Anda di halaman 1dari 30

VISAT

EEE Dept

Expt No:1(a) Date:

ONE LAMP CONTROLLED BY ONE SWITCH


Aim
To wire up a circuit to control one lamp controlled by one switch.

Materials required
Sl No 1 2 3 4 5 6 7 8 9 10 Materials One way switch Batten Lamp holder MCB,DP Switch Box Round Block PVC Conduit 3Way Junction Box Saddles PVC insulated flexible Cu wire Screws Specification 6A,250v 6A,250v 16A,240v PVC 5*7cm PVC 70mm 20mm dia 20mm dia 20mm dia 1.5mm2 38mm 20mm 13mm 250v,40W 3*2 20mm dia quantity 1 1 1 1 1 60cm 1 6 160cm 1 4 14 1 1 1

11 12 13

Incandascent lamp Wiring board PVC Tee

Procedure
1. Draw the wiring diagram and lay out and get them approved by staff in charge. 2. Prepare the list of tools and materials required for the work and collect them. 3. Cut the conduit into required length and draw wires of respective colours through the conduit. 4. Connect the conduit with suitable interconnecting materials as per the layout and fix them on wiring board properly with correct size of clamps and screws.

Electrical Workshop

VISAT

EEE Dept

Wiring Diagram

All dimensions are in cm Layout Diagram

20 cm

All dimensions are in cm

5. Take out the wire terminals through switch box and round block.

Electrical Workshop

20 cm

20 cm

VISAT

EEE Dept

6. Fix the accessories such as fuse unit, neutral link switch and lamp holder as per the diagram. 7. Verify the connections and switch on the supply for testing.

Precautions
1. Avoid loose contacts and cuttings on conductors and wire. 2. Do not over tight the wires. 3. Never need over rated fuse wire inside the fuse units.

Result
The circuit was wired up to control one lamp by one switch and verified.

Electrical Workshop

VISAT Expt No:1(b) Date:

EEE Dept

CONTROL OF TWO LAMPS IN SERIES AND PARALLEL


Aim
To connect two lamps in series and parallel and to prepare an estimate for the same.

Materials required
Sl No 1 2 3 4 5 6 7 8 9 10 11 12 13 14

Material
One way distribution metal and led type neutral link PVC conduit MCB, DP Two way switch PVC Switch box Junction box Junction box Junction box Steady batten lamp holder GI Saddle Bulb PVC bend PVC insulated multistranded flexible Cu wire Screw

Specification

Quantity
1

20mm 250V,16A, 250V,5A ,piano 5x7cm 20mm,3way 20mm,4way 20mm,1way 6A,250V 20mm 250V,60W 20mm 1.5 mm2,1100V 38mm 13mm 20mm

1.2m 1 2 2 1 1 2 2 12 2 1 3.8m 3 14 8

Electrical Workshop

VISAT

EEE Dept

Wiring Diagram

All dimensions are in cm Layout Diagram

All dimensions are in cm

Electrical Workshop

VISAT

EEE Dept

Procedure
1. Draw the wiring diagram and lay out and get them approved by staff in charge. 2. Prepare the list of tools and materials required for the work and collect them. 3. Cut the conduit into required length and draw wires of respective colour through the conduit. 4. Connect the conduit with suitable interconnecting materials as per the layout and fix them on wiring board properly with correct size of clamps and screws. 5. Take out the wire terminals through switch box and round block. 6. Fix the accessories such as fuse unit, neutral link switch and lamp holder as per the diagram. 7. Verify the connections and switch on the supply for testing.

Switching operations S1 C-2 C-1 C-1 C-2 Precautions


1. Avoid loose contacts and cuttings on conductors and wire. 2. Do not over tight the wires. 3. Never need over rated fuse wire inside the fuse units.

S2 C-2 C-1 C-2 C-1

L1 Dim Bright Bright Dark

L2 Dim Bright Dark Dark

Result
The circuit for two lamps by two switches was wired up and tested .

Electrical Workshop

VISAT Expt No:2 Date:

EEE Dept

STAIR CASE WIRING


Aim
Two wire up a circuit to control one lamp by two switches.

