 7.2 (9) 7.2 (10) 7.2 (11) 7.3 (1) 7.3 (2) 7.3 (3) 7.3 (4) 7.3 (5) 7.3 (6) 7.4 (1) 7.4 (2) 7.4 (3) 7.5 (1) 7.5 (2) 7.6 (1) 7.6 (2) 7.6 (3) 7.6 (4) 7.6 (5) 7.6 (6) 7.6 (7) 7.6 (8) 7.6 (9) 7.6 (10) 7.6 (11) 7.6 (12) 7.6 (13) 7.6 (14) 7.6 (15) 7.6 (16) 7.6 (17) 7.6 (18) 7.6 (19) 7.6 (20) 7.6 (21) 7.6 (22) 7.6 (23) 7.6 (24) 7.6 (25) 7.6 (26) 7.7 (1) 7.7 (2) 7.7 (3) 7.7 (4) 7.7 (5) 7.7 (6) 7.7 (7) 7.7 (8) 7.9 7.10 (1) 7.10 (2) 7.10 (3) 7.11 (1) 7.11 (2) 7.11 (3) 7.11 (4) 7.11 (5)

Beton K225 Beton Siklop K175 Beton K125 Unit Pracetak Gelagar Tipe I Bentang 16 meter Unit Pracetak Gelagar Tipe I Bentang 20 meter Unit Pracetak Gelagar Tipe I Bentang 22 meter Unit Pracetak Gelagar Tipe I Bentang 25 meter Unit Pracetak Gelagar Tipe I Bentang 28 meter Unit Pracetak Gelagar Tipe I Bentang 30 meter Unit Pracetak Gelagar Tipe I Bentang 31 meter Unit Pracetak Gelagar Tipe I Bentang 35 meter Baja Prategang Plat Berongga (Hollow Slab) Pracetak Bentang 21 meter Beton Diafragma K350 Termasuk Pekerjaan Pra Penegangan Baja Tulangan U24 Polos Baja Tulangan U32 Polos Baja Tulangan D32 Ulir Baja Tulangan D39 Ulir Baja Tulangan D48 Ulir Anyaman Kawat Yang Dilas (Welded Wire Mesh) Baja Struktur Ttk.Leleh 2500 kg/cm2, penyediaan & pemasangan Baja Struktur Ttk.Leleh 2800 kg/cm2, penyediaan & pemasangan Baja Struktur Ttk.Leleh 3500 kg/cm2, penyediaan & pemasangan Pemasangan Jembatan Rangka Baja Pengangkutan Material Jembatan Pondasi Cerucuk, Penyediaan dan Pemancangan Dinding Turap Kayu Tanpa Pengawetan Dinding Turap Kayu Dengan Pengawetan Dinding Turap Baja Dinding Turap Beton Penyediaan Tiang Pancang Kayu Tanpa Pengawetan Penyediaan Tiang Pancang Kayu Dengan Pengawetan Penyediaan Tiang Pancang Baja Penyediaan Tiang Pancang Beton Bertulang Pracetak Penyediaan Tiang Pancang Beton Pratekan Pracetak Pemancangan Tiang Pancang Kayu Pemancangan Tiang Pancang Pipa Baja : Diameter 400mm Pemancangan Tiang Pancang Pipa Baja : Diameter 500mm Pemancangan Tiang Pancang Pipa Baja : Diameter 600mm Pemancangan T. Pancg. Btn. Pracetak : 30cmX30cm / Dia.300mm Pemancangan T. Pancg. Btn. Pracetak : 40cmX40cm / Dia.400mm Pemancangan T. Pancg. Btn. Pracetak : 50cmX50cm / Dia.500mm Tiang Bor Beton, Diameter 600 mm Tiang Bor Beton, Diameter 800 mm Tiang Bor Beton, Diameter 1000 mm Tiang Bor Beton, Diameter 1200 mm Tiang Bor Beton, Diameter 1500 mm Tamb. Biaya utk No Mata Pemb. 7.6 (11) s/d 7.6 (17) Lok. Berair Tamb. Biaya utk No Mata Pemb. 7.6 (18) s/d 7.6 (22) Lok. Berair Pengujian Pembebanan Pada Tiang dgn. Diameter sampai 600 mm Pengujian Pembebanan Pada Tiang dgn. Diameter di atas 600 mm Penyediaan Dinding Sumuran Silinder, Diameter 250 cm Penyediaan Dinding Sumuran Silinder, Diameter 300 cm Penyediaan Dinding Sumuran Silinder, Diameter 350 cm Penyediaan Dinding Sumuran Silinder, Diameter 400 cm Penurunan Dinding Sumuran Silinder, Diameter 250 cm Penurunan Dinding Sumuran Silinder, Diameter 300 cm Penurunan Dinding Sumuran Silinder, Diameter 350 cm Penurunan Dinding Sumuran Silinder, Diameter 400 cm Pasangan Batu Pasangan Batu Kosong Diisi Adukan Pasangan Batu Kosong Bronjong (Gabions) Expansion Joint Tipe Torma Expansion Joint Tipe Rubber 1 Expansion Joint Tipe Rubber 2 Expansion Joint Tipe Rubber 3 Joint Filler untuk Sambungan Konstruksi

