Drawing (25may2011) (Cloud the G.I Steel Hydrant cabinet ) 2) VO for Retail L1 and L4 additional spk works at Link bridge due to addition o f ceiling As-Built drawing ( compare with construction dwg and cloud the changes ) Construction Drawing (may11) ( compare with the as-built dwg compare with the ch anges) any abortive work? dismantling work? if yes - how many manpower and days to comp lete dismantling? how many to complete the installation of work? 3) VO BQ spk and hosereel pipe for all podium As-Built drawing ( compare with construction dwg and cloud the changes ) Construction Drawing (may11) ( compare with the as-built dwg compare with the ch anges) this VO drawing and bq excludes level 4, common corridors and link bridge. highl ighted areas must not include these area.