Materials Required
Sl No 1 2 3 4 5 6 7 8 9 10 Materials Specification quantity

Two way switch Batten Lamp holder] MCB,DP Switch Box Round Block PVC Conduit 3Way Junction Box Saddles PVC insulated flexible Cu wire Screws

6A,250v 6A,250v 16A,250V PVC 5*7 PVC 70mm 20mm dia 20mm dia 20mm dia 1.5mm2 38mm 20mm 13mm 250v,40W 20mm dia

2 1 2 1 120cm 2 6 420cm 1 6 14 1 1 1

11 12

Incandascent lamp PVC Tee

Procedure
1. Draw the wiring diagram and lay out and get them approved by staff in charge. 2. Prepare the list of tools and materials required for the work and collect them. 3. Cut the conduit into required length and draw wires of respective colourthrough the conduit. 4. Connect the conduit with suitable interconnecting materials as per the layout and fix them on wiring board properly with correct size of clamps and screws. 5. Take out the wire terminals through switch box and round block.

Electrical Workshop

VISAT

EEE Dept

Wiring Diagram

All dimensions are in cm Layout Diagram

All dimensions are in cm

Electrical Workshop

VISAT

EEE Dept

6. Fix the accessories such as fuse unit, neutral link switch and lamp holder as per the diagram. 7. Verify the connections and switch on the supply for testing.

Precautions
1. Avoid loose contacts and cuttings on conductors and wire. 2. Do not over tight the wires. 3. Never need over rated fuse wire inside the fuse units.

Result
The circuit for one lamp by two switches was performed and tested.

Electrical Workshop

VISAT Expt No:3 Date:

EEE Dept

GODOWN WIRING SYSTEM


Aim
To design estimate and wire up a circuit having 3 lamps, controlled by 3 switches such that only one lamp is lightened at a time using conduit system of wiring.

Materials required
Sl No 1 2 3 4 5 6 7 8 9 Materials One way switch Batten Lamp holder Switch Box Round Block PVC Conduit 3Way Junction Box GI Saddles PVC insulated flexible Cu wire Screws Specification 6A,250v 6A,250v PVC 5*7cm PVC 80mm 20mm dia 20mm dia 20mm dia 1.5mm2 38mm 20mm 13mm 250v,5A 16A,250V quantity 1 3 3 3 180cm 2 9 560cm 3 6 18 2 1

11 12

Two way switch MCB,DP

Procedure
1. Draw the wiring diagram and lay out and get them approved by staff in charge. 2. Prepare the list of tools and materials required for the work and collect them. 3. Cut the conduit into required length and draw wires of respective colours through the conduit. 4. Connect the conduit with suitable interconnecting materials as per the layout and fix them on wiring board properly with correct size of clamps and screws.

Electrical Workshop

10

VISAT

EEE Dept

Wiring Diagram

All dimensions are in cm Layout Diagram

All dimensions are in cm

5. Take out the wire terminals through switch box and round block.

Electrical Workshop

11

VISAT

EEE Dept

6. Fix the accessories such as fuse unit, neutral link switch and lamp holder as per the diagram. 7. Verify the connections and switch on the supply for testing.

S1 OFF ON ON ON

S2 OFF OFF ON ON

S3 OFF OFF OFF ON

L1 OFF ON OFF ON

L2 OFF OFF ON OFF

L3 OFF OFF OFF ON

Precautions
1. Avoid loose contacts and cuttings on conductors and wire. 2. Do not over tight the wires. 3. Never need over rated fuse wire inside the fuse units.

Result
Wired up a circuit having 3 lamps, controlled by 3 switches such that only one lamp was lightened at a time using conduit system of wiring.

Electrical Workshop

12

VISAT Expt No:4 Date:

EEE Dept

INSULATION MEGGER-EARTH MEGGER-MEASUREMENT OF INSULATION RESISTANCE AND EARTH RESISTANCE


Aim
1. To measure the earth resistance using earth megger. 2. To measure the insulation resistance using insulation megger.