M3 M3 M3 Buah Buah Buah Buah Buah Buah Buah Buah Kg Buah M3 Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg M1 M2 M2 M2 M2 M3 M3 Kg M3 M3 M1 M1 M1 M1 M1 M1 M1 M1 M1 M1 M1 M1 M1 M1 Buah Buah M1 M1 M1 M1 M1 M1 M1 M1 M3 M3 M3 M3 M1 M1 M1 M1 M1

803,304 749,112 683,969 15,715 14,740 12,565 12,565 12,565 697 620 25,256 5,202,851 2,613,533 66,739 77,042 68,338 78,591 98,574 975,751 1,730,096 2,668,714 3,811,322 5,907,645 23,551,629 25,679,431 5,668,662 6,859,313 7,966,629 10,184,000 200,954 284,913 383,470 496,624 549,929 204,519 138,343 346,882 -

#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! -

File : 86763136.xls.ms_office

7.11 (6) 7.12 (1) 7.12 (2) 7.12 (3) 7.12 (4) 7.12 (5) 7.13 7.14 7.15 (1) 7.15 (2) 7.15 (3) 7.15 (4) 7.15 (5) 7.15 (6) 7.15 (7) 7.15 (8) 7.15 (8) 8.1 (1) 8.1 (2) 8.1 (3) 8.1 (4) 8.1 (5) 8.1 (6) 8.1 (7) 8.1 (8) 8.1 (9) 8.2 (1) 8.2 (2) 8.2 (3) 8.2 (4) 8.2 (5) 8.3 (1) 8.3 (2) 8.3 (3) 8.4 (1) 8.4 (2) 8.4 (3) 8.4 (4) 8.4 (5) 8.4 (6) 8.4 (7) 8.4 (8) 8.4 (9) 8.4 (10) 8.4 (11) 8.4 (12) 8.5 (1) 8.5 (2) 8.5 (3) 9.1 9.2 9.3 9.4 9.5 9.6 9.7 9.8 9.9 9.10 9.11 9.12 9.13 9.14 9.15 9.16 9.17 9.18 9.19

