THIS SETTING OUT DRAWING IS INTENDED TO ENABLE THE CONTRACTOR OF WORKS TO MARK ON SITE, THE CORNERS OF THE BUILDING BLOCKS AND IDENTIFY THE
SAME WITH PEGS AND OTHER PHYSICAL MARKERS.
2. THE FOUR CORNERS OF THE SITE AS INDICATED IN THE SETTING OUT PLAN ARE TAKEN AS PRIMARY REFERENCE POINTS. THESE FOUR CORNERS ARE IDENTIFIED AS
N-W, N-E, S-W AND S-E IN THE DRAWING - WHICH PERTAIN TO THE CARDINAL DIRECTIONS OF THE RESPECTIVE CORNER.
H H 3. THE DIMENSIONS INDICATED FOR THE LOCATION OF THE COLUMNS ARE TAKEN FROM THE INTERSECTION OF THE COLUMN GRID AND ARE TO BE MEASURED
ACCORDINGLY.
4. THE INTERSECTIONAL COLUMN GRID LINES ARE NOT NECESSARILY THE CENTRE OF THE COLUMNS. THE CONTRACTOR IS TO CHECK THE THE SAME WHILE
MARKING.
5. FORMED GROUND LEVEL TO BE 600MM FROM THE EXISTING SIPCOT ROAD LEVEL
N-W N-E
6. THIS DRAWING IS TO BE READ ALONG WITH THE RELEVANT STRUCTURAL AND PLUMBING DRAWINGS .
H' H'
7. ANY DISCREPANCIES OBSERVED IN THE PHYSICAL MARKING VIS A VIS THE DRAWING MUST BE BROUGHT TO THE NOTICE OF THE ARCHITECT.
H'-2
W20
5
DN
50
D4
+104.95 lvl
+104.50 lvl
20
D4
TOILET
+104.95 lvl
W21
W21
20505
SITE CORNER
DETAIL A
scale 1:75
104.50
LVL
103.45 LVL
S-W S-E
A' A'
SUMP LINE OUT PLAN
A A scale 1:100
15 M WIDE SIPCOT ROAD
A" A"
A'" A'"
B B
3
C" C"
D D
D' D'
D'' D''
UG SUMP - SECTION 1
E E
scale 1:50
E' E'
E''
SECURITY CABIN ABOVE
F F
SECTION: GP-01-01
F' F' 2
F'' F''
H H
1' 1 1'' 2 2' 2'' 3 3' 4 4' 5 6 6' 6'' 7 7'8
scale 1:50
W20
+104.95 lvl
D4
DN
D4
+104.50 lvl
PUMP ROOM - SECTION 2
TOILET
RAW WATER TANK FIRE WATER TANK
CAPACITY -10KL/ DEPTH 2.4 M CAPACITY -100KL/ DEPTH 2.4 M
+104.95 lvl
W21
W21
+101.95 lvl
SECTION: GP-01-01
1
+104.95 lvl
103.45 LVL
S-W S-E
+101.95 lvl
GP-01-01
PUMP ROOM/UG SUMP - SECTION 3
scale 1:50
scale 1:50
SUMP LINE OUT KEY PLAN
scale 1:300
project name g e n e r a l n o t e s : 1 - t h e s e d r a w i n g s m a y n o t b e u s e d , d u p l i c a t e d , m o d i f i e d o r c h a n g e d i n a n y m a n n e r w i t h o u t t h e w r i t t e n c o n s e n t o f a r c h i t e c t u r e r e d . t h e u s e r & i t s a g e n t s w i l l b e l i a b l e f o r a n y u n a u t h o r i z e d u s e , d u p l i c a t i o n , m o d i f i c a t i o n o r c h a n g e . 2 - t h e d r a w i n g s & d i m e n s i o n s a r e t o b e r e a d & n o t m e a s u r e d . 3 - a n y d i s c r e p a n c i e s n o t i c e d i n t h e d r a w i n g s s h a l l b e b r o u g h t t o t h e n o t i c e o f t h e a r c h i t e c t s ' o f f i c e f o r c l a r i f i c a t i o n s . 4 - a l l d r a w i n g u n i t s a r e i n t h e m e t r i c s c a l e purpose of release north drawing title
sub-consultant - Structural
review only SUMP LINE OUT PLAN
Industrial Facility, Oragadam
client project number
client approval
statutory approval
tender
drawing number
date
GP-05-02
sheet number
revision
Somadev Nagesh Consulting Engineers architecture RED
research+design
sub-consultant - PHE
Cape Electric 10023
good for construction 01-03-2012 1/1
as built scale drawn checked Sumanam Engineering Services Pvt Ltd
Corporation no revisions/submissions date 1:100 RH KP
c copyright 2008 architectureRED all rights reserved