Tools Required
Earth megger, Aluminium rod, connecting wires, screw driver, hammer, insulation megger

Earth Megger:

Electrical Workshop

13

VISAT

EEE Dept

Procedure
a) To measure earth resistance 1. Short the terminals P and C of earth megger. 2. Resistance is measured from each point and rod was drawn in between pit and first rod P2. 3. Readings are taken. 4. A second pit is shifted at 2.5 m and another reading is taken. 5. Earth resistance is the average of all values.

Observations
Sl No Distance of P2 from earth electrode Earth resistance

Electrical Workshop

14

VISAT

EEE Dept

Insulation Megger

b) To measure Insulation resistance 1. To find the insulation resistance, terminals of megger are connected across the winding and resistance is measured. 2. Terminals are connected to the winding and body of transformers and resistance is measured.

Result
The earth resistance and insulation resistance were found out using earth megger and insulation megger respectively.

Electrical Workshop

15

VISAT Expt No:5(a) Date:

EEE Dept

FLUORESCENT LAMP WIRING


Aim
To wire up a fluorescent lamp as per the wiring diagram. Materials Required Sl No 1 2 3 4 5 Materials Tube frame with holder Fluorescent lamp Starter Choke Connecting wire Specification quantity 1 1 1 1 100cm

250V,40W 250V,40W 250V,40W

FLUORESCENT LAMP

Electrical Workshop

16

VISAT

EEE Dept

Procedure 1. Draw the wiring diagram and lay out and get them approved by staff in charge. 2. Prepare the list of tools and materials required for the work and collect them. 3. Cut the conduit into required length and draw wires of respective colourthrough the conduit. 4. The magnetic or electronic choke is filled in the frame of tube set and connections are made as per the wiring diagram. 5. In case of magnetic choke o glow type starter is also used. Thus the circuit is completed by connecting it to ac supply. 6. Verify the connections and switch on the supply for testing.

Result
Wired up a fluorescent lamp and the circuit was tested.

Electrical Workshop

17

VISAT

EEE Dept

Expt No:5(b) Date:

WIRING OF CFL Aim


To prepare a wiring circuit for CFL.

Materials Required
Sl No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Materials MCB, DP CFL One way switch Batten Lamp holder One way junction box One way distribution box Plasic switch box Standard Cu wire Conduit U pipe Oval T 1/2screw 3/4screw Cu wire Specification 250V,16A, 60W,250V 250V,5A 250V,5A Aquare type Metal clad type Piano type 16mm oval 16mm 16mm Quantity 1 1 1 1 1 1 1 1 3 3 1 5 4 1

18 S.W.G

Procedure
1. Draw the wiring diagram and lay out and get them approved by staff in charge. 2. Prepare the list of tools and materials required for the work and collect them. 3. Cut the conduit into required length and draw wires of respective colourthrough the conduit. 4. The neutral and the phase wire are connected to the lamp holder and CFL is inserted to it. The circuit is tested.

Electrical Workshop

18

VISAT

EEE Dept

Wiring Diagram

All dimensions are in cm Layout Diagram

All dimensions are in cm Result Wired up a CFL lamp and the circuit was tested.

Electrical Workshop

19

VISAT Expt No:5(c) Date:

EEE Dept

WIRING OF MERCURY VAPOUR LAMP


Aim
To prepare an estimation and wire up a circuit for mercury vapour lamp and CFL.

Materials Required
Sl No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Materials Screw type porcelain holder Mercury vapour lamp Choke MCB, DP PVC conduit Switch piano type Switch box Tee Elbow GI saddle clip Screw Screw Cu wire( black) Cu wire( red) Specification Quantity 1 1 1 1 0.6m 1 1 1 1 3 14 4 0.4m 0.8m

80V, Hg vapour 240V,16A 20mm 1way For 1 piano switch 20mm 20mm 20mm 1/2 3/4 1mm2 1mm2

Procedure
1. Draw the wiring diagram and lay out and get them approved by staff in charge. 2. Prepare the list of tools and materials required for the work and collect them. 3. Cut the conduit into required length and draw wires of respective colourthrough the conduit. 4. Wires are drawn through casing and capping is provided. 5. Circuit is verified by connecting to ac supply.