Expansion Joint Tipe Baja Bersudut Perletakan Logam Perletakan Elastomerik Jenis 1 Perletakan Elastomerik Jenis 2 Perletakan Elastomerik Jenis 3 Perletakan Strip Sandaran Jembatan Baja Papan Nama Jembatan Pembongkaran pasangan batu Pembongkaran Beton Pembongkaran Beton Pratekan Pembongkaran Bangunan Gedung Pembongkaran Rangka Baja Pembongkaran Balok Baja (Steel Stringers) Pembongkaran Lantai Jembatan Kayu Pembongkaran Jembatan Kayu Pengangkutan Hasil Bongkaran yang Melebihi 5 Km. Lapis Pondasi agregat Kelas A untuk Pekerjaan Minor Lapis Pondasi agregat Kelas B untuk Pekerjaan Minor Agregat utk.Lapis Pondasi Jalan Tanpa Penutup utk. Pek. Minor Waterbound Macadam untuk Pekerjaan Minor Campuran Aspal Panas untuk Pekerjaan Minor Lasbutag atau Latasbusir untuk Pekerjaan minor Penetrasi Macadam untuk Pekerjaan Minor Campuran Aspal Dingin untuk Pekerjaan Minor Bitumen Residual untuk Pekerjaan Minor Galian untuk Bahu Jalan dan Pekerjaan Minor Lainnya Pemotongan Pohon Diameter 15 - 30 cm. Pemotongan Pohon Diameter 30 - 50 cm. Pemotongan Pohon Diameter 50 - 75 cm. Pemotongan Pohon Diameter > 75 cm. Stabilisasi dengan Tanaman Penanaman Perdu Penanaman Pohon Marka Jalan Bukan Thermoplastic Marka Jalan Thermoplastic Rambu Jalan dengan Permukaan Pemantul Engineering Grade Rambu Jalan dengan Permukaan Pemantul High Intensity Grade Patok Pengarah Patok Kilometer Rel Pengaman Paku Jalan (Road Stud) Mata Kucing (Delianeator) Kerb Pracetak Kerb Yang Digunakan Kembali Perkerasan Blok Beton pada Trotoar dan Median Pengembalian Kondisi Lantai Jembatan Beton Pengembalian Kondisi Lantai Jembatan Kayu Pengembalian Kondisi Pelapisan Permukaan Baja Struktur Mandor Pekerja Biasa Tukang Kayu, Tukang Batu, dsb Dump Truck 3 - 4 M3 Truk dengan bak terbuka kapasitas 3 - 4 M3 Tangki Air 3000 - 4500 Liter Bulldozer 100 - 150 HP Motor Grader min 100 HP Wheel Loader 1.0 - 1.6 M3 Track Loader 75 - 100 HP Excavator 80 - 140 HP Crane 10 - 15 Ton Mesin Gilas Roda Besi 6 - 9 Ton Mesin Gilas Bervibrasi 5 - 8 Ton Pemadat dengan Bervibrasi 1.5 - 3.0 HP Mesin Gilas Roda Karet 8 - 10 Ton Kompresor 4000 - 6500 Ltr/mnt Mesin Pengaduk Beton 0.3 - 0.6 M3 Pompa Air 70 - 100 MM

M1 Buah Buah Buah Buah M1 M1 Buah M2 M3 M3 M2 M2 M1 M2 M2 M3/Km M3 M3 M3 M3 M3 M3 M3 M3 Liter M3 Buah Buah Buah Buah M2 M2 Buah M2 M2 Buah Buah Buah Buah M1 Buah Buah Buah Buah M2 M2 M2 M2 Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam

275,324 202,951 183,835 243,570 1,765,536 1,203,999 1,703,751 9,800 32,197 7,829 113,514 113,514 434,691 484,592 85,884 329,872 302,014 32,728 81,821 6,201 148,877 193,338 164,813 116,272 155,301 67,671 34,106 182,014 4,186 206,112 17,374 15,349 3,336

#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

File : 86763136.xls.ms_office

10.1 (1) 10.1 (2) 10.1 (3) 10.1 (4) 10.1 (5)

Pemeliharaan Rutin Perkerasan Pemeliharaan Rutin Bahu Jalan Pemeliharaan Rutin Selokan, Saluran Air, Galian & Timbunan Pemeliharaan Rutin Perlengkapan Jalan Pemeliharaan Rutin Jembatan

LS LS LS LS LS

File : 86763136.xls.ms_office

#DIV/0!

