URAIAN PEKERJAAN
Pek. Tiang Pancang "Jacked in pile"
Jumlah tiang (9m) 54 ttk
Jasa Pemancangan
Mob./Demob. Alat pancang/unit
Mobilisasi lokal
GRAND TOTAL
SAT.
m'
m'
Ls
Ls
VOL.
486.00
486.00
1.00
1.00
HARGA SATUAN
89,000.00
50,000.00
11,000,000.00
5,000,000.00
TOTAL HARGA
43,254,000.00
24,300,000.00
11,000,000.00
5,000,000.00
83,554,000.00
KETERANGAN