Electrical Workshop

20

VISAT

EEE Dept

Wiring Diagram

All dimensions are in cm

Electrical Workshop

21

VISAT

EEE Dept

Layout Diagram

All dimensions are in cm

Result
The circuit for fluorescent lamp,CFL and mercury vapour lamp was wired up and tested.

Electrical Workshop

22

VISAT Expt No:6 Date:

EEE Dept

HOUSE WIRING

Aim
To wire up a circuit to control house wiring as per the wiring diagram and layout.

Materials required
Sl No 1 2 3 4 5 6 7 8 9 Materials One way switch Batten Lamp holder Switch Box Round Block PVC Conduit 4Way Junction Box Saddles PVC insulated flexible Cu wire Screws Specification 6A,250V 6A,250V PVC 5*7cm PVC 80mm 20mm dia 20mm dia 20mm dia 1100v grade/1.5mm2 38mm 20mm 13mm 250V,5A 3*2 20mm dia 6A,250V 16A,250V quantity 1 1 3 3 160cm 2 8 550cm 2 6 24 1 1 1 1 1

10 11 12 13 14

Three pin plug Wiring board L joint(PVC bend) Ceiling rose MCB, DP

Procedure
1. Draw the wiring diagram and lay out and get them approved by staff in charge. 2. Prepare the list of tools and materials required for the work and collect them. 3. Cut the conduit into required length and draw wires of respective colour through the conduit. 4. Connect the conduit with suitable interconnecting materials as per the layout and fix them on wiring board properly with correct size of clamps and screws.

Electrical Workshop

23

VISAT

EEE Dept

Wiring Diagram

All dimensions are in cm Layout Diagram

All dimensions are in cm

5. Take out the wire terminals through switch box and round block.

Electrical Workshop

24

VISAT

EEE Dept

6. Fix the accessories such as fuse unit, neutral link switch and lamp holder as per the diagram. 7. Verify the connections and switch on the supply for testing.

Precautions
1. Avoid loose contacts and cuttings on conductors and wire. 2. Do not over tight the wires. 3. Never need over rated fuse wire inside the fuse units.

Result
Wired up a circuit to control house wiring as per the wiring diagram and layout and tested.

Electrical Workshop

25

VISAT

EEE Dept

SOLDERING PRACTICE
Aim
To solder two given pieces of wire .

Materials required
Sl No 1 2 3 4 Particulars Connecting wire Soldering iron Solder Soldering flux Quantity 40cm 1 10cm 2gm

Figure

Procedure
1. Strip one end of the given two wires and remove the insulation. 2. Apply soldering flux on the metal wire.
Electrical Workshop 26

VISAT

EEE Dept

3. Connect the soldering iron to the main supply and when it becomes hot place it on the solder so that it melts. 4. Now place the two metal wires in contact with each other and again apply the solder on its surface with the help of soldering iron.

Precaution
1. Avoid burning due to soldering iron. 2. Prevent the solder from falling on any parts of the body.

Result
The two given strands of wire were soldered successfully.

Electrical Workshop

27

VISAT Date

EEE Dept

RECTIFIER UNIT
Aim
To study the characterestics of 1. Half wave rectifier 2. Full wave rectifier and find the rms and average values of the voltage waveform with and without capacitor filter.

Materials required
Sl No 1 2 3 4 5 6 Materials Diodes Resistor Capacitor Step down transformer Bread board CRO Specification IN 4007 1k 100F 230/6-0-6,1A Quantity 2 1 1 1 1 1

Procedure 1. Check all the components using multimeter. 2. Wire the circuit and give the supply. Observe the secondary voltage of transformer and output voltage across the load resistor simultaneously on CRO. Note the peak value Vm 3. Calculate the rms and average value using the given formulae.

Electrical Workshop

28

VISAT

EEE Dept

Circuit Diagram
Half wave Rectifier

Full wave Rectifier

Electrical Workshop

29

VISAT

EEE Dept

Waveforms

Result
The characteristics of half wave and full wave rectifier were studied and found the rms and average values of the voltage waveform with and without capacitor filter.

Electrical Workshop

30

Anda mungkin juga menyukai