File : 86763136.xls.ms_office

Jumlah Harga-Harga (Rupiah) g = (d x e) -

File : 86763136.xls.ms_office

File : 86763136.xls.ms_office

File : 86763136.xls.ms_office

File : 86763136.xls.ms_office

File : 86763136.xls.ms_office

REKAPITULASI DAFTAR KUANTITAS & HARGA


INSTANSI PROGRAM NAMA PAKET PROP / KAB / KODYA VOLUME TAHUN ANGGARAN : DINAS PEKERJAAN UMUM PROVINSI GORONTALO : : : : : 2009

Jumlah Harga No. Divisi Uraian Pekerjaan (Rupiah) 1 2 3 4 5 6 7 8 9 10 (A) (B) (C) Umum Drainase Pekerjaan Tanah Pelebaran Perkerasan dan Bahu Jalan Pekerasan Berbutir Perkerasan Aspal Struktur Pengembalian Kondisi dan Pekerjaan Minor Pekerjaan Harian Pekerjaan Pemeliharaan Rutin Dibulatkan : -

Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) Pajak Pertambahan Nilai ( PPN ) = 10% x (A) JUMLAH TOTAL HARGA PEKERJAAN = (A) + (B)

Terbilang :

Rupiah
Gorontalo, 2010 Dibuat Oleh, CV. CORRIDOR CONSULTAN

ZAKIR KALUKU, ST Direktur

File : 86763136.xls.ms_office

DAFTAR KUANTITAS & HARGA


INSTANSI : DINAS PEKERJAAN UMUM PROVINSI GORONTALO PROGRAM : NAMA PAKET : PROP / KAB / KODYA : VOLUME : TAHUN ANGGARAN : 2009

No. Mata Pemba yaran a DIVISI 1. - MOBILISASI 1.2 Mobilisasi

Uraian b

Sat c

Perkiraan Kuantitas d

Harga Satuan (Rupiah) e

Jumlah Harga-Harga (Rupiah) f = (d x e)

LS

24,700,000.00

Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) DIVISI 2. DRAINASE 2.1 2.2 2.3 2.3 2.3 2.3 2.3 2.3 2.3 (1) (2) (3) (4) (5) (6) (7) Pekerjaan Galian untuk Selokan Drainase dan Saluran Air Pekerjaan Pasangan Batu dengan Mortar Gorong-Gorong Gorong-Gorong Gorong-Gorong Gorong-Gorong Gorong-Gorong Gorong-Gorong Gorong-Gorong Pipa Pipa Pipa Pipa Pipa Pipa Pipa Beton Bertulang, Diameter Dalam < 45 cm Beton Bertulang, Diameter Dalam 45-75 cm Beton Bertulang, Diameter Dalam 75-120 cm Baja Bergelombang Beton Tanpa Tulang Diameter Dalam 20 Cm Beton Tanpa Tulang Diameter Dalam 25 Cm Beton Tanpa Tulang Diameter Dalam 30 Cm M3 M3 M M1 M1 Ton M1 M1 M1 M3 M2 M1
1

31,893.10 472,414.74 226,524.30 362,408.72 748,937.19 10,689,999.90

2.4 (1) 2.4 (2) 2.4 (3)

Timbunan Porus atau Bahan Penyaring Anyaman Filter Plastik Pipa Berlubang Banyak Untuk Pek. Drainase di Bawah Permukaan

207,354.69 37,675.00 191,033.60

Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) DIVISI 3. PEKERJAAN TANAH 3.1 3.1 3.1 3.1 3.1 3.1 3.1 (1) (2) (3) (4) (5) (6) (7) Galian Galian Galian Galian Galian Galian Galian Biasa Batu Struktur dengan Kedalaman 0 - 2 meter Struktur dengan Kedalaman 2 - 4 meter Struktur dengan Kedalaman 4 - 6 meter Perkerasan Beraspal Dengan Cold Milling Machine Perkerasan Beraspal Tanpa Cold Milling Machine M3 3 M M3 M3 M3 M3 M3 M3 M3 M3 M2 23,058.15 146,023.48 74,992.83 84,259.98 89,046.83

3.2 (1) 3.2 (2) 3.2 (3) 3.3

Timbunan Biasa Timbunan Pilihan Timbunan Pilihan di Atas Tanah Rawa (diukur di atas bak truk) Penyiapan Badan Jalan

109,656.73 88,400.12 80,949.77 3,850.38

Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

File : 86763136.xls.ms_office

No. Mata Pemba yaran a

Uraian b DIVISI 4 - PERBAIKAN TEPI PERKERASAN DAN BAHU JALAN

Sat c

Perkiraan Kuantitas d

Harga Satuan (Rupiah) e

Jumlah Harga-Harga (Rupiah) f = (d x e)

4.2 (1) 4.2 (2)

Lapis Pondasi Agregat Kelas A Lapis Pondasi Agregat Kelas B DIVISI 4 berlanjut kehalaman berikutnya Lapis Pondasi Semen Tanah Semen Untuk Lapis Pondasi Semen Tanah Agregat Penutup BURTU Bahan Aspal Untuk Pekerjaan Pelaburan Lapis Resap Pengikat

M 3 M

217,029.72 165,617.36

4.2 4.2 4.2 4.2 4.2

(3) (4) (5) (6) (7)

M3 Ton 2 M Liter Liter

70,275.31 1,480,131.34 8,809.65 10,036.18 8,634.47

Jumlah Harga Pekerjaan DIVISI 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) DIVISI 5. PERKERASAN BERBUTIR 5.1 (1) 5.1 (2) 5.2 (1) 5.2 (2) 5.4 (1) 5.4 (2) Lapis Pondasi Agregat Kelas A Lapis Pondasi Agregat Kelas B Lapis Pondasi Agregat Kelas C Lapis Pondasi Agregat Kelas C2 Semen Untuk Lapis Pondasi Semen Tanah Lapis Pondasi Semen Tanah M3 M3 M3 M3 Ton M3 232,777.93 178,582.04 156,985.53 86,427.14 1,636,313.27 82,725.47

Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) DIVISI 6. PERKERASAN ASPAL 6.1 (1) 6.1 (2) 6.2 (1) 6.2 (2) 6.2 (3) 6.3 6.3 6.3 6.3 6.3 6.3 6.4 6.4 6.4 6.4 6.4 6.4 (1) (2) (3) (4) (5) (6) (1) (2) (3) (4) (5) (6) Lapis Resap Pengikat Lapis Perekat Agregat Penutup BURTU Agregat Penutup BURDA Bahan Aspal untuk Pekerjaan Laburan Latasir (SS) Kelas A Latasir (SS) Kelas B Lataston (HRS) Asphalt Treated Base (ATB) Lapis Aus Aspal Beton (AC-WC) Lapis Aus Aspal Beton (AC-BC) Super Lasbutag (Kabungka) Latasbusir Kelas A Latasbusir Kelas B Bitumen Asbuton Bitumen Bahan Peremaja Bahan Anti-Stripping Aspal Campuran Dingin Lapis Penetrasi Macadam Perata (Levelling ) Liter Liter M2 M2 Liter M2 M2 M2 M3 M2 M3 M3 M2 M2 Ton Ton Liter M3 M3 8,742.23 9,814.70 4,380.15 5,908.99 9,903.52 39,867.25 31,738.40 54,662.42 1,709,021.47 72,865.75 1,526,230.89 7,602.68 3,313.45 4,246.90 3,075,000.00 6,847,745.20

6.5 (1) 6.6

1,645,230.84 1,124,030.36

Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) DIVISI 7. STRUKTUR 7.1 7.1 7.1 7.1 (1) (2) (3) (4) Beton Beton Beton Beton K500 K400 K350 K300 M3 M3 M3 M3 1,187,562.21 1,111,014.81 1,077,585.96 977,303.73

File : 86763136.xls.ms_office

No. Mata Pemba yaran a 7.1 7.1 7.1 7.1 7.2 7.2 7.2 7.2 7.2 7.2 7.2 (5) (6) (7) (8) (1) (2) (3) (4) (5) (6) (7) Beton Beton Beton Beton K250 K225 Siklop K175 K125

Uraian b

Sat c M 3 M M3 3 M Buah Buah Buah Buah Buah Buah Buah


3

Perkiraan Kuantitas d

Harga Satuan (Rupiah) e 888,837.42 803,303.59 749,112.08 683,968.93

Jumlah Harga-Harga (Rupiah) f = (d x e) -

Unit Pracetak Gelagar Tipe I Bentang 16 meter Unit Pracetak Gelagar Tipe I Bentang 20 meter Unit Pracetak Gelagar Tipe I Bentang 22 meter Unit Pracetak Gelagar Tipe I Bentang 25 meter Unit Pracetak Gelagar Tipe I Bentang 28 meter Unit Pracetak Gelagar Tipe I Bentang 30 meter Unit Pracetak Gelagar Tipe I Bentang 31 meter DIVISI 7 berlanjut kehalaman berikutnya Unit Pracetak Gelagar Tipe I Bentang 35 meter Baja Prategang Plat Berongga (Hollow Slab) Pracetak Bentang 21 meter Beton Diafragma K350 Termasuk Pekerjaan Pra Penegangan Baja Tulangan U24 Polos Baja Tulangan U32 Polos Baja Tulangan D32 Ulir Baja Tulangan D39 Ulir Baja Tulangan D48 Ulir Anyaman Kawat Yang Dilas (Welded Wire Mesh) Baja Struktur Ttk.Leleh 2500 kg/cm2, penyediaan & pemasangan Baja Struktur Ttk.Leleh 2800 kg/cm2, penyediaan & pemasangan Baja Struktur Ttk.Leleh 3500 kg/cm2, penyediaan & pemasangan Pemasangan Jembatan Rangka Baja Pengangkutan Material Jembatan Pondasi Cerucuk, Penyediaan dan Pemancangan Dinding Turap Kayu Tanpa Pengawetan Dinding Turap Kayu Dengan Pengawetan Dinding Turap Baja Dinding Turap Beton Penyediaan Tiang Pancang Kayu Tanpa Pengawetan Penyediaan Tiang Pancang Kayu Dengan Pengawetan Penyediaan Tiang Pancang Baja Penyediaan Tiang Pancang Beton Bertulang Pracetak Penyediaan Tiang Pancang Beton Pratekan Pracetak Pemancangan Tiang Pancang Kayu Pemancangan Tiang Pancang Pipa Baja : Diameter 400mm Pemancangan Tiang Pancang Pipa Baja : Diameter 500mm Pemancangan Tiang Pancang Pipa Baja : Diameter 600mm Pemancangan Tiang Pancang Beton Pracetak : 30 cm x 30 cm atau diameter 300 mm Pemancangan Tiang Pancang Beton Pracetak : 40 cm x 40 cm atau diameter 400 mm Pemancangan Tiang Pancang Beton Pracetak : 50 cm x 50 cm atau diameter 500 mm Tiang Bor Beton, Diameter 600 mm Tiang Bor Beton, Diameter 800 mm Tiang Bor Beton, Diameter 1000 mm Tiang Bor Beton, Diameter 1200 mm Tiang Bor Beton, Diameter 1500 mm Tambahan Biaya untuk Nomor Mata Pembayaran 7.6 (11) s/d 7.6 (17) bila Tiang Pancang Dikerjakan di Tempat Berair Tambahan Biaya untuk Nomor Mata Pembayaran 7.6 (18) s/d 7.6 (22) bila Tiang Bor Beton Dikerjakan di Tempat Berair Pengujian Pembebanan Pada Tiang dgn. Diameter sampai 600 mm Pengujian Pembebanan Pada Tiang dgn. Diameter di atas 600 mm

7.2 (8) 7.2 (9) 7.2 (10) 7.2 (11) 7.3 7.3 7.3 7.3 7.3 7.3 (1) (2) (3) (4) (5) (6)

Buah Kg Buah M3 Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg M1 M2 M2 M2 M2 M3 M3 Kg M3 M3 M1 M1 M1 M1 M1 M1 M1 M1 M1 M1 M1 M1 M1 M1 Buah Buah 23,551,628.85 25,679,430.62 696.73 619.52 15,715.31 14,740.29 12,565.25 12,565.25 12,565.25

7.4 (1) 7.4 (2) 7.4 (3) 7.5 (1) 7.5 (2) 7.6 (1) 7.6 (2) 7.6 (3) 7.6 (4) 7.6 (5) 7.6 (6) 7.6 (7) 7.6 (8) 7.6 (9) 7.6 (10) 7.6 (11) 7.6 (12) 7.6 (13) 7.6 (14) 7.6 (15) 7.6 (16) 7.6 (17) 7.6 7.6 7.6 7.6 7.6 7.6 (18) (19) (20) (21) (22) (23)

25,256.43 5,202,851.27 2,613,532.95 66,738.75 77,042.31 68,337.83 78,591.39 98,573.96 975,751.24 1,730,095.87 2,668,714.21 3,811,322.28 5,907,644.95

7.6 (24) 7.6 (25) 7.6 (26)

File : 86763136.xls.ms_office

No. Mata Pemba yaran a 7.7 7.7 7.7 7.7 7.7 7.7 7.7 7.7 (1) (2) (3) (4) (5) (6) (7) (8)

Uraian b Penyediaan Dinding Sumuran Silinder, Diameter 250 cm Penyediaan Dinding Sumuran Silinder, Diameter 300 cm Penyediaan Dinding Sumuran Silinder, Diameter 350 cm Penyediaan Dinding Sumuran Silinder, Diameter 400 cm Penurunan Dinding Sumuran Silinder, Diameter 250 cm Penurunan Dinding Sumuran Silinder, Diameter 300 cm Penurunan Dinding Sumuran Silinder, Diameter 350 cm Penurunan Dinding Sumuran Silinder, Diameter 400 cm Pasangan Batu Pasangan Batu Kosong Diisi Adukan Pasangan Batu Kosong Bronjong (Gabions) Expansion Joint Tipe Torma Expansion Joint Tipe Rubber 1 DIVISI 7 berlanjut kehalaman berikutnya Expansion Expansion Joint Filler Expansion Perletakan Perletakan Perletakan Perletakan Perletakan Joint Tipe Rubber 2 Joint Tipe Rubber 3 untuk Sambungan Konstruksi Joint Tipe Baja Bersudut Logam Elastomerik Jenis 1 Elastomerik Jenis 2 Elastomerik Jenis 3 Strip

Sat c M M1 1 M 1 M 1 M 1 M M1 1 M M
3 1

Perkiraan Kuantitas d

Harga Satuan (Rupiah) e 5,668,662.16 6,859,313.33 7,966,629.49 10,184,000.35 200,953.66 284,912.84 383,469.71 496,624.26 549,928.81 204,518.89 138,342.77 346,881.94

Jumlah Harga-Harga (Rupiah) f = (d x e) -

7.9 7.10 (1) 7.10 (2) 7.10 (3) 7.11 (1) 7.11 (2)

M3 3 M 3 M M M1
1

7.11 7.11 7.11 7.11 7.12 7.12 7.12 7.12 7.12

(3) (4) (5) (6) (1) (2) (3) (4) (5)

M1 M1 M1 M1 Buah Buah Buah Buah M1 M1 Buah M2 M3 M3 M2 M2 M1 M2 M2 3 M /Km

7.13 7.14 7.15 7.15 7.15 7.15 7.15 7.15 7.15 7.15 7.15 (1) (2) (3) (4) (5) (6) (7) (8) (8)

Sandaran Jembatan Baja Papan Nama Jembatan Pembongkaran pasangan batu Pembongkaran Beton Pembongkaran Beton Pratekan Pembongkaran Bangunan Gedung Pembongkaran Rangka Baja Pembongkaran Balok Baja (Steel Stringers) Pembongkaran Lantai Jembatan Kayu Pembongkaran Jembatan Kayu Pengangkutan Hasil Bongkaran yang Melebihi 5 Km.

Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR 8.1 8.1 8.1 8.1 8.1 8.1 8.1 8.1 8.1 8.2 8.2 8.2 8.2 8.2 (1) (2) (3) (4) (5) (6) (7) (8) (9) (1) (2) (3) (4) (5) Lapis Pondasi agregat Kelas A untuk Pekerjaan Minor Lapis Pondasi agregat Kelas B untuk Pekerjaan Minor Agregat utk.Lapis Pondasi Jalan Tanpa Penutup utk. Pek. Minor Waterbound Macadam untuk Pekerjaan Minor Campuran Aspal Panas untuk Pekerjaan Minor Lasbutag atau Latasbusir untuk Pekerjaan minor Penetrasi Macadam untuk Pekerjaan Minor Campuran Aspal Dingin untuk Pekerjaan Minor Bitumen Residual untuk Pekerjaan Minor Galian untuk Bahu Jalan dan Pekerjaan Minor Lainnya Pemotongan Pohon Diameter 15 - 30 cm. Pemotongan Pohon Diameter 30 - 50 cm. Pemotongan Pohon Diameter 50 - 75 cm. Pemotongan Pohon Diameter > 75 cm. M3 M3 M3 M3 M3 M3 M3 M3 Liter M3 Buah Buah Buah Buah 275,324.03 202,950.83 183,835.07 243,569.72 1,765,535.56 1,203,998.90 1,703,751.23 9,800.41 32,196.68

File : 86763136.xls.ms_office

No. Mata Pemba yaran a 8.3 (1) 8.3 (2) 8.3 (3) 8.4 (1) 8.4 (2) 8.4 (3) 8.4 (4) 8.4 (5) 8.4 (6) 8.4 (7) 8.4 (8) 8.4 (9) 8.4 (10) 8.4 (11) 8.4 (12) 8.5 (1) 8.5 (2) 8.5 (3) Stabilisasi dengan Tanaman Penanaman Perdu Penanaman Pohon

Uraian b

Sat c M M2 Buah M 2 M Buah Buah Buah Buah 1 M Buah Buah Buah Buah 2 M M2 M2 M2
2 2

Perkiraan Kuantitas d

Harga Satuan (Rupiah) e 7,828.73

Jumlah Harga-Harga (Rupiah) f = (d x e) -

Marka Jalan Bukan Thermoplastic Marka Jalan Thermoplastic Rambu Jalan dengan Permukaan Pemantul Engineering Grade Rambu Jalan dengan Permukaan Pemantul High Intensity Grade Patok Pengarah Patok Kilometer Rel Pengaman Paku Jalan (Road Stud) Mata Kucing (Delianeator) Kerb Pracetak Kerb Yang Digunakan Kembali Perkerasan Blok Beton pada Trotoar dan Median Pengembalian Kondisi Lantai Jembatan Beton Pengembalian Kondisi Lantai Jembatan Kayu Pengembalian Kondisi Pelapisan Permukaan Baja Struktur

113,513.55 113,513.55 434,690.87 484,591.87 85,883.60 329,872.06 302,013.79

Jumlah Harga Pekerjaan DIVISI 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) DIVISI 9. PEKERJAAN HARIAN 9.1 9.2 9.3 9.4 9.5 9.6 9.7 Mandor Pekerja Biasa Tukang Kayu, Tukang Batu, dsb Dump Truck 3 - 4 M3 Truk dengan bak terbuka kapasitas 3 - 4 M3 Tangki Air 3000 - 4500 Liter Bulldozer 100 - 150 HP Jam Jam Jam Jam Jam Jam Jam 32,728.31

81,820.77 6,201.15 148,876.89

Jumlah Harga Pekerjaan DIVISI 9 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN 10.1 10.1 10.1 10.1 10.1 (1) (2) (3) (4) (5) Pemeliharaan Pemeliharaan Pemeliharaan Pemeliharaan Pemeliharaan Rutin Rutin Rutin Rutin Rutin Perkerasan Bahu Jalan Selokan, Saluran Air, Galian & Timbunan Perlengkapan Jalan Jembatan LS LS LS LS LS

Jumlah Harga Pekerjaan DIVISI 10 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)

Gorontalo, 2010 Dibuat Oleh, CV. CORRIDOR CONSULTAN

ZAKIR KALUKU, ST Direktur

File : 86763136.xls.ms_office

Anda mungkin juga menyukai